DESIGN OF TYP.

ISOLATED FOOTINGS

C1
INPUT DATA
Col width b= 280 mm 230
Col width D= 650 mm 600
col load including self weight P= 61.5 ton
fck= 25 N/mm2
fe -= 500 N/mm2
S.B.C= 30 t/m2
clear cover = 50
Mx= 0.17 T-m
My= 1.1 T-m
load including self weight P= 61.5 ton 0.000
area of footing reqd. Af= 2.050 m2
B= 1.65 m PROVIDED AREA
2
L= 2.02 m 3.333 m
PROVIDE FOOTING OF SIZE 1.65 2.02 (BXL) OFFSET 25
2
upward soil pressure qo= 19.62 t/m AROUND COL 0.025
< SBC = 30 t/m2
Y

Mxx
0.28 0.685 0.69 0.65 0.69
B= 0.28 1.65
X 0.65 X
645
635 145

L= 2.02 Myy
1.65 2.02
Y PLAN section Y -Y section X -X
3

q
2
19.618 19.618
19.247 17.657

P/A = 18.452 corner q (t/m2) x(m) q(t/m2) section


1 Mxx = 0.185 1 19.618 col face 1.34 18.953 -
Zyy Zxx Zxx 2 19.247 d 1.98 19.58 0.645
1.1221 0.9166 Myy = 0.9803 3 17.286 d\2 1.66 19.27 0.3225
6 Zyy 4 17.657 aver @ col 30.00

Bending considerations
Mxx = 13.20 t-m Myy = 7.51 t-m
required dxx= 297.129 mm dyy= 341.45 mm
provide D= 700 mm
dmin= 200 mm
dxx= 645 mm dyy= 635 mm
Ast xx= 731.50 mm2 Ast yy= 428.60 mm2
dia of bar f x= 10 mm f y= 10 mm
required no. of bars = 16.38 required no. of bars = 12.42
along short span 123.3240006 c/c along long span 132.8461538
provided nos. of bars = 16 provided nos. of bars = 13
pt x= 0.2996 % pt y= 0.57 %
1256 mm2 1020.5 mm2
pt min.= 0.12 % pt min. = 0.12 %
Ast min= 1285.8 mm2 Ast min= 975 mm2
126.25 mm 126.9230769

TWO WAY SHEAR CHECK :

CRITICAL SECTION @ d / 2 FROM COLUMN FACE

b D
B= 0.5dy 0.685 0.5dy 0.69
0.28 1.65
X 0.65 X
0.635 0.635 d1 0.645
0.145
0.368
L= 2.02 Y 1.65 2.02
PLAN section Y -Y section X -X
section @ d/2 = 0.3225 m
stress @ section= 19.27 t/m2
avg. stress = 19.44
P/A= 18.45 t/m2
Vu= 62.27 ton d1= 0.410 m
t v= Vu k= 0.5 +(b/D) <= 1
2*(D+dy+b+dy)d1 0.9308

t v= 34.5 t/m2 t c'= .25 * sqrt( fck)


= 0.345 N/mm2 1.25 N/mm2
permissible tc= k * tc'
shear stress in concrete
tc= 1.163 N/mm2
OK

ONE WAY SHEAR CHECK

SECTION @ d FROM COLUMN FACE


Y
0.04
0.04
b D
dy 0.685 dy 0.69
B= 0.28 1.65
X 0.65 X B1 B2
635 =dyy d1 0.635 d2 0.635 dxx= 645
0.145
0.040 0.04
L= 2.02 1.65 2.02
PLAN Y section Y -Y section X -X

Bending @ y-y axis Bending @ x-x axis


SECTION d= 0.645 m
2 2
stress @ sect= 19.60 t/m stress @ sect= 30.00 t/m

Vu= 1.94 Ton Vu= 3.636 Ton


d1= 0.174 m d2= 0.174 m
B1= 1.57 m B2= 1.94 m
t v= Vu t v= Vu
(B*dmin+(B1+L)/2*(d1-dmin) (L*dmin+(B2+L)/2*(d2-dmin)
BETA 8.14 8.11 eff. Area= 0.286 m2 eff. Area= 0.3507 m2
2
SQRT(0.8*FCK) 4.47 4.47 t v= 6.78 t/m t v= 10.37 t/m2
SQRT(1+5B) 6.46 6.44 t v= 0.07 N/mm2 t v= 0.10 N/mm2
Zc 0.42 0.43 pt= 0.356 0.12 pt= 0.358 0.12
tc = 0.42 N/mm2 tc = 0.43 N/mm2
ok ok