INPUT DATA
Col width b= 280 mm 230
Col width D= 650 mm 600
col load including self weight P= 61.5 ton
fck= 25 N/mm2
fe -= 500 N/mm2
S.B.C= 30 t/m2
clear cover = 50
Mx= 0.17 T-m
My= 1.1 T-m
load including self weight P= 61.5 ton 0.000
area of footing reqd. Af= 2.050 m2
B= 1.65 m PROVIDED AREA
2
L= 2.02 m 3.333 m
PROVIDE FOOTING OF SIZE 1.65 2.02 (BXL) OFFSET 25
2
upward soil pressure qo= 19.62 t/m AROUND COL 0.025
< SBC = 30 t/m2
Y
Mxx
0.28 0.685 0.69 0.65 0.69
B= 0.28 1.65
X 0.65 X
645
635 145
L= 2.02 Myy
1.65 2.02
Y PLAN section Y -Y section X -X
3
q
2
19.618 19.618
19.247 17.657
Bending considerations
Mxx = 13.20 t-m Myy = 7.51 t-m
required dxx= 297.129 mm dyy= 341.45 mm
provide D= 700 mm
dmin= 200 mm
dxx= 645 mm dyy= 635 mm
Ast xx= 731.50 mm2 Ast yy= 428.60 mm2
dia of bar f x= 10 mm f y= 10 mm
required no. of bars = 16.38 required no. of bars = 12.42
along short span 123.3240006 c/c along long span 132.8461538
provided nos. of bars = 16 provided nos. of bars = 13
pt x= 0.2996 % pt y= 0.57 %
1256 mm2 1020.5 mm2
pt min.= 0.12 % pt min. = 0.12 %
Ast min= 1285.8 mm2 Ast min= 975 mm2
126.25 mm 126.9230769
b D
B= 0.5dy 0.685 0.5dy 0.69
0.28 1.65
X 0.65 X
0.635 0.635 d1 0.645
0.145
0.368
L= 2.02 Y 1.65 2.02
PLAN section Y -Y section X -X
section @ d/2 = 0.3225 m
stress @ section= 19.27 t/m2
avg. stress = 19.44
P/A= 18.45 t/m2
Vu= 62.27 ton d1= 0.410 m
t v= Vu k= 0.5 +(b/D) <= 1
2*(D+dy+b+dy)d1 0.9308