Você está na página 1de 26

OSI PI

What is it?

Who else uses it?

Why does UVM PPD want to use it?

Mike Pelletier Physical Plant Department


Senior Project Engineer All Hands Meeting 2015
UVM Energy Use PPD received funding for
project implementation from

UVM Clean
Energy Fund
Building Energy
Tracking / Savings
Spring 2015
OSI PI Project Goals
Provide a platform for students to access the campus energy
consumption and have the ability to create scenarios that reduce
energy and greenhouse gas creation.
Create the ability to combine data from multiple sources into one
common repository to simplify use.
Develop a data archive that can be accessed to provide before and
after evidence of benefits.
Create an opportunity for students to understand energy flows in a
real world environment.
Campus Background
Total # Buildings > 350
Total Building Area ~ 5.0M SQ FT
2014 Annual Cost of Electricity = $8.3 Million
> 100 electric accounts with smart meters
2014 Annual cost of Heating = $3.8 Million
> 100 gas meters
Central Cooling & Heating Plants
3 separate control systems which do not talk to each other:
Delta V, Honeywell, and Johnson Controls
~ 100 boilers and ~ 50 cooling units
OSIsoft Company Fact Sheet
Corporate Founded 1980, Private
Dr. J. P. Kennedy, Founder and CEO
Employees 1100+
Engineering 200 Cust. Support - 300
Sales & Mkt 220 Operations - 135
Sales
$ 300 MM (FYE 2013)
14.2 % CAGR 10 years
Geography
Doing business in 110 + countries
26 offices in 16 countries.
The business we are in
Enterprise Wide Infrastructure for streaming data &
events
Installed Base
4,000 + Active Customers
15,000 + Active System licenses (excluding OEM)
400,000,000 DataStreams
Monitor 800 PI servers, 1800 Host computers & 8000
interfaces

Copyright 2012 OSIsoft, LLC.


OSIsofts Core Industries
OSIsoft is ranked 1st in the power industry
DTE Energy, PSE&G, Entergy, British Energy, Iberdrola

100% of the global Top 10 producers use the PI System


BP, Shell, Chevron, ExxonMobil, Pemex, Total, Petrobras

40 of top 50 Chemical Companies rely on the PI System


Dow Corning, Eastman Kodak, Cytec, Rhodia

Nine of the Top 10 pharmaceuticals use the PI System


Amgen, Bayer, PDL, Allergen, Johnson & Johnson, Roche

The PI System is installed in the world's largest mining companies.


Cemex, Cargill, BHP Billiton Yabulu, Codelco

400 sites from worldwide leaders use OSIsoft to manage their mills
Abitibi, Cascades, Inc., International Paper, MeadWestvaco

Innovative use of PI System to monitor complex IT environments


Microsoft, Hewlett Packard, Thomson Reteurs, RBC

6
The software provides.Operational Intelligence

Copyright 2012 OSIsoft, LLC.


OSI PI Many other campus users nationwide

Carnegie Mellon University, PA University of California at San Diego


OSI PI Many other campus users nationwide

Harvard University University of California at Davis


OSI PI Sample Dashboards from other campuses

The University of Iowa


OSI PI Sample Dashboards from other campuses
OSI PI Sample Dashboards from other campuses

CHW Valve Positions

Microsoft Campus in Redmond, WA


Operate CHW pumps
based on CHW valve
positions at coils
The PI System Architecture

Copyright 2012 OSIsoft, LLC.


Proposed UVM PI System Architecture

UVM Cloud at
Tech Park
Chuck
Nortons
Office Chuck
Nortons
Office
Why does UVM want to use OSI PI?
The software works. Its proven technology.
It is embedded in the Delta V controls in the Central Heating Plant
Its cheaper than replacing all existing controls at UVM into one
common platform
Many configurable displays. limited only by our creativity
Well GET THE FACTS to be able to make informed decisions for:
What is the load
Determining when to turn equipment on/off
Optimize operations
What is the cost of heating or cooling

Managing the power demand kW $


Diagnosing equipment
Individual building operational costs

15
Davis Center: # 7 of Top 20 electricity users at UVM
Davis Center Davis Center
$50,000
Total chg.'s 100% $50,000
$45,000 90% $45,000
EEU Chg 80% $40,000
$40,000
70% $35,000

PERCENT OF BILL
$35,000 Prev./Misc. 60% $30,000

50% $25,000
$30,000
Amount Billed

Franchise fee 40% $20,000


$25,000
30% $15,000
Power factor 20% $10,000
$20,000 chg.
10% $5,000
$15,000 Demand chg.
$15,345 0% $-

$10,000
KWH chg.
$5,000 MONTH BILLED

Cust. chg. Cust. chg. KWH chg. Demand chg.


$-
10/18/2012 5/6/2013 11/22/2013 6/10/2014 12/27/2014 7/15/2015 Power factor chg. Franchise fee Leased light
$2,100
Month Billed Prev./Misc. EEU Chg Total chg.'s
OSI Pi Users Sample Dashboards
Even more. Dashboard Samples

Physical Plant Department


M.R. Pelletier 3/2015
Physical Plant Department
M.R .Pelletier 3/2015

OSI PI Project Implementation

Install Server, Software, and Port existing controls

Start with Central Plant then roll out to a Honeywell and a Johnson Building

Create conversion table for converting control names from Martian language to English

Collect electrical data Shark meters; Power Logic; and BED Smart Meters

FUNDING FOR PROJECT

Clean Energy Fund $120,000

Physical Plant operating $40,000

Total Project Cost = $160,000


OSI PI Implementation: Where are we now?
The PCs are here
UVM Cloud is available to load software
Software is ready for download
Network being configured
Secret Decoder Ring (database) not yet developed
BED Smart Electric Meters (need more technology to get it
to work properly)
Need to select 2 UVM buildings for beta testing:
1 Honeywell and 1 Johnson Controls building

25
Summary
What is it - software
Who else uses it - lots of people, other campuses nationwide
Why does UVM want to use it understand and react
appropriately

Você também pode gostar