A. PREFACE
B. TABLE OF CONTENTS
C. BODY
CHAPTER 1 INTRODUCTION
1. Mining Business License (IUP) or Specific Mining Business License (IUPK) holder
status.
A. IUP or IUPK holder identity (name of the legal entity / cooperation / individual,
complete address, person in charge of the plan or activity)
B. Brief descriptions of license status (number, issued date, validity period, IUP or IUPK
of Foreign Capital Investment / Domestic Capital Investment status)
2. The total area of IUP or IUPK and supporting facility outside the IUP and IUPK area
(project area)
a. Total area of IUP and IUPK description which had planned for Manufacture
Operation Activities and supporting facilities;
b. Comprehensive description of supporting facilities outside the IUP or IUPK area
which used to support the activities of Manufacture Operation (project area).
D. APPENDIX LIST
1. Map of land clearance plan situation with minimum map accuracy at least 1: 10,000 (one up
to ten thousand);
2. Map of the reclamation plan situation with minimum map accuracy of 1: 10,000 (one in ten
thousand).
Information:
If the area is very large and or consists of several mining blocks / production, which cannot be
described in 1 (one) map for each year, it can be described in several map sheets and equipped
with index map.
E. LIST OF TABLES \
1. Table 1 Reclamation Plan of Manufacture Operation Stage;
2. Table 2 Reclamation Cost Plan Manufacture Operation Stage.
TABLE 1
Information:
*) Example
TABLE 1
Information:
*) example
1)
** 2.5% of direct or calculated cost
2)
** 2% - 10% of direct costs
3)
** 3% - 14% of direct costs
4)
** 2% - 7% of direct costs