5.2.5 Turbine Cycle Heat rate in kcal/kWh under rated steam conditions, design
condenser pressure with zero make up at 80% TMCR load (for reference).
5.2.6 Continuous TG output at 105% TMCR load under rated steam conditions,
design condenser pressure with zero make-up.
5.2.8 The total auxiliary power consumption for all the auxiliaries of boiler, turbine
Generator and turbine cycle equipments required for continuous unit operation
at 100% TMCR load under rated steam conditions and at design condenser
pressure with zero make-up.
5.2.9 The total auxiliary power consumption for all the auxiliaries of boiler, turbine
Generator and turbine cycle equipments required for continuous unit operation
at 80% TMCR load under rated steam conditions and at design condenser
pressure with zero make-up (for reference).
5.3.1 It shall be guaranteed that, with one field out of service in each stream, the
particulate emission from ESP at TMCR load and design coal firing shall not
exceed 50 mg/Nm3 or stipulated requirement of MOEFs in this regard,
whichever is more stringent. The corresponding ESP efficiency shall be
worked out.
5.3.2 It shall be guaranteed that maximum total NOx emission from the unit will not
be more than 260 grams of NOx (from thermal as well as fuel) per giga joule
of heat input to the boiler at 6% O2 level during the entire operating range of
steam generator for the range of coals specified or as per MOEFs requirement
in this regard (if applicable) whichever is more stringent.