Você está na página 1de 2

Setoran Aspal UPTD Barat II

No Nama Pekerjaan Jumlah (kg) Jumlah (tong) Harga


1 Taji Tinggang I 8667 55.9161290323 Rp 838,742
2 Taji Tambakrejo I 9528 61.4709677419 Rp 922,065
3 Malo Tambakromo I 6074 39.1870967742 Rp 587,806
4 Taji Napis I 10519 67.864516129 Rp 1,017,968
5 Malo Tambakromo II 4968 32.0516129032 Rp 480,774
6 Taji Tinggang II 10122 65.3032258065 Rp 979,548
jumlah 49878 321.7935483871 Rp 4,826,903
Setoran Aspal UPTD Timur I

No Nama Pekerjaan Jumlah (kg) Jumlah (tong) Harga


1 Balen-Sugihwaras 9300 60 Rp 900,000
2 Kapas-Glendeng 8215 53 Rp 795,000
3 Balen-Sugihwaras II 10075 65 Rp 975,000
4 Kapas-Glendeng II 9610 62 Rp 930,000
5 Bojonegoro-Kunci 3875 25 Rp 375,000
6 Balen-Sugihwaras III 9454.26 61 Rp 915,000
7 Jono-Sugihwaras 9300 60 Rp 900,000
8 Kapas-Sampang 9300 60 Rp 900,000
jumlah 69129.26 446 Rp 6,690,000

Você também pode gostar