ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : PEKERJAAN PERSIAPAN

Volume
No Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
Unit Quantity
ANL.I MOBILISASI & DEMOBILISASI
1 Concrete Mixer 0.3 - 0.6 M3 Unit 1.0000 200,000.00 200,000.00
2 Truck Concrete Mixer Unit 1.0000 500,000.00 500,000.00
3 Generator Set Unit 1.0000 150,000.00 150,000.00
4 Mesin Las dan Mesin Potong Unit 1.0000 150,000.00 150,000.00
5 Concrete Vibrator Unit 1.0000 100,000.00 100,000.00
6 Hand Stampher Unit 1.0000 150,000.00 150,000.00
7 Water Pump Unit 1.0000 100,000.00 100,000.00
8 Menara Suar Unit 1.0000 40,000,000.00 40,000,000.00
JUMLAH 41,350,000.00
DEMOBILISASI 1,350,000.00
JUMLAH 42,700,000.00
ANL.II DIREKSI KEET / BARAK KERJA
1 Direksi Keet M2 36.0000 120,000.00 4,320,000.00
2 KM/ WC @ 1 unit 2 x 2 M Unit 4.0000 600,000.00 2,400,000.00
JUMLAH 6,720,000.00
ANL.II ADMINISTRASI PROYEK
1 Dokumentasi Lapangan Ls 1.0000 120,000.00 120,000.00
2 Laporan Harian dan Mingguan @ 3 ex Mgg 60.0000 50,000.00 3,000,000.00
3 Laporan Bulanan @ 3 ex Bln 4.0000 50,000.00 200,000.00
4 Shop Drawing Bk 5.0000 150,000.00 750,000.00
5 As Built Drawing ( ABD ) Ls 5.0000 150,000.00 750,000.00
JUMLAH 4,820,000.00

Jenis Pekerjaan : : Penggalian 1 m3 Tanah Biasa sedalam 2 m


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.9000 75,000.00 67,500.00
2 Mandor L.04 OH 0.0250 120,000.00 3,000.00
Jumlah Tenaga Kerja 70,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 70,500.00
E Overhead & Profit 12% XD 8,460.00
F Harga Satuan Pekerjaan ( D + E ) 78,960.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengurugan kembali 1 m3 galian tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah L.01 OH 0.5000 75,000.00 37,500.00
2 Mandor L.04 OH 0.0500 120,000.00 6,000.00
Jumlah Tenaga Kerja 43,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,500.00
E Overhead & Profit 12% XD 5,220.00
F Harga Satuan Pekerjaan ( D + E ) 48,720.00

Jenis Pekerjaan : Pengurugan 1 m3 dengan pasir urug


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah L.01 OH 0.3000 75,000.00 22,500.00
2 Mandor L.04 OH 0.0100 120,000.00 1,200.00
Jumlah Tenaga Kerja 23,700.00
B. BAHAN
1 Pasir Urug M3 1.200 150,000.00 180,000.00
Jumlah Bahan 180,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 203,700.00
E Overhead & Profit 12% X D 24,444.00
F Harga Satuan Pekerjaan ( D + E ) 228,144.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 1.5000 75,000.00 112,500.00
2 Tukang L.02 OH 0.7500 100,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
4 Mandor L.04 OH 0.0750 120,000.00 9,000.00
Jumlah Tenaga Kerja 205,500.00
B. BAHAN
1 Batu Belah / Kali M3 1.200 170,000.00 204,000.00
2 Semen Portland Kg 163.000 1,450.00 236,350.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 539,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 744,650.00
E Overhead & Profit 12% X D 89,358.00
F Harga Satuan Pekerjaan ( D + E ) 834,008.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m3 batu kosong (Aanstamping)


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.7800 75,000.00 58,500.00
2 Tukang L.02 OH 0.3900 100,000.00 39,000.00
3 Kepala Tukang L.03 OH 0.0390 120,000.00 4,680.00
4 Mandor L.04 OH 0.0390 120,000.00 4,680.00
Jumlah Tenaga Kerja 106,860.00
B. BAHAN
1 Batu Belah/ Kali M3 1.2000 170,000.00 204,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 268,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 375,660.00
E Overhead & Profit 12% X D 45,079.20
F Harga Satuan Pekerjaan ( D + E ) 420,739.20

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 1.6500 75,000.00 123,750.00
2 Tukang L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
4 Mandor L.04 OH 0.0830 120,000.00 9,960.00
Jumlah Tenaga Kerja 164,570.00
B. BAHAN
1 Semen Portland Kg 384.00 1,450.00 556,800.00
2 Pasir Beton Kg 692.00 135.71 93,914.29
3 Batu Pecah Kg 1,039.00 140.74 146,229.63
4 Air Liter 215.00 50.00 10,750.00
Jumlah Bahan 807,693.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 972,263.92
E Overhead & Profit 12% X D 116,671.67
F Harga Satuan Pekerjaan ( D + E ) 1,088,935.59

or; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.0700 75,000.00 5,250.00
2 Tukang L.02 OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang L.03 OH 0.0070 120,000.00 840.00
4 Mandor L.04 OH 0.0400 120,000.00 4,800.00
Jumlah Tenaga Kerja 17,890.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 14,250.00 149,625.00
2 Kawat Beton Kg 0.150 20,000.00 3,000.00
Jumlah Bahan 152,625.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 170,515.00
E Per Kg Pembesian = D / 10 17,051.50
F Overhead & Profit 12% X E 2,046.18
G Harga Satuan Pekerjaan ( E + F ) 19,097.68

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Tenaga Kerja 71,240.00
B. BAHAN
1 Kayu Kelas III M3 0.040 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 130,803.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 202,043.20
E Overhead & Profit 12% X D 24,245.18
F Harga Satuan Pekerjaan ( D + E ) 226,288.38
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Tenaga Kerja 71,240.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,088,000.00 138,960.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 146,243.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 217,483.20
E Overhead & Profit 12% X D 26,097.98
F Harga Satuan Pekerjaan ( D + E ) 243,581.18

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,088,000.00 138,960.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 146,243.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 236,663.20
E Overhead & Profit 12% X D 28,399.58
F Harga Satuan Pekerjaan ( D + E ) 265,062.78
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.4000 20,744.00 8,297.60
3 Minyak Bekisting Liter 0.2000 10,600.00 2,120.00
4 Balok Kayu Kelas II M3 0.0180 4,618,000.00 83,124.00
5 Plywood tebal 9 mm Lbr 0.3500 222,600.00 77,910.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 21,800.00 43,600.00
Jumlah Bahan 338,571.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 428,991.60
F Overhead & Profit 12% X E 51,478.99
G Harga Satuan Pekerjaan ( D + E ) 480,470.59

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.4000 20,744.00 8,297.60
3 Minyak Bekisting Liter 0.2000 10,600.00 2,120.00
4 Balok Kayu Kelas II M3 0.0150 4,618,000.00 69,270.00
5 Plywood tebal 9 mm Lbr 0.3500 222,600.00 77,910.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 21,800.00 130,800.00
Jumlah Bahan 411,917.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 502,337.60
F Overhead & Profit 12% X E 60,280.51
G Harga Satuan Pekerjaan ( D + E ) 562,618.11
SUPLEMEN.1 : Pondasi Tapak 150 x 150 cm
No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 150.0000 19,097.68 2,864,652.00
3 Bekesting A. 4.1.1.20 M2 5.0000 226,288.38 1,131,441.92
Harga Satuan Pekerjaan 5,085,029.51

SUPLEMEN.2 : Beton Bertulang Sloof 40 x 40 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 135.0000 19,097.68 2,578,186.80
3 Bekesting A. 4.1.1.21 M2 5.0000 243,581.18 1,217,905.92
Harga Satuan Pekerjaan 4,885,028.31

SUPLEMEN.3 : Beton Bertulang Sloof 20 x 25 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 140.0000 19,097.68 2,673,675.20
3 Bekesting A. 4.1.1.21 M2 5.0000 243,581.18 1,217,905.92
Harga Satuan Pekerjaan 4,980,516.71

SUPLEMEN.4 : Beton Bertulang Kolom 20 x 20 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 130.0000 19,097.68 2,482,698.40
3 Bekesting A. 4.1.1.22 M2 6.0000 265,062.78 1,590,376.70
Harga Satuan Pekerjaan 5,162,010.69
SUPLEMEN.5 : Beton Bertulang Ring Balk 15 x 20 cm
No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 140.0000 19,097.68 2,673,675.20
3 Bekesting A. 4.1.1.23 M2 4.0000 480,470.59 1,921,882.37
Harga Satuan Pekerjaan 5,684,493.15

SUPLEMEN.6 : Beton Bertulang Plat Lantai 15 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 145.0000 19,097.68 2,769,163.60
3 Bekesting A. 4.1.1.24 M2 6.0000 562,618.11 3,375,708.67
Harga Satuan Pekerjaan 7,233,807.86

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 2PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Tenaga Kerja 35,500.00
B. BAHAN
1 Batu Bata Bh 70.000 850.00 59,500.00
2 Semen Portland Kg 18.950 1,450.00 27,477.50
3 Pasir Pasang M3 0.038 190,000.00 7,220.00
Jumlah Bahan 94,197.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 129,697.50
E Overhead & Profit 12% XD 15,563.70
F Harga Satuan Pekerjaan ( D + E ) 145,261.20

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Tenaga Kerja 41,100.00
B. BAHAN
1 Semen Portland Kg 10.224 1,450.00 14,824.80
2 Pasir Pasang M3 0.020 190,000.00 3,800.00
Jumlah Bahan 18,624.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 59,724.80
E Overhead & Profit 12% XD 7,166.98
F Harga Satuan Pekerjaan ( D + E ) 66,891.78
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.0200 75,000.00 1,500.00
2 Tukang L.02 OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang L.03 OH 0.0060 120,000.00 720.00
4 Mandor L.04 OH 0.0030 120,000.00 360.00
Jumlah Tenaga Kerja 8,880.00
B. BAHAN
1 Plamir Kg 0.1000 15,900.00 1,590.00
2 Cat dasar tembok Kg 0.1000 42,000.00 4,200.00
3 Cat tembok / penutup 2x Kg 0.2600 45,000.00 11,700.00
Jumlah Bahan 17,490.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,370.00
E Overhead & Profit 12% X D 3,164.40
F Harga Satuan Pekerjaan ( D + E ) 29,534.40

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
BILLOFQUANTITY

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

NO HARGA
URAIAN Analisa VOLUME SATUAN
. SATUAN (Rp)

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Taksir 1.00 Ls 7,000,000
2 Pembersihan Lokasi Taksir 225.00 M2 10,000
3 Biaya Mobilisasi dan demobilisasi ANL. I. 1.00 Paket 42,700,000
4 Pemasangan Bowplank Taksir 60.00 m' 15,000
5 Pengukuran Taksir 1.00 Paket 2,500,000
6 Bangunan Direksi Keet dan Barak Kerja ANL.II. 1.00 Paket 6,720,000
7 Air bersih Taksir 4.00 Bln 3,000,000
8 Obat- obatan/ P3K Taksir 4.00 Bln 1,500,000
9 Papan Nama Proyek Taksir 1.00 Paket 1,000,000
10 Dokumentasi/Administrasi/As Built Drawing ANL. III. 1.00 Paket 4,820,000
Jumlah I
II PEKERJAAN TANAH
1 Galian Tanah Pondasi A. 2.3.1.1 137.20 M3 78,960
2 Pasangan Batu Kosong (Aanstamping) A. 3.2.1.9 9.80 M3 420,739
3 Urugan Pasir Bawah Pondasi A. 2.3.1.11 9.80 M3 228,144
4 Timbunan Kembali Tanah Bekas Galian A. 2.3.1.9 117.85 M3 48,720
Jumlah II
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak SUPLEMEN.1 19.35 M3 5,085,030
2 Sloof 40/40 SUPLEMEN.2 2.80 M3 4,885,028
3 Plat Lantai 15 cm SUPLEMEN.6 2.87 M3 7,233,808
Jumlah III
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Taksir 8,250.00 Kg 45,000
2 Pengadaan Baut dan Ring Galvanis Taksir 1,600.00 Bh 10,000
3 Pemasangan/Perakitan Menara Suplemen A 1.00 Unit 55,700,000
4 Pembuatan Pintu Pengaman Lampu Suar Suplemen B 1.00 Unit 3,094,200
5 Cat Menara dengan Cat Marine Paint Putih 3x Suplemen C 1.00 Unit 16,588,000
6 Perancah dan Alat Bantu Taksir 1.00 Unit 10,000,000
Jumlah IV

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Taksir 1.00 Unit 90,000,000
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Taksir 3.00 Unit 7,000,000
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH Taksir 3.00 Bh 5,000,000
4 Pembuatan Box Battery Suplemen D 1.00 Unit 1,175,700
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Suplemen E 1.00 Unit 7,820,000
6 Pengadaan dan Pemasangan Radar Reflektor Suplemen F 1.00 Unit 7,480,000
Jumlah V

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi A. 2.3.1.1 17.80 M3 78,960
b Timbunan Kembali Tanah Bekas Galian A. 2.3.1.9 11.87 M3 48,720
c Urugan Pasir Bawah Pondasi A. 2.3.1.11 3.01 M3 228,144
d Pasangan Pondasi Batu Gunung A. 3.2.1.2 13.40 M3 834,008
e Pasangan Batu Kosong (Aanstamping) A. 3.2.1.9 2.53 M3 420,739
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 SUPLEMEN.4 1.31 M3 5,162,011
b Sloof 20/20 SUPLEMEN.3 1.80 M3 4,980,517
c Ring Balk 5/20 SUPLEMEN.5 0.52 M3 5,684,493
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 A. 4.4.1.7 20.00 M2 145,261
b Plesteran 1:2 A. 4.4.2.2 57.60 M2 66,892
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Taksir 30.00 Btg 600,000
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Taksir 15.00 Unit 1,300,000
6 Pengecatan Dinding/Tembok Pagar A. 4.7.1.10 57.60 M2 29,534
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Taksir 1.00 Unit 8,000,000
8 Relief Kolom Taksir 16.00 Unit 175000
Jumlah VI
JUMLAH
HARGA (Rp)

7,000,000
2,250,000
42,700,000
900,000
2,500,000
6,720,000
12,000,000
6,000,000
1,000,000
4,820,000
85,890,000

10,833,312
4,123,244
2,235,811
5,741,652
22,934,019

98,395,321
13,678,079
20,761,029
###

371,250,000
16,000,000
55,700,000
3,094,200
16,588,000
10,000,000
###

90,000,000
21,000,000

15,000,000
1,175,700
7,820,000
7,480,000
###

1,405,488
578,306
686,713
11,175,707
1,064,470

6,762,234
8,964,930
2,955,936
2,905,224
3,852,966
18,000,000
19,500,000
1,701,181
8,000,000
2,800,000
90,353,157
REKAPITULASI
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
SUMBER DANA : 2017

JUMLAH HARGA
NO. URAIAN

I. PEKERJAAN PERSIAPAN Rp 85,890,000.00

II. PEKERJAAN TANAH Rp 22,934,019.36

III. PEKERJAAN BETON BERTULANG Rp 132,834,428.73

IV. PEKERJAAN KONSTRUKSI MENARA Rp 472,632,200.00

V. PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN Rp 142,475,700.00

VI. PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 Rp 90,353,157.47

JUMLAH Rp 947,119,505.56
P P N 10 % Rp 94,711,950.56
JUMLAH TERMASUK PPN Rp 1,041,831,456.11
PEMBULATAN Rp 1,041,830,000.00
TERBILANG : Satu milyar empat puluh satu juta delapan ratus tiga puluh ribu rupiah

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
Suplemen A : 1 Unit Pemasangan/Perakitan Menara tinggi 20 Meter diperkirakan dapat diselesaikan dalam
jangka waktu 20 hari ( taksir )
15.0000 Orang Pekerja Rp. 75,000.00Rp.
1.0000 Orang Mandor Rp. 120,000.00Rp.
8.0000 Orang Tukang Rp. 100,000.00Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00Rp.
Rp.
Upah 20 Hari x Rp. 2,285,000.00 Rp.
- - Peralatan Rp. 10,000,000.00 Rp.
Jumlah Rp.

Suplemen B : 1 Unit Pembuatan dan Pemasangan Pintu Pengaman Lampu Suar / Menara Suar
60.0000 Kg Besi beton Rp. 14,250.00 Rp.
5.0000 Kg Kawat Las Rp. 28,000.00 Rp.
0.2500 Botol Aceteline Rp. 500,000.00 Rp.
0.5000 Botol Oxigen Rp. 583,000.00 Rp.
1.0000 Stel Engsel Cabut Rp. 26,500.00 Rp.
1.0000 Buah Gembok Rp. 21,200.00 Rp.
9.0000 Orang Pekerja Rp. 75,000.00 Rp.
1.0000 Orang Mandor Rp. 120,000.00 Rp.
2.0000 Orang Tukang Besi Rp. 100,000.00 Rp.
4.0000 Orang Tukang Las Rp. 100,000.00 Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.
Suplemen C : 1 Meter Pengecatan Menara 3 x An. Taksir
3.0000 Kg Cat Marine Paint Rp. 127,200.00 Rp.
1.0000 Liter Thiner Rp. 31,800.00 Rp.
4.0000 Orang Pekerja Rp. 75,000.00 Rp.
0.0500 Orang Mandor Rp. 120,000.00 Rp.
0.5000 Orang Tukang Rp. 100,000.00 Rp.
0.5000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.
Upah 20 Meter x Rp. 829,400.00 Rp.

Suplemen D : 1 Unit Pembuatan dan Pemasangan Box Batteray


25.0000 Kg Besi beton Rp. 14,250.00 Rp.
2.0000 Kg Kawat Las Rp. 28,000.00 Rp.
0.1000 Botol Aceteline Rp. 500,000.00 Rp.
0.2500 Botol Oxigen Rp. 583,000.00 Rp.
1.0000 Stel Engsel Cabut Rp. 26,500.00 Rp.
1.0000 Buah Gembok Rp. 21,200.00 Rp.
2.0000 Orang Pekerja Rp. 75,000.00 Rp.
0.5000 Orang Mandor Rp. 120,000.00 Rp.
0.5000 Orang Tukang Besi Rp. 100,000.00 Rp.
2.0000 Orang Tukang Las Rp. 100,000.00 Rp.
0.5000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.

Suplemen E : 1 Unit Pengadaan/Pemasangan dan Pembumian Penangkal Petir diperkirakan dapat diselesaikan
dalam waktu 2 hari ( taksir )
6.0000 Orang Pekerja Rp. 75,000.00
Rp.
1.0000 Orang Mandor Rp. 120,000.00
Rp.
1.0000 Orang Tukang Rp. 100,000.00
Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00
Rp.
Rp.
Upah 2 Hari x Rp. 910,000.00 Rp.
Bahan dan Peralatan Rp. 6,000,000.00 Rp.
Jumlah Rp.

Supleme F : 1 Unit Pengadaan/Pemasangan Radar Replektor, dapat diselesaikan 2 hari


8.0000 Orang Pekerja Rp. 75,000.00 Rp.
1.0000 Orang Mandor Rp. 120,000.00 Rp.
4.0000 Orang Tukang Rp. 100,000.00 Rp.
1.0000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Rp.
Upah 2 Hari x Rp. 1,240,000.00 Rp.
0.5000 Unit Bahan dan Peralatan Rp. 5,000,000.00 Rp.
Jumlah Rp.
akan dapat diselesaikan dalam

1,125,000.00
120,000.00
800,000.00
240,000.00
2,285,000.00
45,700,000.00
10,000,000.00
55,700,000.00

Suar / Menara Suar


855,000.00
140,000.00
125,000.00
291,500.00
26,500.00
21,200.00
675,000.00
120,000.00
200,000.00
400,000.00
240,000.00
3,094,200.00

381,600.00
31,800.00
300,000.00
6,000.00
50,000.00
60,000.00
829,400.00
16,588,000.00

356,250.00
56,000.00
50,000.00
145,750.00
26,500.00
21,200.00
150,000.00
60,000.00
50,000.00
200,000.00
60,000.00
1,175,700.00

etir diperkirakan dapat diselesaikan

450,000.00
120,000.00
100,000.00
240,000.00
910,000.00
1,820,000.00
6,000,000.00
7,820,000.00

600,000.00
120,000.00
400,000.00
120,000.00
1,240,000.00
2,480,000.00
5,000,000.00
7,480,000.00
Analisa Harga Satuan Bahan

Jenis : Semen PC
Harga : Rp 89,000.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Semen P.C di Simeulue Zak 1.00 Rp 77,000.00 Rp 77,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Zak 1.00 Rp 2,500.00 Rp 2,500.00
- Pengangkutan dengan boat Zak 1.00 Rp 5,000.00 Rp 5,000.00
- upah bongkar dari boat ke dermaga Zak 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi Zak 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 89,000.00

Jenis Batu Gunung


Harga : Rp 355,000.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Batu Gunung di Simeulue m3 1.00 Rp 220,000.00 Rp 220,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat m3 1.00 Rp 25,000.00 Rp 25,000.00
- Pengangkutan dengan boat m3 1.00 Rp 25,000.00 Rp 25,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 25,000.00 Rp 25,000.00
- upah angkut ke lokasi m3 1.00 Rp 60,000.00 Rp 60,000.00

Jumlah Rp 355,000.00

Jenis : Pasir Beton


Harga : Rp 999,500.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Pasir beton di Simeulue m3 1.00 Rp 190,000.00 Rp 190,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 999,500.00
Ket :
- diangkut dalam karung
- 1 m3 = 70 karung

Jenis : Pasir Pasang


,Material
Harga : Rp 999,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Pasir pasang di Simeulue m3 1.00 Rp 190,000.00 Rp 190,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 999,500.00

Ket :
- diangkut dalam karung
- 1 m3 = 70 karung

Jenis : Pasir Urug


Harga : Rp 959,500.00
Satuan/m3
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Pasir urug di Simeulue m3 1.00 Rp 150,000.00 Rp 150,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 959,500.00

Ket :
- diangkut dalam karung
- 1 m3 = 70 karung
Jenis : Besi Beton Polos
Harga : Rp 27,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Besi beton di Simeulue Kg 1.00 Rp 22,000.00 Rp 22,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Kg 1.00 Rp 1,000.00 Rp 1,000.00
- Pengangkutan dengan boat Kg 1.00 Rp 2,500.00 Rp 2,500.00
- upah bongkar dari boat ke dermaga Kg 1.00 Rp 1,000.00 Rp 1,000.00
- upah angkut ke lokasi Kg 1.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 27,500.00

Jenis : Besi Beton Ulir


Harga : Rp 38,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Besi beton di Simeulue Kg 1.00 Rp 33,000.00 Rp 33,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Kg 1.00 Rp 1,000.00 Rp 1,000.00
- Pengangkutan dengan boat Kg 1.00 Rp 2,500.00 Rp 2,500.00
- upah bongkar dari boat ke dermaga Kg 1.00 Rp 1,000.00 Rp 1,000.00
- upah angkut ke lokasi Kg 1.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 38,500.00

Jenis : Batu Bata


Harga : Rp 1,250.00
Satuan/buah

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Batu Bata di Simeulue Buah 1.00 Rp 700.00 Rp 700.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 0.05 Rp 5,000.00 Rp 250.00
- upah muat dari truck ke boat Buah 1.00 Rp 50.00 Rp 50.00
- Pengangkutan dengan boat Buah 1.00 Rp 100.00 Rp 100.00
- upah bongkar dari boat ke dermaga Buah 1.00 Rp 50.00 Rp 50.00
- upah angkut ke lokasi Buah 1.00 Rp 100.00 Rp 100.00

Jumlah Rp 1,250.00

Ket :
- diangkut dalam karung
- 1 Karung = 20 Buah Batu Bata
DAFTAR HARGA
TAHUN ANGGARAN 2017

HARGA
NO. URAIAN UPAH SATUAN SATUAN KETERANGAN
( Rp. )

1 Pekerja Hari 75,000.00


2 Tukang Batu/Besi Hari 100,000.00
3 . Kepala Tukang Batu/Besi Hari 120,000.00
4 Tukang Kayu/Cat Hari 100,000.00
5 Kepala Tukang Kayu/Cat Hari 120,000.00
6 . Mandor Hari 120,000.00
7 . Tukang Las Hari 100,000.00

HARGA
NO. U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )

A. BAHAN
1 Aceteline Botol 500,000.00
2 Air Ltr 50.00
3. Batu Bata Buah 850.00
4. Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm M3 170,000.00
5 Batu Pecah 2/3 M3 190,000.00
6 Besi Beton Polos Kg 14,250.00
7 Besi Beton Ulir Kg 23,000.00
8 Cat Anti Fauling sekualitas Nippon Kg 127,200.00
9 Cat Dasar Kg 42,000.00
10 Cat Dinding Sekualitas Nippon Kg 45,000.00
11 Dolken Kayu 5 x 10 x 400 Cm Btg 21,800.00
12 Ensel Cabut Stel 26,500.00
13 Gembok Buah 21,200.00
14 Grandel Stel 39,220.00
15 Kayu Balok Klas II M3 4,618,000.00
16 Kayu Kasau 5/7 untuk Bouwplank Kayu Klas III M3 3,088,000.00
17 Kawat Beton Kg 20,000.00
18 Kawat Las Kg 28,000.00
19 Minyak Bekisting Liter 10,600.00
20 Oxigen Botol 583,000.00
21 Paku Kayu Kg 20,744.00
22 Papan Bekisting M3 5,088,000.00
23 Pasir Beton M3 190,000.00
24 Pasir Pasang M3 190,000.00
25 Pasir Urug M3 190,000.00
26 Plamir Kg 15,900.00
27 Semen Andalas @ 40 Kg zak 58,000.00
28 Semen Andalas @ 40 Kg Kg 1,450.00
29 Triplek 9 mm Lbr 222,600.00
30 Tanah Urug M3 81,620.00
31 Thiner / Minyak cat Ltr 31,800.00
HARGA
NO. U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
JADWAL PELAKSANAAN
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

Bobot MASA PELAKSANAAN


JUMLAH
NO. URAIAN Rencana BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
HARGA (Rp)
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 7,000,000 0.74% 0.007
2 Pembersihan Lokasi 2,250,000 0.24% 0.002
3 Biaya Mobilisasi dan demobilisasi 42,700,000 4.51% 0.011 0.011 0.011 0.011
4 Pemasangan Bowplank 900,000 0.10% 0.001
5 Pengukuran 2,500,000 0.26% 0.003
6 Bangunan Direksi Keet dan Barak Kerja 6,720,000 0.71% 0.007
7 Air bersih 12,000,000 1.27% 0.003 0.003 0.003 0.003
8 Obat- obatan/ P3K 6,000,000 0.63% 0.002 0.002 0.002 0.002
9 Papan Nama Proyek 1,000,000 0.11% 0.001
10 Dokumentasi/Administrasi/As Built Drawing 4,820,000 0.51% 0.003 0.003

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 10,833,312 1.14% 0.006 0.006
2 Pasangan Batu Kosong (Aanstamping) 4,123,244 0.44% 0.004
3 Urugan Pasir Bawah Pondasi 2,235,811 0.24% 0.002
4 Timbunan Kembali Tanah Bekas Galian 5,741,652 0.61% 0.006

III PEKERJAAN BETON BERTULANG


Beton Bertulang K250
1 Pondasi Tapak 98,395,321 10.39% 0.035 0.035 0.035
2 Sloof 40/40 13,678,079 1.44% 0.014
3 Plat Lantai 15 cm 20,761,029 2.19% 0.022

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis 371,250,000 39.20% 0.065 0.065 0.065 0.065 0.065 0.065
2 Pengadaan Baut dan Ring Galvanis 16,000,000 1.69% 0.003 0.003 0.003 0.003 0.003 0.003
3 Pemasangan/Perakitan Menara 55,700,000 5.88% 0.020 0.020 0.020
4 Pembuatan Pintu Pengaman Lampu Suar 3,094,200 0.33% 0.003
5 Cat Menara dengan Cat Marine Paint Putih 3x 16,588,000 1.75% 0.009 0.009
6 Perancah dan Alat Bantu 10,000,000 1.06% 0.004 0.004 0.004

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 90,000,000 9.50% 0.048 0.048
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 21,000,000 2.22% 0.011 0.011
Bobot MASA PELAKSANAAN
JUMLAH
NO. URAIAN Rencana BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
HARGA (Rp)
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 15,000,000 1.58% 0.008 0.008
4 Pembuatan Box Battery 1,175,700 0.12% 0.001
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 7,820,000 0.83% 0.004 0.004
6 Pengadaan dan Pemasangan Radar Reflektor 7,480,000 0.79% 0.004 0.004

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 1,405,488 0.15% 0.001
b Timbunan Kembali Tanah Bekas Galian 578,306 0.06% 0.001
c Urugan Pasir Bawah Pondasi 686,713 0.07% 0.001
d Pasangan Pondasi Batu Gunung 11,175,707 1.18% 0.012
e Pasangan Batu Kosong (Aanstamping) 1,064,470 0.11% 0.001
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 6,762,234 0.71% 0.007
b Sloof 20/20 8,964,930 0.95% 0.009
c Ring Balk 5/20 2,955,936 0.31% 0.003
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 2,905,224 0.31% 0.003
b Plesteran 1:2 3,852,966 0.41% 0.004
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 18,000,000 1.90% 0.019
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 19,500,000 2.06% 0.021
6 Pengecatan Dinding/Tembok Pagar 1,701,181 0.18% 0.002
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 8,000,000 0.84% 0.008
8 Relief Kolom 2,800,000 0.30% 0.003
JUMLAH 947,119,506 100.00%
0.010 0.052 0.108 0.110 0.150 0.116 0.089 0.185 0.028 0.023 0.023 0.021 0.063 0.009 0.014 -

0.010 0.062 0.170 0.280 0.430 0.546 0.635 0.819 0.847 0.870 0.894 0.914 0.977 0.986 1.000 1.000

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
ANALISA TEKNIS

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 1.00 Ls 1
2 Pembersihan Lokasi 225.00 M2 1
3 Biaya Mobilisasi dan demobilisasi 1.00 Paket 4
4 Pemasangan Bowplank 60.00 m' 1
5 Pengukuran 1.00 Paket 1
6 Bangunan Direksi Keet dan Barak Kerja 1.00 Paket 1
7 Air bersih 4.00 Bln 4
8 Obat- obatan/ P3K 4.00 Bln P3K 4
9 Papan Nama Proyek 1.00 Paket Papan Nama Proyek 1
10 Dokumentasi/Administrasi/As Built Drawing 1.00 Paket 2

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 137.20 M3 Pekerja 10 0.9 11.11 12.35 2
Mandor 1 0.025

2 Pasangan Batu Kosong (Aanstamping) 9.80 M3 Batu Belah/ Kali 11.76 M3 Pekerja 1 0.78
Pasir Urug 4.2336 M3 Tukang 1 0.39 2.56 3.82 1
Kepala Tukang 1 0.039
Mandor 1 0.039

3 Urugan Pasir Bawah Pondasi 9.80 M3 Pasir Urug 11.76 M3 Pekerja Galian Tanah 1 0.3 3.33 2.94 1
Mandor 1 0.01

4 Timbunan Kembali Tanah Bekas Galian 117.85 M3 Pekerja Galian Tanah 10 0.5 20.00 5.89 1
Mandor 1 0.05

III PEKERJAAN BETON BERTULANG


Beton Bertulang K250
1 Pondasi Tapak 19.35 M3
- Beton K.250 19.35 M Semen Portland 7430.4 Kg Pekerja 1 1.650
Pasir Beton 13390.2 Kg Tukang 1 0.275 3.64 5.32 1
Batu Pecah 20104.65 Kg Kepala Tukang 1 0.028
Air 4160.25 Liter Mandor 1 0.083

- Pembesian 2,902.50 Kg Besi Beton Polos 30476.25 Kg Pekerja 5 0.070


Kawat Beton 435.375 Kg Tukang 12 0.070 171.43 16.93 3
Kepala Tukang 1 0.007
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
Mandor 1 0.040

- Bekesting 96.75 M2 Kayu Kelas III 3.87 M3 Pekerja 4 0.520


Paku 5 cm - 10 cm 29.025 Kg Tukang 2 0.260 7.69 12.58 3
Minyak Bekisting 9.675 Liter Kepala Tukang 1 0.026
Mandor 1 0.026

2 Sloof 40/40 2.80 M3


Beton K.250 2.80 M Semen Portland 1075.2 Kg Pekerja 1 1.65
Pasir Beton 1937.6 Kg Tukang 1 0.275 3.64 0.77 1
Batu Pecah 2909.2 Kg Kepala Tukang 1 0.028
Air 602 Liter Mandor 1 0.083

Pembesian 378.00 Kg Besi Beton Polos 3969 Kg Pekerja 2 0.07


Kawat Beton 56.7 Kg Tukang 2 0.07 28.57 13.23 3
Kepala Tukang 1 0.007
Mandor 1 0.04

Bekesting 14.00 M2 Kayu Kelas III 0.630 M3 Pekerja 1 0.52


Paku 5 cm - 10 cm 4.200 Kg Tukang 1 0.26 3.85 3.64 1
Minyak Bekisting 1.400 Liter Kepala Tukang 1 0.026
- Mandor 1 0.026

3 Plat Lantai 15 cm 2.87 M3


Beton K.250 2.87 M Semen Portland 1102.08 Kg Pekerja 1 1.65
Pasir Beton 1986.04 Kg Tukang 1 0.275 3.64 0.79 1
Batu Pecah 2981.93 Kg Kepala Tukang 1 0.028
Air 617.05 Liter Mandor 1 0.083

Pembesian 416.15 Kg Besi Beton Polos 4369.575 Kg Pekerja 1 0.07


Kawat Beton 62.4225 Kg Tukang 1 0.07 14.29 29.13 5
Kepala Tukang 1 0.007
Mandor 1 0.04

Bekesting 17.22 M2 Kayu Kelas III 0.689 M3 Pekerja 1 0.66


Paku 5 cm - 10 cm 6.888 Kg Tukang 1 0.33 3.03 5.68 1
Minyak Bekisting 3.444 Liter Kepala Tukang 1 0.033
Balok Kayu Kelas II 0.258 M3 Mandor 1 0.033
Plywood tebal 9 mm 6.027 Lbr
Kayu dolken 103.320 Batang

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis 8,250.00 Kg Kerangka Menara Besi 5
8,250.00 Kg
Baja Galvanis

2 Pengadaan Baut dan Ring Galvanis 1,600.00 Bh 5


Baut dan Ring Galvanis 1,600.00 Bh
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
3 Pemasangan/Perakitan Menara 1.00 Unit Pekerja 15 20.00 3
Mandor 1
Tukang 8
Kepala Tukang 2

4 Pembuatan Pintu Pengaman Lampu Suar 1.00 Unit Besi beton 60.00 Kg Pekerja 9
Kawat Las 5.00 Kg Mandor 1 1
Aceteline 0.25 Botol Tukang Besi 2
Oxigen 0.50 Botol Tukang Las 4
Engsel Cabut 1.00 Stel Kepala Tukang 2
Gembok 1.00 Buah
Pekerja 9.00 Orang
Mandor 1.00 Orang

5 Cat Menara dengan Cat Marine Paint Putih 3x 1.00 Unit Cat Marine Paint 60 Kg Pekerja 8 2
Thiner 20 Liter Mandor 1
Tukang 1
Kepala Tukang 1

6 Perancah dan Alat Bantu 1.00 Unit Perancah 1 Set 1

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 1.00 Unit Lampu Suar 1 Unit 2
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 3.00 Unit Solar Cell 12V - 50W 3 Unit 2
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 3.00 Bh Battery Maintenance 3 Unit 2
4 Pembuatan Box Battery 1.00 Unit Box Battery 1 Unit 2
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 1.00 Unit Penangkal Petir 1 Unit 2
6 Pengadaan dan Pemasangan Radar Reflektor 1.00 Unit Radar Reflektor 1 Unit 2

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 17.80 M3 Pekerja 3 0.900 3.33 5.34 1
Mandor 1 0.025

b Timbunan Kembali Tanah Bekas Galian 11.87 M3 Pekerja Galian Tanah 1 0.500 2.00 5.94 1
Mandor 1 0.050

c Urugan Pasir Bawah Pondasi 3.01 M3 Pasir Urug 1.200 M3 Pekerja Galian Tanah 1 0.30 3.33 0.90 1
Mandor 1 0.01

d Pasangan Pondasi Batu Gunung 13.40 M3 Batu Belah / Kali 16.080 M3 Pekerja 4 1.500
Semen Portland 2,184.200 Kg Tukang 2 0.750 2.67 5.03 1
Pasir Pasang 6.968 M3 Kepala Tukang 1 0.075
Mandor 1 0.075
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
e Pasangan Batu Kosong (Aanstamping) 2.53 M3 Batu Belah/ Kali 3.036 M3 Pekerja 2 0.780
Pasir Urug 1.093 M3 Tukang 1 0.390 2.56 0.99 1
Kepala Tukang 1 0.039
Mandor 1 0.039

2 PEKERJAAN BETON BERTULANG


a Kolom 20/20 1.31 M3
- Beton K.250 1.31 M Semen Portland 503 Kg Pekerja 1.000 1.650
Pasir Beton 907 Kg Tukang 1.000 0.275 3.64 0.36 1
Batu Pecah 1,361 Kg Kepala Tukang 1.000 0.028
Air 282 Liter Mandor 1.000 0.083

- Pembesian 130.00 Kg Besi Beton Polos 1365 Kg Pekerja 2.000 0.07


Kawat Beton 19.5 Kg Tukang 2.000 0.07 28.57 4.55 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.04

- Bekesting 6.00 M2 Kayu Kelas III 0.045 M3 Pekerja 1.000 0.660


Paku 5 cm - 10 cm 0.3 Kg Tukang 1.000 0.330 3.03 1.98 1
Minyak Bekisting 0.1 Liter Kepala Tukang 1.000 0.033
Mandor 1.000 0.033
b Sloof 20/20 1.80 M3
- Beton K.250 1.80 M Semen Portland 691.2 Kg Pekerja 1.000 1.650
Pasir Beton 1245.6 Kg Tukang 1.000 0.275 3.64 0.50 1
Batu Pecah 1870.2 Kg Kepala Tukang 1.000 0.028
Air 387 Liter Mandor 1.000 0.083

- Pembesian 140.00 Kg Besi Beton Polos 1470 Kg Pekerja 2.000 0.07


Kawat Beton 21 Kg Tukang 2.000 0.07 28.57 4.90 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.04

- Bekesting 5.00 M2 Kayu Kelas III 0.225 M3 Pekerja 1.000 0.520


Paku 5 cm - 10 cm 1.500 Kg Tukang 1.000 0.260 3.85 1.30 1
Minyak Bekisting 0.500 Liter Kepala Tukang 1.000 0.026
Mandor 1.000 0.026

c Ring Balk 5/20 0.52 M3


- Beton K.250 0.52 M Semen Portland 199.68 Kg Pekerja 1.000 1.650
Pasir Beton 359.84 Kg Tukang 1.000 0.275 3.64 0.14 1
Batu Pecah 540.28 Kg Kepala Tukang 1.000 0.028
Air 111.8 Liter Mandor 1.000 0.083

- Pembesian 72.80 Kg Besi Beton Polos 764.4 Kg Pekerja 1.000 0.070


Kawat Beton 10.92 Kg Tukang 1.000 0.070 14.29 5.10 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.040
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg

- Bekesting 2.08 M2 Kayu Kelas III 0.083 M3 Pekerja 1.000 0.660


Paku 5 cm - 10 cm 0.832 Kg Tukang 1.000 0.330 3.03 0.69 1
Minyak Bekisting 0.416 Liter Kepala Tukang 1.000 0.033
Balok Kayu Kelas II 0.037 M3 Mandor 1.000 0.033
Plywood tebal 9 mm 0.728 Lbr
Kayu dolken dia. 8-10 cm, 4.160 Batang

3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 20.00 M2 Batu Bata 1400.000 Bh Pekerja 1.00 0.300
Semen Portland 379.000 Kg Tukang 1.00 0.100 10.00 2.00 1
Pasir Pasang 0.760 M3 Kepala Tukang 1.00 0.010
Mandor 1.00 0.015

b Plesteran 1:2 57.60 M2 Semen Portland 588.902 Kg Pekerja 1.00 0.300


Pasir Pasang 1.152 M3 Tukang 1.00 0.150 6.67 8.64 2
Kepala Tukang 1.00 0.015
Mandor 1.00 0.015

4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 30.00 Btg Tiang Pagar BRC 30.00 Btg Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 15.00 Unit Pagar BRC 15.00 Unit Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

6 Pengecatan Dinding/Tembok Pagar 57.60 M2 Plamir 5.760 Kg Pekerja 1.00 0.020


Cat dasar tembok 5.760 Kg Tukang 1.00 0.063 15.87 3.63 1
Cat tembok / penutup 2x 14.976 Kg Kepala Tukang 1.00 0.006
Mandor 1.00 0.003

7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 1.00 Unit Pintu Pagar dari Besi Plat 1 Unit Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

8 Relief Kolom 16.00 Unit Semen PC Kg Pekerja 1.00 1


Pasir Pasang M3 Tukang 1.00
Air ltr Mandor 1.00

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
DIREKTUR
JADWAL PENGIRIMAN BARANG
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

JADWAL PENGIRIMAN
NO. URAIAN BAHAN/BARANG VOLUME SAT BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 Kerangka Menara Besi Baja Galvanis 8,250.00 Kg


2 Baut dan Ring Galvanis 1,600.00 Bh Pengiriman diseseuaikan dengan kerangka menara
1 Lampu Suar Jarak Tampak 12 NM 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara
2 Solar Cell 12V - 50W 3.00 Unit Pengiriman diseseuaikan dengan kerangka menara
3 Battery Maintenance Free 12 - 105AH 3.00 Bh Pengiriman diseseuaikan dengan kerangka menara
5 Penangkal Petir 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara
6 Radar Reflektor 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara

KET.
Pemesanan Banda Aceh, 10 April 2017
Pabrikasi/ proses orderan di workshop CV. EGROUP KARYA
Pengiriman ke lokasi
Pemasangan di lokasi

M.HERKA
DIREKTUR
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH

NO. URAIAN BAHAN/BARANG VOLUME SAT MEREK SPESIFIKASI KET


1 Kerangka Menara Besi Baja Galvanis 8,250.00 Kg - Jenis besi : besi galvanize
2 Baut dan Ring Galvanis 1,600.00 Bh - Jenis besi : besi galvanize
Standar : SNI 07 1353 1989 ICS
3 Lampu Suar Jarak Tampak 12 NM 1.00 Unit SEALITE - Type : SL-C600 Spesifikasi lengkap lampu suar bisa dilihat
- Light Source : SL- 125-4 (144 LED latern as pad brosur lampu suar
- Bahan rangka lampu standartd)
: polyethylene
- Bahan body lampu : Polycarbonate
- baterai : 100 Ah
4 Solar Cell 12V - 50W 3.00 Unit Sundaya Max Power : 50 W
Power Voltage (Vmp) : 17.5V
Weight : 4,8Kg
Number cell : 36
5 Battery Maintenance Free 12 - 105AH 3.00 Bh Cycling capacity 20 hour rate
reserve capacity 175 minute
Height (w/terminal) 236 mm
Height (case only) 211 mm
Lenght 307 mm
width 169 mm
Weight 30.2 kg
6 Penangkal Petir 1.00 Unit Standar
7 Radar Reflektor 1.00 Unit Standar

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR