Você está na página 1de 32

1

Local News Project Focus Local News Local News


Issue No.34, Interior design market Project Overview : Qatar Steel continues Estate Qatar to unveil
April 2010, sustains growth in
Qatar
Barwa Al Baraha its expansion investment directions

Doha-Qatar
Pages 3 Page 8 Page 14 Pages 24

Project Qatar 2010: a show of success


The increase in the number of exhibitors in Project Qatar proves that the state’s construction sector is still enjoying a boom

P
roject Qatar has es- PQ proves that Qatar is “still QR37.9 billion of the budget
tablished itself as booming” and willing to ex- was set aside for vital infra-
the largest platform pand and strengthen its con- structure projects in areas
for construction com- struction sector. The show has like health, education and
panies in the GCC and most increased in both size (+12%) human resource develop-
importantly the greenest in and participation (+15%) as ment. Officials have indicated
the region. In this interview more than 1,000 manufactur- that the budget for 2010-
with Qatar Construction Sites, ers will showcase their prod- 2011 is likely to be Qatar’s
Michel Gebrael, IFP Project ucts to some 40,000 industry biggest ever. Infrastructure
Manager, explains how the professionals from around the will remain a focus area as
annual event, organized by world. PQ 2010 reflects the will be education, health and
IFP, offers innovative data status of the Qatari economy: environment unlike the past
relevant to construction prod- vibrant & healthy. where their point of attention
ucts, equipment and solu- Conversely do you think was on oil and gas. However,
tions and work for a greener the falling residential pric- there is a concern to keep
tomorrow. es will boost the sale of things from going overboard.
Excerpts from the inter- residential properties in The effort is to maintain a
view: Qatar, encouraging more balance between growth and
What will be the main developers to participate inflation.
focus this year? in the show? How stretched are the
ANSWER: Project Qatar 2010 Logically speaking, when the construction companies
- the seventh international costs and expenses of resi- in Qatar currently? Do you
exhibition for construction dential prices tend to decline, think they can withstand
technology, building materi- there will more demand for further increases in work-
als, equipment and environ- residential areas. More peo- load and demand for ma-
mental technology - has es- ple would want to invest now terials?
tablished itself as the largest that they can afford it and de- There will be an increase in
construction platform in the velopers have a clear access labor demand, with the focus
GCC and most importantly its to market pulse. PQ 2010 is proach. From web to outdoor this year’s exhibition? ing global economic diffi- on the construction sector.
greenest. PQ’s “Sustainabil- a must book/ must attend campaigns, from print to TV The booming of the Qatar culties, this seems to be For instance, the new Doha
ity Week” has strengthened show. Moreover, the idea of and radio, all local and inter- construction market will help boom time for the Qatari International Airport will open
the uniqueness of the show, “green buildings” does aid in national media avenues are boost Project Qatar because construction industry. up as many as 50,000 jobs
bringing more attention to the that matter, because it tends being widely used, ensuring it provides various possibili- How has the slowdown af- when all three phases of its
topic, its challenges and avail- to decrease the operating ex- an optimal coverage of the ties and alternatives for the fected Qatar and how has $14bn construction is com-
able green solutions. It will penses and eliminate the neg- event. construction arena to be im- the industry responded to plete.
offer innovative data relevant ative environmental impacts - Please tell us your view proved and thus cater to what overcome it? With an increasing pop-
to the construction products, a double-whammy deal. of the construction market a new and advancing Qatar His Highness the Emir Sheikh ulation and greater inflow
equipment and solutions. What steps are you tak- in Qatar? needs. Hamad bin Khalifa Al Thani’s of tourists spurring de-
Developers in Qatar ing to encourage more par- At the present the Qatar con- Do you think the return- Economic Advisor, HE Dr Ib- mand for hotels and hous-
have adopted a cautious ticipation in the show? struction market is booming. ing confidence across the rahim Ibrahim recently said ing, has Qatar seen an
approach in launching Most exhibitors would want to The oil and gas state is invest- market will result in an in- that Qatar was expected to influx of construction com-
projects due to global eco- place themselves in the active ing heavily in infrastructure crease in visitor numbers? post a budget surplus in the panies coming to meet
nomic slowdown. How do market to strengthen their projects. This will keep con- And what can visitors ex- ensuing financial year. “The that need?
you think will this affect businesses and they will be struction companies floating pect from Project Qatar? price on which oil revenues In addition to houses and
the turnout at the show? able to do that that by becom- for the upcoming years, help- Visitors shall throng this exhi- are to be calculated is likely public installations, Qatar
The global economic crisis ing part of the show. In addi- ing improve the property mar- bition due to various changes to be in the vicinity of $50 has witnessed a growth in
showed little or no effect on tion to the strong brand rec- ket in order to accommodate that have occurred in the re- per barrel,” he is quoted as its office space market due
the Qatari market. Thanks to ognition achieved through the the growing population. An- gion. They will want to learn saying. to the increased demand
prudent financial government many varied outlets and me- other bonus is the fact that lo- about new projects and get What measures are in from global oil and gas com-
policies, the country has over- dia placements used by the cal banks are specific on how to know more about what the place to ensure that the panies, the banking and fi-
come this bump smoothly. organizers to promote both they handle financing, which exhibitors have to offer. There growth of Qatar is sustain- nancial services area and
Only one major project in the booth sales and attendance, will help to preserve their abil- will be a group of multilingual able? Have lessons been government ministries and
real estate sector was can- PQ 2010 uses conventional ity to keep on going. staff to brief visitors and par- learned from the intense agencies. Growing tourism
celled in Qatar during 2008. and unconventional commu- How will this impact ticipants on seminars and boom and bust that have has also encouraged Qatar to
Moreover, the increase in nication tools that guarantee upon Project Qatar? What conferences. affected Dubai so severe- invest in the development of
the number of exhibitors in a 360-degree marketing ap- are your expectations for In spite of the ongo- ly? hotels and resorts.
2 Local News

Arbitration under Qatar Law


A
rbitration is a dispute bitral tribunal in compliance court, the other party may Code”) which allows parties to
resolution procedure with the institutional rules hold to the condition of arbi- agree the terms of their con-
in which a dispute is and the local law governing tration as an objection to the tract provided that such terms
submitted by agree- the procedure of the arbitra- non-acceptance of the ac- are not contrary to public or-
ment of the parties, to one or tion, are final and binding. tion” der or morals.
more arbitrators who make a There are limited rights of Essentially, this means that Making of award
binding decision in respect of appeal. In many jurisdictions where there is an arbitration Article 202 states:
the dispute. In choosing arbi- including Qatar, ratification clause in any agreement and “The arbitration award shall
tration, the parties opt for pri- by the local courts is required a party to that agreement has, be issued after deliberation
vate proceedings instead of, in order to enforce the award mistakenly or otherwise, com- by the majority of the opin-
as is the case in many jurisdic- against assets located in that menced substantive proceed- ions. The award shall be in
tions, the public court forum. jurisdiction. A number of con- ings in the court, the other writing and shall include in
Broadly, there are two types ventions including the Con- party may seek a stay of the particular, a copy of the arbi-
of arbitration, those with insti- vention on the Recognition of proceeding on the basis of tration document, a brief of
tutional rules, such as the In- Enforcement of Foreign Arbi- the arbitration clause. the statements of the litigants
ternational Chamber of Com- tral Awards, dated June 1958 In practice, the courts will and their documents, the rea-
merce (ICC), London Court (the “New York Convention”) generally stay proceedings on sons for the award, the text of
of International Arbitration and the Riyadh Convention a valid application pursuant the award, the place and date
(LCIA), International Centre (1983) are particularly im- to this provision. It should be of its issue and the signatures
for Dispute Resolution (ICDR) portant in respect of the en- noted however, that such an of the arbitrators.
or the Qatar International Ar- forcement of foreign arbitral application should be made If one arbitrator or more refuse
bitration Centre (QIAC) and awards in Qatar. at the first hearing, otherwise to sign the award, this refusal
adhoc arbitrations. Adhoc Requirements for Arbitration the right to object to the court shall then be mentioned. The
arbitrations are those which in Qatar hearing the dispute on the award shall be valid if signed
are not administered by an Arbitration is codified in Qa- basis of an agreement to arbi- by the majority of arbitrators.
institution and, therefore, the tar’s legislation within Law trate is likely to be lost. The award shall be considered
parties are required to deter- No (13) of 1990 The Civil Time for arbitration as issued as from the date of
mine all aspects of the arbi- and Commercial Code of Pro- Article 197 states that: signature of the arbitrators af-
Laura Warren: senior construction lawyer at Clyde & Co LLP, Doha
tration such as the number of cedure (the “Civil Procedure “The arbitrators shall arbi- ter the writing thereof even if
arbitrators, the manner of ap- Code”) at Articles 190 – 210. trate within the time set in before its pronouncement or bankrupt unless he has been did not sign each page of their
pointment of the arbitrators The provisions deal with: the arbitration document un- deposition.” “rehabilitated”] reasons for the award.
and the procedure. • The formalities required for less the litigants agree on Therefore, a majority decision 3. If the award was issued Article 210 states:
The principle characteristics a binding arbitration agree- its extension. If the litigants, of the tribunal creates a bind- by arbitrators who had not “ The remunerations of the
of arbitration are as follows: ment; in the arbitration documents ing award. been appointed pursuant to arbitrators shall be specified
1 . Arbitration is consensual • The appointment & dismiss- have not imposed a term for Execution of an award the law, or issued by some by an agreement between
Arbitration can only take al of arbitrators; the arbitration award, the ar- Article 204 states: arbitrators where they are not the litigants in an arbitration
place if both parties have • The right of a party to apply bitrators shall issue an award “The award of the arbitrators authorised to arbitrate in the document or in a subsequent
agreed to it. In the case of for a stay of court proceed- within 3 months starting from shall not be executable unless absence of the others. agreement, or otherwise they
future disputes arising under ings given the existence of an the date of their admissibility by virtue of an order issued by 4. If a nullity occurring in the shall be specified by the court
a contract, the parties insert arbitration clause; for arbitration. the judge of the court where award or in the procedures initially competent to examine
an arbitration clause into a • Timing; If the arbitrators did not issue the original copy of the award had affected the award”. the dispute, pursuant to the
relevant agreement. Where • The granting of an award; their award within the time was deposited, pursuant to Article 207, therefore, sets demand of one of the inter-
there is no arbitration clause • Challenge of the award; stipulated in the arbitration the demand of the interested out the limited grounds for ested parties in the presence
in an agreement, parties are and document or during the time party. challenging the arbitration or absence of the remaining
able to agree, upon the oc- • Arbitrator’s costs. determined in the aforemen- The judge shall issue the writ award and includes the expi- ones after having been sum-
currence of a dispute, to refer Formalities tioned paragraph, or if they of execution after inspecting ry of a limitation period, lack moned; and its decision shall
such a dispute to arbitration Significantly, Article 190 failed to do so for a coercive the award and the arbitration of capacity or lack of good be final”.
and will enter into an Arbitra- states: reason, any litigant may sub- document and after making standing of the arbitrators or Thus, the parties are able
tion Agreement. “The agreement upon arbitra- mit the issue to the court ini- sure that, nothing should pre- a procedural error in their ap- to agree on the arbitrators’
2. The Arbitrators are chosen tion shall be verified in writ- tially competent to examine vent the execution thereof. pointment. costs but where there is no
by the parties ing”. the dispute in order to add The writ of execution shall be One of the major differences agreement, the court is able
The parties choose the ar- This means that any agree- a new period or to settle the in an appendix to the original to an arbitration pursuant to to determine such costs.
bitrator or arbitrators. Com- ment to refer issues to ar- dispute or to appoint other ar- award arbitrament. The judge the procedural laws of Qatar Whilst the Civil Procedure
monly, parties either elect bitration must be in writing. bitrators. ordering the execution shall and common law jurisdic- Code is silent in respect of the
to appoint a sole arbitrator Arguments in respect of this In the event of the decease of have the competent jurisdic- tions (for example the UK) is inter relationship between its
or a three-member arbitral formality often arise where a litigant, dismissal of an arbi- tion over all the matters re- the requirement to have an provisions and institutional
tribunal. In the latter case, the agreement or contract trator or submission of recu- lated to the execution of the arbitration deed as referred rules, it is common that arbi-
each party will appoint one containing an arbitration sation plea against him, the award”. to at Article 207(1) which is tration clauses in contracts
of the arbitrators and those clause has not been property time set for issuing the award As mentioned above, in Qatar often incorrectly taken to be in Qatar contain institutional
appointed arbitrators will ap- executed, where the arbitra- shall be extended to the peri- the local courts are required the arbitration agreement . rules and the agreement to
point a presiding arbitrator or tion provision is incorporated ods during which this obstacle to ratify any foreign or do- While akin to terms of refer- use these rules would likely
chair. Where agreement is not by reference or where the should cease to exist”. mestic arbitral award for the ence in an ICC arbitration, the be upheld by the local courts.
forthcoming on the identity of provision does not mention The local court has very wide purpose of execution against arbitration deed is a formal Whether parties have an ad
a sole arbitrator or presiding the word “arbitration”. In Qa- powers under this provision. assets. document signed by the par- hoc arbitration agreement or
arbitrator or chair, an institu- tar it is critical that the par- Where an arbitration award Challenging an award ties and the arbitral tribunal. an agreement referring to the
tion or court is often involved ties agreeing to arbitration has not been issued in accor- Article 207 deals with It generally summarises the use of institutional rules, the
in the appointment of this in- are properly authorised to do dance to the timing agreed by challenge to the award and claim and defence and may provisions of the Civil Proce-
dividual. so. Such authorisation must the parties, set out in the ar- states: deal with the powers of the dure Code should be consid-
3. Arbitration is neutral expressly refer to the right to bitration agreement or pursu- “Every interested party may tribunal generally, and more ered and applied.
In addition to the selection of agree to arbitration. It is not ant to the law (i.e. 3 months move for the nullity of the particularly cover areas in Should you have any ques-
an arbitrator(s) of appropriate sufficient to rely upon a power from the “admissibility for award of the arbitrators in the which the rules selected may tions in respect of this ar-
skill and experience, parties of attorney that authorises a arbitration” of the arbitrators) following cases: be silent, for example costs ticle or legal issues gener-
are able to choose important person to settle all disputes or the court is able to intervene 1. If it was issued without an and interest. The deed of ally, please contact Laura
elements such as the appli- consent to court proceedings. to extend the period for ren- arbitration deed, or pursuant arbitration must be filed with Warren of Clyde & Co LLP at
cable law, language or seat of Stay of court proceedings dering the arbitration award, to a null document or extin- the award on the ratification laura.warren@clydeco.com.
arbitration. This allows them Article 192 states: settle the dispute or appoint guished by prescription, or if application before the court. qa Laura Warren is a Senior
to ensure that no party enjoys “The condition of arbitration another arbitral tribunal. the award went beyond the Further, a number of court de- Construction lawyer at the In-
a home advantage. is that the litigants waive their Please note the wording of limits of the document, or cisions in the GCC (which are ternational Law firm,Clyde &
4. Arbitration is confidential rights to have recourse to the Article 198 i.e.”Their award contravened a rule of public not binding in Qatar but may Co LLP,in Doha. Laura has a
Most institutional rules spe- court having initially the com- shall be pursuant to the rules order or good manners. be persuasive) have seeming- wide ranging contentious and
cifically protect the confidenti- petent jurisdiction to examine of the law unless if they were 2. If the third, fourth or fifth ly put form over substance in non contentious construction
ality of the existence of the ar- the dispute. delegated by conciliation, pro- paragraph of article (190) or nullifying awards at the ratifi- practice involving projects in
bitration, and any disclosures If a dispute had arisen in re- vided that they will not contra- the first paragraph of article cation stage. These have in- Qatar as well as in the UAE,
made during that procedure spect of the execution of a vene the rules of the public (193) were contravened” [Ar- cluded decisions nullifying an Oman, Bahrain, Libya, Egypt
and the award. contact that included the con- order and the good manners” ticle (190) is stated above and award on the basis a witness and Tunisia
5. The decision of the arbitral dition of arbitration, and one is akin to the General Prin- article 193(1)) states that the was not properly sworn, and Laura is Co-ordinator for the
tribunal is final of its parties had brought an ciple enunciated under Law arbitrator shall not be under in a more recent decision, on Society of Construction Law
Valid awards issued by an ar- action before the competent No (22) of 2004 (the “Civil age or convicted of a crime or the basis that the arbitrators (Gulf) in Qatar.
Local News 3

Interior design market sustains growth in Qatar


With 41 new hotels planned for Qatar alone, the sustained pace of development in the region is surpassing other parts of
the world.

D
espite the rumblings website, this makes the Middle tell them even before we sign delayed we can take the stuff save values in our design. are very conservative now.
of the global credit East interiors market almost the contract”, she said. and send them elsewhere”. Sometimes, we have to find a “Before they could have many
crunch, the Middle on a par with well-established Hossein Vetry, General Man- Karen stressed that when the way to keep the quality of de- design variations, with some
East continues to wit- markets such as the EU, the US ager, Sharq Village and Spa, times are tough, only the best sign between us and the cli- variations even doubling the
ness steady growth: this was and Japan. agreed with Karen Hay on the will survive through innovative ent”. cost. Now they are really look-
the view of designers attend- Concepts Middle East 2010 importance of the team spirit. ideas. “Budget constraints are always ing at what they can afford to
ing the Concepts Middle East is the region’s leading interior “When we want to achieve we Vetry explained that when there, but there are several do,” he said.
2010 conference which was design congress designed for stimulate our people. When we faced by budget constraints factors that affect the client’s Vetry described the market
held at Doha’s La Cigale Hotel time-restricted design profes- work on big projects we always designers have to be very hon- budget like aesthetics, ma- status now as “back to reality”
in Doha in February. sionals to network, establish give positive incentives to our est in analyzing the cost rather terials, etc. we have to try to situation. “Before you could
A large number of commercial new contacts, debate the fu- team,” he added. than giving in to what the cli- help the client walk through not find a contractor because
and residential buildings, ho- ture of the sector and most Responding to a question ent needs. “We should be the feasibility of the project,” your project is not big enough.
tels, retail outlets and mixed- importantly - conduct busi- about how to advise your cli- very honest in showing him the Abusukheila said. So budget constraints may not
use developments will reach ness. The congress features ents to approach the market to- consequences of his decision. On the other hand, Karen said be a bad thing at the end,” he
completion this year, they strategic, business-focused day when there is a slowdown, We have to be very careful in that even in good times, there said.
pointed out. With 41 new ho- face-to-face meetings, panel Tareq Abusukheila, General selecting the methodology and is never enough money. “In The conference speakers ex-
plored challenges designers
face when working on public
places like hotels and how to
strike a balance between aes-
thetics and practicalities.
Vetry pointed out that if the
company takes pride in what it
does, its role doesn’t end with
handing over the key. It is im-
portant that operators are in-
volved from the very beginning
of the design, like involving
chefs in restaurants projects.
This makes the product a us-
able one at the end.
Younis expressed his feeling
that the optimization starts
from the construction stage
before the interior designer’s
role does.
Choosing the right materials
was another topic discussed at
the conference.
“When you deal with a local
market, you have to acknowl-
edge what does the market
has to offer for you,” Rebeiz
pointed out.
Karen agreed with Rebeiz that
it depends on the market.
“Some markets have very lim-
ited resources. You have to be
realistic on your choice about
using local products,” she
added.
Is going cheaper a solution?
Vetry said that you can get
something better and cheaper,
but the reputation and relation-
ship you have with your vendor
affects your choice.
Karen noted that interior de-
sign market is becoming a no-
tels planned for Qatar alone, discussions, case studies and Manager, AIA, Gensler EMEA, the material,” he said. this region most projects were brand market. “We can still get
the sustained pace of develop- presentations as well as five- said: “In our industry the client Karen saw the solution in look- overpriced. Now it is taking a good quality products now but
ment in the region is surpass- star networking opportunities. and consultant is one team, ing for more local products. more realistic view of things. It not of a known brand. Some
ing other parts of the world. The impact of the global eco- we are not contractors. When “Anything that you wouldn’t is becoming more normal.” project managers think that
The conference website men- nomic crisis on the design you have cost cutting, it affects have to use the most expen- Naheed Younis, Commercial China is the solution. I think
tions that the spending on industry and the efficiency in fees, but we feel we have to sive products in, you shouldn’t, Manager, Innovative Business it is better to try to maintain
interior projects in all six GCC delivering projects on time was negotiate more with clients.” but you cannot compromise Solutions (Mapie’s UAE sub- the quality even if not through
countries is estimated at $47.1 discussed at the first day of the He added: “In public projects, with the items that give the im- sidiary), responded to Karen’s brands,” she said.
billion for 2009. This is ex- conference. there are feasibility studies pact,” she said. statement, saying that: “Over- Younis expressed his concern
pected to touch $56.9 billion Karen Hay, Director, Stickman and re-measures. That’s why Abusukheila suggested that budgeting is not new. It is even that this might lead to some
in 2010. Furthermore, official Tribe, pointed out that when her sometimes we have to sit and the designer should sit next to seen in construction, in usage designers being dragged by
figures show that imports of company talks to new clients it talk and redesign.” the client and try to find solu- of steel and concrete. Yes to the client to a cheaper solu-
furniture and interior products doesn’t wait until the end be- On the other hand, Aziz Rebeiz, tions together, whether with budgeting and value engineer- tion. “We have to be very care-
to the Gulf region have been fore telling its team, to comply Founder, Rebeiz & Associates restaging or other issues. ing, but we have to think what ful in being cheap or optimizing
rising significantly. According with timely delivery of projects. Interiors, said that in situations Rebeiz stressed that when it will mean for the project.” the product we are choosing,”
to Concepts Middle East 2010 “To keep motivation alive we like these, “when a project is times are hard “we have to Abusukheila noted that clients he said.
4 Interview

Rumaillah Motors enhances its firm foothold


in Qatari market
“The need to use space efficiently and economically has never been greater”

A
s one of the oldest Companies, Storax Mobile Stor- use space efficiently and eco- and feel that this will continue.
companies in Qatar, Ru- age Systems and Constructor nomically has never been great- Many industries remain buoyant
maillah Motors uses its Group of Companies in relation er. Therefore we strive to ensure and the key to winning business
expertise to help cus- to storage solutions, along with our customers have the best and in these areas is maintaining a
tomers make the optimal choice Crown Equipment Corporation, most up to date products avail- consistently high level of service.
for storage systems and heavy Doosan Infracore and Mast Ex- able should they require them. We will continue to work in part-
equipment. The company is com- plorer in terms of materials han- What are your thoughts on nership with our customers with
mitted to its goal of supporting dling equipment. Agreements are the economic recession, es- the aim of delivering real tan-
its customers through the cur- also in place with Genie Europe pecially as it relates to your gible results in both productivity
rent unprecedented global eco- and Tuepen in relation to aerial market? and cost saving.
nomic turmoil. access equipment and AKSA The recession has had its effect Have you seen the rise of
Jim Elliott, Rumaillah Motors Power Generation with regards on our business as one would ex- specific trends in your sector
General Manager, believes that to the supply of power genera- pect; however our focus has been in Qatar?
the key to winning business is tion equipment. and will continue to be on sup- In terms of machinery we have
maintaining a consistently high Which sector is considered porting our customers through certainly seen a rise in the rental
level of service in which the com- the strong focal point in your the current unprecedented eco- market in Qatar. As capital ex-
pany doesn’t compromise. future growth strategy? nomic turmoil. Our goal is to work penditure remains under tight
In this interview, Elliott highlights All sectors have clear focal points with our customers, developing control, more and more organi-
the focal points for Rumaillah and play an important part in our long-term relationships and our zations are opting to rent equip- Jim Elliott: Rumaillah Motors general manager
Motors’ future growth and ex- growth strategy. However, we cur- customers appreciate this part- ment. Our response has been to
plains how the company has rently see particular growth in nership approach. work closely with the rental com- Are you the only company they have their special storage
managed to keep its pioneering the aerial access sector of our How do you see the pros- panies in terms of equipment providing such storage sys- blueprints and we have to follow
position in the Qatari market market. With this in mind we are pects of your company in supply and aftermarket support. tems in Qatar? those for them. The market has
over the years. investing heavily in this area of 2010? In the storage sector of our busi- We are not the only providers of certainly expanded a lot over the
Do you have agreements in our business. This includes the As a general manager, it is my ness, the trend has been to such systems; however, we are last few years, but we have al-
place with your suppliers for addition of qualified and facto- responsibility to assess the mar- maximize storage space. This one of the longest-serving in the ways been involved from day one
specific equipment brands? ry-trained service personnel to ket in which we operate. This has meant a growth in enquiries country. Land and rent are be- and we feel we have contributed
Rumaillah Motors has agree- ensure the highest levels of af- is a continual process and one relating to very narrow aisle stor- coming more expensive and this to a certain extent in educating
ments in place with all our princi- termarket support. Along with which I take seriously. Our focus age systems, mobile storage sys- has made people start to realize local companies on how best to
pals, whether they are exclusive this, we continue to build on the remains clear and very positive tems and bespoke installations the need to make the best use utilize space.
or distributor agreements. The already firm foothold we have in for 2010. We are witnessing an relating to specific customer re- of space. Multinational compa-
main ones being Dexion Group of the storage market. The need to encouraging start to the year quirements. nies are also coming to us and
Wide range of products to interview he also expresses his cess sectors. Materials handling very transparent as well. This ment more functional and re- tion providers having expertise in
cater for the most complex thoughts about the effect of the being a broader term, it com- means there is no hiding place liable, they also make caring Explosion Proof systems specific
applications global downturn on the equip- prises forklift trucks which in- if you are not up to the mark. for individual pieces far more to Oil and Gas sector and IPAF
Rauf Malik, Rumaillah Motors ment market. cludes both warehousing range Rumaillah Motors heavy equip- complicated. Do you have (International Powered access
Machinery Divisional Manager, How big is your range of of electric equipment and inter- ment division maintains suffi- specially-trained mechanics Federation) trained personnel
speaks about the company’s heavy equipment? nal combustion machinery for cient spare parts inventory levels and technicians for repairs for aerial access equipments.
complete range of equipment As a solution provider, our equip- outdoor applications. Also under for its entire product range. We and routine maintenance? With the current economic
that offers solutions to the most ment portfolio caters for materi- the same heading, we have tele- ensure that the stocking levels It is a challenge to commute downtrend, have you seen an
complex applications within the als handling, power generation, scopic handlers, rough terrain remain proportional to the equip- between Qatar’s three industrial increase in the ordering of
sectors we specialize in. In this port operations and aerial ac- forklifts and mobile cranes to ments added as we diversify our hubs; Mesaieed, Ras Laffan and aftermarket parts? Have you
work on construction sites. In product portfolio. the Industrial Area. However, noticed any change in order
the power generation sector we What are the problems within our customer-centric ap- patterns?Aftermarket runs in-
supply generators ranging from associated with heavy equip- proach we operate a fleet of dependent of market corrections
17kva – 2500kva to various in- ment leasing? mobile product support units, which happen over a period of
dustries within the State of Qatar. Outright sales and leasing are manned by factory-trained tech- time. The aging process applies
Port operations include supply of opposite sides of the same coin. nicians to respond to any service to machinery as it applies to liv-
container handling equipment Therefore, it is difficult to sepa- requests 24/7. All our product ing creatures. The parts require-
and mobile harbor cranes. The rate both, but yes, it certainly support units are equipped with ment is proportional to the num-
aerial access sector has grown could be reduced to acceptable advanced diagnostic tools and ber of equipments supplied and
enormously over the past few levels based on the nature of recommended spare parts to rises as machinery ages. This
years and we offer a complete the business. Leasing spreads avoid unnecessary downtime. brings along new challenges of
range of equipment to cover the the cost of the equipment over We also offer full-time and tailor- having higher spare parts inven-
applications, be it indoors or out- an agreed period of time and made maintenance contracts to tory levels, larger stocking area
doors. To summarize, we offer ensures steady returns but at suit customer applications. We and better systems in place to
solutions to the most demanding the same time, it runs the risk also have the ability to house monitor and replenish the stock
and complex applications within of delayed or non-payment. In technicians full time on cus- levels. With regard to the order
the sectors we specialize in. a way, you are linking your suc- tomer sites to provide continu- patterns, customers are opting
Do you offer parts support cess to the clients’ performance. ous backup year round. Periodic for rentals and prefer long term
for all your products? However, the exposure could be training sessions are run to up- maintenance contracts, extend-
Our policy is to constantly back controlled by better risk assess- grade the skills of our service ing the operation life of existing
up the products we offer to the ment. team to keep them updated with equipments to meet the chal-
local market. The Qatari market While advances in technol- the technological improvements. lenges posed by recent econom-
holds a lot of potential and it is ogy may make heavy equip- We are one of the very few solu- ic downtrend.
- The Best utilization of Increasingly the trend has been Do you offer turnkey de- specific needs. The depth of the racks and at the ends must be maximize the use of space and
space is our aim to design racking to meet the cli- sign and installation? analysis varies according to the sufficient, lifting height of mast our design engineers, through
Rumaillah Motors’ extensive ent’s requirements and Dexion is Rumaillah is able to offer a full complexity of the project, in par- must be adequate to reach the our principals, offer the best so-
range of storage products as well at the forefront of storage system range of service and supply, in- ticular those involving integration top beam level, collapsible mast lution.
as over 27 years of expertise in suppliers. cluding design, manufacture, and automations. We compile in- must be able to clear entrance
the field allows it to provide cus- Which storage system is delivery, installation and after formation and then analyze it to doors or first beam of bridge or
tomers with the best storage sys- the most popular in Qatar sales. The design and conceptu- determine the allocation of stor- underpass bay, etc. Specialized
tems for optimal use of space. and why? alization vary in complexity and age according to the fast, medi- MHE such as VNA trucks, dou-
Anu Sondhi, Storage Division Di- Selective racking is the most level of details between a small um and slow moving SKU’s and ble-deep trucks should undergo
visional Manager, explains how popular racking system. This project that involves racks and recommendation of processing even stricter checks to ensure
this is achieved. could be because it is the lowest shelves, compared to an inte- option via MHE and other fulfill- the compatibility is 100%.
What are the storage prod- cost option and the most flexible grated system which involves ment systems. Nothing is left to How do your storage sys-
uct types you offer? in accommodating products of ASRS cranes, conveyors, pick to chance and the result is typically tems improve utilization of
Rumaillah Motors offers a com- varying sizes which is particularly light, carousels and software. measured against the initial ob- space?
prehensive range of DEXION appealing to third-party logistics. How do you ensure you of- jective that was set and agreed Based on the requirements of
storage systems and solutions VNA is also popular as it offers fer your customers the opti- upon by all parties. the customer, our systems utilize
for industrial and commercial ap- full access to pallets and the nar- mal storage system for their How important is the space by allowing the customer
plications. Whatever the require- rower aisle allows more storage needs? choice of MHE when choos- to store at height; for instance, if
ment, we have the right indus- space for a given area compared Together with Dexion, we con- ing a storage system? his warehouse is 10m high and
trial storage system to address to selective racking. Drive-in duct a through study to ensure MHE is the most important inter- he is only using the ground to
it, be it small parts or palletized racks are widely appreciated in we understand the client’s busi- face to a storage system, there- store, we can fit a system that al-
storage, low or high SKU range, food and FMCG industry because ness models and to identify any fore it is vital that the choice lows him to store in the wasted
high or low storage density, FIFO the dense storage is suitable for problem areas prior to recom- of MHE be compatible to the space.
or LIFO product rotations, fast or low SKU count with large batch mending solutions that would storage system being offered. It all depends on the custom-
slow throughput, etc. sizes. be geared towards solving his Clearances of aisles between ers’ need but the whole aim is to
6 Local News

Barwa Negotiations
ture increase in the company’s ment said. proceedings from investments variety of real estate support
earnings,” the company state- “In addition, returns related to and sold properties, Shariah- services. To that end, Barwa
ment said. rents and services provided by compliant finance schemes combined three subsidiaries
Barwa has also begun initial subsidiaries and affiliates as and profits retained from pre- to establish Waseef Property
with
records engineering studies of Salwa
Bay Resort which will be locat-
ed in the south west of Qatar.
well as the acquisition of the
First Investor by Barwa Bank
made a robust contribution to
vious years largely contributed
to this increase.
Barwa Bank commenced op-
Management Company. Wa-
seef will be the link between
Barwa, its clients and suppli-
QP still
QR779
The net profit for 2009 in- Barwa’s net profits. The First erations during the second ers.
creased significantly because Investor’s financials have been half of 2009. In line with its ag- Barwa has also announced
of a surge in total earnings
which amounted to QR3.013
incorporated in the consoli-
dated financials of Barwa,” it
gressive strategy to penetrate
the market, it has acquired the
terms for a merger with Al
Aqaria, a deal that will lead underway
million million in 2009, a 173% in-
crease compared to the earn-
ings of QR1.102 million in
added.
Throughout 2009, Barwa con-
tinued to achieve its strategic
whole shareholding capital of
the First Investor in a move to
establish an integrated Qatar-
to the establishment of Qa-
tar’s largest listed real estate
company when concluded in
Barwa has confirmed that
it is still involved in highly

net
2008. objectives and develop its proj- based, Shariah-compliant 2010. positive negotiations with
“Profits realized through re- ects. This led to an increase banking group. The board of directors is seek-
Qatar Petroleum (QP) over
appraisal of Barwa properties in the total assets of the com- In addition, Barwa has ac- ing to follow up all work-plans
are a main driver behind the in- pany from QR24 billion in 2008 quired Quality International that would diversify the sourc- the planned sale of the

profits crease in earnings,” the state- to QR35 billion in 2009. Also, Qatar (QIQ) to create a wide es of income and enrich the Barwa Financial District to
cash flows of the company, the world’s largest lique-

B
the Barwa statement said. fied natural gas producer.
arwa Real Estate’s “This will directly contribute to Barwa positively sees these
net profit went up the funding of the company’s negotiations to achieve the
154% in 2009, future expansions and will
buoyed by an in- best interest of both par-
strengthen its capabilities to
crease in rent revenues, revalu- penetrate new markets, offer ties.
ation of properties and the ac- new real estate projects and Barwa denies that it is cur-
quisition of an investment firm, financial services to create rently involved in talks to
the company has announced. value for Barwa sharehold- sell its Barwa City project
The group’s net profit rose to ers,” it said. to a government buyer. Be-
QR779 million from QR306 The shareholders’ equity has cause construction is still
million in 2008, according to a increased to reach QR5.23
company statement. underway, there has not yet
billion compared to QR4.44
Earnings per share increased billion in 2008. As a result, been a finalized lease pric-
to QR3.06 in 2009 compared the board of directors has re- ing structure for Barwa City
to QR1.46 in 2008, an increase solved to distribute a dividend properties. The market-
of 110%. of QR2 per share, a 20% per ing strategy of Barwa City
The net profit of QR779 mil- share. is still being evaluated to
lion is reached after deducting Barwa has business interests accommodate the current
amounts related to the Sports in real estate & project de-
and Social Activities Fund. conditions though Barwa
velopment, property & facil-
Barwa expects to deliver and ity management, construction expects to launch a major
operate three major projects material production, environ- marketing campaign dur-
soon: Barwa Village, Barwa mental activities & health, ing the second half of the
Housing (Masaken & Saliyah) banking & finance, hotels & year for the lease of Barwa
and the first phase of Barwa Al resorts, technology & utility, City.
Sadd. “These projects will con- knowledge & communications
tribute significantly to any fu- and agriculture.

Kempinski Residences
Ω.Ω.P ájójó◊G &
äÉYÉæ°ü∏d áØ«∏N
SuitesKhalifa
opens in Industries
Steel April W.L.L.
The Kempinski Residences &
Suites, Doha, is scheduled to
open in April. It will be operat-
INTERTAYM GROUP Provides the
ed and managed by Kempinski Following Products & Services:
Qatar Steel
Hotels. The property is owned
by Al Fardan Hospitality, a lead-
WELDED WIRE STEEL MESH
Authorised
er in Qatar’s luxury market.
Currently, the tallest and only
GALVANIZED MESH
EPOXY COATED MESH
Distributor
square structured building in
the West Bay, the 62-floor resi- SCAFFOLDING
dence tower will have 370 fully-
furnished serviced apartments SCAFFOLDING ACCESSORIES
and suites. PLYWOOD
On the crown of the skyscraper
MARINE PLYWOOD
will be two duplex ‘Sky Vil-
las’ with six-bedrooms each, BINDING WIRE 21 GAUGE G.1.
sprawled across 930 square SCAFFOLDING BOARDS-
meters of total ambience. PREMIUM QUALITY
The project will feature two in- FORM WORK SYSTEM
door swimming pools for adults offer enhanced day care ser- tors for accommodation, said
and families, a large gym with vices, residents at the Kempin- Rabih Elzyr, director (Sales) at
state-of-the-art fitness equip- ski Residences & Suites, Doha, the Kempinski Residences &
ment, steam rooms, sauna, “will have access to not just Suites, Doha.
hydrotherapy bath and several great facilities but also the el- “We will be offering exclusivity
treatment rooms. evated lifestyle that goes with and service quality in tune with
The Residences will also have it”. the best that the Kempinski
ALL THE LISTED PRODUCTS ARE AVAILABLE IN
24-hour housekeeping and in- “Qatar is fast becoming, if not brand offers globally. Rather
residence catering, a board- already the premier business than be just a new destina- OUR STOCK FOR IMMEDIATE DELIVERY.
room and business centre as and cultural destination in the tion for weary travellers, what
well as various food and bever- GCC, which is demonstrated we offer is timeless elegance
age outlets. by its selection as the cultural and the Kempinski brand will
Emel Atikkan, Kempinski Resi- capital of the Arab world in definitely add great value to
dences & Suites, Doha, Gen- 2010. We feel this is the per- Qatar’s hospitality scene.”
eral Manager, said: “This prop- fect time to launch the Kemp- With history dating back to
erty will be unlike any other in inski Residences and Suites, 1897, Europe’s oldest and
Doha and we aim to deliver Doha,” he said. most established luxury hotel
an experience that is unparal- Qatar is a major inbound mar- collection has an “impressive
leled. From food ket for corporate travellers and portfolio” of properties across
Tel:and
+974beverage
4508866 / Fax: +974 4566561 Tel: +974 4553904 / +974 4553907 / Fax: +974 4566561
outlets offering a range of din- the infrastructure, education the world. The Kempinski Resi-
khalifasteel@gmail.com E-mail: intertaym.doha@gmail.com
ing and sensory experiences to and sports industry are emerg- dence & Suites, Doha joins this
P.O.Box
the Kempi Kids Club tailored to ing :32086,Doha
as key demandQatar genera- elite collection. Web : www.intertaymfze.com
Local News

structural
steelworks

* highly skilled employees from FSSME are constructing a massive ship repair yard at Ras Laffan for the maintenance and repair of tankers

engineering fabrication blasting & erection wall & roof project


painting cladding management

With over 50 years of experience and highly skilled employees we are specialized in the
engineering, fabrication, painting, erection, cladding and project management
of turn-key structural steelworks for the petrochemical and process industry.
Our large workshop near Doha is full operational.

FRIJNS Frijns Structural Steel Middle East W.L.L. a division of the Frijns Industrial Group
STRUCTURAL STEEL T1 sT2 s0/"OX$OHAsQATAR
MIDDLE EAST W.L.L. EINFO FRIJNSQATARCOMsW www. frijnsqatar.com
8 Project Focus

Project Overview : Barwa Al Baraha


Barwa says it chose to locate Al Baraha at the Industrial Area due to the fact that this locale has now become the residence of
thousands and thousands of labourers
A tradition of hospitality but also make them feel at tween Abu Samara and Doha. Barwa’s Al Baraha has gone development. the construction of the mega
Hospitality is one of the most home. Barwa’s Al Baraha proj- The truck-parking facility in even further by designing and In perspective truck parking area, driver’s
admired virtues among peo- placing a motel into the con-
ple of the Arabian region. And struction. For those who visit
when it comes to Qatar, this people at Al Baraha, accom-
peninsula, known as the heart modation will be available at
of the Arabian Gulf, the virtue this comfortable motel with a
of hospitality is naturally held capacity for 100 guests. Never
in high esteem. There is a rea- before have blue-collar work-
son for this. The ancient peo- ers been able to invite their
ple of this soil lived their lives families over for a holiday for
in a desert environment and in the lack of an appropriate ac-
ocean ports in which travelers commodation solution. But
and those of the land depend- ect is located at the Industrial the project has some unique now with Al Baraha’s motel Barwa chose to locate Al Ba- utilities, guards rooms, roads,
ed upon each other’s hospitali- Area, right next to Street 52. features. It is being built with this need too has been met. raha at the Industrial Area due fencing, street lighting and
ty in order to survive. The result The project is immense in size state-of-the-art equipment that The motel solution will also as- to the fact that this locale has landscaping. The second part
of all this is that when a Qatari and scope. ensures digital security and di- sist employers who are in the now become the residence of is the construction of buildings
extends hospitality to you, he Barwa’s Al Baraha is a place of rectional guidance. process of organizing accom- thousands and thousands of and infrastructure.
does it not only to make you, abode, featuring recreational Going the extra mile modation for newly recruited labourers. Al Baraha is a QR3 The real measure
a guest in his country, feel at
home, he also does it because
his customs and culture re-
quire it and he considers it an
honor to do so.
Serving people
Guest workers in Qatar have
become an indelible part of the
nation’s demographics. They
come from all corners of the
globe, in search of a better life
and Qataris welcome them and
extend their hospitality toward
them. While there are many lev-
els of guest workers who have
made Qatar their temporary
home, there is a particularly
crucial group of workers who
give of their best to build this
country: the labourers. And to
us at Barwa, they are our VIPs.
As one of Qatar’s most suc-
cessful companies, it is our
honor and delight to place the
best of our skills and highest of
our competencies at the ser-
vice of those who serve us! And
that is what Barwa Al Baraha is
all about. solutions for leisure. Barwa The ambient and comfortable workers. billion project being built in In a world where progress and
Warm-hearted gesture believes that it’s the least they living quarters have the capac- Among the other thoughtfully an approximate 1, 881, 235 success is measured in num-
Barwa believes in extending can do, to help those hard work- ity of housing up to 53,000 planned and considerately square meter land area. The bers, Barwa is a company that
Qatar’s hospitality to all guest ing men to rest, relax and feel persons because Barwa be- built features is administra- built area of the project stands chooses to take a different tra-
workers, across all levels of so- rejuvenated. The cricket fields, lieves they too must enjoy the tive buildings, dining halls and at 802, 700 square meters with jectory. “We measure our suc-
ciety, and Barwa Al Baraha is its tennis and basket ball courts luxury they help create for oth- restaurants, an auction area, a the rest devoted to landscap- cess in terms of the solutions
warm-hearted gesture towards court and the gym have been ers. Every possible comfort has workshop, playgrounds, cinema ing and recreational space. we have provided for people,”
the labourers of this nation. It designed and fitted with the been provided in these apart- halls, a modern medical cen- Al Baraha is a two-phased says the company.
is through their hands and the best equipment, Barwa points ments as a gesture of respect tre, petrol station, fire station construction project. The first “There is a challenging old
sweat of their brow that this out. A massive truck parking and consideration. Al Baraha is and maintenance workshops. phase is to cost approximately proverb that says ‘A society
fast-growing economy is riding area has been built into the to feature five mosques so that Barwa has also invested in QR500 million and the second is only as good as how well it
an unprecedented wave of suc- project and will accommodate the faithful can grow in their lush and impressive landscap- phase QR2,200 million. Part treats the least of its constitu-
cess, believes Barwa. It is their a total of 4, 200 trucks of vari- spiritual life as well. For provi- ing to top off the finely-finished one of the project will feature ents’. And we at Barwa whole-
energy that helps fuel part of ous sizes. This feature is to es- sions and for all the comforts heartedly agree.
Qatar’s developments, their ex- pecially serve the long-distance of everyday life a supermarket Barwa Al Baraha is our gift to
pertise that is behind the rising truck drivers who commute be- has been built into the project. those who labour on behalf of
constructions. This is the hard- us all.”
hatted and thick-gloved blue Working in Partnership
collar worker who, in fairness, Barwa Al Baraha is a limited
is underappreciated. But Bar- liability company (LLC) and is
wa salutes the men in blue. in partnership with others who
Project at glance are likeminded in their commit-
Barwa’s vision for those whose ment: Qatar Aviation Company
labour glues this economy to- (17%), Makhazen Company
gether is to construct living (17%), QRI (17%), undisclosed
quarters for them that cannot investors (17%) and Barwa
just make them comfortable Real Estate (32%).
Construction News

Your
Freight Management
Partner

GEODIS WILSON | INDUSTRIAL PROJECTS

‘Tailored expertise for


competitive solutions’
Demands on the industrial infrastructure have never been Geodis Wilson understands that your project forwarding
so great. requirements are unique. That is why we do not just provide
“off-the-rack” solutions as if every move was generic.
Businesses like yours are increasingly faced with complex
offshore and onshore environments and a vast array of We partner with you to develop and manage customized,
challenging local requirements and regulations. Every cost effective solutions across the entire life-cycle of your
project seems to come with its own set of intricacies. supply chain. Our teams have the technical expertise, local
knowledge and the drive needed to get things done.

For more information please contact


Geodis Wilson Qatar L.L.C. – Tel +974 4666290 – mail: info-doha@qa.geodiswilson.com

www. geodiswilson.com Geodis Wilson, your freight management partner


10 Local News

Qatari Diar, Binladin Group


in joint venture agreement
Qatari Diar Real Estate Invest- as a nation are truly inspiring, and industrial sectors in Qatar.
ment Company and the Saudi and we are eager to be part of The impressive quality of these
Binladin Group Company (SBG) the country’s further develop- agreements is reflective of
have signed a shareholders’ ment.” TFI’s continued dedication to
agreement to establish the QD Under the QD-SBG name, Qa- providing high-quality financial
SBG Group. This agreement, tari Diar and SBG later signed services compliant with Sharia
signed at a ceremony held in two additional shareholders’ Islamic Law.”
the Ritz Carlton Hotel in Doha, agreements with Barwa Real The Jeddah-based Saudi Binla-
marks the Saudi Binladin Estate Company and The First din Group is a leading multina-
Group’s first business venture Investor Company (TFI) to es- tional construction conglomer-
in the State of Qatar. tablish the two specialized ate and holding company with
The QD SBG Group, a joint ven- construction and industrial representation throughout the
ture with an equal partnership services companies. Kingdom of Saudi Arabia, and
between Qatari Diar and SBG, Barwa Chief Executive Officer in a number of capital cities
will establish two special-pur- Yousif Rashid Al Khater and TFI throughout the Middle East
pose companies in Qatar: one board member Mohamed Ab- and Gulf region.
specializing in construction dul Aziz Al Saad, also the dep- The First Investor, regulated by
and the other in industrial ser- uty CEO of Barwa, represented Qatar Central Bank, is the larg-
vices. their respective companies at est closed shareholding Qatari
Qatari Diar’s CEO and Manag- the signing ceremony of the investment banking firm in Qa-
ing Director Ghanim bin Saad construction service company. tar.
al-Saad said it was an honor to Qatari Diar, SBG, Barwa, TFI, Barwa was established in
be partnering with the Saudi and QD-SBG were joined by the 2005 and listed on the Qatar
Binladin Group, the interna- Construction Products Interna- Exchange in 2006 and is one
tionally-renowned construction tional Company (CPC) in sign- of the premier organizations in
conglomerate, in Qatar. ing a shareholder’s agreement the state.
He said: “We are excited that to establish an industrial com- CPC is a member of the Saudi
SBG will enter Qatar and be pany that will supply construc- Binladin Group, and considered
part of its growth. (The) agree- tion and building materials in the extended industrial arm of
ment promises a long-lasting Qatar. SBG. The company’s mission is
and fruitful relationship be- Barwa is partly owned by Qa- to provide the highest standard
tween our two companies, tari Diar, whereas First Inves- in the field of contracting and
and I look forward to working tor Company (TFI), is a wholly- construction throughout the
closely with our Saudi partners owned Islamic investment Middle East.
for years to come.” banking arm of Barwa Bank. Launched in 2005, Qatari Diar
Sheikh Mohammed Moham- Mohamed Al Saad said: “As is wholly-owned by the Qatar
med Binladin, representing one of the leading Qatari-based Investment Authority and cur-
the Saudi Binladin Group, said: investment banking firms, TFI rently has more than 35 real
“We are very excited to have is proud to help spearhead estate development projects in
the opportunity to work in the this important initiative that more than 20 countries around
State of Qatar with Qatari Diar. will provide exciting new op- the world.
Qatar’s vision and ambition portunities for the construction
12 Local News

Sanitaryware, bathroom furniture, bathtubs, shower trays, wellness products and accessories: Duravit has everything you need to make life in the bathroom a little more beautiful.
More Info at United Supplies Co. W.L.L, Salwa Road, P.O.Box: 23353, Doha - Qatar, Tel: 4685164 - 4685277, Fax: 4685395, usc_qatar@qatar.net.qa, www.duravit.com

Lecture on maintenance of
DME_QatarConstr_VF_14_267x193mm.indd 1 25.03.2010 15:06:41 Uhr

petrochemical facilities
Qatar Society Engineers (QSE) tions, he told the gathering,
has organized a lecture, “The illustrating the lecture with ex-
maintenance of petrochemical amples and incidents gained
facilities”, at the Diplomatic from his personal experience.
Club as part of its regular ac- For his part, Engineer Abdul
tivities. Engineer Ibrahim Al Su- Rahman Jolo said that Qatar
laiti, an expert in the field of oil Society of Engineers would
and gas, delivered the lecture continue to provide support
which was attended by a large to the country’s engineers by
number of professionals and holding such lectures given by
officials. experienced engineers who
Al Sulaiti pointed out that the are highly qualified in their
maintenance of petrochemi- specialized fields. He said Al
cal facilities requires highly- Sulaiti is an expert in the field
efficient management skills. of oil and gas.The lecture was
Senior engineers working in followed by a session of open
such facilities must have both discussion during which Al Su-
technical and administrative laiti answered questions from
proficiency. It is important that the audience. After the ses-
work at the plants is not halted sion, Qatar Soci
even in the event of any emer- ety of Engineers, in the pres-
gency circumstances. Team ence of Al Jolo, honored Al
work is essential for tackling Sulaiti for accepting the invi-
such situations. tation and for his exceptional
Management expertise ac- work in the field of oil and gas
quired by the engineer stands for the last 25 years.
in good stead in such situa-
Local News

Build on formwork expertise

Load-bearing
03/2010 en

19th – 25th April / Munich

Come and see us:


Open-Air Area North F8,

tower Staxo 40
Stand N811

The economical shoring system


for building construction

Safe.
Fast.
Efficient.
o highly cost-effective with
optimised load-bearing capability
o ergonomic frame geometry for
easy handling and fast working
o safe erection and dismantling with
working platforms at any level

Doka Qatar WLL


P.O. Box 23439
Doha – Qatar
Tel. +974 (0) 450 06 28
Fax +974 (0) 450 06 08
E-Mail: Qatar@doka.com
www.doka.com

DOA_Inserat_Staxo40_267x390_middleEast.indd 1 17.03.2010 19:59:18 Uhr


14 Local News

Qatar Steel continues its expansion


Qatar Steel Company, which is part of Industries Qatar Group, has achieved good financial results despite the global
financial crisis
Qatar Steel occupies a promi- Demand for steel exceeded 1
nent leadership position in million tons in the local market
industry since its foundation in 2009. Estimated produc-
in 1974 as the first integrated tion of Qatar rebar steel in lo-
factory for iron and steel in the cal factories is 1,400 million
GCC region. Out of its commit- tons per year in addition to the
ment to meet the growing need production of 700,000 tons of
for iron and steel in Qatar and iron blocks, which are all sold
the region in general, Qatar in the form of raw materials to
Steel has taken a series of neighboring and global mar-
initiatives aimed at increasing kets.
production capacity. The com- Qatar Steel has also entered
pany, based in Mesaieed, 45 into a partnership in a factory
kilometers south of Doha, has for the production of ore iron
been witnessing continuous in Bahrain.
redevelopment since its start. It has carried out a number of
It operates a subsidiary com- studies to increase the produc-
pany, at the free zone in the tion of ore iron as it has com-
United Arab Emirates pleted the establishment of a
Its Mesaieed factory covers an new factory at a cost of $400
area of 707,000 square me- million that began operation in
ters, in addition to 375,000 January 2010.
square meters dedicated to Qatar Steel will form a part-
future expansion. nership with a large share in
Qatar Steel Company, which is another company in Bahrain,
part of Industries Qatar Group, which is the factory of Bahrain
has achieved good financial re- Stainless Steel.
sults despite the global finan- The company also develops
cial crisis. and establishes internal proj-
The company moves forward in ects in Mesaieed.
production line expansion as a Sales of iron has been good of this year, especially in light and demand, but the policy for raw materials from global previously bought raw materi-
new factory has recently been during 2009 but the profit of inconsistencies of analysts that the company follows with manufacturers, particularly in als paying high rates. This had
added to the company in the margin was low because of and experts on the status of high guidance to fix steel pric- Brazil, to raise prices. an impact on the profit margin
Jebel Ali free zone in the UAE competition and lower prices the global economy. However, es during the boom period was Qatar Steel has achieved big of the company. However, the
for the production of rebar iron. in addition to large stocks the company was not largely wise and helped create a bal- sales despite the global finan- government has paid an allow-
It started production during stored by the company that affected by the global financial ance in the local market and cial crisis, but its profit margin ance to fix steel prices of the
last summer with the capacity were manufactured with high- crisis, thanks to its prudent the continuation of develop- was low as a result of compe- company. It has been paid in
of 300,000 tons per year. At er cost previously. economic policy. ment projects in a rapid way. tition from Turkish, Ukrainian full and will be included in the
the same it has been expand- For the year 2010, Qatar Steel The global economic crisis that It is expected in 2010 that the and Chinese companies. profits of the company.
ing its old factory in Jebel Ali, principals took notice that it began in 2008 and contin- prices of ore iron will rise by One must also note that while The production of the company
which produces 250,000 tons was difficult to have good ex- ued in 2009 led to significant 30% to 50%, especially since prices had declined during the in Qatar is currently 1,400 mil-
of wire rolls. pectations for the beginning changes in prices, production there is a serious concern crisis period, the company had lion tons. During the past year
local market demand exceed-
ed 1million and 50 tons. The
excess output was exported to
neighboring markets.
Qatar Steel purchased a fac-
tory in Jebel Ali i several years
ago for the production of wire
rolls. It also expanded its prod-
uct lines, in addition to the es-
tablishment of a new factory in
the same area in Jebel Ali. In
this way, it has now two facto-
ries there and their production
reaches 300,000 tons of rein-
forced steel per year.
The second factory for wire rolls
produces 250,000 tons. The
total production of the compa-
ny’s factories in the Emirates
currently touches 550,000
tons per year. This is addition
to 1,400 million tons of rein-
forced steel a year, produced
by the company in Qatar.
Investment in the latest project
of the company has reached
$600 million. Also, its invest-
ments in Bahrain amounted
$200 million, and in the United
Arab Emirates Dh150 million
($40 million).

4HELEADINGCONSTRUCTIVESUPPORTERFORTHEDEVELOPMENTOF1ATAR
Local News

WORLD PIONEERS
IN STEEL BUILDING
INDUSTRY

Low-rise buildings for all applications: industrial, commercial, and institutional


… ranging from warehousing to power plants, multi storey shopping complexes and aircraft hangars.

We'll apply our vast engineering resources, manufacturing capabilities, along with
the international experience of our certified builders and sales network, to provide a
total solution for your building needs.

w w w. z a m i l s t e e l . c o m
PROJECT
QATAR
TIME IS TICKING !!!
2010 SECURE YOUR 2010 AND BOOK NOW

12 -15 April
Doha Exhibition Centre
THE 7TH INTERNATIONAL TRADE EXHIBITION
FOR CONSTRUCTION TECHNOLOGY, BUILDING
MATERIALS, EQUIPMENT & ENVIRONMENTAL
TECHNOLOGY FOR QATAR

Integrity Sponsor: Diamond Sponsor: Gold Sponsor:


Organized By:
PROJECT QATAR 2010

FLOORPLAN 2010

COUNTDOWN TO THE N0. 1


In order to book your space please contact us Tel: 4329900 / 5517971,
E-mail: michel.gebrael@ifpqatar.com Website: www.projectqatar.com
18 Construction News

Centrica
C
entrica, through supplies. attributable to Centrica’s 1(a) and 1(b) comprise a emption from existing field
its subsidiary Cen- This portfolio of gas assets 17.3% stake. This will pro- 90% and 80% operated in- partners.
trica Resources Ar- comprises a 17.3% stake vide Centrica with 60-70 terest respectively and con- Centrica Chief Executive
signs deal mada, has signed
an agreement with Suncor
in the North Coast Marine
Area (NCMA-1) gas produc-
million standard cubic feet
per day (mmscfd) of gas
tain significant contingent
gas resources, with recover-
Sam Laidlaw said: “This is
a significant move into one
Energy, under which Cen- tion area and equity inter- production in 2010. able resources attributable of the world’s most estab-
to acquire trica will acquire Suncor’s
Trinidad and Tobago portfo-
ests in three blocks; Blocks
22, 1(a) and 1(b), for future
Gas produced from NCMA-1
has been contracted to a
to Centrica’s equity stakes
estimated at 1.34 trillion
lished LNG areas providing
us with access to both gas

equity lio of gas assets for $380


million in cash. This acqui-
development.
The NCMA-1 block currently
third party on a long-term
basis until 2023, achiev-
cubic feet (tcf).
Centrica will consider op-
producing and development
blocks. Combined with last
sition provides Centrica supplies gas into the At- ing international gas prices tions for the development year’s acquisition of Ven-
interests in with its first producing Liq-
uefied Natural Gas (LNG)
lantic LNG (ALNG) facility,
and holds remaining work-
with any additional benefits
from diversion being shared
of these gas discoveries
together with appropriate
ture Production, this agree-
ment builds further on our
position and significant ing interests of 266 billion between the partners. equity partnerships. Blocks upstream capability and
gas blocks development opportunities
for future, long-term LNG
cubic feet (bcf) of proven
and probable (2P) reserves
Gas development opportu-
nities in Block 2 and Blocks
1(a) and 1(b) of just under
0.2 tcf are subject to pre-
marks a step change in our
global gas position.”

Aamal cement plant starts production


A
amal Company, one of velopment, industrial manufac- especially given the company’s
the largest industrial turing, trading and distribution, mission of delivering the finest
groups in the region managed services. quality services and products
with interests in the Aamal Cement is a state-of- in whichever section they are
fields of healthcare, real estate the-art plant equipped with involved in. Aamal Company’s
and trading and boasting 14 one of the largest block and success, we are assured, can
branches and subsidiaries, has pavement machines in Qatar be attributed to consistency
commenced operations in its supplied by German cement in standards and policies. Aa-
new cement plant in the Indus- pioneers HESS. The German mal Cement products, as the
trial Area in Doha. The opening manufactured machinery can group’s other goods and ser-
of the new plant is in line with produce different varieties of vices, will also be of the high-
Aamal’s strategy for diversifica- building and pavement blocks est quality.
tion into new high-growth rev- tailored to specific customer Aamal Cement follows all inter-
enue streams while supporting requirements. Production in- national standards for safety,
the wider industrialization of cludes curbstone, interlock production and waste man-
the Qatari economy. slabs and cement bricks. agement procedures. Aamal
Officially launched in Janu- The plant, says Aamal Cement Communication Manager Ms
ary 2009, Aamal Cement is a GM Parveez Aslam, is one of Goussous says: “The Qatari
subsidiary of Aamal Company. the largest in the Qatari mar- government is very strict when
One of the GCC’s fastest grow- ket. The expected production it comes to safety and environ-
ing diversified conglomerates, of Interlock slabs alone is 6900 mental measures. They set the
Aamal’s operations cover more m2/day. It plans to produce rules and we adhere to them.”
than 18 business sectors with strip line (used for decorative While the construction sector
market-leading positions in purposes) and thermal blocks in almost all other parts of the
property management and de- (used for insulation purposes). world has been affected by the
There are over 20 manufac- economic turmoil, (demand
turers and wholesalers of ce- for cement in the developed
ment in Qatar. Would this not world, for instance, has fallen
have adverse effects on the by 30%) the boom continues
prospective market share of in Qatar. Qatar is one of the
Aamal Cement? Not at all, it rare places where construction
seems. Qatar is growing at a projects seem to carry on and
very rapid rate and new proj- on. Several new government
ects, cities and developments projects are expected to get
are fast coming up. underway this year and this will
Aamal Cement’s exact market only mean heightened demand
share cannot be predicted at for cement. And while there
this point. However, one should are projects worth $2.5 trillion
note that with the ever-growing in the GCC as a whole, the de-
market of Qatar and with de- mand for cement is the high-
mand far exceeding supply, est in Qatar. In August 2009,
Aamal Cement’s leadership local production was only able
Parveez Aslam: Aamal Cement general manager believe they will garner a sig- Aamal Cement: state-of the-art plant to meet 50% of the demand in
nificant share of the market, the state.

-Reputed for high speed production and delivery of large quantity of quality concrete .
Equipped with five fully computerized batching plants which are largest in Qatar as far as the capacity is
concerned.
-Equipped with water chillers and 3 ice plants with a capacity of 40ton each to ensure temperature control
in hottest weather. A modern fleet of 80 transit mixers and 9 concrete pumps ensure consistent delivery
regardless of quantities involved. Specialized for high rise pumping with 6 stationary pumps which
guarantee high rise pumping up to 300-400 meters vertically.
-Lusail plant equipped with latest batching plants to cater swift delivery of RMC to Pearl Qatar,Lusail
development and West Bay projects.

Aamal Cement Industries


A SUBSIDIARY OF AAMAL CO. QSC
UÊ-«iVˆ>ˆâi`ʈ˜Ê«Àœ`ÕV̈œ˜ÊœvÊLœVŽÃÊ>˜`ʈ˜ÌiÀœVŽÊ«>ۈ˜}ÊÃ̜˜iÃ
UÊ>ÌiÃÌÊiÀ“>˜Ê«>˜ÌÊ܈̅ʅÕ}iÊ«Àœ`ÕV̈œ˜Êv>VˆˆÌÞÊ܈̅ʏ>ÌiÃÌÊÌiV…˜œœ}ÞÊ
UÊ>˜Õv>VÌÕÀˆ˜}ÊV>«>VˆÌÞʜvÊnx]äääÊVœ˜VÀiÌiÊLœVŽÊ«iÀÊ`>Þ
UÊ>˜Õv>VÌÕÀˆ˜}ÊV>«>VˆÌÞʜvÊșääÓʜvÊ«>ۈ˜}ÊÃ̜˜iÃʜvÊ>˜ÞÊ`iÈ}˜Ê«iÀÊ`>Þ
UÊ7ˆ`iÊÀ>˜}iʜvÊ«Àœ`ÕVÌÃÊ>ÃÊ«iÀÊVÕÃ̜“iÀÃÊëiVˆwV>̈œ˜

*°"°Ê œÝÊ\Ê{äÈÎÓÊÊÊÊÊÊ/iÊ\ʳ™Ç{Ê{xäÓä£ä]Ê{Èn£™xäÊÊÊÊÊÊ>ÝÊ\ʳ™Ç{Ê{x£{ÇÇnÊÊÊÊÊÊÊi“>ˆ°Êˆ˜vœJ>>“>Vi“i˜Ì°Vœ“
Construction News 19

Poraver launches premix


lightweight concrete
B
ETONVER 1500 is ethylene bag. Thus mixing using traditional machinery
based on a combi- is a cinch even for non-pro- and tools with suitable mix-
nation of quartzous fessionals: possible errors ing water and installed like
aggregate and Po- in the dosage of aggregate “ordinary” concrete. During
raver, the mineral lightweight and binder cannot happen. the mixing process the dust
aggregate. Due to its high Due to Poraver, BETONVER is formation is significantly re-
grain strength at low den- acoustic and heat insulating duced due to the already pre-
sity, a lightweight concrete is and its light weight makes moistened aggregate.
produced with a low specific it practical in handling and Depending on the water-ce-
weight of about 1500 kg/m³ storage. ment ratio, the consistency
and a compressive strength BETONVER 1500 with its div- (consistency class S4 and
of 33 N/mm². The elastic ers properties meets differ- S5) can be regulated so that
modulus of BETONVER 1500 ent design requirements and the fresh concrete can also
is 25,000 N/mm ², similar to is ideal for use as load-bear- be pumped.
that of conventional concrete ing fill with a low layer thick- BETONVER 1500 is manufac-
and impact positively on the ness in old building ceilings tured to industry standards,
planning and dimensioning crafted out of wood, iron or in compliance with the re-
of structural parts. brick-cement, in lightweight quirements of UNI EN 206-1,
The premix has already been structures, and (exposed con- so that any complaints be-
pre-dosed in a patented and crete) prefabricated parts. cause of lack of conformity
recyclable two-chamber poly- BETONVER 1500 is blended are covered.

QFMA approves Barwa, Alaqaria merger


Barwa Real Estate Company’s tions set out in the offer docu- The board of directors of Bar- depth across all real estate resents an excellent strategic
merger with Qatar Real Estate ment, each Alaqaria share in wa believes that this contribu- segments. I strongly recom- fit, bringing together two large
Investment Company (Alaqaria) exchange for 1.100 shares in tion of additional land by Qatari mend that Barwa shareholders complementary Qatari real es-
has received approval from the Barwa. This exchange ratio Diar, which has been undertak- vote in favor of what would be a tate companies that operate
Gulf Arab country’s financial values each Alaqaria share at en at the request of Barwa, will hugely beneficial development in different segments of the
regulator, the two companies QR36.30 per share based on be beneficial to the enlarged for Barwa.” Alaqaria chairman real estate industry, including
said in a statement recently. the closing share prices of Bar- Barwa group, allowing it to in- and managing director Sheikh industrial housing, residential
“Following the launch of its of- wa and Alaqaria on January 7, crease its land reserves provid- Khalid Bin Khalifa Bin Jassem communities, commercial com-
fer to acquire the share capital 2010, the trading day prior to ing significant scope for future Al-Thani said: “This combina- plexes, international mixed-
of Qatar Real Estate Invest- the announcement of the initial development. tion of our two businesses use developed communities,
ment Co. (Alaqaria) on 9 March terms of the proposed transac- Commenting on the proposed represents a very exciting a full service bank and various
2010, Barwa Real Estate Co. tion, and represents a 30.6% transaction, Chairman Ghanim opportunity for Alaqaria and businesses offering real estate
(Barwa) announced that fol- premium over Alaqaria’s clos- Bin Saad Al Saad, who is also Barwa, and in particular for support services such as proj-
lowing approval from the Qatar ing share price on January 7. the managing director of Bar- the shareholders of both com- ect management, properties
Financial Markets Authority the Qatari Diar Real Estate Invest- wa and CEO and managing panies. The offer, which repre- and facilities management and
offer document is now avail- ment Company, the largest director of Qatari Diar, said: “I sents a 30.6% premium to the utility services.
able,” the property companies shareholder in both Barwa and am delighted that the terms value of the shares on January The Barwa and Alaqaria boards Ghanim Bin Saad Al Saad: Barwa chairman
and managing director
said in a statement. Alaqaria Alaqaria, has undertaken to of our transaction have now 7, 2010, recognizes the inher- of directors believe that the
has until April 14 to accept the support the proposed transac- been agreed and approved by ent current and future value of proposed transaction is a com- to be proposed at the EGM.
terms of the merger, the state- tion. Furthermore, Qatari Diar the boards of directors of both the company. I strongly recom- pelling business combination Goldman Sachs International
ment said. has agreed to maintain a 45% Barwa and Alaqaria and we are mend that Alaqaria sharehold- which will enhance Barwa’s and The First Investor are act-
The merger will see Barwa and equity shareholding in the en- able to present this compelling ers vote in favor of this transac- position as a leading regional ing as financial advisers to
Alaqaria form a QAR11.1 billion larged Barwa group through a transaction to our sharehold- tion”. The boards of directors of real estate company with scale Barwa and J P Morgan is acting
property company. contribution of certain land in ers. Barwa and Alaqaria recognize and enhanced financial and as financial adviser to Alaqaria.
Qatari Diar, the property arm of the Lusail area. Such land is “The businesses of Barwa the importance of combining operational ability to capture a Linklaters and Hassan Al Khat-
the cash-rich state’s sovereign to be known as the Education and Alaqaria are highly com- their two businesses to form significant share of the market er Law Office are acting as legal
wealth fund, will own 45% of and Medical District. Further plementary, both geographi- a Qatari real estate company in Qatar and growth opportuni- advisers to Barwa, and White
the newly formed developer. details of this transaction will cally and operationally, and the with operations across the ties internationally. & Case and Badri and Salim El
Barwa is offering to acquire, be included in the offer docu- transaction will create a com- entire real estate value chain. *Attend the Barwa EGM and Meouchi Law Firm are acting
subject to the terms and condi- ment. pany with significant scale and The proposed transaction rep- vote in favour of the resolutions as legal advisers to Alaqaria.
Qatar Construction Sites.pdf 12/29/09 1:07:30� �PM

20 Local News

Qatar Intercare setting fresh standards


in entrance matting system
Since its establishment 11 years inside the building. subject to heavy use, Geggus
ago, Qatar Intercare Technical Geggus EMS is the right choice EMS entrance matting system
Services has gained an enviable to address these consider- benefits from a regular cleaning
reputation for the quality of its ations. It has been carefully de- regime. The foot-borne dirt will
routine cleaning & maintenance veloped to not only be an effec- have fallen between the trends
products, wash room & kitchen tive dirt barrier by removing dirt, into the well. How much dirt
hygiene systems, floor restora- grit and moisture before it has collects obviously dictates the
tion services, window films ap- a chance to effect interior floor frequency of cleaning. In most
plications and entrance matting finishes, but also to compliment locations, however, we would
systems. the most stylish entranceways recommend cleaning once a
Qatar Intercare Technical Ser- – both outside and inside a week.
vices is once again setting new doorway. It is important to ensure that
standards of entrance matting Gegggus EMS has been con- dirt does not become lodged
systems by joining hands with structed in such a way that it under the aluminum sections
Geggus EMS from Germany. can be easily kept clean and as this would stop the mat from
They are designed for a wide have sections replaced where lying flat in the well.
variety of applications to com- that mat surface becomes Under normal circumstances
pliment interior and exterior damaged. the mat can be cleaned using
styling. Geggus EMS also gives you a vacuum cleaner but in areas
Why entrance matting sys- the choice of a wide range of of particularly heavy usage it
tem? designs, colors and finishes to is recommended that the mat-
Foot-borne dirt carried inside compliment today’s finest build- ting receives a regular clean
buildings can be abrasive to ings and can be offered in virtu- using a high-pressure cleaner.
sensitive finishes like marble, ally any shape to precisely suit To do this it will be necessary
timber or laminates. Many sur- any entranceway. to remove the mat to a suitable
faces will be made slippery by Cleaning and maintenance location and stand vertically for
moisture introduced on visitor’s Like any other floor covering cleaning.
feet which can compromise In a very short span of
safety. Increased wear on time, Qatar Intercare has
carpets and other types successfully completed the
of flooring covering can delivery and installation
occur from dirt carried on of Geggus EMS for QNB,
footwear and the impres- Al Ahli Bank, Standard
sion created by a carefully Chartered Bank, W-Hotel,
designed entrance will be Grand Hyatt Hotel, Woqod
spoiled. Petrol Station, Kempinski
An efficient entrance Hotel, Hyatt Plaza Mall and
matting system needs Mercedes Benz.
to address all these con- For more information,
siderations by removing please visit Qatar Intercare
dirt, moisture and grit in- Stall No. T-117 at Project
troduced on visitor’s feet, Qatar 2010. Email: www.
before it can be carried qatarintercare.com

QCCI holds talks with Iranian team


A
n Iranian business Ghulam Zarai, Assistant Gov- economic links between them
delegation has met ernor of Bushahar city. The would achieve further prog-
with officials of Qa- 25-member delegation includ- ress.
tar Chamber of Com- ed the head of the Chamber He stressed that the trade ex-
merce and Industry (QCCI) to of Commerce and Industry of change between the two coun-
discuss trade opportunities Bushahar city. tries has still not reached up
and ways to expand coopera- Al Kuwari pledged to support to the expected level, hoping
tion between the two coun- all efforts to promote com- that the team’s visit would of-
tries in traditional industries mercial and investment co- fer a chance “to develop more
and investment areas. operation between the two effective and realistic mecha-
The Qatari side was headed countries. nisms” to expand it further.
by Mohammed Bin Twar Al He praised the “distinguished For his part, Rasool Zarai
Kuwari, Executive Member of brotherly” relations between praised Iranian-Qatari rela-
QCCI, and the Iranian delega- Qatar and the Islamic Repub- tions, pointing out the histori-
The Iranian business delegation meeting with officials of Qatar Chamber of Commerce and Industry
tion was headed by Rasool lic of Iran and hoped that the cal links between Qatar and
the province of Bushahar. industry to promote trade re- kilometers of waterfront. its abundant natural water re-
“This creates a suitable plat- lations between the two coun- About 1,500 tons of shrimp sources, offers promising in-
form and a great motive for tries. are extracted from its beach- vestment opportunities in its
businessmen of the two coun- Zarai pointed out that the es. There are about 600,000 agriculture and livestock sec-
tries for developing bilateral Bushahar province has set up hectares of farmland that can tors. He called on Qatari busi-
trade exchange further.” five special economic zones be used for shrimp farming nessmen to visit Bushahar to
This comes in line with the with all necessary infrastruc- in the region, according to a review the opportunities it of-
determination of the govern- ture, offering great investment study. fers closely.
ments of the Islamic Republic opportunities. The Bushahar He said that Bushahar produc- The delegation also presented
of Iran and of Qatar as well port is the closest Iranian es about 150,000 of dates, investment opportunities in
as of the business leaders of port to the State of Qatar. representing 14% of the to- oil and gas industries, metals,
the two countries and of the He pointed out that the Bush- tal production of the Islamic textiles, clothing, construction
The Iranian team leader receiving a memento
chambers of commerce and ahar province overviews 700 Republic. The province, with and petrochemicals in Iran.
Local News
22 Local News

Pathbreaking formwork technology with a ‘wow!’ factor


F
rom 19th April 2010, all What messages do you aim to will be like entering another and thus genuine added value
eyes in the worldwide reach construction firms with world. We have consciously – after all, nobody forms either
construction industry this time? decided to do without one of only walls or only floor-slabs.
will once again be Our aim is to “bring alive” the the usual shows here. We shall The theme worlds allow us to
fixed on the sector’s biggest values that Doka stands for. be mobilising the emotional pitch to different target groups
tradeshow, bauma 2010. This First and foremost, this means component in a rather different directly and showcase the
keynote expo, attracting over reliability and high capability way this time, captivating relevant formwork solutions at
half a million visitors, only – and filling our customers fairgoers’ attention with an work in a true-to-life interplay
takes place once every three with enthusiasm for the Doka imaginative but applications- on complex structures. Product
years, and gives construction brand. We work alongside focused presentation of our demonstrations on the new
firms from all over the world our customers throughout products and services that will systems will also show visitors
vital guidance for their future the world, supporting them make our brand values come how easily, quickly and safely
investment decisions. This time with the full Doka service and alive in an exciting “Doka brand the Doka systems accomplish
too, Doka will be redefining the product range wherever they world”. any formwork task. Of course,
“state of the art” in formwork happen to be. Doka customers In keeping with the different the key topics of “Safety”
technology, from its very own profit from new technologies requirements applying to and “Fair-faced concrete” will
expo pavilion. Johann Strunz, that make it easier for them different types of construction also be visualised in the expo
the Doka Group Executive to form cast-in-place concrete. project, we have created pavilion. In addition, this time
Manager responsible for And there is no challenge that four theme worlds so as to we also want to make a splash
Johann Strunz: Doka Group executive manager
Sales, Marketing & Product we will shun, no matter how engage each visitor in his or in the increasingly important
Management, spoke about great. As we are continually her “own world”. The specific component business, with a developed a whole bundle of “theme worlds”, we are going
the forthcoming expo proving on highly demanding requirements of the civil specially designed “Component dependable and highly efficient to differentiate ourselves very
presentation. projects, such as the Burj engineering segment will corner”. formwork solutions. clearly from our competitors
Mr. Strunz, just how important Khalifa, where our recent be addressed by the theme What construction-sector In the building-construction and bring our brand values very
is bauma for Doka? pioneering achievement set worlds “Mobility” and “Facility”. trends is Doka looking to with segment, too, where the trends much alive at bauma 2010.
Our presence at bauma is a new formwork-engineering While “Mobility” includes its innovations? are currently very different Our explicit and overriding
more important for the Doka world record. Never before all formwork solutions for Doka’s roots lie in civil from one geographical region objective is to get and keep
Group this time than ever had a climbing formwork been infrastructural building-works engineering, so it’s not to the next, the construction “top of mind awareness”. Put
before. Due to the tough in action for such a long time such as bridges and tunnels, surprising that we are such downturn has further very simply, what this means is
economic situation throughout and worked its way up to such “Facility” is all about efficient “pathbreakers” in this segment ratcheted up the pressure that after our visitors go home
the world, construction firms dizzying heights. The standard forming of power installations and that we were among the to perform. Construction from the fair, the name they
are increasingly having to we set ourselves is to surpass and industrial buildings. Doka first to note the increased firms are being expected to will remember as the Number
rationalise and economise. our customers’ expectations will be exhibiting its building- trend towards infrastructure be more effective and more 1 in formwork technology will
This is a great opportunity for day in, day out, and to be construction offerings in the construction. With innovations efficient. Just the demands, be ours – Doka. For our many
Doka. Because nowadays, pathbreakers – in every way! theme worlds “Business” and like the Forming wagon TU, then, that innovations of ours regular customers, we want
the sense and “bottom- What shape does this year’s “Living”. “Business” will give a which runs on the underside of like Dokadek, Staxo 40 and to prove to them yet again
line” cost effectiveness of expo concept take? complete overview of our high- bridges, the Cantilever forming Monotec help to solve. They that their decision to work
every investment are being A conspicuous one that no-one performing solutions for offices traveller with integrated show how with Doka formwork with Doka continues to be the
scrutinised and weighed up can possibly miss! The rigorous and high-rises. In the “Living” formwork, the super-strong technology, construction right one. And for all potential
more critically than ever. architectural conception of zone, we shall be spotlighting timber-beam formworks FF100 companies can rise to today’s new customers, our aim is to
Innovative companies like the Doka expo pavilion as an formwork technology for tec and Top 100 tec, as well heightened demands. give them a clear signal that
Doka that exploit every scope outsize yellow cube makes residential construction. as with our own wind-turbine What are your personal without Doka, they’re missing
for rationalisation, no matter it a landmark that is visible We are quite sure that our formwork, Doka anticipated the expectations of bauma? out on the very best!
how small, are benefiting from from far away. For the visitor, exhibition concept gives trend triggered by government With our new and very distinct Thank you for sharing your
this trend. stepping inside our pavilion fairgoers an ideal overview, stimulus packages and expo concept, based on Doka thoughts with us, Mr Strunz!

Ω.Ω.P ájójó◊G äÉYÉæ°ü∏d áØ«∏N Road project in New Azghoui


Khalifa Steel Industries W.L.L. complete
Qatar’s Public Works Authority
Ashghal has completed a road INTERTAYM GROUP Provides the
project in New Azghoui that will
Following Products & Services:
Qatar Steel
serve the flow of traffic from
Bani Hajar and Nasiriyah to WELDED WIRE STEEL MESH
Authorised
Azghoui and to the North Road.
The QR170 million project in-
GALVANIZED MESH
cludes construction of an 8-ki- EPOXY COATED MESH
Distributor lometer long dual carriageway,
separated by a median island,
SCAFFOLDING
as well as service roads. Rain SCAFFOLDING ACCESSORIES
water drainage and sewage
works, installation of water,
PLYWOOD
electricity,MARINE PLYWOOD
and telephone lines,
BINDING
street lighting, pavedWIRE 21 GAUGE G.1.
sidewalks,
asphalt and traffic signs form
SCAFFOLDING BOARDS-
part of thePREMIUM
construction.
QUALITY
The project is part of a plan be-
FORM WORK
ing implemented by the SYSTEM
Public
Works Authority to establish a
new network of roads in Doha
and remote areas. They cover
renovation and replacement of
all infrastructure facilities. consists of residential units stances.
Earthworks for highways for and supporting facilities. It is Ashghal has signed a contract
Barwa City is one of the infra- expected ALL THE 25,000
to house LISTEDpeo-
PRODUCTS
with AlARE AVAILABLE
Jaber IN
and Almakhloof
OUR STOCK FOR IMMEDIATE DELIVERY.
structure projects in the roads ple. The second phase consists Contracting Company for the
sector which has been signed of a smaller number of residen- implementation of the work to
by Ashghal. The contractor of tial units expected to house improve the roads in Central
the QR63 million project is Mar- 10,000 people. Rayyan second stage.
bo Contracting. In order to facilitate the imple- Construction includes roads,
Barwa City, a major new resi- mentation of assistance servic- parking lots, side streets, inter-
dential area, covers 2.68 mil- es, external roads of Barwa City sections in the area “35”, which
lion square meters. The “city” will be constructed to a higher is part of Al-Rayyan Municipali-
is located in the southern area standard. ty, and infrastructure works like
of Doha between the road of Al Work involves cleaning the site clearing the site of debris and
Tel: +974 4508866 / Fax: +974 4566561 Muntaza toTel:the +974
north and the and removing
4553904
all debris and waste materials and building of
/ +974 4553907 / Fax: +974 4566561
proposed east-west road to the waste materials, dumping them earthen pits for the disposal of
khalifasteel@gmail.com E-mail: intertaym.doha@gmail.com
south. in approved areas or in a treat- surface water.
P.O.Box :32086,Doha Qatar Web : www.intertaymfze.com
The first phase of Barwa City ment plant for hazardous sub-
24 Local News

Lead Sponsors: Gold Sponsor & Coffee Sponsor:


Team
discounts
are available. Valbruna
Please call Stainless Steel
+971 4 3642975
for more
details 

Lunch Sponsors
The region’s premier conference dedicated to designing, building Gold Sponsor:
Day One & Associate Sponsors:

and maintaining next generation bridges comes to Qatar


Executive-level Conference: 12-13 April 2010
ECO
Interactive Workshops: 11 & 14 April 2010
The Ritz-Carlton, Doha, Qatar Silver Sponsor: Lunch Sponsor – Day Two:

Associate Sponsors:

S T E E L D M C C

Courtesy of Qatar-Bahrain Causeway Foundation

Outstanding contributions from key experts including: Essential case studies on:
Exhibitors:
His Excellency Dr. Eng. Habib Zein Alabideen, Deputy Minister NORTH MANAMA CAUSEWAY, BAHRAIN
MINISTRY OF MUNICIPAL AND RURAL AFFAIRS,
KINGDOM OF SAUDI ARABIA ABU DHABI DEPARTMENT OF TRANSPORT’S VISION
FOR BRIDGE PROJECTS, UAE
Ahmed Elmetwally, Senior Bridges Engineer /
Project Manager Special Projects / Roads Directorate, SHEIKH RASHID BIN SAEED CROSSING, DUBAI
MINISTRY OF WORKS, BAHRAIN
SHEIKH ZAYED BRIDGE, ABU DHABI
Parviz Djahani, Highways Infrastructure Consultant
ABU DHABI DEPARTMENT OF TRANSPORT, UAE SUBIYA CAUSEWAY, KUWAIT
Dr. Walid Damaj, Internal Roads and Infrastructure Division, DUBAI METRO VIADUCTS, UAE
AL AIN MUNICIPALITY, UAE
BRIDGE MAINTENANCE STRATEGIES IN AL AIN
Nidal Odeh, Regional Head of Bridges and Civil Structures, MUNICIPALITY, UAE R M D
HYDER CONSULTING MIDDLE EAST KWIKFORM
MIDDLE EAST
ECO

P.O. Box 29410 | Abu Dhabi | UAE

+971 2 6656607 | +971 2 6652737 | info@ecooo.com | www.ecooo.com

For more information or to register


Tel: +971 4 364 2975 Fax: +971 4 363 1938 Email: enquiry@iqpc.ae
WWW.BRIDGESQATAR.COM

Estate Qatar to unveil investment directions


halfpage.indd 1 25/03/2010 09:56:01

The third edition of Estate Qa- lighting the viability of the real ulty and participants. About teractive platform bringing to- to-business platform bringing
tar 2010: Qatar Property In- estate sector and its continued 50 speakers will contribute to gether key market players and people and ideas together.
vestment Forum will be held at attractiveness for investments. the event through the differ- professionals to share their ex- Beside the many networking
the Four Seasons Hotel on May Estate Qatar 2010 brings to- ent panel sessions. The top- pertise and knowledge. sessions provided during the
5 and 6 under the patronage of gether property developers, ics highlighted will include the CEOs will debate winning strat- two-day program, the forum
HE the Prime Minister and For- financiers, investors, and con- Changing Economic Funda- egies and industry issues. facilitates formal connections
eign Minister Sheikh Hamad sultants to debate alternative mentals of Real Estate Invest- Through their personal experi- among participants. These on-
Bin Jassim Bin Jabor Al Thani. practices and strategies for ments, Funding Real Estate ence they will bring insights on site B2B meetings will connect
The forum has quickly grown a sustainable and balanced Development Projects, The where the region’s real estate participants, opening wide op-
to become Qatar’s leading real growth of real estate industry. New Dynamics of Real estate developments are heading and portunities for a variety of busi-
estate event. It is organized by Through two days of panel dis- Markets, Corporate Consolida- where future opportunities lie. ness partnerships.
World Trade Center Qatar in cussions, intensive debates, tion Strategies, Overview of The forum’s website have been Abou Daher announced that
partnership with the Ministry of and multiple networking oppor- Sub Real Estate Sectors in Qa- recently launched and updat- the success of Estate Qatar
Business and Trade. tunities participants are pro- tar: Residential, Commercial & ed. Full program is available has prompted the expansion
World Trade Center Qatar Gen- vided with a unique platform to Hospitality, Analysis of Global online: www.estateqatar.com. of the forum into other region-
eral Manager Chadi Abou Da- share their ideas, experiences, Real Estate Investments in Chadi Abou Daher: World Trade Center Qatar general
manager The forum continues to evolve al markets. A Lebanese edi-
her said the forum is held at a and build future alliances. 2010, Investing Wisely in the session which was introduced in both format and content. tion, Estate Lebanon 2010, is
very significant moment in the Year after year, the forum has Property Market, and Qatar Na- in the last edition. Held on the The third edition will mark the scheduled for June 2 and 3 of
economic history of the region reinforced its international tional Vision 2030. first day of the forum, The CEO introduction of the concept of this year in Beirut, and another
where much of the economic standing though a diversified Estate Qatar 2010 will continue Debate offers an exciting in- Business Matchmaking, which one in Algeria is planned for
fundamentals that have guid- international speakership fac- the distinguished CEO Debate offers an ultimate business- next November.
ed property investments have
changed or become obsolete.
The forum’s prime objective is
to unveil new economic trends
and identify future investments
directions.
Abou Daher said the forum,
through a renowned speaker-
ship faculty, will provide an
unparalleled perspective for
clarifying the current state of
affairs in the local and regional
File picture of senior officials during an earlier edition of Estate Qatar: Qatar Property Investment Forum
property market and for high-
Local News
26 Energy Roundup

Energy Roundup
Gulf Petroleum ‘to US Energy Dept,
the annual production capacity to 77 million tonnes by the end
of 2010 reinforcing our position as the world’s largest exporter

build $5 billion hub’ QSTP sign MoU


of LNG.” The Minister added that such projects would allow the
State of Qatar to make long-term commitments to safely and eco-
nomically supply gas to its customers in almost all parts of the
A Qatari consortium led by Gulf Petroleum has selected Port The US Department of Energy (DoE) has signed a memorandum globe including such distant markets as the United States.
Dickson in the central Malaysian state of Negri Sembilan to set of understanding (MoU) with the Qatar Science and Technology Commenting on the contract, Faisal Al Suwaidi, CEO of Qatargas,
up a $5 billion integrated oil and gas complex. Nor Azmi Abdulla, Park (QSTP) to co-develop projects of innovation and science. said: “This agreement underscores our commitment towards
the managing director of the Malaysian company incorporated “The intent of the agreement was to look into wide-ranging proj- achieving the target of 42 million tonnes of LNG production per
to undertake the project, Gulf Petroleum (M) Sendirian Berhad ects from both sides,” US Secretary of Energy Steven Chu said annum from seven LNG trains by the end of 2010. The current
(GPLM), said that construction of the complex would begin af- after delivering a lecture at the CarnegieMellon University in Qa- production level from Qatargas 1 is roughly 10 mtpa. This three-
ter the consortium had finalized talks with shareholders in May. tar. “The framework signed between DoE and QSTP (would ex- year project will ensure that this production level is maintained
“From the proposed 10 sites, we shortlisted (the northern state plore) energy efficiency, carbon capture, solar technology,” Chu, for years to come.” He added that the Qatargas 1 facilities were
of) Perak and Port Dickson, which was selected because of its a Nobel Laureate, said. According to US Ambassador to Qatar Jo- initially built to produce 6 mtpa of LNG. These facilities were up-
heritage in the oil and gas industry and because major players seph Lebaron, who accompanied the Secretary to the MoU sign- graded in 2005 through a debottlenecking project which resulted
such as Exxon Mobil, Shell and (Malaysian national oil company) ing, the issues that came up for discussion with officials in Qatar in a new capacity of 10 mtpa.
Petronas have their refineries there,” he said at a signing cere- ranged from food security and desalination to animal breeding
mony among consortium members on the project. Nor Azmi said
the complex, which would include a refinery, petrochemical plant
and plant genomics. “Qatar, along with Saudi Arabia and the
UAE, are all looking at how to diversify (their resources). Yes, they Opec holds output
quotas unchanged
and storage facilities, would be able to process about 150,000 have a lot of oil and gas but no one knows when it is going to run
barrels of oil per day. Gulf Petroleum said in a statement that the out. They have sun, and that’s a good resource,” Chu said.
complex would have the advantages of access to the main route He signaled out natural gas as a “transitional” energy as the
of oil tankers through the Straits of Melaka between the Mid- shift to renewable energies gathers momentum. “Qatar is the Opec has frozen its output ceiling at a meeting in Vienna against
dle East and East Asia. It said the complex was intended to be largest LNG producer in the world. Natural gas emits half the a backdrop of recovering oil prices and uncertainty over global
GPLM’s regional hub for its activities in the Asia-Pacific region. CO2 as coal and as well as being a cleaner burning fuel, it also economic prospects. In a statement issued after the meeting,
“GPLM has secured crude oil supply among consortium mem- has the potential of very large-scale storages,” Chu noted. the Organization of Petroleum Exporting Countries said it “de-
bers and has finalized initial agreements on products off-take cided to maintain the current oil production ceiling unchanged”.

Offshore oilfield
arrangements with several countries within Asean (Association Nevertheless, “given the uncertainty in the macroeconomic en-
of South East Asian Nations) and in the Asia-Pacific,” it said. vironment and world oil demand, the secretariat will continue to

ABB wins $2.8 million gets rig boost monitor closely developments in the months ahead,” the state-
ment said.
Opec, which is marking its 50th anniversary this year, said it

safety project in Qatar The $6 billion Field Development Plan at Qatar’s largest offshore
oilfield – Al Shaheen - has got a major boost with the success-
would review the economic situation at its next ordinary meet-
ing in Vienna on October 14. “We have to be very cautious be-
ABB, the leading power and automation technology group, has ful installation of the 15th and the last new platform and other cause what we are seeing at this time, it’s not really (economic)
signed a $2.8 million deal with leading Contractor BlackCat Engi- offshore facilities. Together with Qatar Petroleum (QP), Maersk growth,” Opec Secretary General Abdalla Salem el-Badri told
neering & Construction to design and develop a major integrated Oil Qatar is developing the oilfield. The goal is to significantly reporters at a news conference in the organization’s new head-
Safety Integrity Level 3(SIL 3) and process control solution for increase oil production capacity at Al Shaheen Field from the quarters in central Vienna.
a gas pipeline project in Dukhan. Dukhan is home to one of current 300,000 barrels per day. Maersk Oil Qatar operates “A lot of money is being thrown into the market and the growth
Qatar’s large oil fields and is located in the western part of the Al Shaheen oil field under a long-term exploration and produc- (we’re seeing at the moment) is because of the stimulus pack-
country. The Dukhan field encompasses four reservoirs, three of tion sharing (EPSA) in co-operation with QP. Maersk Oil Qatar’s ages. China is having stimulus packages, the United States, Eu-
which are oil reserves and one containing associated gas. The Field Development Plan encompasses the installation of new rope, Japan. And everyone is putting money into the economy so
production facilities located in the oil field produce over 335,000 platforms and associated facilities totaling 131,000 tonnes and they can prevent this recession.”
barrels per day. ABB will supply SIL 3 controllers for emergency the drilling of more than 160 oil production and water injection El-Badri said the main worry for Opec was how it handled “the
shutdown, process control, and fire and gas systems as well as wells, of which 131 have already been drilled. Hook-up and com- exit from those stimulus packages”.
its SIL3-compliant System 800xA for new and existing plants on missioning of the new platforms is underway and expected to be

Power generation
the field as part of an upgrade and development plan. The ABB finalized shortly, connecting facilities through 300 kilometers of
system provides a host of new automation functions and gives inter-field pipelines and about 50 kilometers of subsea cables.
The inauguration of the Al Shaheen Field Development Plan is

surges in Qatar
operators at Dukhan secured centralised access to these func-
tions. This will result in improved safety standards, less down- scheduled for the second quarter of 2010.
time for the gas transmission network, and lower operating costs The field was originally deemed unviable, due to its “tight thin”
as well. Safety integrity level (SIL) is a standard that allows cus- reservoirs, making economic development extremely difficult.
tomer to specify exactly how much protection is required for any However, Maersk Oil Qatar’s use of horizontal well technology Qatar will account for 1.69% of Middle East and Africa (MEA)
given safety function. If a safety system is rated SIL 3, it means (HWT) has enabled successful development of the field, with cur- regional power generation by 2013, Business Monitor Interna-
the solution provides the highest level of integration of safety rent production at some 300,000 barrels of oil per day. tional (BMI) has said. In its report BMI has forecast an increase
and control. in regional generation to 1,523 terawatt hours (twh) by 2013,

Qatargas contract for


representing a rise of 29.3% between 2008 and the end of the
period. Thermal power generation in 2008 is estimated by BMI
Indonesian firm to buy Qatar LNG
Technip and Chiyoda
at 1,100twh, accounting for 93.4% of the total electricity sup-
plied in the region. “Our forecast for 2013 is 1,414twh, implying
Indonesia’s state-owned gas distribution company PT Perusahaan 35.7% growth that reduces slightly the market share of thermal
Gas Negara Tbk (PGN) plans to import between 1.5 and 2 million tons generation to 92.8% -- thanks in part to environmental concerns
of liquefied natural gas (LNG) a year from Qatar. Qatargas signed an Engineering, Procurement and Construction
promoting renewables, hydroelectricity and nuclear generation,”
PGN’s vice president for gas supply, Gamal Imam Santoso, said in (EPC) contract with TCJV, a joint venture between Technip and
BMI said. Qatar’s thermal generation in 2008 was an estimated
Jakarta that the LNG to be imported from Qatar would be supplied to Chiyoda, to ensure that the production capacity of Qatargas 1 is
17twh, or 1.55% of the regional total. By 2013, the country is
two LNG floating receiving terminals to be located adjacent to North maintained well into the future. The Plateau Maintenance Proj-
expected to account for 1.82% of thermal generation. For Qatar,
Sumatra and Banten. Gamal said that PGN, the main distributor of ect (PMP) has been initiated to meet the need for increased feed
gas was the dominant fuel in 2007, accounting for 81.7% of pri-
gas in the country, was still waiting for the government’s formal ap- gas rates from offshore wells and to augment onshore plant pro-
proval to go ahead with the import plan. mary energy demand (PED), followed by oil at 18.3%.
cessing facilities in order to handle the additional volumes.
“PGN executives, along with government officials will soon go to Qatar Regional energy demand is forecast to reach 853mn tonnes of
This project will enable Qatargas 1 to maintain its current pro-
to meet the Qatari officials,” he was quoted as saying by the detik.com oil equivalent (toe) by 2013, representing 19.6% growth over
duction level of 10 million tonnes per annum (mtpa) of liquefied
website. PGN plans to build two floating LNG terminals, one off North the period since 2008. Qatar’s estimated 2008 market share
natural gas (LNG). The EPC contract with TCJV covers the design
Sumatra and another off Banten, to meet the surge in gas demand of 3.25% is set to ease to 3.13% by 2013. Qatar is now ranked
and execution of the onshore processing facilities scope of the
in the two provinces. The North Sumatra terminal will have a storage third along with Saudi Arabia and South Africa in BMI’s updated
capacity of 1.5 million tons a year while the one in Banten will have PMP. HE Abdullah Bin Hamad Al Attiyah, Deputy Prime Minister
Power Business Environment rating, thanks largely to the coun-
a storage capacity of 3 million tons a year. Gamal said the import and Minister of Energy and Industry, said: “This project is signifi-
try’s market size, low level of energy import dependency and a
plan was prepared because the company faced difficulties in getting cant for the State of Qatar as it stems from the country’s strategy
particularly low proportion of renewables use. The power sector
enough additional gas supply from Indonesian gas fields and produc- to achieve optimal utilization of the country’s natural resources.
is competitive, with good progress towards privatization.
tion facilities to meet the surging demand from local industries as well As the global LNG market continues to expand, we will continue
Qatar has the longer term potential to break away from its close
as gas-fired power stations. pursuing our current expansion plans of LNG projects to raise
rivals and challenge Egypt for second place.

Ran
ct R UP
ge (( U
ange G ))
PG
Pro
P duct
rodu

Al Malki Trading
P.O. Box 40688, Doha, Qatar
Tel.: 4372217 / 4314284 • Fax: 4372271
web: www.aac.com.qa
email: atc@almalkigroup.net
Energy Roundup 27

Energy Roundup
US energy secretary delivers lecture at Carnegie Mellon Qatar
U
S Secretary of Energy Steven Chu, PhD, visited Carn- Secretary Chu took questions from students and guests on a tar, Chu also toured Qatar Science and Technology Park (QSTP).
egie Mellon University in Qatar and delivered a lecture range of topics, including US energy policy, energy pricing and “Carnegie Mellon University has a deep interest in energy. Our
and took part in a dialogue session with an audience ways to reach a global agreement on reducing emissions. links in Pittsburgh to the gas and nuclear industry have tradition-
of students, faculty, members of the Education City Charles E Thorpe, Dean of Carnegie Mellon Qatar, moderated ally been strong. Here in Qatar we have strong research ties with
community and guests from the oil and gas industry. Chu’s visit the question-and-answer session. Topics of discussion included energy institutions and partners such as QSTP,” says Thorpe.
to Carnegie Mellon Qatar follows a visit by US Secretary of State Qatar’s leadership role in LNG, bio-fuels and the importance of
Hillary Rodham Clinton, who addressed students and members education to develop and research new energy technologies.
of Education City. “There is a vast potential for development in the field of alterna-
Chu’s lecture was a collaborative effort between Carnegie Mel- tive energy both in Qatar and the United States,” said Dr Abdelali
lon Qatar and the United States Embassy. US Ambassador Jo- Al Houdi, VP of Research, Qatar Foundation.
seph LeBaron introduced Secretary Chu to an audience of 370 “This forum is not a conventional conference or seminar but a
students and VIP guests. meeting between relevant parties to discuss and provide recom-
Chu is a distinguished scientist and co-winner of the Nobel Prize mendations for Qatar to lead in energy. Dr Chu’s visit will help
for Physics in 1997. He has devoted his recent scientific career build on the strong ties already established between Qatar’s en-
to the search for new solutions to energy challenges and stop- ergy companies and the United States’ technology developers
ping global climate change. Chu supports an education initia- which in turn will boost the country’s competitiveness,” said Dr
tive for training new scientists on basic and applied research on Al Houdi.
clean energy, starting at the elementary and high school levels Chu’s visit to Qatar and the Middle East is part of the US admin-
through postdoctoral study. istration’s efforts to continue strengthening partnerships within
“I am delighted to be here at Education City and Carnegie Mel- the region. During his visit to Qatar, Chu met with government offi-
lon University in Qatar,” said Secretary Chu. “Innovation and cials, research and scientific leaders and members of the private
education can provide the world with a new energy solution. We sector to discuss a range of energy issues.
have to work together to find the solution.” In addition to visiting Qatar Foundation and Carnegie Mellon Qa-

RasGas Train 7 starts up


The chief executive of RasGas has announced the successful RasGas project teams fully embraced these challenges to deliver
completion and start-up of Train 7 of Ras Laffan Liquefied Natu- exceptional results,” he added.
ral Gas Company Limited 3. The Train 7’s production capacity of 7.8 Mta is a quantum leap
“Train 7 is a clear demonstration of RasGas’s confidence and from the 4.7 Mta capacities of RasGas Train 3, 4 and 5. The lat-
ambition,” said RasGas Managing Director and CEO Hamad est project involved scaling up of the machinery used to power
Rashid Al Mohannadi. “These mega facilities are the embodi- the process. The technology used to generate power confirms to
ment of a bold investment and the culmination of years of tech- the company’s commitment to environment norms and engaging
nological development and preparation. The start-up of Train 7 in sustainable development. RasGas has retrofitted dry low NOX
also demonstrates RasGas commitment to ensure a secure and technology on six power-generation turbines.
reliable supply of LNG for its customers,” he told reporters at “We are doing a lot to protect the environment since a gas plant
the second media round table organized by RasGas at its tower has many flares,” said Brett Dohertry, RasGas Saftey Health and
in Doha. Environment Group Manager. “Our strategy is to conserve the
RasGas Train 7 is capable of producing 7.8 million tonnes of state’s natural resources, eliminate production losses and not to
LNG per annum (Mta), boosting the overall production capacity contaminate the environment with high emission levels. We are
of all RasGas companies to approximately 36.3 Mta. The project safely below the required limit and the dry low NOX technology
is a joint venture of Qatar Petroleum (70%) and ExxonMobil Ras helps reduce the atmospheric emissions of oxides of nitrogen
Laffan 3 (30%). It is the fourth 7.8 Mta per annum LNG plant significantly.”
brought online by the JV partners in the last 12 months. RasGas has reduced gas flare emissions at Ras Laffan by 40%
The latest train matches the capacity of Ras Laffan 3 Train 6, last year compared to 2008 levels. The flare reduction has cut
one of the largest operating LNG production plant in the world, the quantity of carbon dioxide released into the atmosphere by
opened last year. “The startup of Ras Laffan 3 Train 7 is a sig- 220,000 tonnes this year.
nificant accomplishment in the further development of natural Al Mohannadi expressed satisfaction at the successful start-up.
gas from the North field to help supply growing energy demand,” “The commencement of supply from RasGas Train 7 underlines
said Neil Duffin, President, ExxonMobil Development Company. the company’s reputation as one of the world’s premier and
“Initiating LNG production from Ras Laffan 3 Train 7 marks most reliable suppliers of LNG, underpinned by world-class per-
another major milestone in the unprecedented effort between formance in safety, health and environmental management,” he
Qatar Petroleum and ExxonMobil to design and effectively imple- said.
ment the largest liquefaction trains, LNG vessels and terminals “RasGas now supplies to customers over three continents and is
in the world.” continuing to secure its position as a leading LNG supplier,” he
“Train 7 is one of the new generation of mega-trains, each ca- said. Before commencing the Round Table, the media was taken
pable of producing 7.8 Mta,” Al Mohannadi told the second me- on an orientation tour of RasGas’s 3D Visualisation Department. the process involved in drilling and engineering works.
dia round table. Briefing newspersons, Fahed Hussain Al Mussawi, Head of Geo- RasGas Company Limited (RasGas) has been re-accredited to the
“This is a big step up from the 4.7 Mta production capacity of science Operations, the Petroleum Engineering Department, said International Standard Organization (ISO) 17025:2005 quality
RasGas Trains 3, 4 and 5. The project involved scaling up every that the latest technology and methods were being used by the system standard. RasGas environmental laboratory was awarded
aspect of the new train, from pipeline diameters to the machin- engineering staff, including the sophisticated 3D visulisation of the Certificate of Accreditation by the American Association for
ery used to power the process. the subsurface which increases the efficiency and accuracy of Laboratory Accreditation (A2LA) last month.

Gas producers may restrict output


Natural gas producers may restrict their output to correct over- price) is unfair,” he said. “We aren’t asking for a premium, but
supply and boost prices, the president of the Gas Exporting price parity for gas with oil.”
Countries Forum (GECF) has said, countering skepticism that Members of the GECF have blamed depressed global prices on
gas countries can’t influence prices the same way as oil produc- new gas supplies from US non-conventional gas fields. Last year,
ers. Speaking to reporters ahead of an Opec meeting in Vienna, the Henry Hub US gas contract was on average 44% lower than
Chakib Khelil, who is also Algeria’s oil minister, said if there is in 2008 at $3.99 per million British thermal units. By contrast,
a market imbalance “all you need to do is to take back some of Khelil said a fair price for natural gas is $13 to $14 per million
your production. “It isn’t a problem to shut-in fields,” he said. British thermal units, but didn’t specify which particular bench-
The statements are the clearest indication to date of the poli- mark contract he had in mind.
cies the GECF could discuss when it meets on April 19 in Oran, The prices have already led some producers to warn they could
Algeria. Restricting output would be similar to the actions of the reign in production. Statoil ASA (STO) said recently it might delay
Organization of Petroleum Exporting Countries (Opec), which some natural gas output in Norway, the world’s third-largest gas
has cut or increased production to stabilize markets. exporter. But Russia, which holds the forum’s secretariat general
Some gas producers and experts have said cutting output to and is the world’s largest gas exporter, has said the GECF has
boost prices would be harder for gas producers than for oil as no immediate plans to co-ordinate output volumes and regulate
the majority of the deals are tied to long-term prices. prices.
Qatar’s Deputy Premier and Minister of Energy and Industry, HE The 11-member GECF - which comprises Qatar, Russia, Bolivia,
Abdullah Bin Hamad Al Attiyah, however, said it was too early Venezuela, Egypt, Iran, Libya, Nigeria, Trinidad & Tobago, and
to say whether GECF would cut gas supplies but agreed prices Equatorial Guinea - controls 73% of global gas reserves and 42%
were currently below their optimum range. “We feel (the low gas of production.
28 Exhibitions & Events

APRIL & May 2010 CALENDAR


PROJECT QATAR Fax: 1 4544846
OF EXHIBITIONS & EVENTS
Tel: +974 4954888 tions Organizer: IFP Jordan Fax: +973 1755-3447
2010 E-mail: info@recexpo. Fax: +974 4834480 Event Date (s): Event Date (s): E-mail: info@recexpo.
Organizer: IFP Qatar com, build@recexpo. Website: http://www. 18-21 April 2010 03-06 May, 2010 com, build@recexpo.
Ltd. com agd-exhibitions.net Venue: Abu Dhabi Na- Venue: Amman Exhibi- com
Event Date (s): Website: http://www. SAUDI INTERNA- tional Exhibition Centre tions Park Website: http://www.
12-15 April, 2010 agd-exhibitions.net TIONAL WINDOWS, Location: UAE Location: Amman, Jor- agd-exhibitions.net
Venue: Qatar Interna- BRIDGES MIDDLE DOORS, SHUTTERS, Tel: +971 4 3365161 dan International Exhibi-
tional Exhibition Centre EAST – QATAR 2010 AND SOLAR PROTEC- E-mail: info@ifpjordan. tion for Construc-
Fax: +971 4 3351891
Organizer: IQPC Middle TION EXHIBITION com tion Technology and
Location: Doha - Qatar E-mail: citybuild@iirme.
East 2010 Building Industry
Tel: +974 4954888 com Website: www.ifpjordan.
Event Date (s): Organizer: Riyadh Exhi- 2010
Fax: +974 4834480 Website: www.citybuild- com
11-14 April, 2010 bitions Co. Ltd Organizer: Arabian
E-mail: mgebrael@ abudhabi.com GULF BID EXHIBITION
Event Date (s): Group for Exhibitions
Venue: Ritz – Carlton CITYSCAPE ABU 2010
ifpqatar.com 11-14 April 2010 and Conferences
Location: Doha - Qatar DHABI 2010 Event: GULF CON-
Website: www.ifpqatar. Venue: Riyadh Exhibi- Event Date (s):
Tel: +971 4 3642975 Organizer: IIR ME STRUCTION INTERI-
com tion Centre 12-16-May, 2010
Fax: +971 4 3631938 ORS & FURNITURE
SAUDI BUILD THE Event Date (s): Venue: Damascus Inter-
Location: Riyadh Saudi EXHIBITION
PMV SERIES 2010 E-mail: enquiry@iqpc. 18-21 April 2010 national Fairground
Arabia Organizer: DMG GULF
Organizer: Riyadh, Exhi- com Venue: Abu Dhabi Na-
Tel: +966 1 4541448 MEDIA Location: International
bitions Co. Ltd. HEAVY MAX tional Exhibition Centre Airport Highway, Da-
Fax: +966 1 4544846 Event Date (s):
Event Date (s): Organizer: AGTA Gem- Location: Abu Dhabi, mascus, Syria
ological Testing Center/ E-mail: esales@reexpo. 04-06-May, 2010
11-14-April, 2010 UAE Tel: +963 11-5666994
American Gem Trade com Venue: Bahrain Inter-
Venue: Riyadh Exhibi- Tel: +971 4 3365161 Fax: +963 11-5626900
Event Date (s): Website: www.recexpo. national Exhibition and
tion Center com Fax: +971 4 3353526 Convention Centre Website: http://www.
15 April, 2010 E-mail: roadex-railex@ peife.gov.sy/
Location: Riyadh, Saudi CITYBUILD ABU DHA- Location: Manama,
Arabia Venue: Qatar Interna- iirme.com
BI Bahrain
tional Exhibition Center PROJECT NEAR EAST
Tel: 1 4541448, Organizer: IIR Exhibi- Tel: +973-17-558800
4542448 Location: Doha - Qatar 2010
Project Focus 29
C onsult ant Project Title Client Main Contractor
Value Range
(QR) Million Project Status Type of Project

Bridge Towers M/s. Commercial Development Not Appointed 500-750 Piling & Shoring Hotel and Office Buildings
CONSULTING GROUP
ARCHITECTURAL

Audit Bureau Towers M/s. Al Attiya Group Trading Co. Not Appointed 400-600 Tender Stage Offices / Residential Towers

Al Waab Mall M/s. Qatar Industrial Services Man Enterprize, Qatar 300-400 Under Construction Mall

Mesiemer Q-Tel Not Appointed 250-350 Tender Stage Technical

Mr. Mohamed Abdel Ghani Al


Manarat Lusail Mansouri Not Appointed 200-300 Under Design Shopping Mall & Office Tower

Al Hodaifi Tower II Ghanem Al Hodaifi Not Appointed 600-800 Detail Stage Office Building

Al Sadd Development Complex Barwa Midmac 1.2-1.4 bn Under Construction Commercial, Residencial & 5 Star Hotel
ARAB ENGINEERING

Alfardan Residence at the Pearl Al Fardan Properties CDC 500-600 Under Construction Hotel Apartment
BUREAU

Business Park & Hotel Facilities N/A Redco 500-700 Under Construction Hotel Apartment

Al Majid Tower N/A Al Seal Trading 260-280 Under Construction Residential Building

Gulf Mall at Gharrafa Business Trading Company IDC 300-400 Under Construction Shopping Mall

E'EMAR Development & Real Estate


Khalifa Hotel Inv. SEG 130-160 Under Construction Hotel

Al Baker Executive Towers Ahmed Abed El Aziz Al Baker Construction and Reconstruction Co. 675 Under Construction Office Building

Residential Tower at Pearl Qatar Capital Investment Qatari Arabian Construction Co. 300 Under Construction Residential Building
JAMES CUBITT &
PARTNERS

Al Baker Tower Yussef Ahmed Khalil Al-Baker PCSI Global 240 Under Construction Residential Building
Ghanim Bin Saad Al Saad &Sons
Al Maha English Schools Group Al Khayarin Group 220 Under Construction Education

Panasonic Showroom & Residential Building Shiekh Abdullah Bin Naser Al Thani Construction and Reconstruction Co. 205 Under Construction Commercial / Residential
Shiekh Mohamed Bin Abed El Rahman
Sahara Tower Al Thani
PCSI Global 170 Under Construction Residential Building

Al Khor Comlex Al-Khor and Al-Dakhera Co. Not Appointed 400-500 Under Design Mix use

Al Rams Tower Mr. Abdullah Mohamed Al Attiya Redco 178 Under Construction Office Building
CONSULTANTS

Retaj Hotel Retaj Marketing and Project Badaer Hazeq 120 Under Construction Five Star Hotel
UNITED

Management

3 nos. Mawashi Market Mawash Co. Not Appointed 76 x 3 Tender stage Commercial

Red Crescent Complex Qatar Red Crescent Badr Cont. & Trad. Co. 55 Under Construction Residential

Al Bawkir Office Al Bawkir Co. Ramco 38 Under Construction Office Building


ARCHITECTS

Floral International Developers Al Soor 11 Under Construction Water Factory


UNITED

M.E.S Indian School Phase VI Indian School n/a n/a Under Construction School

Floral International Developers Al Soor 62 Under Construction Plastic Factory

Wakra Hospital PWA J&P 1.1 bn Under Construction 300 Bed Hospital

Al Refaa Tower QIB Al Darwish 300 Under Construction High Rise Residential

Doha International Aiport Terminal Expansion Qatar Airways GHD 1.3 bn Under Construction Airport

Al Bidda Tower Platinum Tower Company Higg and Hill 400 Under Construction 44 storey Office Tower

QA 4 Star Hotel Qatar Airways Gulf Contracting 400 Under Construction 4 Star Hotel

Bilal Pearl Ahmed Hassan Bilal Gulf Contracting 350 Under Construction 22 storey Apartment Building

Al Rayyan Tower QIB Al Darwish 300 Under Construction High Rise Residential
Misc. Projects for Qatar Radio & Television Corporation PWA (Qatar Radio & Television
at Wadi El Sail Corporation)
Not Appointed n/a Detail Stage Studios, Workshop & Store
TB (Communicable Disease) Unit for Rumailah at
Rumailah
PWA (Hamad Medical Corporation) Not Appointed n/a Detail Stage TB Hospital
ENGINEERING GROUP

Qatar Tower (3B+G+1+2+Mech.+29+2Services) at


Westbay
Mr. Mohamed Zaid Al Khayareen Al-Huda 200-250 Under Construction Office Building
CONSULTING

Commercial & Office Building (3B+G+21+P) at Lusail Mr. Abdul Rahaman Hamad El Attia Not Appointed 200-275 Design Stage Commercial and Office Building

Residential & Office Building (2B+G+M+7) at Najma Mr. Abdul Jaleel Abdul Ghani Nasser Al Bandary 100-150 Under Construction Residential & Office Building

Laboratories and Preventive Health at Al Wukair PWA Supreme Council of Health) Not Appointed n/a Sketch Stage Laboratories

Shopping Mall at Mebaireek Al Meera Consumer Goods Co. Al Noras 42-45 Under Construction Shopping Mall

Al Jassimya Tower Al Jassimya Real Estate Commodore Qatar 500 - 550 Under Construction 3B+G+M+40 Storey Office Tower

Al Wajba Palace Seikha Al Jazi Al Swaidy Al Sraya Contracting and Trading 40 - 42 Under Construction Residential Building

Maiezer 41 villas Compound Tharawat Real Estate Investment Real Estate & Construction Co (RECC) 35 - 40 Under Construction Residential Compound
Co.

Al Hatmi Hotel Mr. Mohammad Al-Majid - 20 - 25 Detailed Design 3B+G+M+10 Hotel Building

Zahira Asphalt Plant Zahira Co. Sorenson Qatar 20 - 22 Under Construction Asphalt Plant

Al Emadi Twin Towers IBA GROUP Not Appointed 400 Design Stage Commercial / Offices Towers

City Tower Mr. Saeed Ben Zayed El-Khayareen Al-Huda 200-250 Under Construction Office Building

Fahd Suite - Apartment Hotel FBA GROUP Not Appointed 200 Detail Stage Shopping Mall & Office Tower

IBA Hotel IBA GROUP Not Appointed 200 Under Construction Hotel

Al Attiya Compound Tameer Real Estate Al Seal Trading 160 Under Construction Residential Building
Mr. Mohamed Ben Zayed El-
El Doha Tower Khayareen
Al-Huda 100-120 Completed Office Building

NOTE: Whilst we take pride in keeping our Consultants Database with the most up-to-date information, please note that the above information is provided by the Consultants mentioned in the list; therefore QCS in not responsible for any incorrect data.
Qatari Sources
GRP/STEEL FIRE SECTIONAL TANKS
TA N K S (P O TA B LE -SEWAGE-FIRE)
R
STEEL FABR CYLINDRICAL WATE
ICATION WASTE WATER TREATMENT
PRE-INSUL
ATED DUCT
LEED & GREEN BUILDING SOLUTIONS S & ACCESS
ORIES
(Head Office) I NSUL
Tel: +974 4871872 / Mobile: +974 5141030
ATION
Fax: +974 4863414
P.O.Box 17175 Doha-Qatar e-mail: mohdzeli@gmail.com

NUMIX Concrete Industries




Plant: Head Office:


Tel.: +974 490 3822 / 490 3823 Tel.: +974 465 5077 / 465 5088
Fax: +974 490 2869 Fax: +974 465 5099
P.O. Box 12470 Doha – Qatar P.O. Box 12470 Doha – Qatar
w w w . n u m i x . c o m . q a Email: sales@numix.com.qa Email: info@numix.com.qa
Structural Steel Projects, Pre - Engineered Projects, Industrial and Warehouse Supplies, Erection
and Installation, Design and Sales Support
Tel : +974 4323705 Fax : +974 4323593 P. O. Box : 8152, Doha-Qatar E-mail : sbssteel@gmail.com
Pre - Engineered Steel Buildings and Accessories Space Frame Systems Turnkey Projects Transmissions and Telecom Towers
Sheeting, Cladding, Single and Sandwich Panels Structural Steel, Fences, Parking, Portables Maintenance of all Steel Buildings

D›J›JÉE<ÏÖ^{rj◊÷<ÇËÇ¢]<^flf÷]<Ì“Ü{{ç

BUILDWELL
Buildwell Trading CO. ( L.L.C)
International Trading W.L.L.
P. O. Box: 22613, Doha, Qatar
Tel: +974 4321909, 4351343 Fax:+974 4321933
Email: alferoz@qatar.net.qa

Sanitary, Plumbing, Hardware & Building Materials Suppliers


Musherib: 4417490
Fax: 4316878
ABBAS HAFIZI PPMSPUL<V<h4éπ]
M a n a g i n g P a r t n e r POMRTST<V<ã“^ 
Store Tel: 4606550 PRLRQQL<Vã“^ <·àß
Store Fax: 4581614
Old Salata: 4329487
PONUPTS<V‹ËÇœ÷]<Ì�◊ä÷]
Old Salata Fax: 4370112 POSLMMN<Vã“^ <Ì�◊ä÷]
P.O Box: 37290 OSNULVhJî
DOHA-QATAR E-mail: abbas_hafizi@yahoo.com <Ü�Œ–<ÌuÊÇ÷]
www.bwellqatar.com

ELAND
CABLES
Monthly construction news, tenders, project
focus, and forthcoming exhibitions in Qatar
Tel.: +974 469 3173 - Fax: +974 451 0428

Issue No. (34) APRIL 2010, Doha - Qatar

QSAS official version available online soon


QSAS, Qatar’s first performance-based sustainability ratings system, has been developed by Barwa and Qatari Diar Real Estate
Investment companies

A
ll consultants may version called V1.0/2010 of QSAS covered design, ects. Given that Barwa and tar Society of Engineers, “These things are achievable
start registering their will be available online within construction, as well as op- Diar projects take up 75% of ENOC, Qatar Cool, Schneider and the slowdown has made
companies as Qatar weeks”, Al Horr said during a erational stages of buildings, construction volume in the Electric, Sidra Medical & Re- it more likely to happen,” he
Sustainability As- presentation at the Building expressing his hope that it country, the new rating sys- search Center, and Arup. said.
sessment System (QSAS) so- Sustainable Communities in would set the stage for intro- tem will naturally be applied During a discussion about Asked whether tenants might
lution providers, even though Qatar conference. duction of several policies in in many developments. green building regulation pay more for housing that has
the official version of QSAS is The conference, organized by the green building field. Al Horr proposed the idea of and codes, Engineer Ahmed green building features, Wil-
yet to be introduced, accord- MEED from March 15 to 18, Decrease in operating cost establishing a fund to pro- Jassim Al Jolo, Qatar Society lis said: “Statistics in the UK
ing to Barwa & Qatari Diar gathered industry leaders to and increase in rent and in mote green building prac- of Engineers (QSE) chair- and the USA state that ten-
Research Institute (BQDRI) discuss key issues arising building value were some tices. He stressed that this man, said the burden was ants are willing to pay more
Chairman & Managing Direc- from sustainable develop- of the benefits of adapting was just an idea and no ne- heavily on consultants on for a green building but we
tor Dr Youssef Al Horr. ment. QSAS on individual buildings gotiations were taking place the absence of laws and don’t have something mature
QSAS, Qatar’s first perfor- Al Horr explained in the pre- as stated by Al Horr. at the moment with specific regulations. enough here in the region.”
mance-based sustainability sentation that BQDRI had de- He said that adaptation of parties to start such fund. On the other hand, Emir-
ratings system, has been de- cided to develop a local rating QSAS so far was not up to Responding to a question ates Green Building Council Hussein Moussa, P.Eng.,
veloped by Barwa and Qatari system for green buildings to standard. One reason for that about why wouldn’t Barwa Chairman Jeffrey Willis point- LEED AP, Project Manager,
Diar Real Estate Investment ensure that the one being could be that builders wanted and Qatari Diar provide the ed out that a long education ARUP, pointed out that a lot
companies. The system aims developed within the context to see incentives. required funding, Al Horr process would still be need- of entities in Qatar were try-
to create a sustainable built of Qatar would take into ac- said the two companies had ed. “Most of green building ing to make a sustainability
environment that minimizes count local regulations, cul- “A lot of people don’t yet ap- already invested over three councils are looking at a base, referring to talks to up-
the ecological impact through ture, climate, ecology, etc. preciate the impact of build- years to develop this piece of level above the current laws grade the local systems.
the development of a building “We started very late com- ings on our lives. The govern- work. “We want other organi- and regulations,” he said.
energy standard and sustain- pared to well-developed coun- ment should be brave enough zations to step in and help in On the consultants’ side, he
ability rating system that ad- tries. Creating our own rating to offer incentives to those developing QSAS further,” he Commenting on the effect of noted that every company
dresses the specific regional system enables us to benefit who want to adopt QSAS,” he pointed out. slowdown on the progress of was trying to achieve a better
needs and environment of from all other available rating added. sustainable agenda, Willis standard on sustainability.
Qatar. systems and it doesn’t con- The conference featured oth- said the Dubai Chamber of “Consultants should have the
fine itself to a specific one,” Barwa Real Estate Company er specialists in sustainable Commerce building, which responsibility to follow a sus-
“The manuals for different he pointed out. and Qatari Diar are among development from Qatar and was built in 1999, was LEED tainable approach on their
applications have been out the big developers who ad- beyond, including Barwa, certified recently without any designs even if the laws are
from last year. The official He explained that the scope opted QSAS in their new proj- Qatar Building Council, Qa- extra cost. not pushing for it,” he said.

Você também pode gostar