Dear Sir:
Hemphill Construction Company, Inc. has been awarded a contract to construct SOM Infrastructure Contract 2
Roadway Improvements (UMMC #209-552) at the University of Mississippi Medical Center. This project is part of
a larger common plan of development, referred to as the Master Plan which has coverage under Large Construction
General Permit Number MSR 101976. This project will disturb approximately 1.90 acres.
Enclosed please find a completed Prime Contractor Certification and a scaled site map which depicts the proposed
construction activities, the original and proposed contours, a north arrow, drainage pattern arrows, location of
sensitive areas and adjacent receiving water bodies, location of any storm drain inlets, all erosion and sediment
controls, any post-construction control measures, and the location of housekeeping practices. We plan to commence
construction on Marcy 7, 2016.
If you have any questions conceming this matter or require additional information, please dont hesitate to contact
me at the number listed above.
Sincerely,
fl.Templ
Vice President