Você está na página 1de 2

INCIDENT REPORT IR NO : 9

Date : 5 Juli 2010 Time: 14:26

EQUIPMENT / WORK ACTIVITY : Turbine unit 2

LOCATION OF EQUIPMENT : Turbin

Condition prior to disturbance : ( Kondisi sebelum gangguan )


13:55 All D/G IMM Port Stop
All Load system from T/G Power plant Total Load 1763 Kw
!4:16 Request for start Conveyor C.44
14:24 Request for start Conveyor C26

Chronology incident : ( Kronologi kejadian )


14:26 Start Conveyor C.26 and T/G trip while start 2nd motor.
Causing The system Black out

Cause of incident : ( Penyebab kejadian )


- T/G not able to follow the voltage changes

Remedial Action Short term (Perbaikan jangka pendek )


Turbine rolling and prepare for synchronizing
18:06 unit synchronize

Remedial Action Long term ( Perbaikan jangka panjang )


Unit will be check for respone of voltage changes due start Conveyor C 26

REPORTED BY : Sukarijono Date : 5 Juli 2010


APPROVED BY : Zhang Aimin Date : 5 Juli 2010
INCIDENT REPORT IR NO :

Date : January 28th .2017 Time: 12.00

EQUIPMENT / WORK ACTIVITY : Turbin Generator # 1

LOCATION OF EQUIPMENT : T/G unit 1

Condition prior to disturbance : ( Kondisi sebelum gangguan ) at . 11.59 WITA


DG Port Load : 5 X 450 kW & 1200 kW
TG#1 Normal condition, Load = 5.338 kW
Boiler #1 Normal condition. Steam flow 13.4 t/h. Press 3.5 Mpa. Temp. 435 C
Boiler #2 Normal condition. Steam flow 13.0 t/h. Press 3.51 Mpa. Temp. 450 C

Chronology incident : ( Kronologi kejadian )


At 11.59.36 WITA Trip T/G # 1. Indication Under Frequency 45.19 Hertz .

Cause of incident : ( Penyebab kejadian )

when the IPCC trip and would want to start again, going under frequency due motorized
steam inlet valve T / G # 1 is closed because ketidaksengajaan operator closing the
motorized valve steam inlet T / G # 1.

Remedial Action Short term (Perbaikan jangka pendek )


CB open 505 to reduce load T / G #1 . Rolling back turbin again.
At 12.18 Wita T/G synchron with D/G. 12.23 Energize to 70 KV
At 12.26 Energize to CPP1,CPP3,IPCC,KM10
At 12.27 Unit powerplant back to normal again

Remedial Action Long term ( Perbaikan jangka panjang )


Ensuring units were operating and that are not operating to avoid mistakes that are running equipment

REPORTED BY : M.Firmansyah Date : 28/1/2017


APPROVED BY : Bujang Panko Date :

Você também pode gostar