TPI REVIEW COMMENTS- WPS-MEDGULF CONSTRUCTION

WPS-610-09 Rev.0 - 36 Main Line Welding ( Pipe to pipe- Downhill )

1) Code Latest edition updated


2) Application datas are clearly detailed
3) Joint Design Joint Type, Mis-allignment, Welding Sequence, Base metal type and No of Weld Passes are
clearly detailed
4) Base metal Heat treatment type mentioned, Pipe Dia Range updated as per QP- STD-R006 Rev.1
5) Filler Metals Welding processes are updated
6) Filler Metals Diameter specified
7) Welding Position Specified as 5G Fixed
8) Pre heat application and Interpass temperature measurement added in Notes.
9) Weaving Range Maximum limit specified.
10) Initial and Inter pass cleaning Power Brushing and / or Power Grinding specified
11) Nickel content not to exceed 1% - added in notes
12) Welding Interruption requirements as per QP STD-R006 added in Notes
13) Welding to be completed in one cycle-added in notes.
14) Technique- Multiple Pass and Single Electrode details are added
15) Technical Deviation Request form (TDR) for WPS Reviewed and final acceptance of WPS subjected to QP Approval

WPS-610-10 Rev.0 - 36 Main Pipe Line Tie-in Welding ( Pipe to pipe- Dollymix )

1) Code Latest edition updated


2) Application datas are clearly detailed
3) Joint Design Joint Type, Mis-allignment, Welding Sequence , Base metal type and No of Weld Passes are
clearly detailed
4) Base metal Heat treatment type mentioned, Pipe Dia Range updated as per QP- STD-R006 Rev.1
5) Filler Metals Welding processes are updated
6) Filler Metals Diameter specified
7) Welding Position Specified as 5G Fixed
8) Pre heat application and Inter pass temperature measurement added in Notes.
9) Weaving Range Maximum limit specified.
10) Initial and Inter pass cleaning Power Brushing and / or Power Grinding specified
11) UT for all Tie-in Weld Joints added in notes.
12) Nickel content not to exceed 1% - added in notes
13) Welding Interruption requirements as per QP STD-R006 added in Notes
14) Welding to be completed in one cycle-added in notes.
15) Technique- Multiple Pass and Single Electrode details are added
16) Technical Deviation Request form (TDR) for WPS Reviewed and final acceptance of WPS subjected to QP Approval

WPS Review Page 1


WPS-610-13 Rev.0 - 36 Main Pipeline to Hot Induction Bend ( Dollymix )

1) Code Latest edition updated


2) Application datas are clearly detailed
3) Joint Design Joint Type, Mis-allignment, Welding Sequence , Base metal type and No of Weld Passes are
clearly detailed
4) Base metal Heat treatment type mentioned, Pipe Dia Range updated as per QP- STD-R006 Rev.1
5) Filler Metals welding processes are updated
6) Filler Metals Diameter specified
7) Welding Position Specified as 5G Fixed
8) Pre heat application and Inter pass temperature measurement added in Notes.
9) Weaving Range Maximum limit specified.
10) Initial and inter pass cleaning Power Brushing and / or Power Grinding specified
11) UT for all Tie-in Weld Joints added in notes.
12) Nickel content not to exceed 1% - added in notes
13) Welding Interruption requirements as per QP STD-R006 added in Notes
14) Welding to be completed in one cycle-added in notes.
15) Maximum Mis- alignment specified- added in notes
16) PQR Test coupon details specified Pipe to HIB
17) Technique- Multiple Pass and Single Electrode details are added
18) Technical Deviation Request form (TDR) for WPS Reviewed and final acceptance of WPS subjected to QP Approval

WPS-610-11 Rev.0 - 36 Main Pipeline and PipeTie-in (Through Thickness Repair-TTR)

1) Code Latest edition updated


2) Application datas are clearly detailed
3) Joint Design Joint Type, Mis-allignment, Welding Sequence , Base metal type and No of Weld Passes are
clearly detailed
4) Base metal Heat treatment type mentioned, Pipe Dia Range updated as per QP- STD-R006 Rev.1
5) Filler Metals Welding processes are updated
6) Filler Metals Diameter specified
7) Welding Position Specified as 5G Fixed
8) Pre heat application and Interpass temperature measurement added in Notes.
9) Weaving Range Maximum limit specified.
10) Initial and Interpass cleaning Power Brushing and / or Power Grinding specified
11) Nickel content not to exceed 1% - added in notes
12) Welding Interruption requirements as per QP STD-R006 added in Notes
13) Welding to be completed in one cycle-added in notes.
14) Technique- Multiple Pass and Single Electrode details are added
15) Technical Deviation Request form (TDR) for WPS Reviewed and final acceptance of WPS subjected to QP Approval

WPS Review Page 2


WPS-610-12 Rev.0 - 36 Main Pipeline and Tie-in Welds (Partial thickness repair-PTR)

1) Code Latest edition updated


2) Application datas are clearly detailed
3) Joint Design Joint Type, Mis-allignment, Welding Sequence , Base metal type and No of Weld Passes are
clearly detailed
4) Base metal Heat treatment type mentioned , Pipe Dia Range updated as per QP- STD-R006 Rev.1
5) Filler Metals Welding processes are updated
6) Filler Metals Diameter specified
7) Welding Position Specified as 5G Fixed
8) Pre heat application and Interpass temperature measurement added in Notes.
9) Weaving Range Maximum limit specified.
10) Initial and Interpass cleaning Power Brushing and / or Power Grinding specified
11) Nickel content not to exceed 1% - added in notes
12) Welding Interruption requirements as per QP STD-R006 added in Notes
13) Welding to be completed in one cycle-added in notes.
14) Technique- Multiple Pass and Single Electrode details are added
15) Technical Deviation Request form (TDR) for WPS Reviewed and final acceptance of WPS subjected to QP Approval

WPS Review Page 3