Data Gathering Network Impact Energy Storage Grid Code SCADA & EMS
Assessment Options Development Assessment
Power system data including Power System Network Energy storage grid feasibility Review of existing gid codes Reviewing the level of Existing and planned network Modelling using Power System studies for the Pacific Islands Gap assessment automation in Pacific Islands developments Analysis Software power systems- medium term Highlighting best practices power system and long -term horizon. adopted worldwide for RE Assessing the need for Present & Future Performance of baseline power Generation/Demand Scenarios flow study for "As-Is" network Outlining the best suitable Integration code SCADA/EMS technologies for confirmance ENergy Storage Options for the Development of guidelines for RE Pacific Islands power system. Existing/Planned VRE capacities Pacific Islands power system. grid interconnection and drafting Highlighting the detailed benefits Range of system stability & Development of operational & VRE integration code specific to of SCADA/EMS technologies to Existing Grid power quality studies to assess network investment strategy the country power system the power system networks Code/Interconnection practice by the impact of VRE integration PI countries & Territories Development of overall startegy requirements Development of highlevel SCADA into the Power system. The for grid scale Energy storage /EMS archeitecture for the stuides will also address the integration. typical Pacific Island power HVRT & LVRT capability systems The Energy Storage feasibility requirements for VRE study will performed considering Preparation of Draft technical integration. following key aspects: specifications and cost estimates Assessment of grid constraints in Reduction in system inertia Detailed cost-benefit analysis for transmissions and/or distribution resulting from an increase in the SCADA/EMS applications to network. VRE. the Pacific Islands power system Addressing the network planning New renewable plants being requirements for VRE integration built in remote locations at the end of long power lines Prevalence of grid constraints in transmission and/or distribution network Poor coverage of distribution grid and/or poor access to energy. Unreliable or poor quality supply of grid power to productive industries.