Data Gathering Network Impact Energy Storage Grid Code SCADA & EMS

Assessment Options Development Assessment


Power system data including Power System Network Energy storage grid feasibility Review of existing gid codes Reviewing the level of
Existing and planned network Modelling using Power System studies for the Pacific Islands Gap assessment automation in Pacific Islands
developments Analysis Software power systems- medium term Highlighting best practices power system
and long -term horizon. adopted worldwide for RE Assessing the need for
Present & Future Performance of baseline power
Generation/Demand Scenarios flow study for "As-Is" network Outlining the best suitable Integration code SCADA/EMS technologies for
confirmance ENergy Storage Options for the Development of guidelines for RE Pacific Islands power system.
Existing/Planned VRE capacities Pacific Islands power system. grid interconnection and drafting Highlighting the detailed benefits
Range of system stability & Development of operational & VRE integration code specific to of SCADA/EMS technologies to
Existing Grid power quality studies to assess network investment strategy the country power system the power system networks
Code/Interconnection practice by the impact of VRE integration
PI countries & Territories Development of overall startegy requirements Development of highlevel SCADA
into the Power system. The for grid scale Energy storage /EMS archeitecture for the
stuides will also address the integration. typical Pacific Island power
HVRT & LVRT capability systems
The Energy Storage feasibility
requirements for VRE study will performed considering Preparation of Draft technical
integration.
following key aspects: specifications and cost estimates
Assessment of grid constraints in Reduction in system inertia Detailed cost-benefit analysis for
transmissions and/or distribution resulting from an increase in the SCADA/EMS applications to
network. VRE. the Pacific Islands power system
Addressing the network planning New renewable plants being
requirements for VRE integration built in remote locations at the
end of long power lines
Prevalence of grid constraints in
transmission and/or distribution
network
Poor coverage of distribution
grid and/or poor access to
energy.
Unreliable or poor quality
supply of grid power to
productive industries.