INTRODUTION
PRINCIPLES PROCESS STRUCTURE

Introdution
1. WDT WIRELESS DEPLOYMENT TOOL (Version 7.6)
- Developed by Huawei, focuses on site deployment and acceptance
- Application runs on Android 2.3 5.0.
- Applies to SRAN7.0 to 11.1 micro base stations and SRAN8.0 to 11.1 micro base stations.
- Provides the following functions
Site commissioning: Software and configuration loading, querry information ( board state, optical power, cell GPS, clock, query of transmission link
setup progress, Ping & Tracert, antenna system, remote electrical tilt antenna (RET antenna), alarm query, base station management,
customization MML)
Site acceptance: service test, ESN scanning, snapshot taking, and GPS data obtaining.
Data post processing: replay, encryption, and report generation.

2. WDTRP WIRELESS DEPLOYMENT TERMINAL RESOURCE PLATFORM

- A server provides the APP uniform access, site deployment data transmission, site deployment result send-back, terminal APP automatic updating, and
terminal APP license management for the site deployment through smartphones.
- Provides the following functions:
Push Deployment data: Push site configuration files and software packages to a terminal.
Deployment log backhaul: Backhaul ESNs, GPS, site deployment logs, and fault photos to the WDTRP.
Terminal Management: Update APPs and manage license files.
- Link (Server HongKong): http://wdt-hk.huawei.com/

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 3
OPERATION SITE DEPLOYMENT DATAFILE
INTRODUTION
PRINCIPLES PROCESS STRUCTURE

OPERATION FLOW PRINCIPLES


3 5 7 8 9 11 13 15
WDT
Deployment
Automatically Obtain site One-click
Install App and Data preparation Service
updates WDT Detection Auxiliary Detection Acceptance
configuration files Device connection Verification
Apply for a config files
License Download software

2 4 6 10 12 14 16
RETConfig.txt
Obtaining the WDT Config.txt Site Configuration ServiceTest.xml Acceptance.xml Generate Site Report
WDT File *.xml
PingTable.xml

WDTRP
1 Deployed nine servers :China, UK,
Choose data Brazil, Mexico, Hong Kong, US, South
center to
create project Africa, Russia, Bahrain Data Centers.

WDT Config Ping Table WDT Service WDT WDT


Tool Create Tool Test Tool Acceptance Tool Assistant

WDT WDT Service


Offline Tools: Assistant WDT ATP Tool Test Tool

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 4
OPERATION SITE DEPLOYMENT DATAFILE
INTRODUTION
PRINCIPLES PROCESS STRUCTURE

SITE DEPLOYMENT PROCESS


B. Upload the base station scripts
to WDTRP server.

A. Create base station scripts on


C. View graphical log files on the OMC side, and instruct the onsite team to
the OMC side.
clear faults on the site (if having)
After the fault is rectified, the OMC side ask the onsite team to leave the site.

Hardware installation
personnel

Synchronize
scripts

1. Onsite Team synchronize 2. Connect the AP to a 3. Use smartphone to load 5. Ensure that no
4. Perform the project quality self-check, and upload
scripts in web disks or the base station. software and scripts and complete quality-related problem
all result to WDTRP Server
server to the mobile phone the base station deployment. exists on the site and
memory then leave the site.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 5
OPERATION SITE DEPLOYMENT DATAFILE
INTRODUTION
PRINCIPLES PROCESS STRUCTURE

DATAFILE STRUCTURE
02 methods:

- Manual create folder tree and copy to smartphone.

- Synchronization from WDTRP.

eNodeB

BTS3900
V100R008C00SPC210 NodeB

WDTConfig.txt
Software
BTS3900
HuaweiBTSInfo V100R008C00SPC220 NodeB

...
BTS3900

...
SMARTPHONE
SDCARD
Site A NodeBCfg.xml

LIC

HuaweiSDTData

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 6
CONTENTS

GENERAL INTRODUTION
WDTRP OPERATION
WDT OPERATION
DISCUSSION
DOCUMENTATION

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 7
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

BASIC PROCESS

Choose Server, apply for permission Responsible Persion:


Create a Project, audit permission for user
Project Manager

Create sites one-by-one or in batches by CME


OMC Team
Upload Site deployment files (software,XML, MML Querry, Site design picture)
Onsite Team
Install and activate WDT application (from provided QR codes)

Audit permission for terminal.

WDT Operation

Check the result and make report from upload files.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 8
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE PROJECT
CREATE PROJECT: Project Management Add Fill in the information

Go to Site List Page

For OnSite Team install and


activate WDT Tool
Download
APP Register APP

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 9
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE USER
USER AUDIT: System Management Permission Auditing Choose which one to audit

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 10
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE USER
TERMINAL AUDIT: System Management Terminal Querry Choose which one to audit

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 11
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE SITES
ADD SITES:
Add/Import Manualy : Choose ADD
Import In Batches by CME: Choose CME Create Files

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 12
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE SITES
UPLOAD SITE DEPLOYMENT FILES:
in Dedicated Site Mode
in Site List Mode: Single Mode or Batch Mode

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 13
PROCESS MANAGE PROJECT MANAGE USER MANAGE SITES

MANAGE SITES
MANAGE UPLOAD FILES FROM WDT:

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 14
CONTENTS

GENERAL INTRODUTION
WDTRP OPERATION
WDT OPERATION
DISCUSSION
DOCUMENTATION

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 15
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start
Connect AP to xMPT board

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification
Access Point Mode

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 16
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

- Config file, software


2.Active Software
- WDT Config file (Optional)

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 17
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT
Prepare hardware

2.Active Software installation topo

3. Download file
(can be exported by

NEP-SD)
4. Commission

Upload to WDTRP
5. Service Verification
Download to WDT
6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 18
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 19
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 20
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 21
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 22
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 23
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 24
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT Prepare Ping Table File

2.Active Software (WDT ATP Tool or

3. Download file Template on WDTRP)

4. Commission Upload to WDTRP

5. Service Verification
Download to WDT

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 25
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software
Prepare MML File

3. Download file
(Notepad)

4. Commission Upload to WDTRP

5. Service Verification Download to WDT

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 26
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 27
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 28
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start
Prepare Service Test

Scenario
1.Obtain WDT
(Using WDT Services

2.Active Software Test Tool (XML File) or

Online WDTRP Tool(XLS

3. Download file File))

OMC Team Upload

4. Commission to WDTRP

Onsite Team

5. Service Verification download to WDT

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 29
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 30
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 31
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 32
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 33
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 34
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start
Onsite Team upload all

1.Obtain WDT data, log files to WTRP

OMC Engineer will


2.Active Software

use WDT Assistant to


3. Download file
make report

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 35
SERVICES
PREPARATION COMMISSION DATA PROCESSING
VERIFICATION

PROCESS
start

1.Obtain WDT

2.Active Software

3. Download file

4. Commission

5. Service Verification

6. Information Collection

7. Upload

End

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 36
CONTENTS

GENERAL INTRODUTION
WDTRP OPERATION
WDT OPERATION
DISCUSSION
DOCUMENTATION

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 37
DISCUSSION TOPICS

Site Comissioning Security:

Authentication.

Mistake during manual steps.

Advantage and Disavantage in comparision with current local deployment way:

Deployment steps, time spend

Troubleshoot scenario.

Building dedicated local WDTRP Server

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 38
CONTENTS

GENERAL INTRODUTION
WDTRP OPERATION
WDT OPERATION
DISCUSSION
DOCUMENTATION

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 39
DOCUMENTATION

Wireless Deployment Tool 7.6 User Guide

WDT Assistance Tool

http://support.huawei.com/carrier/navi#allProduct=true&col=product&path=PBI1-

7851894/PBI1-7923444/PBI1-7275905/PBI1-7275986/PBI1-21149518&resTab=SW

WDT ATP Tool

http://3ms.huawei.com/hi/group/2028181/blog_1906145.html?mapId=2855393

WDT Servcies Test Tool

http://3ms.huawei.com/hi/group/2028181/blog_1724249.html?mapId=2476523&for_statistic

_from=all_group_blog

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 40
Thank you!

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 41

Você também pode gostar