PROJECT : PROPOSED RESIDENTIAL BUILDING

LOCATION : ST. MICHAEL'S, BANILAD, CEBU CITY


OWNER : DR. ALEX TAN
ARCHITECT :-

BEAM LOADING:

BEAM DL LL BEAM DL LL
2ND FLOOR 85 + WALL 50 PSF 3RD FLOOR 85 +WALL 60 PSF

2B1 0.559 0.191


2B1A 0.443 0.123
2B1B 0.234 -
2B1C 0.597 0.213
2B1D 0.722 0.143
2B2 0.443 0.123
2B3 0.443 0.123
2B4 0.453 0.266
2B5 0.937 0.413
2B6 0.488 0.287
2B7 0.478 0.143
2G1 1.294 0.596
2G1A 0.278 0.164
2G1B 0.325 0.191
2G1C 0.373 0.164
CB1 0.234 -
CB2 1.628 0.651
RB1 - -
RB1A 0.384 -
RB2 - -

ROOF BEAM 85 + WALL 10 PSF

RB3 - -
PROJECT : PROPOSED RESIDENTIAL BLDG.
LOCATION : ST. MICHAELS, BANILAD, CEBU CITY
DATE : MARCH 8, 2008

ORIGINAL
35.60 38.25 35.60 44.50 47.81
2B1 50.66 28.68 50.66 2B1 57.34 35.86
5.53 - 5.53 -
DL DL
14.15 13.99 14.15 17.69 17.49
1.58 - 1.58 -
LL LL
3.79 5.07 3.79 4.74 6.34
2.18 2.18 2.18 2.18
EL/WL EL/WL
12.60 - 12.60 12.60 -
3.50 11.4800 5.7400 3.50 11.4800

- 3.95 - - 4.93
2B2 - 2.96 - 2B2 - 3.70
1.33 - 1.33 -
DL DL
- 1.63 - - 2.04
0.30 - 0.30 -
LL - 0.37 - LL - 0.46
- - - -
EL/WL EL/WL
- - - - -
1.50 4.9200 2.4600 1.50 4.9200

- 129.42 - - 161.78
2B3 - 97.07 - 2B3 - 121.34
9.68 - - 9.68 -
DL DL
- 54.94 - - 68.68
1.94 - 1.94 -
LL LL
- 10.90 - - 13.63
- - - -
EL/WL EL/WL
- - - - -
8.12 26.6336 13.3168 8.12 26.6336

- 138.86 - - 173.58
2B4 16.62 104.15 16.62 2B4 16.62 130.18
9.66 - 9.66 -
DL - 48.51 - DL - 60.64
3.99 - 3.99 -
LL LL
- 20.29 - - 25.36
0.80 0.80 0.80 0.80
EL/WL EL/WL
8.74 - 8.74 8.74 -
8.12 26.6336 13.3168 8.12 26.6336

22.87 43.64 22.87 28.58 54.55


2B5 40.37 32.73 40.37 2B5 44.66 40.91
7.26 - 7.26 -
DL DL
8.16 15.80 8.16 10.20 19.75
2.75 - 2.75 -
LL LL
LL LL
3.20 5.92 3.20 4.00 7.40
1.76 1.76 1.76 1.76
EL/WL EL/WL
12.21 - 12.21 12.21 -
4.00 13.1200 6.5600 4.00 13.1200

- 111.69 - - 139.62
2B6 - 83.77 - 2B6 - 104.71
7.04 - 7.04 -
DL DL
- 38.29 - - 47.86
3.11 - 3.11 -
LL LL
- 16.92 - - 21.15
- -
EL/WL EL/WL - -
6.62 21.7136 10.8568 6.62 21.7136

82.15 (9.82) 5.55 102.68 (12.28)


2B7 88.06 (7.37) 30.62 2B7 103.47 (9.21)
5.11 - 5.11 -
DL DL
31.02 (3.62) 2.05 38.78 (4.53)
1.46 - 1.46 -
LL LL
10.09 (1.28) 0.72 12.61 (1.60)
2.37 2.37 2.37 2.37
EL/WL EL/WL
13.91 - 13.91 13.91 -
3.06 10.0368 5.0184 3.06 10.0368

58.97 64.93 58.97 73.71 81.16


2G1 80.95 48.70 80.95 2G1 92.01 60.87
9.54 4.83 9.54 4.83
DL DL
22.09 25.24 22.09 27.61 31.55
2.82 1.04 2.82 1.04
LL LL
7.39 7.38 7.39 9.24 9.23
2.71 2.71 2.71 2.71
EL/WL EL/WL
19.31 - 19.31 19.31 -
3.50 11.4800 5.7400 3.50 11.4800

7.40 10.07 7.40 9.25 12.59


RB1 25.29 7.55 25.29 RB1 26.68 9.44
2.80 - 2.80 -
DL DL
3.46 4.71 3.46 4.33 5.89
0.29 - 0.29 -
LL LL
0.36 0.49 0.36 0.45 0.61
3.56 3.56 3.56 3.56
EL/WL 10.38 - 10.38 EL/WL 10.38 -
3.00 9.8400 4.9200 3.00 9.8400

12.30 15.47 12.30 15.37 19.33


RB2 16.13 11.60 16.13 RB2 18.43 14.50
2.30 - 2.30 -
DL DL
4.22 5.10 4.22 5.28 6.38
1.01 - 1.01 -
LL LL
1.86 2.51 1.86 2.33 3.14
0.38 0.38 0.38 0.38
EL/WL EL/WL
3.63 - 3.63 3.63 -
6.00 19.6800 9.8400 6.00 19.6800

18.95 30.87 18.95 23.69 38.59


RB3 24.80 23.15 24.80 RB3 28.36 28.94
1.18 - 1.18 -
DL DL
5.95 9.74 5.95 7.44 12.18
0.40 - 0.40 -
LL LL
3.32 5.37 3.32 4.15 6.71
1.04 1.04 1.04 1.04
EL/WL EL/WL
5.57 - 5.57 5.57 -
4.56 14.9568 7.4784 4.56 14.9568

- 98.55 - - 98.55
CB1 - 73.91 - CB1 - 73.91
7.82 9.60 7.50 7.50
DL DL
36.88 - 36.88
2.73 2.98 2.52 2.52
LL LL
12.38 - 12.38
- -
EL/WL EL/WL - -
1.50 4.9200 2.4600 1.50 4.9200

- 58.73 - - 58.73
CB2 - 44.05 - CB2 - 44.05
0.01 8.70 4.35 4.35
DL DL
21.38 - 21.38
0.01 3.20 1.60 1.60
LL LL
7.87 - 7.87
- -
EL/WL EL/WL - -
1.50 4.9200 2.4600 1.50 4.9200
PT & ADJACENT BEAMS RELEASED
SIMPLY SUPPORTED
44.50 - - -
57.34 B1 - - -

DL
17.69

LL
4.74

EL/WL
12.60
5.7400 7.00 22.9600 11.4800

-
-

-
2.4600

-
-

-
13.3168

-
16.62

8.74
13.3168

28.58
44.66

10.20
4.00

12.21
6.5600

-
-

-
10.8568

6.94
31.66

2.56

0.90

13.91
5.0184

73.71
92.01

27.61

9.24

19.31
5.7400

9.25
26.68

4.33

0.45

10.38
4.9200

15.37
18.43

5.28

2.33
3.63
9.8400

23.69
28.36

7.44

4.15

5.57
7.4784

-
-

-
2.4600

-
-

-
2.4600
Project : PROPOSED RESIDENTIAL BUILDING
Location : ST. MICHAEL'S, BANILAD, CEBU CITY
Owner : DR. ALEX TAN
Architect : ROBERT LOUIS YAP
SCHEDULE OF BEAMS
Fc' = 3,000 Psi Fy = 40,000 Psi Fvy = 33,000 Psi
BEAM WIDTH DEPTH SPAN 10mm STIRRUPS
LOCATION LEFT SUPPORT MIDSPAN RIGHT SUPPORT STIFFENER REMARKS
DESIGNATION (cm) (cm) (m) ( 2-legs )
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 8 @ 5 , 4 @ 10 Conventional
2B1 20 35 3.50 -
bottom 2 - 16 mm 3 - 16 mm 2 - 16 mm rest @ 30 cm O.C. Beam
top 2 - 16 mm 2 - 16 mm 2 - 16 mm 3 @ 10 Conventional
2B2 20 30 1.50 -
bottom 2 - 16 mm 2 - 16 mm 2 - 16 mm rest @ 26 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 4 @ 10 Conventional
2B3 25 45 8.12 -
bottom 3 - 16 mm 9 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 10 @ 5 , 4 @ 10 Conventional
2B4 25 45 8.12 -
bottom 3 - 16 mm 9 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 4 - 16 mm 2 - 16 mm 4 - 16 mm 8 @ 5 , 4 @ 10 Conventional
2B5 25 35 4.00 -
bottom 3 - 16 mm 5 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 4 @ 10 Conventional
2B6 25 45 6.62 -
bottom 3 - 16 mm 7 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 7 - 16 mm 3 - 16 mm 3 - 16 mm 10 @ 5 , 4 @ 10 Conventional
2B7 20 45 3.06 -
bottom 2 - 16 mm 2 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 5 - 16 mm 2 - 16 mm 5 - 16 mm 11 @ 5 , 4 @ 10 Conventional
2G1 25 45 3.50 -
bottom 3 - 16 mm 5 - 16 mm 3 - 16 mm rest @ 30 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 8 @ 5 , 3 @ 10 Conventional
RB1 20 30 3.00 -
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 26 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 8 @ 5 , 5 @ 10 Conventional
RB2 20 30 6.00 -
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 26 cm O.C. Beam
top 3 - 16 mm 2 - 16 mm 3 - 16 mm 8 @ 5 , 4 @ 10 Conventional
RB3 20 30 4.56 -
bottom 3 - 16 mm 3 - 16 mm 3 - 16 mm rest @ 26 cm O.C. Beam
top 7 - 16 mm 7 - 16 mm 7 - 16 mm 4 @ 5 , 4 @ 10 Conventional
CB1 20 45 1.50 -
bottom 2 - 16 mm 2 - 16 mm 2 - 16 mm rest @ 20 cm O.C. Beam

NOTE: USE LARGER QUANTITY OF REBARS BETWEEN 2 ADJACENT BEAMS.

Page 8 of 9
Project : PROPOSED RESIDENTIAL BUILDING
Location : ST. MICHAEL'S, BANILAD, CEBU CITY
Owner : DR. ALEX TAN
Architect : -

SCHEDULE OF ISOLATED FOOTINGS


( SBC = 4,000 PSF )

Fc = 3,000 PSI Fy = 40,000 PSI Fvy = 33,000 PSI


FOOTING LENGTH WIDTH REINFORCING STEEL BAR (RSB)
THICKNESS
DESIGNATION ( X-X Direction ) ( Y-Y Direction ) BOTTOM BARS TOP BARS REMARKS
m. m. m. Length ( X-X ) Width ( Y-Y ) Length ( X-X ) Width ( Y-Y )

F1 1.20 1.20 0.30 6 - 16 mm 6 - 16 mm - - isolated footing

F2 1.60 1.60 0.35 10 - 16 mm 10 - 16 mm - - isolated footing

F3 1.40 1.40 0.30 7 - 16 mm 7 - 16 mm - - isolated footing

F4 0.80 0.80 0.25 3 - 16 mm 3 - 16 mm - - isolated footing

F5 1.00 1.00 0.25 4 - 16 mm 4 - 16 mm - - isolated footing