HSSE
5887-ON-PR-HM-013
CONSTRUCTION PHASE
TABLE OF CONTENTS
1.0 PURPOSE............................................................................................................................... 5
2.0 SCOPE.................................................................................................................................... 5
2.1 Supporting Procedures ................................................................................................. 6
3.0 RISKS ..................................................................................................................................... 7
4.0 REFERENCES........................................................................................................................ 8
4.1 Project Reference Documents ...................................................................................... 8
4.2 Reference Associated Procedures ............................................................................... 8
5.0 DEFINITIONS AND ABBREVIATIONS .................................................................................. 9
5.1 Definitions ....................................................................................................................... 9
5.2 Abbreviations ................................................................................................................. 9
6.0 PROCESS............................................................................................................................. 10
7.0 PROCEDURE ....................................................................................................................... 11
7.1 Risk Assessment.......................................................................................................... 11
7.2 Permit Planning ............................................................................................................ 12
7.3 PTW Coordination ........................................................................................................ 12
7.4 Permit to Work Forms .................................................................................................. 12
7.5 PTW Distribution .......................................................................................................... 13
7.6 Permit Authorisation .................................................................................................... 14
7.7 Validity Period and Revalidation................................................................................. 14
7.8 Shift Handover .............................................................................................................. 15
7.9 Changes and Emergency Conditions......................................................................... 15
7.10 Close-out and Return to Service................................................................................. 15
7.11 Records ......................................................................................................................... 15
7.12 Monitoring, Audit and Review ..................................................................................... 16
8.0 RESPONSIBILITIES ............................................................................................................. 16
8.1 Pearl GTL Project Manager / Asset Manager ............................................................. 16
8.2 Pearl GTL / PMC / IC / EPCM HSSE/SD Mangers ....................................................... 17
8.3 Permit Requestor ......................................................................................................... 17
8.4 Permit Coordinator....................................................................................................... 17
8.5 Issue Authority ............................................................................................................. 17
8.6 Supervisor..................................................................................................................... 18
8.7 Permit Holder ................................................................................................................ 18
8.8 Authorised Gas Tester ................................................................................................. 18
9.0 PERMIT TO WORK ACTIVITIES ......................................................................................... 19
9.1 Entry into Confined Spaces ........................................................................................ 19
9.2 Electrical Isolations and Work on Live Systems ....................................................... 19
9.3 NDE and Ionising Radiation Activities ....................................................................... 19
9.4 Excavations and Piles.................................................................................................. 19
9.5 Operating Equipment Near Energised Overhead Electrical Services ..................... 19
9.6 Grating and Handrail Removal .................................................................................... 20
9.7 Hot Work in the Vicinity of Flammables or Explosives............................................. 20
9.8 Storage and Handling of Chemical and Hazardous or Toxic Materials................... 20
9.9 Explosive Devices and Tools Utilising Explosive Charges...................................... 20
9.10 Lifting of Personnel by Mechanical Means ................................................................ 20
9.11 Diving Operations ........................................................................................................ 21
10.0 CONTROLLED PROCEDURE ACTIVITIES......................................................................... 21
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 3 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 4 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 5 of 59
1.0 PURPOSE
The objective of this procedure is to describe for the ICs, EPCs, PMC and Early Works
Contractors how hazardous construction activities are controlled in the workplace, and to
identify the actions and responsibilities that are necessary to operate the Pearl GTL
Permit to Work (PTW) system for the construction phase.
This procedure has been prepared by PMC, henceforth referred to herein as COMPANY
acting for and on behalf of Qatar Shell GTL.
The IC, EPCM, Early Works Contractors and their Sub contractors shall henceforth be
referred to herein as CONTRACTOR.
A further amendment to this procedure is planned to include an enhanced permit to work
system to hazardous pre-commissioning and commissioning activities, start-up and early
operations. A PTW procedure for construction work close to equipment undergoing
commissioning will also be prepared.
A PTW will be applied during construction. Activities within RLC in an unfenced area are
subjected to the RLC PTW system. Activities on site that can have an affect outside of a
fenced off area are also subject to the RLC PTW system.
The construction PTW system will be used up until the commencement of commissioning
activities at which time a further set of pre-commissioning, commissioning, start-up and
operations PTW systems will be introduced.
This procedure does not address hazardous activities after the construction phase i.e. pre-
commissioning, commissioning, start-up and production operations.
This procedure identifies the standards and sets the ground rules required to ensure, as
far as is possible, that the PTW system is applied in a similar way.
2.0 SCOPE
This document describes the procedure for the onshore ICs, EPCs, PMC and Early Works
Contractors will use whilst implementing the PTW system where required during
construction activities.
It also describes the principles and essential features of the Pearl GTL PTW system.
Providing details of the way in which planning, control and administration of work that is
under permit control is achieved by Pearl GTL.
CONTRACTOR, ICs, EPCM's and Early Works Contractors, shall be governed by this
PTW system.
The procedure includes descriptions of the following essential elements of the Pearl GTL
PTW system:
• The activities and types of work that will be controlled through the PTW system.
• A description of the permits that will be issued for various types of work.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 6 of 59
• The method for deciding which hazardous work requires additional control
measures, such as confined space or excavation permits.
• The method used to ensure that a Health Risk Assessment (HRA) has been
carried out and the results incorporated in the control measures for work under
permit control as per the JSA.
• The persons who are authorised to issue permits and to specify the necessary
controls on supporting certificates.
• The method used to assure the competence of permit signatories and others
playing an active role in the Pearl GTL PTW system.
• A method for monitoring, auditing and reviewing the effectiveness of the PTW
system, including the role of System Custodian.
• Electrical Isolations and Work on - See Electrical Lock Out / Tag Out (LOTO)
Live Systems. Procedure in Section 4.2, Ref. [2].
• NDE and Ionising Radiation - See Radiation Control and NDE Procedure
Activities. Section 4.2, Ref. [3].
• Grating and Handrail Removal. - See Fall Prevention Procedure Section 4.2,
Ref. [6].
• Explosive Devices and Tools Using - See Small Tools and Equipment –
Explosive Charges. Inspection and Safe Use Procedure
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 7 of 59
3.0 RISKS
Failure to adequately identify and control health, safety and environmental hazards in the
workplace through a robust PTW system may result in serious injury, death, severe
environmental pollution, damage to assets and loss of local and international reputation.
Failure to identify competent personnel to administer the PTW system may result in the
PTW system being incapable of controlling hazards in the work place.
Failure to monitor the effectiveness of the PTW system may result in inadequate control of
hazards in the work place.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 8 of 59
4.0 REFERENCES
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 9 of 59
5.1 Definitions
Item Description
Permit Document issued by the PMC to a specific contractor for a specific task
in a specific area authorising high risk tasks.
See Section 8.0 Responsibilities.
5.2 Abbreviations
Item Description
ALARP As Low As Reasonable Practicable
EPCM Engineer Procurement and Construction Management
EPCI Engineering Procurement Construction Installation Contractor
G&P Shell Gas and Power
SGS Shell Global Solutions International
GTL Gas to Liquids
HRA Health Risk Assessment
HSE Health, Safety and Environment
HSSE/SD MS Health, Safety, Security, Environmental / Social Development
Management System
IA Issuing Authority
IC Implementation Contractor
JSA Job Safety Analysis
NDE Non Destructive Testing
PC Permit Co-ordinator
PEFS Process Engineering Flow Sheets
PMC Project Management Contractor
PPE Personal Protective Equipment
PTW Permit to Work
RLC Ras Laffan City
TSTI Total Safety Task Instruction
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 10 of 59
6.0 PROCESS
S Start
PC / IA / Supervisor *
Activity Step I Informed
Permit Requestor
X Meeting
Permit Holder
* Not to be the same person.
Notes
1 Identify Work. S
4 Identify precautions. C R C C C C
9 Issue permit. R
10 Accepting permit R
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 11 of 59
16 Close permit. R
7.0 PROCEDURE
The PTW system ensures that for activities generating additional risk in the workplace,
additional controls are in place to reduce the risk to acceptable levels (ALARP).
• The inherent risks of the activity assessed as high or medium by the Risk
Assessment Matrix identified in the HSSE/SD MS, see Appendix W.
• High risk construction activities where controls are not detailed in other procedures
or work instructions.
The following personnel will carry out the process risk assessments:
• PMC and EPC Area Managers for the onshore construction. The boundaries of the
working areas will normally be designated by secure fencing and signage
• Pearl GTL Asset Manager for operations in all areas within the fence line of the
Pearl GTL Complex (see T-13.369.401) and specific external operated areas
including Pearl Platform A; Pearl Platform B, Beach Valve and within 3rd party
operated areas of responsibility where specific activities occur that may interfere
with Pearl GTL’s operability e.g. Jetty, Offsite Storage, and Pipetracks.
For each phase of the Pearl GTL project Permit Control Areas will be identified, Appendix
X, which define the extent of control needed for the activities and types of work that have
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 12 of 59
been assessed. A plot plan which identifies the control areas is shown at Appendix A.
Typically the types of control will be:
• Coordinate all permit to work activities within the area, including those permits
which are suspended, but where the work is not complete.
• Inform the relevant authority of any potentially hazardous situations arising from
permitted work.
• Operate the permit issue point to reflect the current state of work.
• Clear precise description of the work, which includes the actual location of the
work, the designated equipment to be worked on, the actual tools and equipment
to be used and the planned work method. The description may require other
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 13 of 59
documents to be attached to the permit these may include job hazard analyses,
method statements, isolation lists, drawings or sketches.
• Identification of any interfaces with other work being carried out in the same area
or in another adjacent area.
• Confirmation that all necessary preparations that have been made. Commonly
these will be:
• Gas and / or dust testing to confirm that the equipment is free of any
flammable, toxic or asphyxiate atmosphere.
• A description of any residual hazards that remain after preparations have been
made. The hazards may include residual construction, materials, pressure,
temperature and physical hazards arising from the location or work to be carried
out.
• After discussing the details of the work, the preparations that have been completed
and the controls specified on the permit, the permit issuing authority, focal point
construction supervisor and Permit Holder sign the permit to authorise the
commencement work and issue the permit. The Permit Holder undertakes to
explain to the work party the details of the work, the hazards and the controls.
• Confirmation by the permit holder and the permit issue authority that the work has
been completed or suspended and that the site has been left in a clean and safe
condition.
• A signed working master copy to be held by the Permit Issuing Authority whilst the
permit is in operation. (When the work is completed and the permit is closed this
becomes the file copy).
• An updated copy of the master for display at the worksite whenever work is under
way.
As well as the permit forms and certificates, additional precautions required for the work
can be provided by safety checklists, see Appendices. The checklists are useful for
providing instruction and guidance to the Permit Holder and the workforce. The permit will
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 14 of 59
• Permit Issuing Authority, who is responsible for ensuring that all preparations are
complete, and for authorising the work to proceed.
• Authorised Gas Tester, responsible for measuring flammable, toxic and asphyxiate
gas, and to interpreting the results.
• Permit Holder, responsible for carrying out the work in accordance with the
conditions on the permit.
It is important that the Permit Issuing Authority and the Permit Holder is not the same
person. This is to prevent the possibility of a person issuing a permit to himself.
The Pearl GTL Training Manager will identify the levels of competence required for each
role and will establish training requirements to maintain the competence. Records of PTW
training and authorisation will be kept by the Pearl GTL Training Manager and the Pearl
GTL HSSE Manager respectively to demonstrate competence and authorisation of permit
signatories.
Only personnel who have successfully completed appropriate PTW training will be
authorised to perform signatory roles. Authorisation will be subject to an expiry date no
greater than 3 years. The need for refresher training, reassessment and reauthorisation at
periods of less than 3 years will be subject to the results from PTW audits. An up-to date
list of authorised personnel will be displayed at each permit issue point;
PTW awareness and the use of standard workplace PPE will form a part of the site
induction training provided for the whole workforce.
• No other work is being carried out that could conflict with the work identified on the
permit.
• The preparations carried out to make the worksite safe for work remain in place
and are still valid.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 15 of 59
When re-validating a permit it is mandatory that permit issuing authority and the permit
holder verify that the worksite remains safe by completing a worksite inspection before the
permit is re-validated.
A person authorised as issuing authority may revalidate, close, suspend or cancel any
permit.
7.11 Records
The master copy of completed permits, supporting documentation and certificates will be
retained by the PMC / Asset Holder until the end of the project.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 16 of 59
The following records will be retained by the COMPANY, Pearl GTL PMC, Training
Departments until the end of the project:
• Permit training,
• Refresher training,
• Worksite safety precautions are adequate and controls are being implemented
• Permits have been completed correctly and being displayed at the worksite.
• The work party been briefed and have an understanding of what the work entails,
the safety precautions that must be taken and the controls that must be
implemented
Periodic inspections of the way the PTW system is being implemented will be carried out
at 3 month intervals by an HSSE Advisor using a permit picked at random and the check
list at Appendix O. The results from these inspections will be used to improve the
operation of the PTW system and the training of those who use it.
An independent audit of the operation of the PTW system across the whole site will be
carried out at 2 year intervals as required by the Pearl GTL HSSE Internal audit
programme. The frequency of the internal HSSE audits will be dependent on results from
the previous audits or the frequency of workplace incidents.
As part of the continuous improvement of HSSE Management that results from the
management review process detailed in Pearl GTL HSSE MS Management Review
Procedure, management will review the effectiveness of the PTW system annually and
modify it where necessary
8.0 RESPONSIBILITIES
• Ensuring that the PTW system remains suitable and effective, through monitoring,
audit and periodic review.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 17 of 59
• Detailing on the permit the work to be done, the equipment to be worked on, the
method to be used, the area, the tools and equipment to be used.
• Attaching to the permit any job hazard analyses, drawings or other details
developed during planning of the work and assessment of the risks.
• Confirming that all hazards associated with the work have been identified and
authorised permit signatories and authorised discipline engineers have provided
their input and agree with the precautions.
• Identifying any conflicts between the proposed work and other activities in the
area.
• Signing off and cancelling the permit when the work is complete or suspended.
• Ensuring that all necessary supporting certificates, job hazard analyses and
drawings are attached to the permit.
• Specifying on the permit any additional precautions that need to be taken during
the work, including use of safety equipment and PPE.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 18 of 59
• Ensuring that the Permit Holder knows the exact location of the work, all the
hazards that may be present and all the precautions that must be taken during the
work.
8.6 Supervisor
• Confirming that the work site is safe for the work to proceed.
• Knowing the status of the work at all times and communicating the status to the
oncoming shift at shift handover.
• Discussing the job fully with the permit issue authority before signing to accept the
permit.
• Showing the work party the exact location and equipment to be worked on.
• Explaining to the work party the details of the work, any potential hazards and
precautions to be taken.
• Ensuring that the precautions are maintained throughout the work, and that the
work party and the work stays within the limits (area, types of work, time) specified
on the permit.
• Stopping the work and seeking advice from the permit issue authority if conditions
at the worksite change.
• Ensuring that the work-site is left in a safe and tidy condition before handing back
the permit on completion or suspension of the work.
• Providing and maintaining a list of all personnel working under the permit. (Note a
record will be kept of those personnel who leave the permit control area).
• Carrying out gas tests (oxygen, toxic and flammability) at the frequency specified
on the permit and supporting certificates, see Appendix C.
• Stopping the work and instructing personnel to withdraw from the area whenever a
gas test or change in conditions indicates that it is unsafe for the work to continue,
then reporting back to the permit holder and permit issue authority.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 19 of 59
• Identify buried cables and pipes during excavation work of greater than a spade depth
(300mm).
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 20 of 59
• Work within 15m of flammable material storage areas. Therefore the contractor shall
plan the flammable material storage locations in order to minimise the use of a Hot
Work PTW;
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 21 of 59
Prior to use of any work platform suspended from cranes or derricks for hoisting
personnel, the highest level of Project Management (i.e. Construction Manager) shall
determine if the use of conventional means is more hazardous or not possible because of
structural design or worksite conditions.
CONTRACTOR shall submit a justification to the COMPANY Construction Manager for
approval prior to issuing a Crane Suspended Work Platform PTW.
• Marked-up Process Engineering Flow Sheets and Plot Plan showing the work scope
and the isolations;
• Sizing, calibration and certification of pressure safety valve, relief valve, temperature
and pressure recorders and test pressure gauges as required for individual tests
• Procedures for leak detection that minimises the potential for release of energy;
• Timing and duration of the test in order to minimise HSSE and schedule impacts at the
Worksite;
• Procedures for barricading of exclusion zones and also for the monitoring of the
exclusion zone to prevent unauthorised access.
10.2 Scaffolding
Scaffolding quality shall be controlled via a “Scaffold tag” system and the Project
Scaffolding Procedure T-13.377.451, Ref. [12] and further described in the Fall Prevention
Procedure Ref. [6].
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 22 of 59
• Inherent risks of the activity assessed are high or medium by the Risk Assessment
Matrix – See Appendix Y.
• High risk construction activities where controls are not detailed in other procedures
or work instructions.
• Identify buried cables and pipes during excavation work of greater than a spade
depth (100mm).
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 23 of 59
12.0 APPENDICES
Attachment Description
A Permit Control Area Plot Plan
B Confined Space Entry Permit
C Gas Test Certificate
D Confined Space Entry / Exit Log
E Non Destructive Examination (NDE) Permit
F Radiological Material Storage Permit
G Excavation Permit
H Crane Suspended Work Platform Permit
I Crane Suspended Work Platform Daily Checklist
Working within 6 meters of Energised Overhead Uninsulated Electrical
J
Lines Permit
K Grating / Flooring / Hand-Railing Removal Permit
L Hot Work Permit
M Hazardous Material Storage Permit
N Powder / Explosive Charge Activated Tools Permit
O Permit to Work Inspection Check List
P Permit to Work Register
Q Total Safety Task Instruction Form
R Deleted
S Diving Permit
T Safety System Override Permit
U Permit to Work Form
V Permit Revalidation Certificate
W PTW Issuing Authority Appointees
X Index of Permit Areas
Y Risk Assessment Matrix (RAM)
Z Risk Assessment Matrix Risk Assessment Matrix – Definition of Terms
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 24 of 59
Appendix A
Permit Control Area Plot Plan
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 25 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 26 of 59
Gas Test One Name Badge number Telephone number Date and time
Hole Watch
Authorised Gas Tester
Atmospheric Hazard Tested Acceptable Range of Hazard Actual Reading (Record) Acceptable (Yes / No)
Oxygen Content 20.0% - 21.5% %
Combustible Gas (% LEL) 0% %
Other (specify): PEL = ppm ppm
Other (specify): PEL = ppm ppm
Gas Test Two Name Badge number Telephone number Date and time
Hole Watch
Authorised Gas Tester
Atmospheric Hazard Tested Acceptable Range of Hazard Actual Reading (Record) Acceptable (Yes / No)
Oxygen Content 20.0% - 21.5% %
Combustible Gas (% LEL) 0% %
Other (specify): PEL = ppm ppm
Other (specify): PEL = ppm ppm
Gas Test Three Name Badge number Telephone number Date and time
Hole Watch
Authorised Gas Tester
Atmospheric Hazard Tested Acceptable Range of Hazard Actual Reading (Record) Acceptable (Yes / No)
Oxygen Content 20.0% - 21.5% %
Combustible Gas (% LEL) 0% %
Other (specify): PEL = ppm ppm
Other (specify): PEL = ppm ppm
Gas Test Four Name Badge number Telephone number Date and time
Hole Watch
Authorised Gas Tester
Atmospheric Hazard Tested Acceptable Range of Hazard Actual Reading (Record) Acceptable (Yes / No)
Oxygen Content 20.0% - 21.5% %
Combustible Gas (% LEL) 0% %
Other (specify): PEL = ppm ppm
Other (specify): PEL = ppm ppm
Gas Test Five Name Badge number Telephone number Date and time
Hole Watch
Authorised Gas Tester
Atmospheric Hazard Tested Acceptable Range of Hazard Actual Reading (Record) Acceptable (Yes / No)
Oxygen Content 20.0% - 21.5% %
Combustible Gas (% LEL) 0% %
Other (specify): PEL = ppm ppm
Other (specify): PEL = ppm ppm
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 27 of 59
THE CIRCUMSTANCES AND CONDITIONS OF THE JOB WILL DETERMINE THE SAFETY REQUIREMENTS AND WHAT
YOUR STANDBY DUTIES ARE. HOWEVER, THE FOLLOWING DUTIES ARE BASIC TO ALL JOBS:
• Do not leave your assignment while personnel are inside the vessel or confined space.
• (The only exception is to get help in an emergency). If other duties require you to leave your standby post, have all
personnel evacuate the enclosure.
• If you have any questions regarding your job, check with your foreman.
• BE ALERT, and try to anticipate and / or prevent any conditions that could be hazardous.
• Prevent interference of air lines and / or lifelines.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 28 of 59
• If you are required to have respiratory equipment and lifelines, be sure you know how to use this equipment.
• Upon completion of the job, clean and return all special equipment to its original location.
Hole Watch Name Badge number Telephone number Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 29 of 59
SECTION 6: APPROVALS
Worksite NDE coordinator informed of NDE activity Yes No
Name Badge number Signature Date
CONTRACTOR representative
PTW Issuing Authority
Permit start (time / date) Permit finish (time / date)
SECTION 7: PTW ACCPETED BY CONTRACTOR
PTW Holder (Work supervisor) Name Badge number Telephone number Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 30 of 59
SECTION 4: APPROVALS
Name Badge number Signature Date
CONTRACTOR representative
PMC / IC HSSE Manager
PMC / IC Construction Manager
PTW Issuing Authority
Permit start date Permit finish date
SECTION 5: PTW ACCEPTED BY CONTRACTOR
PTW Holder (Storage supervisor) Name Badge number Telephone number Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 31 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 32 of 59
Prior to use of any work platform suspended from cranes or derricks for hoisting personnel, the highest
level of Project Management (i.e. Construction Manager) shall determine if the use of conventional
means is more hazardous or not possible because of structural design or worksite conditions.
CONTRACTOR shall submit justification below for Construction Manager approval.
Reason for use
NOTE: This copy shall be used for each lift and a copy kept inside the crane cab or operator's station. The form shall be
filed in the HSSE Office files after use.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 33 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 34 of 59
Documentation of lift capacity information is required before using work platform suspended from cranes
This Checklist to be filled out prior to using work platform and information shall be retained in project site files
Sub-Contractor Operator / Crane
Supervisor
Sub-Contractor Work Supervisor
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 35 of 59
Yes / No
SECTION 3: APPROVALS
Name Badge number Signature Date
Lead Electrical Field Engineer /
Electrical Superintendent
PTW Issuing Authority
Permit start date Permit finish date
SECTION 4: PTW ACCEPTED BY CONTRACTOR
PTW Holder (Work supervisor) Name Badge number Telephone number Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 36 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 37 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 38 of 59
Work description
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 39 of 59
SECTION 2: HAZARDS
Flammable Combustible Corrosive
Material hazardous properties
Yes No Yes No Yes No
Irritant Toxic Carcinogenic Dangerous to the Environment
Yes No Yes No Yes No Yes No
Distance from nearest building, fabrication
shop, etc
Distance from nearest occupied buildings
SECTION 3: APPROVALS
Name Badge number Telephone No. Date
CONTRACTOR HSSE Manager
Electrical Engineer
Issuing Authority (HSSE Manager)
Permit start date Permit finish date
SECTION 4: PTW ACCPETED BY CONTRACTOR
PTW Holder (Work supervisor) Name Badge number Telephone No. Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 40 of 59
SECTION 3: OPERATORS
Name Badge number Name Badge number
OPERATOR #1 OPERATOR #2
OPERATOR #3 OPERATOR #4
SECTION 4: APPROVAL
Name Badge number Signature Date
CONTRACTOR HSSE Manager
PTW Issuing Authority
Permit start date Permit finish date
SECTION 5: PTW ACCEPTED BY CONTRACTOR
PTW Holder (Work supervisor) Name Badge number Telephone no. Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 41 of 59
1) Permit No:
2) Date of Issue:
3) Type of Permit:
4) Description of work (inc. work location)
7) Validity
a) The permit should clearly state the time and dates between which it is valid. Yes / No
b) Is permit revalidation being signed and dated by Issuing Authority? Yes / No
c) Are revalidations up to date? Yes / No
8) Hazards
a) Are hazards clearly identified? Yes / No
b) Are they directly applicable to job being undertaken? Yes / No
9) Precautions
a) Are appropriate precautions identified and specific enough? Yes / No
b) Have other affected personnel outside the permit area been notified of the permit work? Yes / No
If yes, have they appended their signature? Yes / No
c) Have all precautions been implemented at the worksite? Yes / No
If no, explain deficiency
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 42 of 59
If not, specify
12) Isolation
a) Are isolation certificates attached to the permit? Yes / No
b) Are they cross-referenced? Yes / No
c) Do certificates or attachments detail specific isolation points? Yes / No
d) Are all isolations secure? Yes / No
e) Are all isolations tagged? Yes / No
f) If more than one task on same isolation, has multiple lock/key system or other suitable control
Yes / No
been used?
If so, give details
Inspector:
Name (Capitals): Signature: Time: Date:
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 43 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 44 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 45 of 59
Task Planning
Standard equipment required (9) Special equipment and tools (10) Support craft and third party (11)
Example: Excavator, manlift, compressor, Example: radios, special testing meters, Example: Equipment Vendor, laborers,
crane, forklift, truck special tools, SCBA special hole drilling, testing company
Risk Management
Safe Work Practices (12) Basic Safeguards (13) PPE Required (14)
Asbestos abatement Arc shields Arc suit
Confined space entry Barricades Chemical resistant clothing
Crane lift study Crane suspended work platform Eye protection
Electrical - close proximity Fire extinguishers located Fall protection
Excavations and shoring Fire watch Foot wear
Hot taps Hole covers Hand protection
Lead abatement Hole watch Head protection
Line breaking / equipment Housekeeping Hearing protection
opening Lighting - additional Respirator (RPE)
Lock-Out / Tag-Out Post warning signs Weather resistant clothing
MSDS and labeling Scaffolding Work breaks and shade for heat
Water for heat stress Tools and equipment in good stress
condition and colour coded
Other: Ventilation / exhaust systems Other:
Communication
Stop work conditions (reminders) (15)
Adjacent work hazards Chemical spills or releases Excessive noise Fires and explosions
Change in conditions Evacuation alarm Extreme weather Unusual odours
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 46 of 59
Acknowledgement
I acknowledge receiving and understanding these instructions, I will fully comply with the assigned task
requirements (17)
Initials and Surname (Print) Badge number Signature Date
Acknowledgement
To be completed at the end of each shift. (18)
I hereby declare that I have not been injured today.
Initials and Surname (Print) Badge number Signature Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 47 of 59
Appendix R – Deleted
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 48 of 59
HOLD
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 49 of 59
Method to be used
Certificate Validity
This Certificate valid From Date Time
This Certificate Expires Date Time
This Certificate has been Date Time
extended to
Extension Approved by
Issuing Authority
Name (Capitals) Signature Time Date
Override Completed
Authorised Engineer
Name (Capitals) Position (Capitals) Signature Date Time
Re-instatement
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 50 of 59
Re-instatement Requested
Issuing authority
Name (Capitals) Signature Time Date
Override Cancellation
Safety System Override Re-instatement Complete and Tested
Authorised Engineer
Name (Capitals) Signature Time Date
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 51 of 59
SECTION 3: Approvals
Name: Badge no: Signature: Date:
PTW Issuing
Authority:
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 52 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 53 of 59
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision 4
Ras Laffan, Qatar Page 54 of 59
C1 Buildings C4 Feed Gas Processing (FGP) C6 GTL Facilities C7 Off-Plot & Jetty
C1-P Admin & CCR Area C4-H Receiving facilities C6-A GTL Facilities Ph 1 C7-V Loading Lines
C1-PA Admin & Control Bldgs. C4-HA Slug Catcher C6-AA 2nd Stage HPS C7-VZ General
C1-PB Storage / Warehousing C4-HB Cond. Stab. Common & Ph.1 C6-AB 1st Stage HPS C7-W LPG Storage
C1-PZ General C4-HC Cond. Stab. Ph.2 + Future C6-AC SGP C7-WZ General
C2 Air separation Units (ASU) C4-HD E-W Piperack C6-AD N-S Piperack C7-Z Loading Jetty
C2-F Units 1-4 Ph1 ASU's C4-HZ General C6-AZ General C7-ZZ General
C2-FA ASU-1 Ph 1 C4-J Processing Ph 1 C6-B GTL Facilities Ph 2 C8 Effluent Treatment Plant (ETP)
C2-FB ASU-2 Ph1 C4-JA AGR. & DMR C6-BA 2nd Stage HPS C8-N Effluent Treatment
C2-FC ASU-3 Ph 1 C4-JB NGL, LPG & Ethane C6-BB 1st Stage HPS C8-NA AOC, COC, etc.
C2-FD ASU-4 Ph1 C4-JC Chilled Water C6-BC SGP C8-NB Biotreater, etc. Ph. 1
C2-FE S/Stn & FAR's C4-JD E-W Piperack C6-BD N-S Piperack C8-NC Biotreater, etc. Ph. 2
C2-FF LIN & LOX C4-JZ General C6-BZ General C8-ND Effluent Water, RO, etc.
C2-FG N-S Piperack C4-K Processing Ph 2 C6-C GTL Power Generation C8-NE FAR
C2-FZ General C4-KA AGR. & DMR C6-CA Steam Turbine Generator C8-NF Future
C2-G Units 1-4 Ph2 ASU's C4-KB NGL, LPG & Ethane C6-CB Steam Generator & IA C8-NZ General
C2-GA ASU-1 Ph 2 C4-KC Chilled Water C6-CC Power Generation Buildings PMC PMC Office Complex
C2-GB ASU-2 Ph2 C4-KD E-W Piperack C6-CD Gas Turbine Generator
C2-GC ASU-3 Ph 2 C4-KZ General C6-CE BFW
C2-GD ASU-4 Ph2 C4-L SRU & SCOT C6-CF Condensate Recovery EPCM EPCM Office Complex
C2-GE S/Stn & FAR's C4-LA SRU & SCOT Ph. 1 C6-CJ E-W Piperack Ph. 1 (North)
C2-GG N-S Piperack C4-LB SRU & SCOT Ph. 2 C6-CK E-W Piperack Ph. 2 (South)
C2-GZ General C4-LC Common Storage Area C6-CZ General TSF Pioneer Office
C4-LZ General
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 55 of 59
C3 Tank Farm C5 Liquid Processing Units ( LPU ) C6-U GTL General Utilities C Camp Complex
C3-M Gas Oil C5-D Units Ph 1 C6-UA CW Ph 1 + Waste Disp. (North)
C3-MA Gas Oil Tanks North C5-DA LDF C6-UB CW Ph 2 (South) CEW Early Works Camp
C3-MB Gas oil Tanks South C5-DB Downstream Units C6-UC Water Treatment CSTF JK Staff Camp
C3-MZ General C5-DC HMU & SMR Units C6-UD Flare CC1 Buildings Contractor Camp
C3-Q Kero, Naptha & Slops C5-DZ Common C6-UE Future CC2 ASU Contractor Camp
C3-QA Kerosene C5-E Units Ph 2 C6-UZ General CC3 Tanks Contractor Camp
C3-QB Naptha C5-EA LDF C6-Z General & Infrastructure CC4 Feed Gas Preparation(FGP) Contr. Camp
C3-QC Hot Slops Ph 1 C5-EB Downstream Units C6-ZC Main Cable Routes CC5 LPU/HMU Contractor Camp
C3-QD Hot Slops Ph 2 C5-EC HMU & SMR Units CC6 EPCM GTL / Util / BDI / Add'l. Plant Bldgs.
C3-QZ General C5-EZ Common MOF Material Offloading Facility Contractor Camp
C3-R Base Oil & Misc. CC7 Jetty & Offplots Contractor Camp
C3-RA Base Oil & Misc. (North) LD Laydown Areas (cont'd) CC8 Effluent Treatment Plant Contractor Camp
C3-RB Base Oil & Misc. (South) LDC7 Jetty & Offplots Fab & Laydown Area HTK Harbour Tanks CCM2B Civil & Mechanical Contractor Camp
C3-RZ General LDC8 ETP Fab & Laydown Area CC11 Spare Contractor Camp
LD Laydown Areas LDJK JK Fab & Laydown Area CGB1 Camp Area Greenbelt-1
LDC2 ASU Fab & Laydown Area LDEQ Heavy Equipment Yard WWT Waste Water Treatment CGB2 Camp Area Greenbelt-2
LDC3 Tank Fab & Laydown Area LDMT MMT Laydown Area CGB3 Camp Area Greenbelt-3
LDC4 FGP Fab & Laydown Area LDFS Main Fuel Storage CGB4 Camp Area Greenbelt-4
LDC5 LPU/HMU Fab & Laydown Area BAT Batch Plant
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 56 of 59
A B C D E
Environment
Reputation
Severity
People
Asset
Has happened in Has happened at Has happened
Never heard of in Heard of in the G&P or more than QSGTL or more more than once
the industry. industry. once per year in than once per year per year at
the industry. in G&P. QSGTL.
No injury or health
0 No damage. No effect. No impact. Low Low Low Low Low
affect.
3
Slight injury or Slight damage. Slight effect. <1m Slight impact. Local
1 Low Low Low Low Low
health effect FAC. <$10,000. contained. community.
3
Minor injury or Minor damage. Minor effect. >1m Minor impact. Local Low
2 Low Low Medium Medium
health effect MTC. >$10,000. no lasting effect. media.
Moderate effect
Major injury or Moderate damage. 3 Moderate impact.
3 >10m requires Low Low Medium Medium High
health effect LTD. $100,000 to $1m. Regional media.
clean-up.
Major effect.
PTD or up to 3 Major damage. $1m 3 Major impact.
4 >100m extensive Low Medium Medium High High
fatalities. to $10m. National media.
clean-up.
Massive effect
3
>100m extensive
More than 3 Massive damage. Massive impact.
5 clean-up and Medium Medium High High High
fatalities. >$10m. International media.
remediation
measures.
Low Notes PTD Permanent Total Disability
Medium Risk Assessment Matrix FAC First Aid Case MTC Medical Treatment Case
High (RAM) LTI Lost Time Incident LTD Long Term Disability
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 57 of 59
1 Slight Injury or health effect - Not affecting work performance and not affecting daily life 1 Slight damage – Cost is less than $10,000. E.g.
activities. E.g.
• No disruption to the operation.
• First aid cases and medical treatment cases.
• Exposure to health hazards that give rise to noticeable discomfort, minor irritations or
transient effects reversible after exposure stops.
2 Minor Injury or health effect - Affecting work performance, such as restriction to work 2 Minor damage – Costs between $10,000 and $100,000. E.g.
activities or the need to take up to 5 days to fully recover. Or affecting daily life activities
for up to 5 days. Or reversible health effects. E.g. • Brief disruption to operations.
• Restricted workday cases or lost work day cases resulting in up to 5 calendar days
away from work.
3 Major injury or health effect – Affecting work performance in the longer term, such as 3 Moderate damage - Costs between $100,000 and $1,000,000. E.g.
absence from work for more than 5 days. Or affecting daily life activities for more than 5
days. Or irreversible damage to health. E.g. • Partial shutdown.
• Illnesses such as sensitisation, noise induced hearing loss, chronic back injury,
repetitive strain injury or stress.
4 Permanent Total Disability * (PTD) or one to three fatalities – Resulting from injuries 4 Major damage - Costs between 1 and $10,000,000. E.g.
or occupational illness. E.g.
• Up to two weeks shutdown.
• Illnesses such as corrosive burns, asbestosis, silicosis, cancer and serious work
related depression.
5 More than three fatalities – Resulting from injuries or occupational illness. E.g. 5 Massive damage - Costs in excess of $10,000,000. E.g.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 58 of 59
• Multiple asbestosis cases traces to a single exposure situation. • Substantial or total loss or operation.
0 No effect. 0 No impact.
1 Slight effect – Slight environmental damage – contained within the premises. E.g. 1 Slight effect.
• Small spill in process area or tank farm area that readily evaporates. • Local public awareness but no discernible concern.
• No media coverage.
2 Minor effect – Minor environmental damage but no lasting effect. E.g. 2 Minor impact.
• Small spill -off site that seeps into the ground. • Local public concern.
3 Moderate effect - Limited environmental damage that will persist or will require cleaning 3 Moderate impact - Significant impact in region or county.
up. E.g.
• Regional public concern.
• Spill from a pipeline into soil/sand that requires removal and disposal of large
quantities of soil / sand. • Local stakeholders, e.g. community, NGO’s, industry and government are aware.
• Observed off-site affects or damage. E.g. fish killed, vegetation damaged. • Extensive attention in local media. Some regional or national media cover.
5887-ON-PR-HM-013
Permit To Work Procedure - Construction Phase
Pearl GTL Project Revision: 4
Ras Laffan, Qatar Page 59 of 59
• Frequent exceedance of statutory or other prescribed limits with potential long term
effects.
4 Major effect - Severe environmental damage that will require extensive measures to 4 Major impact – Likely to escalate and affect group reputation.
restore beneficial uses of the environment. E.g.
• National public concern.
• Oil spill at a jetty during tanker loading or off-loading that ends up on local beaches
requiring clean up operations. • Impact on national stakeholder relations. National government and NGO
involvement with potential for international NGO action.
• Off-site ground water contamination over an extensive area.
• Extensive attention in national media. Some international coverage.
• Many complaints from community organisations or local authorities.
• Potential for regulatory action leading to restricted operations or impact on operating
• Extended exceedance of statutory or other prescribed limits with potential long term licences.
effects.
5 Massive effect – Persistent severe environmental damage that will lead to loss of 5 Massive impact – Severe impact on group reputation.
commercial, recreational use or loss of natural resources over a wide area. E.g.
• International public concern.
• Crude oil spillage resulting in pollution of a large part of a river estuary and extensive
clean- up and remedial measures. • High level of concern amongst governments and action by international NGO’s.
5887-ON-PR-HM-013