NOTES:

1. BEFORE TRENCHING, THE EXACT LOCATION AND LEVEL OF THE FOREIGN LINE
WILL BE DETERMINED BY HAND-EXCAVATED TRENCH.

2. THE UNCOVERING OF THE BURIED PIPES OR CABLES SHALL BE CARRIED OUT BY


HAND EXCAVATION.

3. BEFORE BACKFILLING, THE COATING OF THE EXPOSED FOREIGN LINE WILL BE


TESTED BY A HOLIDAY DETECTOR AND COATING REPAIRS WILL BE CARRIED OUT IF
HOLIDAYS ARE DETECTED.

4. AGREEMENT WITH OWNER/OPERATOR OF THE FOREIGN CROSSED DISTANCES


LINES MAY NECESSITATE ADDITIONAL MEASURES OR DIFFERENT. DRAINAGES, D.I.
PIPES AND SEWERS HAVE TO BE TESTED BY HYDROSTATIC WATER TEST.

CROSSING OF FOREIGN CABLES OR PIPES 5. FOREIGN LINES HAVE TO BE TEMPORARILY SUPPORTED

LONGITUDINAL SECTION
LEGEND:
EXISTING CABLE
PLASTIC MESH FOREIGN PIPE
A TEMPORARY SUPPORT
NATURAL TERRAIN

REFERENCE DRAWINGS
DRAWING No.: DRAWING TITLE:

ENGINEER'S STAMP CONTRACTOR'S STAMP

SECTION A-A RESTORED SURFACE


SELECTED MATERIAL
DEPENDING ON THE SIZE AND MATERIAL OF THE FOREIGN
LINE, THE LINES HAVE TO BE
TEMPORARILY SUPPORTED IN THE PIPE TRENCH
SELECTED MATERIAL

FOREIGN LINE

Do. 0 Issue for Tender BR


BR
Ofner 12.08.2008
B Issue for Draft Tender Ofner 25.07.2008
A Issue for Engineering Report BR HARB 10.12.2007
TRENCH WALLS MAY HAVE TO BE SUPPORTED REV. DESCRIPTION DRAWN CHECKED DATE
TO AVOID DAMAGES ON THE EXISTING AND NEW PIPE
SALINE WATER CONVERSION CORPORATION
KINGDOM OF SAUDI ARABIA

AL LITH
WATER TRANSMISSION SYSTEM

CONSULTING
ILF CONSULTING ENGINEERS
ENGINEERS

Subconsultant: DRAWING TITLE:

P H S TYPICAL CROSSING OF
FOREIGN CABLES OR PIPES

SCALE: DRAWING SHEET REV.


No.:

--- QP10 -U- 705 - 0