Você está na página 1de 18

VALORIZ

VALORIZACIN N 01

OBRA: MEJORAMIENTO DEL PARQUE RECREACIONAL SANTA BARBARA DE LA LOCALIDAD DE HUACULLANI, DISTRITO DE HUACUL

Costo Total del Proyecto (S/.) :

Presupuesto Asignado (S/.):

tem Partidas Und

01 TRABAJOS PRELIMINARES

01.01 ALMACEN Y CASETA DE GUARDIANIA GLB

01.02 LIMPIEZA DEL TERRENO m2

01.03 TRAZO Y REPLANTEO CON TOPOGRAFO m2

01.04 DEMOLICION DE ESTRUCTURAS EXISTENTES m3

02 MOVIMIENTO DE TIERRAS

02.01 CORTE DE MATERIAL C/ MAQUINARIA m3

02.02 EXCAVACION MANUAL m3

02.03 RELLENO CON MATERIAL PROPIO m3

02.04 ACARREO DE MATERIAL EXCEDENTE m3

02.05 ELIMINACION DE MATERIAL EXCEDENTE m3

03 OBRAS DE CONCRETO SIMPLE

03.01 SOLADO PARA ZAPATAS MEZCLA 1:12 m2

03.02 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3


03.03 CONCRETO EN SARDINELES m3

03.04 ENCOFRADO Y DEDESENCOFRADO EN SARDINELES m2

04 OBRAS DE CONCRETO ARMADO

04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3

04.02 ZAPATAS, ACERO FY=4200 KG/CM2 kg

04.03 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3

04.04 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2

04.05 COLUMNAS, ACERO FY = 4200 KG/CM2 kg

04.06 BANCAS, JARD: CONCRETO F'C= 175 KG/CM2 m3

04.07 BANCAS,JARD: ENCOFRADO Y DESENCOFRADO m2

04.08 BANCAS,JARD: ACERO FY = 4200KG/CM2 kg

04.09 CONCRETO MUROS DE CONTENCION F'C=210 KG/CM2 m3

04.10 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2

04.11 MURO DE CONTENCION ACERO FY = 4200 KG/CM2 kg

04.12 CONCRETO F'C= 210KG/CM2, EN OBILISCO m3

04.13 ENCOFRADO Y DESENCOFRADO EN OBILISCO m2

04.14 ACERO FY = 4200KG/CM2 EN OBILISCO kg

05 REBOQUES Y ENLUCIDOS

05.01 TARRAJEO EN EXTERIORES m2

05.02 TARRAJEO EN COLUMNAS m2

05.03 TARRAJEO PRIMARIO m2

05.04 TARRAJEO CON ESCARCHADO FINO m2

05.05 BRUAS m

06 PISOS Y PAVIMENTOS

06.01 NIVELACIN Y COMPACTADO MANUAL m2

06.02 EMPEDRADO DE PISO E=6" m2

06.03 FALSO PISO DE 4" DE CONCRETO 1:8 m2


06.04 PISO PIEDRA LAJA m2

06.05 PISO PIEDRA POMES m2

06.06 PISO GRAVILLA BLANCA m2

06.07 PISO CANTO RODADO m2

06.08 PISO DE TERRAZO CON PERFILES DE ALUMINIO m2

07 ENCHAPES

07.01 ENCHAPE CON PIEDRA LAJA m2

07.02 ENCHAPES CON PIEDRA POMES m2

08 AREAS VERDES

08.01 SEMBRADO DE CESPED EN JARDINERAS m2

08.02 SEMBRADO DE PLANTAS HORNAMENTALES und

09 CARPINTERIA METALICA

09.01 ARCO VIRTUAL und

09.02 REJA METALICA TIPO 1 und

09.03 BARANDA DE TUBO FIERRO GALVANIZADO m

09.04 POSTE PARA LUMINARIAS und

10 PINTURA

10.01 PINTURA EN EXTERIORES m2

10.02 PINTURA EN CARPINTERIA METALICA m2

11 INSTALACIONES SANITARIAS

11.01 SALIDA DE AGUA FRIA PVC pto

11.02 TUBERIA PVC CLASE-10 DE 1/2" m

11.03 VALVULA DE COMPUERTA DE BRONCE 1/2" und

11.04 GRIFO DE BRONCE 1/2" und

12 INSTALACIONES ELECTRICAS

12.01 SALIDA PARA PTOS DE LUZ pto

12.02 REFECTOR QVF 135/300 W HALOGENO und


12.03 TUBERIA PVC SEL DE 3/4 ML

12.04 TABLERO GENERAL DE DISTRIBUCION und

12.05 CABLE ELECTRICO NYY2X1X6MM2 ML

01 FLETES

01.01 FLETE TERRESTRE GLB

01.02 C GLB

01 PLACA RECORDATORIA

01.01 PLACA RECORDATORIA und

01 PRUEBAS DE LABORATORIO

01.01 DISEO DE MEZCLAS AGR. und

01.02 ENSAYO RESISTENCIA COMPRESIN CONCRETO und

01 CARTEL DE OBRA TIPO GIGANTOGRAFIA

01.01 CARTEL OBRA und

COSTO DIRECTO
GASTOS GENERALES (11.21%CD)
GASTOS DE SUPERVISION (3.37%CD)
GASTOS DE LIQUIDACION (0.85%CD)
EXPEDIENTE TECNICO (4.58%)
PRESUPUESTO TOTAL

% AVANCE FSICO EJECUTADO

% AVANCE FSICO PROGRAMADO


FORMATO RO - 06

VALORIZACIN MENSUAL DEL MES DE ENERO DEL 2014

Mes Jan-14

UACULLANI, DISTRITO DE HUACULLANI - CHUCUITO - PUNO Plazo de Ejecucin: 90 dias

259,026.51 Fecha de Inicio 20 de Enero del 2014

259,026.51 Fecha de termino

Costo Parcial Costo Parcial


ANTERIOR ACTUAL
(S/.) (S/.)
Metrado
Unitario Parcial Valorizacin
Metrado % Metrado
(S/.) (S/.) Total
-
9,747.10 -

1.00 600.00 600.00 - - 0.00% 1.00

771.73 0.22 169.78 - - 0.00% 561.40

771.73 0.39 300.97 - - 0.00% 438.90

88.48 98.06 8,676.35 - - 0.00% 88.48

6,388.15 -

55.98 6.03 337.56 - - 0.00% 45.60

100.60 41.06 4,130.64 - - 0.00% 38.15

50.30 17.64 887.29 - - 0.00% 6.20

50.30 16.61 835.48 - - 0.00% 28.70

50.30 3.92 197.18 - - 0.00% 25.40

15,732.48 -

66.81 19.20 1,282.75 - - 0.00% -

33.00 250.49 8,266.17 - - 0.00% -


7.92 260.64 2,064.27 - - 0.00% -

105.84 38.92 4,119.29 - - 0.00% -

76,554.66 -

62.31 290.53 18,102.92 - - 0.00% -

133.10 4.95 658.85 - - 0.00% -

6.43 328.82 2,114.31 - - 0.00% -

60.46 44.54 2,692.89 - - 0.00% -

622.12 5.12 3,185.25 - - 0.00% -

4.99 304.41 1,519.02 - - 0.00% -

133.75 37.36 4,996.90 - - 0.00% -

419.33 5.11 2,142.78 - - 0.00% -

31.00 329.84 10,225.04 - - 0.00% -

311.08 37.73 11,737.05 - - 0.00% -

1,534.65 7.24 11,110.87 - - 0.00% -

2.85 343.20 978.12 - - 0.00% -

105.50 37.36 3,941.48 - - 0.00% -

616.28 5.11 3,149.19 - - 0.00% -

5,698.27 -

281.00 11.12 3,124.72 - - 0.00% -

84.40 17.28 1,458.43 - - 0.00% -

45.20 9.14 413.13 - - 0.00% -

36.82 16.56 609.74 - - 0.00% -

75.00 1.23 92.25 - - 0.00% -

48,296.83 -

350.00 3.21 1,123.50 - - 0.00% -

350.00 8.96 3,136.00 - - 0.00% -

350.00 27.00 9,450.00 - - 0.00% -


83.54 110.92 9,266.26 - - 0.00% -

5.75 174.06 1,000.85 - - 0.00% -

162.35 119.16 19,345.63 - - 0.00% -

12.60 58.56 737.86 - - 0.00% -

45.00 94.15 4,236.75 - - 0.00% -

5,002.26 -

24.87 121.00 3,009.27 - - 0.00% -

11.45 174.06 1,992.99 - - 0.00% -

5,705.00 -

361.88 14.98 5,420.96 - - 0.00% -

12.00 23.67 284.04 - - 0.00% -

27,379.85 -

9.00 1,435.29 12,917.61 - - 0.00% -

53.00 146.90 7,785.70 - - 0.00% -

54.00 84.61 4,568.94 - - 0.00% -

20.00 105.38 2,107.60 - - 0.00% -

2,719.82 -

121.22 8.56 1,037.64 - - 0.00% -

223.10 7.54 1,682.17 - - 0.00% -

1,549.96 -

8.00 14.67 117.36 - - 0.00% -

180.00 5.75 1,035.00 - - 0.00% -

4.00 44.92 179.68 - - 0.00% -

8.00 27.24 217.92 - - 0.00% -

2,528.37 -

20.00 4.60 92.00 - - 0.00% -

20.00 33.67 673.40 - - 0.00% -


210.00 1.57 329.70 - - 0.00% -

1.00 234.17 234.17 - - 0.00% -

210.00 5.71 1,199.10 - - 0.00% -

5,000.00 -

1.00 3,000.00 3,000.00 - - 0.00% 0.50

1.00 2,000.00 2,000.00 - - 0.00% 0.50

652.67 -

1.00 652.67 652.67 - - 0.00% -

1,700.00 -

6.00 200.00 1,200.00 - - 0.00% -

20.00 25.00 500.00 - - 0.00% -

1,200.00 -

1.00 1,200.00 1,200.00 - - 0.00% -

215,855.43 -

24,197.39 0.00

7,263.58 0.00

1,834.82 0.00

9,875.44 0.00

259,026.66 0.00

100% 0.00%

100%
O DEL 2014
MUNICIPALIDAD DISTRITAL
HUACULLANI

Jan-14 Ubicacin Localidad de Huacullani

Departamento Puno

de Enero del 2014 Provincia Chucuito

Distrito Huacullani

ACTUAL ACUMULADO SALDO

Valorizacin Valorizacin
% Metrado % Metrado SALDO
Total Total

600.00 100.00% 1.00 600.00 100.00% - -

123.51 72.75% 561.40 123.51 72.75% 210.33 46.27

171.17 56.87% 438.90 171.17 56.87% 332.83 129.80

8,676.35 100.00% 88.48 8,676.35 100.00% 0.00 0.00

274.97 81.46% 45.60 274.97 81.46% 10.38 62.59

1,566.44 37.92% 38.15 1,566.44 37.92% 62.45 2,564.20

109.37 12.33% 6.20 109.37 12.33% 44.10 777.92

476.71 57.06% 28.70 476.71 57.06% 21.60 358.78

99.57 50.50% 25.40 99.57 50.50% 24.90 97.61

- 0.00% - - 0.00% 66.81 1,282.75

- 0.00% - - 0.00% 33.00 8,266.17


- 0.00% - - 0.00% 7.92 2,064.27

- 0.00% - - 0.00% 105.84 4,119.29

- 0.00% - - 0.00% 62.31 18,102.92

- 0.00% - - 0.00% 133.10 658.85

- 0.00% - - 0.00% 6.43 2,114.31

- 0.00% - - 0.00% 60.46 2,692.89

- 0.00% - - 0.00% 622.12 3,185.25

- 0.00% - - 0.00% 4.99 1,519.02

- 0.00% - - 0.00% 133.75 4,996.90

- 0.00% - - 0.00% 419.33 2,142.78

- 0.00% - - 0.00% 31.00 10,225.04

- 0.00% - - 0.00% 311.08 11,737.05

- 0.00% - - 0.00% 1,534.65 11,110.87

- 0.00% - - 0.00% 2.85 978.12

- 0.00% - - 0.00% 105.50 3,941.48

- 0.00% - - 0.00% 616.28 3,149.19

- 0.00% - - 0.00% 281.00 3,124.72

- 0.00% - - 0.00% 84.40 1,458.43

- 0.00% - - 0.00% 45.20 413.13

- 0.00% - - 0.00% 36.82 609.74

- 0.00% - - 0.00% 75.00 92.25

- 0.00% - - 0.00% 350.00 1,123.50

- 0.00% - - 0.00% 350.00 3,136.00

- 0.00% - - 0.00% 350.00 9,450.00


- 0.00% - - 0.00% 83.54 9,266.26

- 0.00% - - 0.00% 5.75 1,000.85

- 0.00% - - 0.00% 162.35 19,345.63

- 0.00% - - 0.00% 12.60 737.86

- 0.00% - - 0.00% 45.00 4,236.75

- 0.00% - - 0.00% 24.87 3,009.27

- 0.00% - - 0.00% 11.45 1,992.99

- 0.00% - - 0.00% 361.88 5,420.96

- 0.00% - - 0.00% 12.00 284.04

- 0.00% - - 9.00 12,917.61

- 0.00% - - 0.00% 53.00 7,785.70

- 0.00% - - 0.00% 54.00 4,568.94

- 0.00% - - 0.00% 20.00 2,107.60

- 0.00% - - 0.00% 121.22 1,037.64

- 0.00% - - 0.00% 223.10 1,682.17

- 0.00% - - 0.00% 8.00 117.36

- 0.00% - - 0.00% 180.00 1,035.00

- 0.00% - - 0.00% 4.00 179.68

- 0.00% - 8.00 217.92

- 0.00% - - 0.00% 20.00 92.00

- 0.00% - - 0.00% 20.00 673.40


- 0.00% - - 0.00% 210.00 329.70

- 0.00% - - 0.00% 1.00 234.17

- 0.00% - - 0.00% 210.00 1,199.10

1,500.00 50.00% 0.50 1,500.00 50.00% 0.50 1,500.00

1,000.00 50.00% 0.50 1,000.00 50.00% 0.50 1,000.00

- 0.00% - - 0.00% 1.00 652.67

- 0.00% - - 0.00% 6.00 1,200.00

- 0.00% - - 0.00% 20.00 500.00

1,200.00

14,598.08 14,598.08 201,257.35

1,636.44 1,636.44 22,560.95

491.23 491.23 6,772.35

124.09 124.09 1,710.73

667.87 667.87 9,207.57

17,517.70 17,517.70 241,508.95

6.76% 6.76% 93.24%

8.50% 8.50% 91.50%

22,017.27 22,017.27 237,009.39


ALIDAD DISTRITAL
ACULLANI

SALDO

0.00%

27.25%

43.13%

0.00%

18.54%

62.08%

87.67%

42.94%

49.50%

100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
100.00%

100.00%

100.00%

50.00%

50.00%

100.00%

100.00%

100.00%

100.00%

Você também pode gostar