Escolar Documentos
Profissional Documentos
Cultura Documentos
Inspection Priority
Bundle Corrosion 15
External Deterioration 15
Fretting 15
Internal Corrosion 15
Inspection Location
Internal Corrosion No. of Recommended Locations External Corrosion No. of Recommended Locations
No. of Heads/Covers:
0 Heads: 0 No. of Barrier Penetrations: 0 0
Inspection Plan
Damage Mechanism Insp. Location Method Extent Availability Last Insp. Due Date Freq., Preparation Driver Override
Priority Date Frequency
Bundle Corrosion 15 Eddy Current 10% of Tubes (Min. Shutdown 27/09/2005 25/09/2015 10 MI
Testing or with Eddy Current -50
IRIS tubes; Min. with IRIS -
10 tubes) (Date In
Service of the Bundle
was used as last
inspection date.)
Representative Asset
Damage Mechanism Method Equipment ID Last Insp. Date Due Date Frequency Comment
Comment
Inspection Planning
The signature below certify that the above is a true report of the inspection / test of the equipment specified and
consider fit for service until the date of next inspection.
Approved by:
Signature: Date:
Signature: Date: