AS BUILT DATA FOR CONNECTION POINTS


MH NAME GROUND INVERT
Northing EASTING ELEVATIO ELEVATIO
Main line Secondary Additional N N L Remark DEPTH
Secondary MWB292 995579.418 465171.68 2447.867 2445.936 27.60 12,13 1.93 465171.681,995579.418
Additional INSTAL PIPE 995565.151 465195.31 2447.285 7.85 12,14 2447.29 465195.313,995565.151
Trunk MW147A 995,586.39 465,175.28 2,447.41 2,442.79 29.20 14,13 4.62 465175.28,995586.39
0.00 ,
Secondary MW294 995479.129 465221.01 2446.546 2444.677 1.87 465221.014,995479.129
Main line must be
Additional INSTAL PIPE 995502.86 465222.02 2446.639 23.75 shifted/ additional 2446.64 465222.024,995502.86
Trunk MW146 995,526.31 465,214.22 2,446.65 2,442.15 24.71 manhole 4.50 465214.22,995526.31
47.67 0.00 ,
Secondary MW142A 995515.453 465388.53 2442.181 7.89 2442.18 465388.527,995515.453
Trunk MW142 995,523.26 465,387.37 2,441.18 2,438.57 7.89 2.61 995523.26,465387.37
1,098,932.19 0.00 ,
Secondary MWB341 995409.022 466127.67 2435.722 2433.85 1,099,142.45 1.87 466127.672,995409.022
Additional INSTAL PIPE 995445.905 466184.51 2432.879 67.75 Main line must be 2432.88 466184.506,995445.905
Trunk MW127 995,450.92 466,193.47 2,432.63 2,428.32 10.27 shifted 4.31 466193.47,995450.92
1,099,208.30 0.00
ALREADY LAID BUT
Secondary MW126 995372.744 466199.94 2432.167 2430.388 1,099,140.25 READING IS NOT 1.78 466199.942,995372.744
Trunk MW126 995,390.68 466,232.80 2,430.80 2,427.96 37.43 TAKEN 2.84 466232.8,995390.68
1,099,170.43 0.00 ,
Secondary MWB36 994,794.83 465828.23 2416.638 2414.862 1,098,459.23 1.78 465828.227,994794.825
Additional INSTAL PIPE 994,760.37 465825.17 2413.658 34.59 Main line must be -2413.66 465825.165,994760.366
Trunk MW57AS 994742.101 465819.12 2406.78 19.24 shifted -2406.78 465819.119,994742.1012
1,098,407.62 0.00
Secondary MWB64 994772.153 465738.87 2414.762 1,098,426.72 2414.76 465738.868,994772.153
Additional MWB63A 994767.149 465748.48 2413.673 10.83 MH not casted 2413.67 465748.476,994767.149
Trunk MW57AT 994724.394 465743.79 2407.36 43.01 -2407.36 465743.7871,994724.3935
48.01 0.00
Secondary MWB101A 994887.862 465395.97 2426.813 1,098,360.26 MH not casted 2426.81 465395.968,994887.862
Trunk MW57AX 994837.04 465395.3 2413.06 50.83 -2413.06 465395.3,994837.04
1,098,313.94 0.00 ,
Secondary MWB73 994927.904 465190.08 2424.351 1,098,309.31 2424.35 465190.079,994927.904
Trunk MW57AZ 994900.26 465174.71 2417.59 2415.35 31.63 2.24 465174.71,994900.26
1,098,277.76 0.00 ,
Secondary MWB75 994984.868 465081.69 2428.014 1,098,315.01 2428.01 465081.69,994984.868
Additional MWB75T 994936.511 465077.3 2423.823 48.56 2423.82 465077.3,994936.511
Trunk MW57BA 994909.73 465077.03 2421.06 2418.25 26.78 2.81 465077.03,994909.73
0.00
0.00
Lot -3 Connnections
Manholes and
Structures
Slope MH not
Manhole L L
MH NAME Y X TOP Invert greater Additional
depth (m) (Fikru)
(%) 1.5m
Main line Secondary
MW55AY1 994821.10 464603.42 2425.81

MW55AX2 994741.31 464625.41 2423.91


994765.94 464649.08 2423.71 24.64 9.00 1.00
MW55AX1 994562.14 464904.51 2421.03 2418.23 179.17
203.80
MW55AW1 MW55AW2 20.00 1.00
MW55AU1 994282.90 465125.77 2409.58 2407.65
INSTALLED PI 994269.45 465115.15 2409.57 13.45 19.00 1.00 1 0.90
MW55AU 994256.02 465102.59 2408.63 2405.13 13.43

MW55AT1 994198.70 465233.20 2402.69 2400.95


INSTALLED PIP INSTALLED PI 994186.95 465223.85 2402.34 11.75 18.00 3.40 1 0.50
MW55AT 994171.56 465209.82 2400.84 2397.34 15.39

MW55AS1 994112.15 465341.84 2394.61 2392.79 14.94


INSTALLED PIPE 994097.21 465328.58 2394.02 12.90 13.00 2.60 1 0.50
MW55AS 994084.31 465321.05 2392.39 2388.89

MW55AR1 994050.15 465454.78 2390.94 2389.16 30.21


INSTALLED PI 994019.94 465430.48 2388.35 12.30 33.00 4.20 1 0.50
MW55AR 994007.64 465418.02 2386.41 2382.91

MW55AP1 993942.20 465600.64 2385.63 2383.78 36.91


INSTALLED PI 993905.30 465572.34 2382.49 10.88 23.00 3.80 1 0.50
MW55AP 993894.42 465562.01 2380.57 2377.07

MW55AM1 993893.91 465677.36 2381.96 2379.95 38.26


INSTALLED PI 993855.65 465648.51 2378.51 17.98 23.00 4.80 1 0.45
MW55AM 993837.67 465633.78 2376.59 2373.09

MW55AL1 993871.05 465716.60 2379.46 33.25


INSTALLED PI 993837.80 465689.78 2377.23 26.94 33.00 4.60 1 0.45
MW55AL 993810.86 465667.33 2374.39 2370.89

MW55AK1 993830.51 465747.65 2375.21 21.72


INSTALLED PI 993808.79 465728.26 2374.26 24.92 18.00 2.70 1 0.46
MW55AK 993783.87 465702.23 2372.14 2368.64

MW57M10 993226.92 466648.83 2324.73 2323.19 2.91 1


INSTALLED PI 993229.82 466635.25 2325.55 2.06
MW57W09 993227.76 466634.21 2325.69 2322.88

MW57M08 7.50
MW57M09 993251.34 466584.98 2330.33 8.15 1
MW57W10 993243.19 466581.73 2329.65 2326.85

MW55Y
MW55Y1 21.00

MW55M09V
MW55M06 86.50
324.00 10.00 Err:522
A B C D E F G H I J S T U V W X
Ite Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
6
m away
101-Precutting Paved 102-Removing Stone 201.Trench Excavation, Backfill 202.Trench rock
No. Surfaces Road Surfaces
7 & Cart away excavation
Manhole Pipe Type
Length A
Designation dia,
(Sewer Section) (m) (mm) a) b) c) a) b) e) Type A Type A trench Type a) b)
Concr Ordin Reinf Coble CARE Tile trench= trench= = A Grade Grade
8 ete ary orced stone stone 0-2 0-3 0-4 m trench 1- Soft 2-Hard
Aspha Aspha concr (m) (m) m m depth = 0- rock 3 rock
lt lt ete depth depth (m) 5m (m ) (m3)
(m) (m) (m) (m) (m) depth
9 LOT 1 (m) (m)
10 MW177 300
11 MWB261A 90.50 135.75 90.50 21.13 49.31
12 MWB261 10.87 10.87 10.87 6.68 15.58
13 MW175 300
14 MWB264
15 MWB267 76.28 26.28 50.00
16 MW171A 300
17 MWB452 66.66 99.99 66.66 31.40 73.26
18 MW169 600
19 MW269G 76.28 30.00 46.28 17.32 40.42
20 MW57BG 600
21 MWB160A 58.82 4.5 58.82 9.68 22.59
22 MW57BG 600
23 MW57BH 81.34 4.5 81.34 13.67 31.93
24 Total Lot 1 9.00 0.00 0.00 235.74 0.00 10.87 0.00 364.47 96.28 99.88 233.09
25 Prepared by:-__________________________ Checked BY:_____________________________
A B C D E F G H I J S T U V W X
26 LOT 2
27 MW147A 600
28 INSTAL PIPE 27.60 7.85 8.62 17.27
29 MWB292 29.20
30 MW146 600
31 INSTAL PIPE 24.71 24.71 13.98 32.62
32 MW294 23.75
33 MW142 600
34 MW142A 7.89 7.89 6.79 15.84
35 MW127
36 INSTAL PIPE 10.27 15.41 4.00 6.27 0.00 0.00
37 MWB341 67.75
38 MW126
39 MW330 37.43 56.15 37.43 23.93 55.84
40 MW57AS
41 INSTAL PIPE 19.24 19.24
42 MWB36 34.59
43 MW57AT
44 MWB63A 43.10 43.01 18.24 46.03
45 MWB64 10.83
46 MW57AX 600
47 MWB101A 50.83 50.83 43.59 101.71
48 MW57AZ 600
49 MWB73 31.63 31.63 22.92 53.49
50 MW57BA
51 MWB75T 48.56 40.17 48.56 24.14 56.32
52 MWB75 26.78
53 Page Total 2 0.00 0.00 0.00 111.72 0.00 0.00 48.56 171.74 11.85 49.28 162.21 379.11
54 Prepared by:-__________________________ Checked BY:___________
_______________________
A B C D E F G H I J S T U V W X
55 LOT 3
56 MW55Y
57 MW55Y1 31.5 11.00 10.00 3.68 7.35
58 MW55AX1
59 MW55AX2 13.50 6.00 3.00 3.09 6.17
60 MW55AW1
61 MW55AW2 30.00 20.00 2.80 5.60
62 MW55AU
63 INSTALLED PIPE 17.14
64 MW55AU1 18.39 4.5 28.50 19.00 7.58 15.16
65 MW55AT
66 INSTALLED PIPE 20.83
67 MW55AT1 15.01 4.5 27.00 10.00 8.00 3.91 7.81
68 MW55AS
69 INSTALLED PIPE 14.94
70 MW55AS1 19.97 4.5 6.00 7.00 4.87 9.74
71 MW55AR
72 INSTALLED PIPE 17.51
73 MW55AR1 38.77 4.5 18.00 15.00 12.24 24.49
74 MW55AP
75 INSTALLED PIPE 15.00
76 MW55AP1 46.50 4.5 10.00 13.00 6.12 12.24
77 MW55AM
78 INSTALLED PIPE 23.24
79 MW55AM1 48.91 4.5 15.00 8.00 12.88 25.76
80 MW55AL
81 INSTALLED PIPE 35.07
82 MW55AL1 42.72 4.5 21.00 12.00 18.83 37.65
83 MW55AK
84 INSTALLED PIPE 36.04
85 MW55AK1 29.11 15.00 27.00 10.00 8.00 10.84 21.67
86 MW57W08
87 MW57M09 8.77 11.25 7.50 7.35 14.70
88 MW57M09A2
89 MW57M09A1 35.00 200 52.50 35.00 33.32 49.98
90 MW57M09A1
91 MW57M09A 67.50 200 101.25 67.50 60.95 142.22
92 MW57M09A
93 MW57M09X 15.00 200 22.50 15.00 13.55 31.61
94 MW57M09X
95 MW57M09W 48.50 200 72.75 48.50 34.63 80.80
96 MW57M09W
97 MW57M09V 78.00 200 117.00 78.00 55.69 129.95
98 MW57M09V
99 MW57M06 86.50 200 129.75 86.50 61.76 144.11
100
101 Total Lot 3 78.00 0.00 0.00 633.00 0.00 0.00 355.00 205.50 7.50 0.00 354.07 767.01
102 Prepared by:-__________________________ Checked BY:___________
_______________________ Approved By___________________
A B C D E F G H I J S T U V W X
103 LOT 4
104 MW56K
105 MW56L 43.00 300 64.50 43.00 52.68 52.68
106 MW56M 48.50 300 72.75 48.50 59.41 59.41
107 MW56N01 58.00 300 87.00 58.00 71.05 71.05
108 MW56L 300
109 MW56L06 49.53 74.30 49.53 57.27 85.90
110 MW56J 300
111 MW56J01 40.79 61.19 40.79 49.01 73.51
112 MW56G 300
113 MW56G01 37.28 55.92 37.28 25.91 38.86
114 MW71 900
115 MW436A 67.01 100.52 67.01 132.51 309.19
116 MW78 900
117 MWB479F 44.28 44.28 48.39 112.91
118 MW81 900
119 MW81 33.30 49.95 33.30 11.96 27.92
120 MW82
121 Installed pipe 5.44 8.16
122 MWB423A 26.88 5.44 5.51 12.86
123 MW83
124 MW83A 74.48 74.48 87.94 263.81
125 MW85
126 MW424 50.84 76.26 50.84 27.09 81.27
127 MW87 900
128 MW484A 60.98 91.47 60.98 37.17 111.51
129 MW93
130 MW393 48.33 7.5 48.33 29.81 89.43
131 MW98 900
132 MW390 17.82 7.5 17.82 13.02 39.06
133 MW101 600
134 MW379A 33.96 7.5 50.94 33.96 26.33 61.43
135 MW105 600
136 MW374A 34.45 7.5 51.68 34.45 29.55 68.95
137 MW108
138 MWB371A 48.55 7.5 72.83 48.55 37.92 88.49
139 MW112
140 MWB350 55.49 7.5 83.24 55.49 44.98 104.95
141 MW114
142 MW347A 62.98 7.5 94.47 62.98 49.17 62.98
143 MW117
144 MW346 44.54 7.5 66.81 44.54 38.84 90.63
145 TOTAL -LOT 4 60.00 385.95 0.00 701.72 74.30 0.00 38.74 692.04 161.75 67.01 935.51 1906.80
146 Prepared by:-__________________________ Checked BY:___________
_______________________ Approved By___________________
A B C D E F G H I J S T U V W X
147 LOT 5
148 1 MW57C 900
149 MW57C2 New 3.97 3.00 6.75 6.75
150 MW57C2 60.02 4.5
151 2 MW57F02 300
152 MW57F02A 8.92 13.5 9.00 20.25 20.25
153 3 MW57F03 300
154 MW57F03A 58.81 88.5 59.00 132.75 132.75
155 4 MW57K 900
156 MWB92 42.64 14.50 32.63 32.63
157 5 MW57AB 600
158 (N)MWB114AAB 26.80 40.20 27.00 60.75 60.75
159 (N)MWB114AA 34.56 51.84 34.50
160 MWB114A 24.95 40.5 24.95
161 8 MW57AE (ahead) 600
162 (N)MW57AE2AA 24.74 R 36.75 24.50 55.13 55.13
163 MW57AE2A 55.65 ??? 83.475 55.65 25.35 30.00
164 6 MW57AE2AA (right) 200
165 (N)MWB113AA 79.09 118.635 79.09 75.92 177.14
166 MWB113 12.18 erected. 18.27 12.18 43.85
167 9 (N)MW57AE2AA (left) 200
168 (N)MWB2AAC 87.07 130.61 87.07 53.29 186.50
169 (N)MWB2AAB 66.35 99.53 66.35 40.61 142.12
170 (N)MWB2AA 65.11 97.67 65.11 39.85 139.47
171 MWB2 44.86 67.29 44.86 27.45 96.09
172 7 MW57F05CL 300
173 MWB558 76.00 114.00 10.00 66.00 171.00 171.00
174 10 MW57AL 600
175 MWB8 65.22 44.00 99.00 44.00
176 11 MW57F10CL 300
177 MWB563 41.50 62.25 41.50 93.38 93.38
178 12 MW57F11CL 300
179 MWB567A 28.50 42.75 28.50 64.13 64.13
180 13 MWB520 300
181 MWB519 65.00 73.50 49.00 11.25 11.25
182 57H 600
183 MWB492N 31.00 15.00 16.00 69.75 69.75
184 TOTAL -LOT5 0.00 147.00 0.00 1036.76 0.00 0.00 398.27 261.25 201.24 16.00 1079.21 1576.92
185 Prepared by:-__________________________ Checked BY:___________
_______________________ Approved By___________________
A B C D E F G H I J S T U V W X
186 LOT 6
187 MW27 1000
188 MW28A 25.08 37.62 24.83 34.83 81.27
189 MW29 1000
190 MW29A 27.77 41.66 14.77 15.00 15.57 36.33
191 MW03A 600
192 MW03AA01 19.69 29.54 29.54 7.59 12.10 13.00 30.33
193 MW03D01
194 MW03D01 43.55 65.33 13.55 30.00 14.64 34.15
195 MW03E
196 MW03E01 48.92 73.38 23.42 25.50 13.20 30.81
197 MW03P 15
198 ADD NEW
199 MW03P01 136.50 204.75 136.50 82.38 192.21
200 MW03S03A
201 ADD NEW
202 MW03S03A2 128.78 193.17 48.28 80.50 17.64 41.15
203 MW03S03B
204 MW03S05A1 53.68 0.00 53.58 7.25 16.93
205 MW03S03D
206 MW03S03BL6 38.48 57.72 38.48 14.80 34.52
207 MW03S08 600
208 MW03S03F1 88.54 132.81 38.00 50.54 124.95 124.95
209 MW03S038A
210 MW03S03G1 89.56 134.34 39.30 50.26 54.35 126.81
211 MW03S10 600
212 MW03S10A 52.02 78.03 8 15 29.02 57.42 133.99
213 MW03S11 600
214 MW03S11A 52.53 78.80 5.00 7.53 18 22 48.62 113.45
215 MW03S12
216 MW03S12Z 32.78 49.17 4.20 18.30 10.28 25.89 60.41
217 MW03S12
218 MW03S12A 58.12 87.18 5.02 23.10 30.00 45.91 107.12
219 TOTAL -LOT6 44.54 0.00 0.00 1263.48 0.00 0.00 162.16 380.71 303.76 51.02 570.44 1164.43
220 191.54 532.95 0.00 3982.41 74.30 10.87 1002.73 2075.70 782.38 183.31 3201.33 6027.36
221 Prepared by:-__________________________ Checked BY:___________ 4044.13_______ Approved By___________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
Section IV: Manholes and
6 Section III: Gravity Sewers Section VI: Finishing works
Structures
301.Pipe 302.C 303. uPVC 305. 401.M 402.Addit 405.Ditc Section V: 601.Permanent restoration of trench 602.Replacement of walls and
7 bedding and asting Sewer Pipe anhole ional h linings Access Road surfaces fences
surrounding of Supply & Conne s: manhole
ancho Installation ction Supply depth
a) Type b) r
a) DN DN to the &
a) a) Type b) Type 501 502 503 a) a) b) Coble c) d) a) b) c)
2 Type 4 blocks
Type 200mm 300mm main Constr
Type A- Depth TB2 Concrete Ordinary stone (m) CARE Tiles Masonry Reinforced Corrugated
8 bedding beddin A (m) (m) trunk uctA-RC >1.5m Masonry Asphalt Asphalt stone (m) Concrete iron sheet
=Type A g trench line Precas
1000m (pcs) (m2) (m) (m) (m) (m3) (m3) (m2)
trench (m) (m) Manho mt
(m) le (no) Circula
inter.Di
9 r
a.dept - - - - - - -
10 1 manho
h<=1.5 - - - - - - - -
11 90.50 90.50 lemas 1 0.93 - - 135.75 - - - - -
10.87 10.87 per
(pcs) the - - - - 10.87 - - -
12
drawin
13 g detail - - - - - - - -
14 1 - - - - - - - -
15 76.28 76.28 - - - - - - - -
16 1 - - - - - - - -
17 66.66 66.66 - - 99.99 - - - - -
18 1 - - - - - - - -
19 76.28 76.28 - - - - - - - -
20 1 - - - - - - - -
21 58.82 58.82 1 0.81 4.50 - - - - - - -
22 1 - - - - - - - -
23 81.34 81.34 1 0.68 4.50 - - - - - - -
24 460.74 0.00 0.00 460.75 0.00 6 3 2.42 0.00 0.00 0.00 0.00 9.00 0.00 235.74 0.00 10.87 0.00 0.00 0.00
25 Approved By__________________________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
26 - - - - - - - -
27 1 - - - - - - - -
28 7.85 0.00 7.85 1 1.50 - - - - - - - -
29 - - - - - - - -
30 1 - - - - - - - -
31 24.71 24.71 1 1.25 - - - - - - - -
32 - - - - - - - -
33 1 - - - - - - - -
34 7.89 7.89 1 1.35 - - - - - - - -
35 1 - - - - - - - -
36 10.27 10.27 1 2.37 - - 15.41 - - - - -
37 - - - - - - - -
38 1 - - - - - - - -
39 37.43 37.43 1 1.45 - - 56.15 - - - - -
40 1 - - - - - - - -
41 19.24 19.24 1 1.00 - - - - - - - -
42 - - - - - - - -
43 1 - - - - - - - -
44 43.10 43.10 1 3.50 - - - - - - - -
45 - - - - - - - -
46 1 - - - - - - - -
47 50.83 0.00 50.83 1 1.30 - - - - - - - -
48 1 - - - - - - - -
49 31.63 0.00 31.63 1 1.42 - - - - - - - -
50 1 - - - - - - - -
51 48.56 0.00 48.56 1 0.49 - - 40.17 - - - - -
52 - - - - - - -
53 281.51 0.00 0.00 281.51 0.00 9.00 10.00 15.63 0.00 0.00 0.00 0.00 0.00 0.00 111.72 0.00 0.00 0.00 0.00 0.00
54 Checked BY:_____________________________ Approved By__________________________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
55 - - - - - - - -
56 - - - - - - - -
57 21.00 21.00 1 1 0.65 31.50 - - - - - - -
58 - - - - - - - -
59 9.00 9.00 1 1 0.50 - - 13.50 - - - - -
60 - - - - - - - -
61 20.00 20.00 1 1 0.62 - - 30.00 - - - - -
62 - - - - - - - -
63 - - - - - - - -
64 19.00 19.00 1 1 0.59 4.50 - 28.50 - - - - -
65 - - - - - - - -
66 - - - - - - - -
67 18.00 18.00 1 1 0.53 4.50 - 27.00 - - - - -
68 - - - - - - - -
69 - - - - - - - -
70 13.00 13.00 1 1 0.54 4.50 - - - - - - -
71 - - - - - - - -
72 - - - - - - - -
73 33.00 33.00 1 1 0.63 4.50 - - - - - - -
74 - - - - - - - -
75 - - - - - - - -
76 23.00 23.00 1 1 0.65 4.50 - - - - - - -
77 - - - - - - - -
78 - - - - - - - -
79 23.00 23.00 1 1 0.45 4.50 - - - - - - -
80 - - - - - - - -
81 - - - - - - - -
82 33.00 33.00 1 1 0.52 4.50 - - - - - - -
83 - - - - - - - -
84 - - - - - - - -
85 18.00 18.00 1 1 0.60 15.00 - 27.00 - - - - -
86 - - - - - - - -
87 7.50 7.50 1 1 0.62 - - 11.25 - - - - -
88 - - - - - - - -
89 35.00 35.00 1 0.50 - - 52.50 - - 115.00 2.80 75.00
90 - - - - - - - -
91 67.50 67.50 1 1.50 - - 101.25 - - - - -
92 - - - - - - - -
93 15.00 15.00 1 1.50 - - 22.50 - - - - -
94 - - - - - - - -
95 48.50 48.50 1 0.50 - - 72.75 - - - - -
96 - - - - - - - -
97 78.00 78.00 1 0.50 - - 117.00 - - - - -
98 - - - - - - - -
99 86.50 86.50 1 0.50 - - 129.75 - - - - -
100 - - - - - - - -
101 568.00 0.00 0.00 568.00 0.00 12.00 18.00 11.90 0.00 0.00 0.00 0.00 78.00 0.00 633.00 0.00 0.00 115.00 2.80 75.00
proved
102 By___________________ Checked BY:_____________________________ Approved By__________________________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
103
104
105 43.00 43.00 1 2.23 - 64.50 - - - - - -
106 48.50 48.50 1 1.20 - 72.75 - - - - - -
107 58.00 58.00 1 1.00 - 87.00 - - - - - -
108 1 - - - - - - - -
109 49.53 0.00 49.53 - - - 74.30 - - - -
110 1 - - - - - - - -
111 40.79 0.00 40.79 - 61.19 - - - - - -
112 1 - - - - - - - -
113 37.28 37.28 - - 55.92 - - - - -
114 1 - - - - - - - -
115 67.01 0.00 67.01 - 100.52 - - - - - -
116 1 - - - - - - - -
117 44.28 0.00 44.28 - - - - - - - -
118 1 - - - - - - - -
119 33.30 33.30 - - 49.95 - - - - -
120 1 - - - - - - - -
121 5.44 5.44 - - 8.16 - - - - -
122 - - - - - - - -
123 1 - - - - - - - -
124 74.48 74.48 - - - - - - - -
125 1 - - - - - - - -
126 50.84 50.84 1 - - 76.26 - - - - -
127 1 - - - - - - - -
128 60.98 0.00 60.98 1 - - 91.47 - - - - -
129 1 - - - - - - - -
130 48.33 48.33 1 7.50 - - - - - - -
131 1 - - - - - - - -
132 17.82 0.00 17.82 7.50 - - - - - - -
133 1 - - - - - - - -
134 33.96 0.00 33.96 7.50 - 50.94 - - - - -
135 1 - - - - - - - -
136 34.45 0.00 34.45 7.50 - 51.68 - - - - -
137 1 - - - - - - - -
138 48.55 48.55 7.50 - 72.83 - - - - -
139 1 - - - - - - - -
140 55.49 55.49 7.50 - 83.24 - - - - -
141 1 - - - - - - - -
142 62.98 62.98 7.50 - 94.47 - - - - -
143 1 - - - - - - - -
144 44.54 44.54 7.50 - 66.81 - - - - -
145 959.55 0.00 0.00 810.05 149.50 18.00 6.00 4.43 0.00 0.00 0.00 0.00 60.00 385.95 701.72 74.30 0.00 0.00 0.00 0.00
proved
146 By___________________ Checked BY:_____________________________ Approved By__________________________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
147 - - - - - - - -
148 - - - - - - - -
149 3.00 3.00 1 1 - - - - - - - -
150 - 4.50 - - - - - -
151 - - - - - - - -
152 9.00 0.00 9.00 1 - 13.50 - - - - - -
153 - - - - - - - -
154 59.00 0.00 59.00 1 - 88.50 - - - - - -
155 - - - - - - - -
156 14.50 0.00 14.50 1 - - - - - - - -
157 - - - - - - - -
158 27.00 0.00 27.00 1 1 - - 40.20 - - - - -
159 34.50 0.00 34.50 - - 51.84 - - - - -
160 24.95 0.00 24.95 - 40.50 - - - - - -
161 - - - - - - - -
162 24.50 24.50 1 1 - - 36.75 - - - - -
163 55.65 55.65 - - 83.48 - - - - -
164 - - - - - - - -
165 79.09 79.09 1 - - 118.64 - - - - -
166 12.18 12.18 - - 18.27 - - - - -
167 - - - - - - - -
168 87.07 87.07 1 1.55 - - 130.61 - - - - -
169 66.35 66.35 1 0.40 - - 99.53 - - - - -
170 65.11 65.11 1 0.80 - - 97.67 - - - - -
171 44.86 44.86 - - 67.29 - - - - -
172 - - - - - - - -
173 76.00 76.00 1 - - 114.00 - - - - -
174 - - - - - - - -
175 44.00 0.00 44.00 1 - - - - - - - -
176 - - - - - - - -
177 41.50 0.00 41.50 1 - - 62.25 - - - - -
178 - - - - - - - -
179 28.50 0.00 28.50 1 - - 42.75 - - - - -
180 - - - - - - - -
181 49.00 49.00 1 - - 73.50 - - - - -
182 - - - - - - - -
183 31.00 31.00 1 - - - - - - - -
184 876.76 0.00 0.00 876.76 0.00 12.00 7.00 2.75 0.00 0.00 0.00 0.00 0.00 147.00 1036.76 0.00 0.00 0.00 0.00 0.00
proved
185 By___________________ Checked BY:_____________________________ Approved By__________________________________
Y Z AA AB AC AD AE AG AH AI AJ AK AL AM AN AO AP AQ AR AS
186
187 1 - - - - - - - -
188 24.83 0.00 24.83 1 0.54 - - 37.62 - - - - -
189 1 - - - - - - - -
190 29.77 0.00 29.77 1 0.50 - - 41.66 - - - - -
191 1 - - - - - - - -
192 19.69 19.69 1 0.75 29.54 - 29.54 - - - - -
193 1 - - - - - - - -
194 43.55 43.55 1 0.81 - - 65.33 - - - - -
195 1 - - - - - - - -
196 48.92 48.92 - - 73.38 - - - - -
197 1 15.00 - - - - - - -
198 1 - - - - - - - -
199 136.50 136.50 - - 204.75 - - - - -
200 1 - - - - - - - -
201 1 - - - - - - - -
202 128.78 128.78 - - 193.17 - - - - -
203 1 1 0.56 - - - - - - - -
204 53.58 53.58 - - - - - - - -
205 1 1 0.81 - - - - - - - -
206 38.48 38.48 - - 57.72 - - - - -
207 1 1 0.35 - - - - - - - -
208 88.54 0.00 88.54 - - 132.81 - - - - -
209 - - - - - - - -
210 89.56 6.00 89.56 1 1 0.35 - - 134.34 - - - - -
211 - - - - - - - -
212 52.02 0.00 52.02 1 1 0.40 - - 78.03 - - - - -
213 - - - - - - - -
214 52.53 0.00 52.53 1 1 0.31 - - 78.80 - - - - -
215 - - - - - - - -
216 32.78 32.78 1 1 0.41 - - 49.17 - - - - -
217 - - - - - - - -
218 58.12 58.12 1 1 0.41 - - 87.18 - - - - -
219 897.65 0.00 6.00 897.65 0.00 14.00 14.00 6.20 0.00 0.00 0.00 0.00 44.54 0.00 1263.48 0.00 0.00 0.00 0.00 0.00
220 4044.21 6.00 3894.72 149.50 71.00 58.00 43.33 0.00 0.00 0.00 0.00 191.54 532.95 3982.41 74.30 10.87 115.00 2.80 75.00
proved
221 By___________________ 4044.22________________________ Approved By__________________________________
PROJECT : Construction Of Secondary New Sewer Lines For Selected Areas Of Kality
Catchment
EMPLOYER (Lot-2)
: AAWSA Water and Sanitation Development & Rehabilitation Project Office
CONTRACTOR : SABERCON Engineering PLc
CONSULTANT : SWS Consultancy
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES)
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart Section V:
Manhole Pipe Section III: Gravity Sewers Section IV: Manholes and Structures Section VI: Finishing works
No. Designation (Sewer Length dia, away Access Road
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of Working Platforms 201.Trench Excavation, Backfill 202.Trench 301.Pipe 302.Ca 303. 305. 401.Manholes: 402.Addit 405.Ditc 501 502 503 601.Permanent restoration of
Section) (m) (mm) Surfaces Road Surfaces
a) b) c) a) b) e) Removal
a) of existing
b) c) a) b) c) d) g) Cart Type & Cart away
Type Type Type rock a) excavation
b) bedding
a) and
b) sting
a) DN Supply
a) & Construct ional h linings
e)Type E- a) Type b) Type a) trench
b) surfaces
c) d) c
Concre Ordina Reinfor Coble CARE Tile wallsReinfor
and fences surrounding of A uPVC
200m Conne RC Precast manhole
LOT 1 Mason Corrug Remov Comm Extra Extra away A A A A Grade Grade Type 2 Type 4 Type
anchor m Sewer ction
Type
Circular
Special A-
manhole
Depth TB2
depth Masonry
Ordinary Coble CARE Tiles )
te ry ced stone stone ry ced ated al of on over over to any trench trench trench trench 1- Soft 2-Hard beddin beddin trench (m) A- Deep >1.5m Asphalt stone stone (m)
MW177 300 Pipe to the1
Asphal Asphal concre (m) (m) (m3) Concre iron trees exc'n for soft for distanc = = = 0- = 0- rock rock g=Typ g (m) blocks (m) as per the
1000m drawing (pcs)
Manholes (m2) (m) (m) (m) C
MWB261A 90.50 t t te 90.50 te sheet of any for rock hard e from 0-2 m 0-390.50
m 4m 5m 21.13
(m3) (m 49.31
3
) e90.50
A Supply
90.50 main m 1detail((pcs) 90.50 o
(m) & trunk
MWB261 10.87 (m) (m) 10.87 (m3) (m3) girth; workin exc'n rock: site depth depth
10.87 depth depth 6.68 15.58trench
10.87 10.87 inter.Di
1? 10.87 r
(m )
(no) g (m3) Withou (m3) (m) (m) (m) (m) (m) Installa line a.dept r
MW175 300 tion Manho1
platfor t h<=1.5 u
MWB264 ms blastin le (no) m g
MWB267 76.28 (m3) g 26.28 50.00 76.28 76.28 (pcs) a
MW171A 300 (m3) 1 t
e
MWB452 66.66 66.66 66.66 31.40 73.26 66.66 66.66 66.66
d
MW169 600 1
MW269G 76.28 30.00 46.28 17.32 40.42 76.28 76.28 i
MW57BG 600 1 cr
)o
MWB160A 58.82 58.82 9.68 22.59 58.82 58.82 n
MW57BG 600 1 C
MW57BH 81.34 81.34 13.67 31.93 81.34 81.34 s
o
h
r
re
e
u
Page Total- 157.16 10.87 0.00 364.47 96.28 99.88 233.09 460.74 460.75 6 157.16 10.87 g t
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked BY:_____________________________ Approved By___________________ 303. Checked BY:_____________________________ Approved By__________________________________
305. a
b) a) t
WORK ITEMS (DESCRIPTION OF ACTIVITIES) Comm WORK ITEMS (DESCRIPTION
302. OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES)
401.Manholes: (
a) c) d) Section
Type II:Type
TrenchType
Excavation,
Type Backfill & Cart uPVC Conne Type Section V: e
Section I=Preparation of Grounds b) Section III: Gravity Supply & Construct 402.Addit Section VI: Finishing works m
Manhole Pipe b) c) b)
103=Cutting and c)
Remov
on
Extra Extra g) Cart 201.Trench A A A A a) away
b)
a) 301.Pipe a) Sewer Sewers
ction Section
A- IV: Manholes and Structures Access Road
e)Type E-
d
Item Designation Length 101-Precutting Paved
Ordina Reinfor 102-Removing Stone a) Reinfor Corrug 104.Construction
exc'n Excavation, Backfill 202.Trench Type Castin 1000m RC Precast a) Type ional 405.Ditc
b) Type 501 502 503 601.Permanent restoration of 2
(Sewer dia, Removal of existing al of of
overWorking Platforms
over away trench trench trench bedding and Pipe to the
No.
Section)
(m)
(mm)
Surfaces
ry ced Road Surfaces Mason cedfencesated for & Carttrench Grade
away rock Grade
excavation Type 2 4
Type
g of DN Circular
m
Special manhole h linings
manhole A- Depth TB2 trench surfaces i)
a) a) b) e) walls and trees for soft for from = = = 0- = 0- 1- Soft 2-Hard surrounding A Supply
200m main as per the drawing Deep a) b) c) d)
Asphal concre ry Concre iron workin beddin beddin anchor inter.Di depth Masonry
>1.5m r
LOT 2 Concre Coble CARE Tile or rock hard site 0-2 m 0-3 m 4m 5 m rock rock trench m (m)& trunk Manholes Ordinary Coble CARE Tiles
t te (m3) te sheet g g (m) g (m) blocks Installa line a.dept
detail (pcs) (m2) o
te stone stone girth; exc'n rock: (m3) depth depth depth depth (m3) (m3) (m) (pcs) Asphalt stone stone (m)
MW147A 600 (m) (m) (m3) (m3) platfor tion Manho 1 h<=1.5 n
Asphal (m) (m) (no) (m ) (m )
3 3
(m) (m) (m) (m) (m) (m) (m)
INSTAL PIPE 27.60 7.85 ms 7.85 8.62 17.27 7.85 7.85 le (no) m 7.85
t (m) (m )
3
(pcs) s
MWB292 29.20 h
MW146 (m) 1 e
INSTAL PIPE 24.71 24.71 24.71 13.98 32.62 24.71 24.71 24.71 e
t
MW294 23.75
MW142 1
MW142A 7.89 7.89 7.89 6.79 15.84 7.89 7.89 7.89 (
MW127 1 m
2
INSTAL PIPE 10.27 10.27 4.00 6.27 0.00 0.00 10.27 10.27 10.27 )
MWB341 67.75
MW126 1
MW330 37.43 37.43 37.43 23.93 55.84 37.43 37.43 37.43
MW57AS 1
INSTAL PIPE 19.24 19.24 19.24 19.24 19.24 19.24
MWB36 34.59
MW57AT 1
MWB63A 43.10 43.10 43.01 18.24 46.03 43.10 43.10 43.10
MWB64 10.83
MW57AX 1
MWB101A 50.83 50.83 50.83 43.59 101.71 50.83 50.83 50.83 c
)
MW57AZ 1
MWB73 31.63 31.63 31.63 22.92 53.49 31.63 31.63 31.63 C
MW57BA 1 o
MWB75T 48.56 48.56 48.56 24.14 56.32 48.56 48.56 1 48.56 r
r
MWB75 26.78 u
Page Total- g
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked a
d)BY:_____________________________ Approved By___________________ 303.uP Checked
305.BY:_____________________________ Approved By__________________________________
b) a) t
WORK ITEMS (DESCRIPTION OF ACTIVITIES) Comm Extra WORK ITEMS (DESCRIPTION OFVC ACTIVITIES) Type 401.Manholes: WORK ITEMS (DESCRIPTION OF ACTIVITIES) e
a) c) over g) Cart Section
Type II:Type
TrenchType
Excavation,
Type Backfill & Cart a) 302.Ca Conne Supply & Construct 402.Addit Section V:
b) c) Section I=Preparation b) of Grounds
c) on Sectionsting Sewer
III: Gravity Sewers Section
A- IV: Manholes and Structures Access Road Section VI: Finishing
d) works d
Manhole
Item Designation Length Pipe 101-Precutting Paved 102-Removing Stone
102=Cutting and Remov Extra for away 201.Trench
A A A A a) away
b) Type 301.Pipe
2 b) ction e)Type E- c )
(Sewer (m) dia, Ordina Reinfor a) Reinfor Corrug 103.Construction
exc'n Excavation, Backfill 202.Trench a) Pipe 1000m RC Precast a) Type ional 405.Ditc
b) Type 601.Permanent
b) restoration of
Coble
Removal of existing al of of Working
over hardPlatforms
of any trench trench trench bedding and of DN to the Special manhole h linings 501 502 503
No.
Section) (mm)
Surfaces
ry ced Road Surfaces Mason cedfencesated for & Carttrench Grade
away rock Grade beddin
excavation Type 4
Type A Supply main Circular m manhole A- Depth TB2 Ordinary
Gravel trench surfaces
and/or
e)Tiles
i
a) a) b) e) walls and trees for soft rock: distanc = = = 0- = 0- 1- Soft 2-Hard g=Typ surrounding
beddin anchor 200m Deep Road
Asphal concre ry Concre iron workin trench & as per the drawing depth Masonry
MW57AZ Concre Coble CARE Tile or rock Withou e from 0-2 m 0-3 m 4m 5 m rock rock e A g (m) blocks m (m)
Installa trunk inter.Di Manholes
detail
>1.5m Asphalt CARE
(m2)
r
t te (m )3
te sheet g (m) line a.dept (pcs) (m )
2
(m )2
2 stone o
te stone stone girth; exc'n t site depth depth depth depth (m 3
) (m 3
) trench tion ((pcs) (m )
Page Total- (m) (m) 281.51 (m3) (m3) platfor 48.56 171.74 11.85 49.28 162.21 379.11 281.51 0.00 0.00 281.51 Manho9.00 1.00
h<=1.5 0.00 0.00 0.00
(m 2
) 281.51 n
Asphal (m) (m) (no) (m ) blastin (m )
3 3
(m) (m) (m) (m) (m)
LOT 3 ms le (no) m
t (m) g
(m )
3
(pcs) s
MW55Y (m3)
h
MW55Y1 (m) 21 11.00 10.00 7.35 21.00 21.00 1 21 e
MW55AX1 e
t
MW55AX2 9.00 6.00 3.00 6.17 9.00 9.00 1 9
MW55AW1
MW55AW2 20.00 20.00 5.60 20.00 20.00 1 20 (
MW55AU m
2
INSTALLED PIPE 17.14 )
MW55AU1 18.39 19.00 19.00 15.16 19.00 19.00 1 19
MW55AT
INSTALLED PIPE 20.83
MW55AT1 15.01 18.00 10.00 8.00 7.81 18.00 18.00 1 18
MW55AS
INSTALLED PIPE 14.94
MW55AS1 19.97 6.00 7.00 9.74 13.00 13.00 1
MW55AR
INSTALLED PIPE 17.51
MW55AR1 38.77 18.00 15.00 24.49 33.00 33.00 1
MW55AP
INSTALLED PIPE 15.00
MW55AP1 46.50 10.00 13.00 12.24 23.00 23.00 1
MW55AM
INSTALLED PIPE 23.24
MW55AM1 48.91 15.00 8.00 25.76 23.00 23.00 1
Page Total- 21 66.00 76.00 103.00 114.32 179.00 0.00 0.00 179.00 9.00 21 66
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked BY:_____________________________ Approved By___________________ Checked BY:_____________________________ Approved By__________________________________
c
)

C
o
r
r
303.uP
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OFVC ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES) u
Manhole 401.Manholes:
Section II: Trench Excavation, Backfill & Cart 302.Ca Section V: g
Designation (Sewer Section I=Preparation of Grounds Sectionsting Sewer Sewers
III: Gravity Supply
Section& IV:
Construct
Manholes402.Addit
and Structures Section VI: Finishing works
103=Cutting and away 301.Pipe a
Section) 101-Precutting Paved 102-Removing Stone d) 201.Trench Excavation, Backfill 202.Trench Pipe 305. RC Precast ional 405.Ditc Access Road 601.Permanent restoration of
Surfaces Road Surfaces Removal of existing 103.Construction
b) of Working Platforms bedding and of 501 502 503 t
Extra & Cart away rock excavation Supply Circular manhole manhole h linings trench surfaces
a) a) b) c) walls and fences Comm surrounding anchor a) a) b) c) d) e
a) c) over g) Cart Type Type Type Type a) & Conne as per the drawing depth
Pipe Concre b) c) Coble CARE Tile b) c) on blocks Type Ordinary Coble CARE Tiles d
Item Length Remov Extra for away A A A A a) b) Type 2 b) Installa ction e)Type
detail
E-
dia, te Ordina Reinfor stone stone a) Reinfor Corrug exc'n a) A- a) Type b) Type Asphalt stone stone (m)
No. (m) al of over hard of any trench trench trench trench Grade Grade beddin Type 4 DN to the
tion Special
(mm) Asphal ry ced (m) (m) Mason ced ated for Type A 1000m A- Depth TB2 (m) (m) (m) i
trees for soft rock: distanc = = = 0- = 0- 1- Soft 2-Hard g=Typ beddin 200m main Deep
t Asphal concre ry Concre iron workin trench trunkm:dept >1.5m Masonry r
(m) or rock Withou e from 0-2 m 0-3 m 4m 5 m rock rock e A g (m) m (m) Manholes
t te (m3) te sheet g (m) lineh<=1.5 (pcs) (m2) o
girth; exc'n t site depth depth depth depth (m3) (m3) trench ((pcs)
(m ) (m) (m) (m3) (m3) platfor Manho m n
(no) (m3) blastin (m3) (m) (m) (m) (m) (m)
ms le (no) (pcs)
g
MW55AL (m3) s
(m )3

INSTALLED PIPE 35.07 h


e
MW55AL1 42.72 21.00 12.00 37.65 33.00 33.00 1
e
MW55AK t
INSTALLED PIPE 36.04
MW55AK6 29.11 18.00 10.00 8.00 21.67 18.00 18.00 1 18.00
(
MW57W08 m
MW57M09 8.77 7.50 7.50 14.70 7.50 7.50 1 7.50 2

Page Total- 25.50 31.00 20.00 7.50 74.03 58.50 58.50 3.00 25.50 )
LOT 4
SH To be constructed by
MW56N01 33.87 ASER
MW56L 1
MW56L06 49.53 49.53 49.53 57.27 85.90 49.53 49.53 49.53
MW56K
MW56J 1
MW56J01 40.79 40.79 40.79 49.01 73.51 40.79 40.79 40.79
MW56G 1
MW56G01 37.28 37.28 37.28 25.91 38.86 37.28 37.28 37.28
MW71 1
MW436A 67.01 67.01 67.01 132.51 309.19 67.01 67.01 67.01
Page Total- 107.80 37.28 49.53 127.60 67.01 264.69 507.46 194.61 194.61 4 107.8 37.28 49.53
MW78 1
MWB479F 44.28 44.28 48.39 112.91 44.28 44.28
MW81 1
MW81 33.30 33.30 33.30 11.96 27.92 33.30 33.30 33.3
MW82 1
Installed pipe 5.44 5.44 5.44 5.44 5.44
MWB423A 26.88 5.44 5.51 12.86
MW83 1
MW83A 74.48 74.48 87.94 263.81 74.48 74.48
MW85 1
MW424 50.84 50.84 50.84 27.09 81.27 50.84 50.84 50.84
MW87 1
MW484A 60.98 60.98 60.98 37.17 111.51 60.98 60.98 60.98
MW93 1
MW393 48.33 48.33 29.81 89.43 48.33 48.33
MW98 1
MW390 17.82 17.82 13.02 39.06 17.82 17.82
MW101 1
MW379A 33.96 33.96 33.96 26.33 61.43 33.96 33.96 33.96
MW105 1
MW374A 34.45 34.45 34.45 29.55 68.95 34.45 34.45 34.45
MW108 1
MWB371A 48.55 48.55 48.55 37.92 88.49 48.55 48.55 48.55
Page Total- 267.52 38.74 294.92 118.75 0.00 354.69 957.63 452.42 452.42 11 0 267.52 0
MW112 1
MWB350 55.49 55.49 55.49 44.98 104.95 55.49 55.49 55.49
MW114 1
MW347A 62.98 62.98 62.98 49.17 62.98 62.98 62.98 62.98
MW117 1
MW346 44.54 44.54 44.54 38.84 90.63 44.54 44.54 44.54
Page Total- 163.01 163.02 132.99 258.56 163.02 163.02 3 163.01
TOTAL -LOT 4 0.00 107.80 0.00 467.81 49.53 38.74 585.54 118.75 67.01 752.37 1723.66 810.05 810.05 18 107.80 467.81 49.53
LOT 5
1 MW57C
MW57C2 New 3.97 3.00 6.75 6.75 3.00 3.00 1 1
MW57C2 60.02 3 3
2 MW57F02
MW57F02A 8.92 9 9.00 20.25 20.25 9.00 9.00 1 9
3 MW57F03
MW57F03A 58.81 59 59.00 132.75 132.75 59.00 59.00 1 59
4 MW57K
MWB92 42.64 14.50 32.63 32.63 14.50 14.50 1
5 MW57AB
(N)MWB114AAB 26.80 27.00 60.75 60.75 27.00 27.00 1 1
(N)MWB114AA 34.56 c
)
MWB114A 24.95 27 27
6 MW57AE R C
(N)MW57AE2AA 24.74 R 24.50 55.13 55.13 24.50 24.50 1 1 o
(N)MWB113AA 79.09 DOES IT EXIST? r
r
MWB113 12.18 DOES IT EXIST? u
Page Total- 98 68.00 17.50 51.50 308.25 308.26 137.00 137.00 6 3 98 g
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked a
d)BY:_____________________________ Approved By___________________ Checked BY:_____________________________ Approved By__________________________________
b) t
WORK ITEMS (DESCRIPTION OF ACTIVITIES) Comm
Extra WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES)
e
Section I=Preparation a) c) over g) Cart Section
Type II:Type
TrenchType
Excavation,
Type Backfill & Cart Section V:
Pipe b) of Grounds
103=Cutting andc) on Section III: Gravity Sewers Section IV: Manholes and Structures Section VI: Finishing works d
Item Length 101-Precutting Paved 102-Removing Stone Remov Extra for away 201.Trench
A A
Excavation,A Backfill
A a) away b)
202.Trench Access Road 601.Permanent restoration of
Pipe dia, (mm) dia, a)
RemovalReinfor Corrug 103.Construction
of existing exc'n of Working
No. (m) Surfaces Road Surfaces al of over hardPlatforms
of any trench trench trench& Carttrench
away Grade
rock Grade 301.Pi
excavation
302.Ca 303.uP 305. 401.Manholes: 402.Addit 405.Ditc 501 502 503
trench surfaces
(mm) Mason cedfences
walls and ated for i
a) b) c) a) b) e) trees for soft rock: distanc = = = 0- = 0- 1- Soft 2-Hard pe a) b) sting
a) VC
DN Supply
a) &e)Type
Construct
E- a)ional
Type hb)linings
Type a) b) c) d)
ry Concre iron workin r
7 MW57F05CL Concre Ordina Reinfor Coble CARE Tile or rock Withou e from 0-2 m 0-3 m 4 m 5 m rock rock beddin
Type 2 Type 4 of A Sewer
Type 200m Conne Type RC Precast
Special manhole
A- Depth TB2 Ordinary Coble CARE Tiles
(m3) te sheet g g and anchor Pipe ction Circular manhole depth o
te ry ced stone stone girth; exc'n t site depth depth depth depth (m )
3
(m ) beddin beddin trench m (m)
3
A- Deep >1.5m Masonry Asphalt stone stone (m)
MWB558 76.00 (m3) (m3) platfor 10.00 n
Asphal Asphal concre 76.00
(m) (m) (no) (m3) blastin (m3) (m) 66.00
(m) (m) (m) 171.00 171.00 surrou 76.00 g (m) blocks
g=Typ 76.00 to the1 1000m
(m) Supply as per the drawing (pcs)
Manholes (m2) (m) 76
(m) (m)
ms nding & main
8 MW57AE R t t te (m) g eA m detail
((pcs)
(m3) Installa trunk s
(N)MW57AE2AA 24.74 R (m) (m) (m )3
trench inter.Di
tion line h
MW57AE2A 55.65 ??? (m) (m) a.dept
Manho h<=1.5 e
9 MW57AF le (no) e
m
t
(N)MWB2AAC 17.07 (pcs)
(N)MWB2AAB 66.35
(N)MWB2AA 65.11 (
MWB2 44.86 m
2
10 MW57AL )
MWB8 65.22 44.00 99.00 44.00 44.00 44.00 1
11 MW57F10CL
MWB563 41.50 41.50 41.50 93.38 93.38 41.50 41.50 1 41.5
12 MW57F11CL
MWB567A 28.50 28.50 28.50 64.13 64.13 28.50 28.50 1
13 MWB520
MWB519 65.00 5.00 5.00 11.25 11.25 5.00 5.00 1
57H
MWB492N 31.00 15.00 16.00 69.75 69.75 31.00 31.00 1
Page Total- 151.00 85.00 110.00 15.00 16 508.5 453.5 226 0 0 226 6 0 0 117.5
TOTAL -LOT5 98 151.00 153.00 127.50 66.50 16.00 816.75 761.76 363.00 0.00 0.00 363.00 12.00 3.00 98.00 117.50

LOT 6
MW27
MW28A 25.08
MW29
MW29A 27.77
MW03A
MW03AA01 19.69
MW03D01 c
)
MW03D01 43.55
MW03E C
MW03E01 49.07 o
MW03P r
r
MW03P01 136.50 u
Page Total- g
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked BY:_____________________________ Approved By___________________ Checked BY:_____________________________ Approved By__________________________________ a
b)
d) 303.uP 305. a) t
WORK ITEMS (DESCRIPTION OF ACTIVITIES) Comm Extra WORK ITEMS (DESCRIPTION OFVC ACTIVITIES) 401.Manholes:
Type
WORK ITEMS (DESCRIPTION OF ACTIVITIES)
e
a) c) over g) Cart Section
Type II: Trench
Type Excavation,
Type Type Backfill & Cart a) 302.Ca Conne Section V:
b) Section
d) I=Preparationb) of Grounds
c) on Sectionsting Sewer Sewers Supply
III: Gravity A- & IV:
Section Construct
Manholes402.Addit
and Structures Section VI: Finishing
d) works d
Manhole Pipe a) 102=Cutting and Remov Extra for away 201.Trench
A A A Backfill
A a) away
b) Type 2 301.Pipe
b) ction e)Type E- Access Road c ) restoration of
Item Length Excavation, 202.Trench Pipe 1000m RC Precast a) Type ional 405.Ditc 601.Permanent
No. Designation (Sewer (m) dia, Concre Ordina c ) Surfaces
101-Precutting Paved Coble a)
RemovalReinfor Corrug 103.Construction
of existing al of
exc'n of Working
over hardPlatforms
of any trench trench trench trench Grade bedding
Grade beddin and
Type 4
a)
of b) Type
Special manhole h linings 501 502 503
DN to the Circular manhole
b) Coble
Gravel trench surfaces
e)Tiles
Section) (mm) ry Gravel and/or Mason cedfencesated for & Cart away rock excavation Type A Supply m A- Depth TB2 Ordinary and/or i
walls and surrounding
beddin anchor 200m
te
Asphal Road CARE ry Concre iron
trees
workin
for soft rock: distanc = = = 0- = 0- 1- Soft 2-Hard g=Typ
trench & main inter.Di Deep
as per the drawing depth Masonry
>1.5m Asphalt
Road
CARE r
MW03S03A Asphal or rock Withou e from 0-2 m 0-3 m 4m 5 m rock rock e A g (m) blocks m (m) trunk Manholes (m2)
t (m2) stone (m3) te sheet g (m) Installa line a.dept
detail (pcs) (m2) (m2) stone o
t (m2) girth; exc'n t site depth depth depth depth (m3) (m3) trench tion ((pcs) (m2)
MW03S03A2 128.78 (m2) (m2) (m3) (m3) platfor Manho h<=1.5 (m 2
) n
(no) (m3) blastin (m3) (m) (m) (m) (m) (m)
MW03S03B ms le (no) m
g
(m3) (pcs) s
MW03S05A1 53.68 (m )3
h
MW03S03D e
MW03S03BL6 38.48 e
t
MW03S08
MW03S03F1 88.54
MW03S038A (
MW03S03G1 89.56 m
2
MW03S10 )
MW03S10A 52.02
MW03S11
MW03S11A 52.53
MW03S12
MW03S12A 32.78

Page Total-
TOTAL -LOT6
Prepared by:-__________________________ Checked BY:_____________________________ Approved BY:____________________________________
Checked BY:_____________________________ Approved By___________________ Checked BY:_____________________________ Approved By__________________________________
LOT 1 994127.73 466574.23 2376.86 2374.25 Z
MW177 463988.841 996259.943 2459.70 2457.59 2.11
MWB261A 90.50 463997.266 996169.833 2464.73 2462.30 2.43
MWB261 10.87 463986.615 996167.666 2464.87 2462.80 2.07
MW175 464150.098 996248.680 2459.94 2455.79
MWB264 464162.725 996183.271 2463.79 2461.54 2.25
MWB267 76.27 464234.505 996186.858 2464.80 2461.54 3.26
MW171A 464383.390 996238.820 2456.22 2453.80 2.42
MWB452 66.66 464380.381 996172.230 2458.77 2456.04 2.73
MW169 464505.580 996162.890 2453.47 2451.24 2.23
MW269G 76.28 464508.207 996086.659 2459.48 2455.92 3.56
MW57BG 464582.700 994990.660 2432.28 2429.47 2.81
MWB160A 58.82 464613.409 995040.832 2433.74 2431.84 1.90
MW57BG 464582.700 994990.660 2432.28 2429.47 2.81
MW57BH 81.34 464570.208 995071.030 2434.24 2432.27 1.97
460.74
LOT 2
MW147A 465175.280 995586.390 2447.41 2442.79
INSTAL PIPE 27.60 465195.313 995565.151 2447.29
MWB292 29.2 465171.68 995579.418 2447.867 2445.94
MW146 465214.220 995526.310 2446.65 2442.15
INSTAL PIPE 24.71 465222.024 995502.860 2446.64
MW294 23.75 465221.014 995479.129 2446.55 2444.68
MW142 465387.370 995523.260 2441.18 2438.57
MW142A 7.89 465388.527 995515.453 2442.18
MW127 466193.470 995450.920 2432.63 2428.32
INSTAL PIPE 10.27 466184.506 995445.905 2432.88
MWB341 67.75 466127.672 995409.022 2435.72 2433.85
MW126 466232.800 995390.680 2430.80 2427.96
MW126 37.43 466199.942 995372.744 2432.17 2430.39
MW57AS 465819.119 994742.101 2406.78
INSTAL PIPE 19.24 465825.165 994760.366 2413.66
MWB36 34.59 465828.227 994794.825 2416.64 2414.86
MW57AT 465743.787 994724.394 2407.36
MWB63A 43.10 465748.476 994767.149 2413.67
MWB64 10.83 465738.868 994772.153 2414.76
MW57AX 465395.300 994837.040 2413.06
MWB101A 5.83 465395.968 994887.862 2426.81
MW57AZ 465174.710 994900.260 2417.59 2415.35
MWB73 31.63 465190.079 994927.904 2424.35
MW57BA 465077.030 994909.730 2421.06 2418.25
MWB75T 48.56 465077.300 994936.511 2423.82
MWB75 26.78 465081.690 994984.868 2428.01
LOT 3
MW55AU 465102.590 994256.020 2408.63 2405.13
INSTALLED PIPE 17.14 465115.153 994269.450 2409.57
MW55AU1 18.39 465125.768 994282.904 2409.58 2407.65
MW55AT 465209.820 994171.560 2400.84 2397.34
INSTALLED PIPE 20.83 465223.854 994186.952 2402.34
MW55AT1 15.01 465233.201 994198.698 2402.69 2400.95
MW55AS 465321.050 994084.310 2392.39 2388.89
INSTALLED PIPE 14.94 465328.580 994097.213 2394.02
MW55AS1 19.97 465341.842 994112.149 2394.61 2392.79
MW55AR 465418.020 994007.640 2386.41 2382.91
INSTALLED PIPE 17.51 465430.483 994019.941 2388.35
MW55AR1 38.77 465454.781 994050.154 2390.94 2389.16
MW55AP 465562.010 993894.420 2380.57 2377.07
INSTALLED PIPE 15.00 465572.343 993905.296 2382.49
MW55AP1 46.50 465600.638 993942.201 2385.63 2383.78
MW55AM 465633.780 993837.670 2376.59 2373.09
INSTALLED PIPE 23.24 465648.511 993855.649 2378.51
MW55AM1 48.91 465677.355 993893.906 2381.96 2379.95
MW55AL 465667.330 993810.860 2374.39 2370.89
INSTALLED PIPE 35.07 465689.778 993837.799 2377.23
MW55AL1 42.72 465716.598 993871.047 2379.46
MW55AK 465702.230 993783.870 2372.14 2368.64
INSTALLED PIPE 36.04 465728.260 993808.793 2374.26
MW55AK1 29.11 465747.646 993830.508 2375.21
MW57W09 466634.210 993227.760 2325.69 2322.88
INSTALLED PIPE 13.89 466635.248 993229.822 2325.55
MW57M10 2.31 466648.833 993226.916 2324.73 2323.19
MW57W10 466581.730 993243.190 2329.65 2326.85
MW57M09 8.77 466584.979 993251.340 2330.33
LOT 4
SH 468147.352 993881.901
MW56N01 33.87 468194.972 993868.277
MW56L 468147.352 993881.901
MW56L06 49.53 468194.972 993868.277
MW56K 468185.830 993827.377 2287.23
MW56J 468143.570 993750.390 2287.85 2284.08
MW56J01 40.79 468185.830 993827.377 2287.23
MW56G 468001.380 993647.960 2283.84 2281.74
MW56G01 37.28 467966.093 993635.937 2284.55
MW71 467895.660 994225.030 2323.20 2315.75
MW436A 67.01 467831.660 994244.887 2329.31
MW78 467831.780 994593.700 2322.38 2317.64
MWB479F 44.28 467789.244 994605.987 2324.94 2323.16
MW81 467874.310 994669.240 2319.70 2318.29
MW81 33.30 467841.242 994665.299 2322.21 2320.54
MW82 467929.920 994715.120 2327.42 2324.50
Installed pipe 5.44 467924.575 994714.095
MWB423A 26.88 467900.415 994725.875 2329.54 2327.56
MW83 467952.960 994740.780 2330.16 2325.66
MW83A 74.48 468026.929 994732.072 2330.00
MW85 467954.900 994833.250 2335.78 2332.97
MW424 50.84 467904.066 994832.718 2337.23
MW87 467951.890 994990.090 2339.70 2336.56
MW484A 60.98 467890.933 994991.917 2343.14
MW93 467651.890 995229.040 2345.20 2342.59
MW93 48.33 467639.469 995275.742 2348.34
MW98 467345.350 995146.660 2372.19 2368.69
MW390 17.82 467338.961 995163.297 2373.93
MW101 467214.890 995086.850 2383.18 2379.67
MW379A 33.96 467207.356 995119.961 2387.82 2386.08
MW105 467047.360 995049.900 2394.78 2391.27
MW374A 34.45 467058.196 995082.597 2397.25 2395.16
MW108 466896.260 995081.020 2406.79 2403.29
MWB371A 48.55 466927.992 995117.763 2407.91 2406.14
MW112 466738.550 995119.150 2412.72 2409.22
MWB350 55.49 466746.368 995174.087 2414.53
MW114 466618.280 995092.860 2414.77 2411.27
MW347A 62.98 466629.745 995154.790 2415.82
MW117 466493.560 995065.300 2417.82 2414.32
MW346 44.54 466496.341 995109.757 2419.41
LOT 5
MW57C 467685.070 993339.330 2278.43 2275.67
MW57C2 New 3.97 467684.684 993343.285 2278.77
MW57C2 60.02 467688.024 993403.210 2281.77 2279.98
MW57F02 467534.750 993648.322 2294.10 2290.60
MW57F02 8.92 467540.380 993648.322 2293.91 2292.00
MW57F03 467494.420 993661.930 2291.05
MW57F03A 58.81 467494.192 993720.742 2298.087 2296.187
MW57K 467287.905 993196.303 2290.394 2286.99
MWB92 42.64 467261.908 993230.095 2294.82 2292.71
MW57AB 466709.310 993919.980 2370.23 2367.83
(N)MWB114AAB 26.80 466735.043 993927.468 2375
(N)MWB114AA 34.56 466765.122 993944.478 2377.957
MWB114A 24.95 466775.434 993967.195 2380.102 2378.202
MW57AE 466574.23 994127.73 2376.86 2374.25
(N)MW57AE2AA 24.74 466594.21 994142.324 2380.12
(N)MWB113AA 79.09 466655.475 994092.305 2380.996
MWB113 12.18 466664.774 994100.164 2381.4 2379.5
MW57AE
(N)MW57AE2AA 24.74
MW57AE2A 55.65
MW57AF
(N)MWB2AAC 17.07
(N)MWB2AAB 66.35
(N)MWB2AA 65.11
MWB2 44.86
MW57AL
MWB8 65.22
LOT 6
MW27 992638.660 469093.680 2257.82 2251.61
MW28A 25.08 992622.689 469113.019 2259.77 2257.73
MW29 992610.330 468898.140 2255.05 2252.82
MW29A 27.77 992580.572 468898.983 2262.76
MW03A 991751.220 470419.870 2224.40 2221.59
MW03AA01 19.69 991763.162 470404.220 2225.37
MW03D01 991566.470 470197.160 2231.04 2227.48
MW03D01 43.55 991598.041 470167.163 2231.94
MW03E 991467.390 470083.290 2231.23 2228.23
MW03E01 49.07 991500.638 470047.203 2231.95 2229.96
MW03P 991252.350 469315.310 2238.95 2236.06
MW03P01 136.50 991331.283 469426.671 2240.02
MW03S03A 991752.960 468775.300 2249.35 2246.75
MW03S03A2 128.78 991860.394 468846.315 2254.27
MW03S03B 991876.260 468626.540 2252.12 2249.51
MW03S05A1 53.68 991923.184 468652.615 2253.49 2251.42
MW03S03D 991975.313 468480.390 2254.74 2252.50
MW03S03BL6 38.48 992009.033 468498.923 2256.37
MW03S08 992193.540 468357.900 2261.07 2258.47
MW03S03F1 88.54 992227.919 468439.497 2265.22
MW03S038A 992267.060 468330.380 2262.70 2260.09
MW03S03G1 89.56 992300.479 468413.476 2269.13
MW03S10 992348.470 468400.030 2271.43 2266.76
MW03S10A 52.02 992367.858 468448.300 2275.40
MW03S11 992434.780 468302.840 2271.49 2267.42
MW03S11A 52.53 992471.009 468340.878 2276.78
MW03S12 992508.510 468212.770 2271.40 2268.00
MW03S12A 32.78 992514.292 468180.508 2271.82

Prepared by:-__________________________ Checked BY:_____________________________


BILL OF QUANTITIES FOR SANITARY SEWERAGE SYSTEM CONSTRUCTION PROJECTS

LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 TOTAL


M
Item Description Unit Quantity Quantity QuantityQuantityQuantity Quantity Quantity a
No. x
Section I: Preparation of Ground
101 Precutting Paved Road
Surfaces
a) Ordinary Asphalt M 0.00 385.95 98 483.95
###
b) Concrete Asphalt M
c) Reinforced Concrete M
Removing Stone Road
102 Surfaces
a) Cobble Stones M 235.74 111.72 633.00 531.81 1036.76 1263.48 3812.51
###
b) CARE and/or Other M
Large Stone Surfacings 49.53
c) Tile M 10.87 10.87
###
Total Section I-Carried to Summary
Section II: Trench Excavation, Backfill & Cart
away
201 Trench Excavation,
away
Backfill & Cart
a) Type A trench
0-2 m depth M 0.00 48.56 355.00 38.74 398.27 162.16 1002.73
###
0-3 m depth M 364.47 171.74 205.50 756.04 261.25 380.71 2139.70
###
0-4 m depth M 96.28 11.85 7.50 161.75 201.24 303.76 782.38
###
0-5 m depth M 49.28 67.01 16.00 51.02 183.31
###
202 Trench rock excavation
a) Grade 1- Soft rock M 99.88 162.21 354.071 935.51 1079.21 570.44 3201.33
###
b) Grade 2-Hard rock
I) Without blasting M 233.09 379.11 767.01 ### 1576.92 1164.43 6078.88
###
Total Section II-Carried to
Summary
Section III: Gravity Sewers
301 Pipe bedding and
surrounding
a) Type 2 bedding
- Type A Trench M 460.74 281.51 568.00 ### 876.76 897.65 4108.21
###
302 Casting of anchor blocks
a) Type A trench Pcs 16 35 28 23 102.00
###
LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 TOTAL
M
Item Description Unit Quantity Quantity QuantityQuantityQuantity Quantity Quantity a
No. x
303
uPVC Sewer Pipe Supply & Installation
DN 200mm M 460.75 281.51 568.00 874.05 876.76 897.65 3958.72
###
DN 300mm M 149.50 149.50
305 Connection to the trunk Pcs 6.00 9.00 12.00 18.00 12.00 14.00 71.00
###
Manhole
Total Section III-Carried to
Summary
Section IV: Manholes and Structures

401 Manholes: Construct


Precast Circular manholes

a) Type A-1000mm internal


diameter Depth 1.5m or less

i) with Cast Iron Cover


and Frame (supply by the Pcs 3.00
Client)
10.00 12.00 7.00 14.00 46.00
###
402 Additional manhole depth
a) Type A- Depth greater than
1.5m M 2.42 15.63 4.43 6.20 28.68
###
403 Retaining Wall and/or check
dams
a) Masonry M
b) Reinforced Concrete M
Total Section IV-Carried to
Summary
Section VI: Finishing works
601 Permanent restoration of trench surfaces
a) Concrete Asphalt M
b) Ordinary Asphalt M 0.00 257.30 98.00 355.30
###
d) CARE stone M 49.53 69.75 119.28
e) Cobble stone M 235.74 111.72 633.00 467.81 1036.76 1263.48 3748.51
###
f) Tiles M 10.87 296.58
###
g) Reinforced Concrete M
Total Section VI-Carried to
Summary
Total
15% VAT
Grand Total
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES)
Item Section III: Gravity Sewers Section IV: Manholes and Structures Section V: Access Road Section VI: Finishing works
No.
301.Pipe bedding 302.Cast 303. 305. 401.Manholes: 402.Addit 405.Ditc 501 502 503 601.Permanent restoration of
and surrounding ing of uPVC Supply & Construct ional h linings trench surfaces
Manhole Pipe a) Type b) Type a) anchor
Type Sewer
DN Connecti RC Precast
a) Type Circular
e)Type E- manhole
a) Type b) Type a) b) c) d) b
Length
Designation (Sewer (m) dia, 2 4 Ablocks Pipe
trench 200mm on to the manhole
A- asSpecial
per the A-depth
Depth TB2 Ordinary Coble CARE Tiles )
Section) (mm)
bedding bedding (m) Supply
(m) & main MH;dept
drawing detail
Deep >1.5m Masonry Asphalt stone stone (m)
=Type A (m) Installati trunk h<=1.5m Manholes (pcs) (m2) (m) (m) (m) R
trench on line (pcs) ((pcs) e
(m) Manhole i
(no)
LOT 4 n
constru f
SH cted by o
MW56N01 33.87 ASER r
MW56L 1 c
MW56L06 49.53 49.53 49.53 49.53 e
MW56K d
MW56J 1
C
MW56J01 40.79 40.79 40.79 40.79
o
MW56G 1 n
MW56G01 37.28 37.28 37.28 37.28 c
MW71 1 r
MW436A 67.01 67.01 67.01 67.01 e
MW78 1 t
e
MWB479F 44.28 44.28 44.28
MW81 1
MW81 33.30 33.30 33.30 33.3 (
MW82 1 m
3
Installed pipe 5.44 5.44 5.44 5.44
MWB423A 26.88 )
MW83 1
MW83A 74.48 74.48 74.48
MW85 1
MW424 50.84 50.84 50.84 50.84
MW87 1
MW484A 60.98 60.98 60.98 60.98
MW93 1
MW393 48.33 48.33 48.33
MW98 1
MW390 17.82 17.82 17.82
MW101 1
MW379A 33.96 33.96 33.96 33.96
MW105 1
MW374A 34.45 34.45 34.45 34.45
MW108 1
MWB371A 48.55 48.55 48.55 48.55
MW112 1
MWB350 55.49 55.49 55.49 55.49
MW114 1
MW347A 62.98 62.98 62.98 62.98
MW117 1
MW346 44.54 44.54 44.54 44.54
TOTAL -LOT 4 810.05 810.05 18 107.80 467.81 49.53
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRIPTION OF ACTIVITIES)
Item Section V:
No. Section III: Gravity Sewers Section IV: Manholes and Structures Section VI: Finishing works
Access Road
301.Pipe 302.Ca 303. 305. 401.Manholes: 402.Addit 405.Ditc 501 502 503 601.Permanent restoration of
bedding and sting Supply & Construct ional h linings trench surfaces
Manhole Pipe
Length surrounding of uPVC Conne
Designation (Sewer
(m)
dia, a) b) a) DN a)RC Precast
e)Type E- manhole
a) Type b) Type a) b) c) d)
Section) (mm) Type 2 Type 4 anchor
Type A Sewer
200m ction Circular
Type manhole
Special A-depth
Depth TB2 Ordinary Coble CARE Tiles
blocks
beddin beddin trench Pipe
m (m) to the asA-
per the Deep
drawing >1.5m Masonry Asphalt stone stone (m)
g=Typ g (m) (m) Supply main detail
1000m Manholes (pcs) (m2) (m) (m) (m)
eA & trunk m ((pcs)
trench Installa line inter.Di
tion Manho a.dept
LOT 5 (m)
le (no) h<=1.5
1 MW57C
m
MW57C2 New 3.97 3.00 3.00 1 (pcs) 1
MW57C2 60.02 3
2 MW57F02
MW57F02A 8.92 9.00 9.00 1 9
3 MW57F03
MW57F03A 58.81 59.00 59.00 1 59
4 MW57K
MWB92 42.64 14.50 14.50 1
5 MW57AB
(N)MWB114AAB 26.80 27.00 27.00 1 1
(N)MWB114AA 34.56
MWB114A 24.95 27
6 MW57AE R
(N)MW57AE2AA 24.74 R 24.50 24.50 1 1
(N)MWB113AA 79.09 DOES IT EXIST?
MWB113 12.18 DOES IT EXIST?
7 MW57F05CL
MWB558 76.00 76.00 76.00 1 76
8 MW57AE R
(N)MW57AE2AA 24.74 R
MW57AE2A 55.65 ???
9 MW57AF
(N)MWB2AAC 17.07
(N)MWB2AAB 66.35
(N)MWB2AA 65.11
MWB2 44.86
10 MW57AL
MWB8 65.22 44.00 44.00 1
11 MW57F10CL
MWB563 41.50 41.50 41.50 1 41.5
12 MW57F11CL
MWB567A 28.50 28.50 28.50 1
13 MWB520
MWB519 65.00 5.00 5.00 1
57H
MWB492N 31.00 31.00 31.00 1
TOTAL -LOT5 363.00 0.00 0.00 363.00 12.00 3.00 98.00 117.50
Prepared by:-___________________ By___________________ Checked BY:_____________________________ Approved By__________________________________
PROJECT : Construction Of Secondary New Sewer Lines For Selected
Areas Of Kality Catchment
EMPLOYER (Lot-2)
: AAWSA Water and Sanitation Development & Rehabilitation Projec
CONTRACTOR : SABERCON Engineering PLc
CONSULTANT : SWS Consultancy
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS (DESCRI
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) (mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
LOT 1 platfor
MW177 300 ms
MWB261A 90.50 90.50 (m3) 90.50 21.13 49.31 90.50
MWB261 10.87 10.87 10.87 6.68 15.58 10.87
MW175 300
MWB264
MWB267 76.28 26.28 50.00 76.28
MW171A 300
MWB452 66.66 66.66 66.66 31.40 73.26 66.66
MW169 600
MW269G 76.28 30.00 46.28 17.32 40.42 76.28
MW57BG 600
MWB160A 58.82 58.82 9.68 22.59 58.82
MW57BG 600
MW57BH 81.34 81.34 13.67 31.93 81.34
Page Total 157.16 10.87 0.00 364.47 96.28 99.88 233.09 460.74
LOT 2
MW147A 600
INSTAL PIPE 27.60 7.85 7.85 8.62 17.27 7.85
MWB292 29.20
MW146
INSTAL PIPE 24.71 24.71 24.71 13.98 32.62 24.71
MW294 23.75
MW142
MW142A 7.89 7.89 7.89 6.79 15.84 7.89
MW127
INSTAL PIPE 10.27 10.27 4.00 6.27 0.00 0.00 10.27
MWB341 67.75
MW126
MW330 37.43 37.43 37.43 23.93 55.84 37.43
MW57AS
INSTAL PIPE 19.24 19.24 19.24 19.24
MWB36 34.59
MW57AT
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m)
(mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
MWB63A 43.10 (m )
43.10 (no) g (m3) (m) (m) (m) (m)
43.01 18.24 46.03 (m)
43.10
platfor
MWB64 10.83 ms
MW57AX (m3)
MWB101A 50.83 50.83 50.83 43.59 101.71 50.83
MW57AZ
MWB73 31.63 31.63 31.63 22.92 53.49 31.63
MW57BA
MWB75T 48.56 48.56 48.56 24.14 56.32 48.56
MWB75 26.78
Total Lot2 281.51 48.56 171.74 11.85 49.28 162.21 379.11 281.51
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) (mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
LOT 3 platfor
MW55Y ms
MW55Y1 21 (m3) 11.00 10.00 7.35 21.00
MW55AX1
MW55AX2 9.00 6.00 3.00 6.17 9.00
MW55AW1
MW55AW2 20.00 20.00 5.60 20.00
MW55AU
INSTALLED PIPE 17.14
MW55AU1 18.39 19.00 19.00 15.16 19.00
MW55AT
INSTALLED PIPE 20.83
MW55AT1 15.01 18.00 10.00 8.00 7.81 18.00
MW55AS
INSTALLED PIPE 14.94
MW55AS1 19.97 6.00 7.00 9.74 13.00
MW55AR
INSTALLED PIPE 17.51
MW55AR1 38.77 18.00 15.00 24.49 33.00
MW55AP
INSTALLED PIPE 15.00
MW55AP1 46.50 10.00 13.00 12.24 23.00
MW55AM
INSTALLED PIPE 23.24
MW55AM1 48.91 15.00 8.00 25.76 23.00
Page Total- 21.00 66.00 76.00 103.00 114.32 179.00
MW55AL
INSTALLED PIPE 35.07
MW55AL1 42.72 21.00 12.00 37.65 33.00
MW55AK
INSTALLED PIPE 36.04
MW55AK6 29.11 18.00 10.00 8.00 21.67 18.00
MW57W08
MW57M09 8.77 7.50 7.50 14.70 7.50
Page Total 25.50 31.00 20.00 7.50 74.03 58.50
Total Lot 3 21.00 91.50 107.00 123.00 7.50 188.34 237.50
LOT 4
SH To be constructed by
MW56N01 33.87 ASER
MW56L
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) (mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
MW56L06 49.53 49.53 49.53 57.27 85.90 49.53
platfor
MW56K ms
MW56J (m3)
MW56J01 40.79 40.79 40.79 49.01 73.51 40.79
MW56G
MW56G01 37.28 37.28 37.28 25.91 38.86 37.28
MW71
MW436A 67.01 67.01 67.01 132.51 309.19 67.01
Page Total- 107.80 37.28 49.53 127.60 67.01 264.69 507.46 194.61
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
(mm)
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m) (no) g (m3) (m) (m) (m) (m) (m)
MW78
platfor
MWB479F 44.28 ms 44.28 48.39 112.91 44.28
MW81 (m3)
MW81 33.30 33.30 33.30 11.96 27.92 33.30
MW82
Installed pipe 5.44 5.44 5.44
MWB423A 26.88 5.44 5.51 12.86
MW83
MW83A 74.48 74.48 87.94 263.81 74.48
MW85
MW424 50.84 50.84 50.84 27.09 81.27 50.84
MW87
MW484A 60.98 60.98 60.98 37.17 111.51 60.98
MW93
MW393 48.33 48.33 29.81 89.43 48.33
MW98
MW390 17.82 17.82 13.02 39.06 17.82
MW101
MW379A 33.96 33.96 33.96 26.33 61.43 33.96
MW105
MW374A 34.45 34.45 34.45 29.55 68.95 34.45
MW108
MWB371A 48.55 48.55 48.55 37.92 88.49 48.55
Page Total- 267.52 38.74 294.92 118.75 0.00 354.69 957.63 452.42
MW112
MWB350 55.49 55.49 55.49 44.98 104.95 55.49
MW114
MW347A 62.98 62.98 62.98 49.17 62.98 62.98
MW117
MW346 44.54 44.54 44.54 38.84 90.63 44.54
Page Total- 163.01 163.02 132.99 258.56 163.02
TOTAL -LOT 4 0.00 107.80 0.00 467.81 49.53 38.74 585.54 118.75 67.01 752.37 1723.66 810.05
LOT 5
1 MW57C
MW57C2 New 3.97 3.00 6.75 6.75 3.00
MW57C2 60.02 3
2 MW57F02
MW57F02A 8.92 9 9.00 20.25 20.25 9.00
3 MW57F03
MW57F03A 58.81 59 59.00 132.75 132.75 59.00
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) (mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
4 MW57K
platfor
MWB92 42.64 ms 14.50 32.63 32.63 14.50
5 MW57AB (m3)
(N)MWB114AAB 26.80 27.00 60.75 60.75 27.00
(N)MWB114AA 34.56
MWB114A 24.95 27
6 MW57AE R
(N)MW57AE2AA 24.74 R 24.50 55.13 55.13 24.50
(N)MWB113AA 79.09 DOES IT EXIST?
MWB113 12.18 DOES IT EXIST?
Page Total- 98 68.00 17.50 51.5 308.25 308.26 137.00
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m) (mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
7 MW57F05CL
platfor
MWB558 76.00 76.00 ms 10.00 66.00 171.00 171.00 76.00
8 MW57AE R (m3)
(N)MW57AE2AA 24.74 R
MW57AE2A 55.65 ???
9 MW57AF T
(N)MWB2AAC 17.07
(N)MWB2AAB 66.35
(N)MWB2AA 65.11
MWB2 44.86
10 MW57AL
MWB8 65.22 44.00 99.00 44.00 44.00
11 MW57F10CL
MWB563 41.50 41.50 41.50 93.38 93.38 41.50
12 MW57F11CL
MWB567A 28.50 28.50 28.50 64.13 64.13 28.50
13 MWB520
MWB519 65.00 5.00 5.00 11.25 11.25 5.00
57H
MWB492N 31.00 15.00 16.00 69.75 69.75 31.00
Page Total- 151.00 85.00 110.00 15 16.00 508.50 453.50 226.00
TOTAL -LOT5 98 151.00 153.00 127.50 66.5 16.00 816.75 761.76 363.00
LOT 6
MW27
MW28A 25.08 24.83 24.83 34.83 81.27 24.83
MW29
MW29A 27.77 0.00 15.57 36.33 29.77
MW03A
MW03AA01 19.69 0.00 7.59 12.10 13.00 30.33 19.69
MW03D01
MW03D01 43.55 43.55 13.55 30.00 14.64 34.15 43.55
MW03E
MW03E01 48.92 48.92 23.42 26.50 13.20 30.81 48.92
MW03P
ADD NEW
MW03P01 136.50 136.50 136.50 82.38 192.21 136.50
Page Total-
MW03S03A
ADD NEW
Item Section I=Preparation of Grounds Section II: Trench Excavation, Backfill & Cart
Section I
No. away
101-Precutting Paved 102-Removing Stone 103=Cutting and 104.Construction of 201.Trench Excavation, Backfill 202.Trench 301.Pipe
Surfaces Road Surfaces Removal of existing Working Platforms & Cart away rock excavation bedding a
walls and fences surroundin
Manhole Designation Length Pipe
dia, a) b) c) a) b) e) a) b) c) a) b) g) Cart Type Type Type Type a) b) a)
(Sewer Section) (m)
(mm) Concre Ordinar Reinfor Coble CARE Tile Mason Reinfor Corrug Remov Comm away A A A A Grade Grade Type 2
te y ced stone stone ry ced ated al of on to any trench trench trench trench 1- Soft 2-Hard beddin
Asphal Asphalt concre (m) (m) (m3) Concre iron trees exc'n distanc = = = 0- = 0- rock rock g=Typ
t (m) te (m) te sheet of any for e from 0-2 m 0-3 m 4 m 5m (m3) (m3) eA
(m) (m3) (m3) girth; workin site depth depth depth depth trench
(m )
(no) g (m3) (m) (m) (m) (m) (m)
MW03S03A2 128.78 128.78 48.28 80.50 17.64 41.15 128.78
platfor
MW03S03B ms
MW03S05A1 53.68 0.00 (m3) 53.58 7.25 16.93 53.58
MW03S03D
MW03S03BL6 38.48 46.28 46.28 14.80 34.52 46.28
MW03S08
MW03S03F1 88.54 88.54 38.00 50.50 124.95 124.95 88.54
MW03S038A
MW03S03G1 89.56 89.56 39.30 51.26 54.35 126.811 89.56
MW03S10
MW03S10A 52.02 52.02 8 15 29.02 57.42 133.99 52.02
MW03S11
MW03S11A 52.53 52.53 5.00 7.53 18 22 48.62 113.45 52.53
MW03S12
MW03S12Z 32.78 32.78 4.20 18.30 10.28 25.89 60.41 32.78
MW03S12
MW03S12A 58.12 58.12 5.02 23.10 30.00 45.91 107.12 58.12
TOTAL -LOT6 802.41 147.39 366.67 312.56 51.02 570.44 1164.43 905.45
WORK ITEMS (DESCRIPTION OF ACTIVITIES) WORK ITEMS
Section IV: (DESCRIPTION OF ACTIVITIES)
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
r
h<=1.5
1 manho
m
90.50 le as 1
(pcs) 90.50
per the
10.87 drawin 1? 10.87
1 g detail

76.28
1
66.66 66.66
1
76.28
1
58.82
1
81.34
460.75 6 157.16 10.87

1
7.85 7.85

1
24.71 24.71

1
7.89 7.89
1
10.27 10.27

1
37.43 37.43
1
19.24 19.24

1
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
43.10 r 43.10
h<=1.5
manho
m
le as
1 (pcs)
50.83 per the 50.83
drawin
1
g detail
31.63 31.63
1
48.56 1 48.56

0 281.51 9 1 0 0 0 281.51
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
r
h<=1.5
manho
m
21.00 le as
1 (pcs)
per the
drawin
9.00 1 g detail 9

20.00 1 20

19.00 1 19

18.00 1 18

13.00 1

33.00 1

23.00 1

23.00 1
0 179.00 9 66

33.00 1

18.00 1 18.00

7.50 1 7.50
58.50 3 25.5
237.50 12 91.5

1
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
49.53 r 49.53
h<=1.5
manho
m
le as
1 (pcs)
40.79 per the
drawin
1
g detail
37.28 37.28
1
67.01
194.61 4 37.28 49.53
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
1 r
h<=1.5
44.28 manho
m
1 le as
(pcs)
33.30 per the 33.3
drawin
1
g detail
5.44 5.44

1
74.48
1
50.84 50.84
1
60.98 60.98
1
48.33
1
17.82
1
33.96 33.96
1
34.45 34.45
1
48.55 48.55
452.42 11 267.52 0
1
55.49 55.49
1
62.98 62.98
1
44.54 44.54
163.02 3 163.01
810.05 18 467.81 49.53

3.00 1 1

9.00 1

59.00 1
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the &
Type depth
Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
r
h<=1.5
14.50 1 manho
m
le as
(pcs)
27.00 1 per the1
drawin
g detail

24.50 1 1

137.00 6 3
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the & depth
Type Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
r
h<=1.5
76.00 1 manho
m 76
le as
(pcs)
per the
drawin
g detail

44.00 1

41.50 1 41.5

28.50 1

5.00 1

31.00 1
0 226.00 6 0 117.5
0 363.00 12 3 117.5

1
24.83 1 0.54 24.83
1
29.77 1 0.5
1
19.69 1 0.75
1
43.55 1 0.81 43.55
1
48.92 48.92
1
1 136.50
136.50

1
1
Section IV:
Section III: Gravity Sewers Manholes and Section VI: Finishing works
301.Pipe 303. 305. Structures
401.M 402.Ad 601.Permanent restoration of
bedding and anhole ditional trench surfaces
surrounding uPVC Conne s: manho
b) Sewer
DN ction Supply
a) le
a) b) c) d) Tiles
Type 4 200mPipe to the & depth
Type Type Coble CARE (m)
beddin m Supply
(m) main Constr
A- A- stone stone
g (m) & trunk uct
1000m RC Depth (m) (m)
Installa line Precas
m >1.5m
tion Manho t
inter.Di (pcs)
le (no) Circula
a.dept
128.78 r 128.78
h<=1.5
1 m 1
manho 0.56
53.58 le as
(pcs)
1 per the1 0.81
drawin
46.28 g detail 46.28
1 1 0.35
88.54 88.54

89.56 1 1 0.35 89.56

52.02 1 1 0.4 52.02

52.53 1 1 0.31 52.53

32.78 1 1 0.41 32.78

58.12 1 1 0.41 58.12


0 905.45 15 14 6.2 802.41
Handling Slope/Drop Problems - Connecting to TRUNK
SLOPE/DROP/ANCHOR BLOCK Analysis
Invert Depth at
Item Dia. Dist. Slope Ground MH Drop No. of anchor
MH Name (mm blocks REMARKS
No u/s d/s (m) (%) Elev. u/s d/s at MH
)
LOT 2
MW147A 600 2443.99 2443.39 2447.41 3.42 4.02 0.60 Provide 1 Anchor Block
MWB292 2445.94 2445.94 7.85 24.79 2447.87 1.93 1.93 0.00 1 at the first bell.

MW142 600 2438.87 2438.57 2441.18 2.31 2.61 0.30 No anchor block
MW142A 2439.18 2439.18 7.89 3.93 2442.18 3.00 3.00 0.00 required

MW57AT 600 2407.96 2407.36 0.60 No anchor block


MWB63A 2409.17 2409.17 43.01 2.81 2413.67 4.50 4.50 0.00 required

MW57AX 600 2413.66 2413.06 0.60


MWB101A 2424.01 2424.01 50.83 20.36 2426.81 2.80 2.80 0.00 8 Provide 1 at each bell

MW57AZ 600 2415.95 2415.35 2417.59 1.64 2.24 0.60


MWB73 2421.57 2421.57 31.63 17.77 2424.35 2.78 2.78 0.00 5 Provide 1 at each bell

MW57BA 600 2418.85 2418.25 2421.06 2.21 2.81 0.60

MWB75T 2421.83 2421.83 26.78 11.13 2423.82 1.99 1.99 0.00 2 Provide 1 at every other
bell
16

Page 46 of 93
Invert Depth at
Item Dia. Dist. Slope Ground MH Drop No. of anchor
MH Name (mm blocks REMARKS
No u/s d/s (m) (%) Elev. u/s d/s at MH
)
LOT 4
MW56L 300 2284.09 2283.79 2287.52 3.43 3.73 0.30
MW56L06 2293.41 2293.41 49.53 18.82 2295.32 1.91 1.91 7 Provide 1 at each bell
MW56J 300 2284.38 2284.08 2287.85 3.47 3.77 0.30
13.31 2.01 Provide 1 at every other
MW56J01 2289.81 2289.81 40.79 2291.82 2.01 3 bell

MW71 900 2316.65 2315.75 2323.20 6.55 7.45 0.90


MW436A 2327.41 2327.41 67.01 16.06 2329.31 1.90 1.90 0.00 10 Provide 1 at each bell

MW78 900 2318.54 2317.64 2322.38 3.84 4.74 0.90 Provide 1 at every other
MWB479F 2323.16 2323.16 44.28 10.42 2324.94 1.79 1.79 3 bell

MW87 2337.46 2336.56 2339.70 2.24 3.14 0.90 Provide 1 at every other
MW484A 900 2341.23 2341.23 60.98 9.31 2343.14 1.91 1.91 4 bell

MW98 900 2369.59 2368.69 2372.19 2.60 3.50 0.90


MW390 2371.75 2371.75 17.82 12.13 2373.93 2.18 2.18 2 Provide 1 at each bell

MW101 600 2380.27 2379.67 2383.18 2.91 3.51 0.60


MW379A 2386.08 2386.08 33.96 17.11 2387.82 1.74 1.74 0.00 4 Provide 1 at each bell

MW105 600 2391.87 2391.27 2394.78 2.91 3.51 0.60 Provide 1 at every other
MW374A 2395.16 2395.16 34.45 9.55 2397.25 2.09 2.09 0.00 2 bell
35

Page 47 of 93
Invert Depth at
Item Dia. Dist. Slope Ground MH Drop No. of anchor
MH Name (mm blocks REMARKS
No u/s d/s (m) (%) Elev. u/s d/s at MH
)
LOT 5
MWB57AB 600 2368.43 2367.83 2370.23 1.800 2.400 0.60
MWB114AAB 2371.70 2371.50 27.00 11.37 2375.00 3.300 3.500 0.20 2
Provide 1 at every other
MWB114AA 2375.70 2375.50 34.50 11.01 2377.96 2.260 2.460 0.20 2 bell
MWB114A 2378.50 2378.50 25.00 11.20 2380.10 1.600 1.600 0.00 1

MW57AL 600 2383.10 2382.50 2386.01 2.910 3.510 0.60


MWB 8 2393.57 2393.57 82.00 12.77 2396.17 2.600 2.600 0.00 6

MW57K 900 2287.89 2286.99 2289.79 1.900 2.800 0.60 Provide 1 at every other
MWB92 2292.41 2292.41 47.50 9.52 2294.82 2.410 2.410 0.00 3 bell

MW57F03 300 2291.35 2291.05 2294.03 2.680 2.980 0.60


MW57F03A 2296.44 2296.44 59.00 8.63 2298.09 1.650 1.650 0.00 3 At every other 3

MW57F02 300 2290.90 2290.60 2294.10 3.20 3.50 0.30


9.00 14.56 0.00 Provide 1 at the first
MW57F02A 2292.21 2292.21 2293.91 1.70 1.70 1 bell only

MW57F05CL 300 2308.33 2308.03 2309.63 1.30 1.60 0.30


MWB558 2307.96 2307.96 76.00 -0.49 2310.06 2.10 2.10 0.00 Decision -may require trunk line realign

MW57F10CL 300 2327.07 2326.77 2329.17 2.10 2.40 0.30


MWB563 2332.95 2332.95 41.50 14.17 2334.85 1.90 1.90 0.00 6 Provide 1 at each bell

MW57F11CL 300 2343.05 2342.75 2345.15 2.10 2.40 0.30


MWB567A 2346.78 2346.78 28.50 13.09 2348.43 1.65 1.65 0.00 4 Provide 1 at each bell
28

Page 48 of 93
Invert Depth at
Item Dia. Dist. Slope Ground MH Drop No. of anchor
MH Name (mm blocks REMARKS
No u/s d/s (m) (%) Elev. u/s d/s at MH
)
LOT 6
MW03A 600 2222.19 2221.59 2224.40 2.21 2.81 0.60 No anchor block
MW03AA1 2223.46 2223.46 19.69 6.44 2225.37 1.91 1.91 0.00 required

MW03S08 600 2260.69 2260.09 2262.70 2.01 2.61 0.60


89.56 7.36 1.85 0.00 provide 1 at every other
MW03S05G1 2267.28 2267.28 2269.13 1.85 6 bell

MW03S10 600 2267.36 2266.76 2271.43 4.07 4.67 0.60


52.02 11.81 1.90 0.00 provide 1 at every other
MW03S10A 2273.5 2273.50 2275.40 1.90 3 bell

MW03S11 600 2268.02 2267.42 2271.49 3.47 4.07 0.60


MW03S11A 2274.97 2274.97 52.53 13.23 2276.78 1.81 1.81 0.00 7 provide 1 at each bell

MW27 1000 2252.61 2251.61 2257.82 5.21 6.21 1.00 TOO DEEP
MW28A 2257.73 2257.73 24.83 20.60 2259.77 2.04 2.04 0.00 3 1 at each bell

MW29 1000 2253.82 2252.82 2255.05 1.23 2.23 1.00


MW29A 2260.76 2260.76 29.77 23.30 2262.76 2.00 2.00 0.00 4
23

Page 49 of 93
BILL OF QUANTITIES FOR SANITARY SEWERAGE SYSTEM CONSTRUCTION PROJECTS

TOTAL
Unit Amount
Item Description Unit Quantity Price in
No. in Birr
Birr
Section I: Preparation of Ground
101 Precutting Paved Road
Surfaces
a) Ordinary Asphalt M 483.95 35404.79
b) Concrete Asphalt M 0.00
c) Reinforced Concrete M
Removing Stone Road
102 Surfaces
a) Cobble Stones M 3812.51 142098.07
b) CARE and/or Other M
Large Stone Surfacings 0.00
c) Tile M 10.87 310.56
Total Section I-Carried to 177813.42
Summary
Section II: Trench Excavation,
Backfill & Cart away
201 Trench Excavation, away
Backfill & Cart
a) Type A trench
0-2 m depth M 1002.73 198675.13
0-3 m depth M 2139.70 382853.52
0-4 m depth M 782.38 155663.75
0-5 m depth M 183.31 33451.68
202 Trench rock excavation
a) Grade 1- Soft rock M 3201.33 493147.01
b) Grade 2-Hard rock
I) Without blasting M 6078.88 1768479.37
Total Section II-Carried to 1768479.37
Summary
Section III: Gravity Sewers
301 Pipe bedding and
surrounding
a) Type 2 bedding
- Type A Trench M 4108.21 387825.90
302 Casting of anchor blocks
a) Type A trench Pcs 102.00 202750.00
TOTAL
Unit Amount
Item Description Unit Quantity Price in
No. in Birr
Birr
303
uPVC Sewer Pipe Supply & Installation
DN 200mm M 3958.72 276258.55
DN 300mm M 149.50
305 Connection to the trunk Pcs 71.00 154100.00
Manhole
Total Section III-Carried to 1020934.45
Summary
Section IV: Manholes and
Structures
401 Manholes: Construct
Precast Circular manholes

a) Type A-1000mm internal


diameter Depth 1.5m or less

i) with Cast Iron Cover


and Frame (supply by the Pcs
Client)
46.00 248400.00
402 Additional manhole depth
a) Type A- Depth greater than
1.5m M 28.68 60515.00
403 Retaining Wall and/or check
dams
a) Masonry M
b) Reinforced Concrete M
Total Section IV-Carried to
Summary 308915.00
Section VI: Finishing works
601 Permanent restoration of trench surfaces
a) Concrete Asphalt M
b) Ordinary Asphalt M 355.30 85052.48
d) CARE stone M 119.28 19928.27
e) Cobble stone M 3748.51 1398879.26
f) Tiles M 296.58 2329.22
g) Reinforced Concrete M
Total Section VI-Carried to 1506189.24
Summary
Total 4782331.48
15% VAT 717349.72
Grand Total 5499681.20
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office
Bill of Quantities
Quantity
Item No Description Unit
Lot-1 Unit Rate Amount Lot-2 Unit Rate Amount Lot-3 Unit Rate Amount Lot-4 Unit Rate Amount Lot-5 Unit Rate Amount Lot-6 Unit Rate Amount

Section I: Preparation of Ground


101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 9.90 20.00 198.00 - - - 85.80 100.00 8,580.00 66.00 50.00 3,300.00 - - - 48.99 2,000.00 97,977.00 210.69
b) Ordinary Asphalt M2 - 20.00 - - 20.00 - - 35.00 - 424.55 50.00 21,227.44 161.70 80.00 12,936.00 - 50.00 - 586.25
C) Gravel Road M2 - 20.00 - - 80.00 - - 2.00 - - 25.00 - - 30.00 - - 20.00 - -
d) Coble and/or CARE Stone M2 259.31 20.00 5,186.28 122.89 10.00 1,228.92 696.30 17.00 11,837.10 771.89 30.00 23,156.60 1,140.43 40.00 45,617.22 1,389.83 30.00 41,694.84 4,380.65
e)Tiles M2 11.96 20.00 239.14 - 15.00 - - 17.00 - - 30.00 - - 50.00 - - 50.00 - 11.96
f) Reinforced Concrete M2 - - - - - - - - - - - - - - 1,000.00 - -
102 Cutting and Removal of existing walls and fences - - - - - - - -
a)Masonry M2 - 500.00 - - 100.00 - 126.50 1,200.00 151,800.00 - 100.00 - - 1,000.00 - - 200.00 - 126.50
b) Reinforeced Concrete M2 - 600.00 - - 100.00 - 3.08 1,200.00 3,696.00 - 120.00 - - 1,500.00 - - 200.00 - 3.08
C) Corrugated Iron sheet M2 - 200.00 - - 30.00 - 82.50 800.00 66,000.00 - 20.00 - - 1,500.00 - - 200.00 - 82.50
103 Construction of Working Platforms - - - - - - - - - - - - - - -
a) Removal of trees or girth of any size,the price
shall include transportation to selected site by No. - - - - - 50.00 -
engineer of any distance - 50.00 - - - 1,800.00 - 200.00 - 350.00 - -
b) Common excavation M3 - 20.00 - 571.00 - - - 150.00 - 776.00 55.00 42,680.00 185.00 70.00 12,950.00 591.00 10.00 5,910.00 2,123.00
c) Extra over for soft rock excavation M 3
- 50.00 - 96.00 - - - 200.00 - 131.00 140.00 18,340.00 31.00 30.00 930.00 99.00 10.00 990.00 357.00
d)Extra over for hard rock: without blasting M3 - 100.00 - 96.00 - - - 300.00 - 131.00 200.00 26,200.00 31.00 70.00 2,170.00 100.00 10.00 1,000.00 358.00
e)Extraover for hard rock: wirh blasting M3 - - - - - - - 350.00 - - - - - - - - - -
f)Fill for working platforms:From site,incl.
M3 - - - - - - -
production,transportation and placing - - - - - - - - -
from site excavated material M3 - - - - - - - 350.00 - - - - - - - - - -
from the borrow selected material site M3 - - - - - - - 350.00 - - - - - - - - -
g) Cart away of any distance from site M3 - 20.00 - 763.00 - - - 200.00 - 1,038.00 60.00 62,280.00 247.00 30.00 7,410.00 790.00 40.00 31,600.00 2,838.00
Sub Total Section-I - 5,623.42 - 1,228.92 - 241,913.10 - 197,184.03 - 82,013.22 - - 179,171.84 -
Section II: Trench Excavation,Backfill &Cart
-
away - - - - - - -
201 Trench Excavation,Backfill &Cart away - - - - - - - -
a) Type A trench - - - - - - - -
0-2m depth M - 80.00 - 53.42 200.00 10,683.20 390.50 180.00 70,290.00 42.62 122.00 5,199.18 438.10 180.00 78,857.46 178.38 300.00 53,512.80 1,103.01
0-3m depth M 400.92 100.00 40,091.70 188.91 150.00 28,336.42 226.05 195.00 44,079.75 761.24 224.00 170,518.30 287.38 280.00 80,465.00 418.78 100.00 41,878.10 2,283.27
0-4m depth M 105.91 150.00 15,886.20 13.03 10.00 130.31 8.25 240.00 1,980.00 177.93 326.00 58,005.30 221.36 400.00 88,545.60 334.14 20.00 6,682.72 860.62
0-5m depth M - 200.00 - 54.21 10.00 542.08 - 245.00 - 73.71 441.00 32,506.41 17.60 180.00 3,168.00 56.12 20.00 1,122.44 201.64
202 Trench rock excavation - -
a) Grade 1- Soft rock M3 109.87 100.00 10,986.80 178.43 100.00 17,843.29 389.48 250.00 97,369.39 1,029.06 140.00 144,068.72 1,187.14 150.00 178,070.42 627.49 150.00 94,123.09 3,521.46
b) Grade 2- Hard rock - - - - - - - -
i) with out blasting M3 256.40 300.00 76,919.70 417.02 100.00 41,702.06 843.71 250.00 210,927.06 2,097.48 220.00 461,445.51 1,734.62 230.00 398,961.87 1,280.87 580.00 742,903.27 6,630.09
ii) With blasting - - - - - - - -
Sub Total Section-II - 143,884.40 - 99,237.37 - 424,646.20 - 871,743.41 - 828,068.35 - - 940,222.42 -
Section III: Gravity Sewers - - - - - - - -
301 Pipe bedding and surrounding - - - - - - - -
a) Type 2 bedding - - - - - - - -
Type A Trench M 506.82 70.00 35,477.23 309.66 70.00 21,676.44 624.80 100.00 62,480.00 1,055.50 74.00 78,106.97 964.44 150.00 144,665.40 987.41 80.00 78,992.84 4,448.63
b) Type 4 Bedding - - - - - - - -
Type A Trench M - - - - - - - -
302 Casting of anchor blocks - - - - - - - -
a) Type A trench Pcs - 18 800.00 - 2,000.00 39 250.00 28 2,000.00 32 6,000.00 116.90
303 uPVC Sewer pipe supply & Installation - - - - - - - -
DN200mm Supply M 506.82 - 309.66 - 624.80 - 1,055.50 - 964.44 - 987.41 - - 4,448.63
DN200mm Installation M 506.82 25.00 12,670.44 309.66 35.00 10,838.22 624.80 60.00 37,488.00 1,055.50 20.00 21,109.99 964.44 150.00 144,665.40 987.41 80.00 78,992.84 4,448.63
305 Connection to the main trunk sewer line Manhole Pcs 7.00 2,000.00 14,000.00 10.00 300.00 3,000.00 13.00 700.00 9,100.00 20.00 2,500.00 50,000.00 13.00 2,500.00 32,500.00 16.00 4,000.00 64,000.00 79.00
Sub Total Section-III - 62,147.68 - 35,514.67 - 109,068.00 - 149,216.97 - 321,830.80 - - 221,985.67 -
Section IV:Manholes and Surfaces - - - - - - - -
Manholes: Supply& Construct RC Precast circular
401 -
manhole as per the drawing detail - - - - - - -
a) Type A-1000mm internal diameter Depth 1.5m or
-
less - - - - - - -
i) with cast iron cover and Frame Pcs 3.00 17,800.00 53,400.00 11.00 6,000.00 66,000.00 20.00 8,400.00 168,000.00 7.00 6,000.00 42,000.00 8.00 4,000.00 32,000.00 15.00 2,500.00 37,500.00 64.00
402 Additional manhole depth - - - - - - - -
a) Type A-Depth greater than 1.5m M 2.66 7,000.00 18,634.00 17.19 2,000.00 34,386.00 13.09 2,300.00 30,107.00 4.87 2,500.00 12,182.50 3.03 1,500.00 4,537.50 6.82 200.00 1,364.00 47.66
403 Retaining wall and/or check dams - - - - - - - -
a)Masonry M3 - - - - - - - - - - - - - -
b) Reinforced Concrete M3 - - - - - - - - - - - - - -
404 Culvert inlet and Outlets - - - - - - - - - - - - - -
a)Masonry M3 - - - - - - - - - - - - - -
b) Reinforced Concrete M3 - - - - - - - - - - - - - -
Sub Total Section-IV - 72,034.00 - 100,386.00 - 198,107.00 - 54,182.50 - 36,537.50 - - 38,864.00 -
Section V: River Crossing & Pipe Support
-
Structures; - - - - - - -
Normal Material Excavation for foundation as per
501 the drawing & site condition including cart away at M - - - - 325.71 350.00 113,998.50 - - - - - - -
any distance from the site. 325.71
Selected borrowed fill material and compacted at
502 M - - - - 260.57 450.00 117,255.60 - - - - - - - 260.57
every 15cm layer by layer.
503 Soft rock excavation M - - - - 80.08 400.00 32,032.00 - - - - - - - 80.08
504 Hard rock excavation M - - - - 101.75 800.00 81,400.00 - - - - - - - 101.75
Concrete, Retaining Protection Work and Form
505 - - - - - - - - - - - - - - -
Work
a) 10 cm thick lean concrete C-5 under footing M - - - - 58.08 400.00 23,232.00 - - - - - - - 58.08
b) Stone Masonry Retaining Wall M - - - - 159.50 2,300.00 366,850.00 - - - - - - - 159.50
c) C-25 concrete in footings M - - - - 7.92 4,500.00 35,640.00 - - - - - - - 7.92
d) Ditto, but in foundation columns and column
M - - - - 10.58 4,500.00 47,619.00 - - - - - - - 10.58
heads
d) Ditto, but in Bracing Beam M - - - - 1.76 5,000.00 8,800.00 - - - - - - - 1.76

52 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office
Bill of Quantities
Quantity
Item No Description Unit
Lot-1 Unit Rate Amount Lot-2 Unit Rate Amount Lot-3 Unit Rate Amount Lot-4 Unit Rate Amount Lot-5 Unit Rate Amount Lot-6 Unit Rate Amount

e) Sawn zigba form work - - - - - - - - - - - - - - -


i) Sides of footings M - - - - 13.20 400.00 5,280.00 - - - - - - - 13.20
ii) Sides of foundation columns and column
M - - - - 70.05 400.00 28,020.96 - - - - - - - 70.05
heads
iii) sides and bottom of bracing beam M - - - - 5.50 400.00 2,200.00 - - - - - - - 5.50
Mild steel rod reinforcement, cutting, bending &
506 - - - - - - - - - - - - - - -
placing in position
a) 10mm dia. Deformed Kg - - - - - 56.00 - - - - - - - - -
b) 12mm dia. Deformed Kg - - - - 394.98 56.00 22,118.71 - - - - - - - 394.98
c) 16mm dia. Deformed Kg - - - - 512.05 56.00 28,674.80 - - - - - - - 512.05
d) 20mm dia. Deformed Kg - - - - 1,078.55 56.00 60,398.80 - - - - - - - 1,078.55
e) 24mm dia. Deformed Kg - - - - - 56.00 - - - - - - - - -
Cutting, welding, placing in position & including two
- - - - - - - - - - - - - - -
coats of anti-rust paint
507 a) Trusses & purlins in structural RHS - - - - - - - - - - - - - - -
i) Size 200x100x4mm M - - - - 88.00 2,500.00 220,000.00 - - - - - - - 88.00
ii) Size 100x100x4mm M - - - - 246.40 1,700.00 418,880.00 - - - - - - - 246.40
b) 450x450x8mm End Support Anchor Plates No. - - - - 8.80 2,500.00 22,000.00 - - - - - - - 8.80
c) 16mm J-Bolts for end support plates anchoring No. - - - - 26.40 500.00 13,200.00 - - - - - - - 26.40
d) 6mm thick Pipe support plates Kg - - - - 97.66 75.00 7,324.47 - - - - - - - 97.66
e) 900x50x3mm Pipe Anchorring belts No. - - - - 6.60 900.00 5,940.00 - - - - - - - 6.60
f) 16mm Diameter Bolts for Pipe Anchorring belt
No. - - - - 13.20 200.00 2,640.00 - - - - - - - 13.20
Fixing
g) 300x100x3mm thick walk way plate M - - - - 39.60 1,500.00 59,400.00 - - - - - - - 39.60
h) 2x(300x400x20mm) thick RHS connection plates
M - - - - 11.00 2,500.00 27,500.00 - - - - - - - 11.00
including 10 diam. 20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe
M - - - - 18.80 6,000.00 112,800.00 - - - - - - - 18.80
above ground
j) supply and install 200x100x4mm pipe support M - - - - 17.60 950.00 16,720.00 - - - - - - - 17.60
Sub Total Section-V - - - - - 1,879,924.84 - - - - - - - -
Section VI: Finishing works - - - - - - - -
601 Permanenet restoration of trench surfaces - - - - - - - -
a) Concrete Asphalt M2 9.90 99.00 980.10 - 99.00 - 85.80 800.00 68,640.00 66.00 165.00 10,890.00 - 148.50 - 48.99 594.00 29,099.17 210.69
b) Ordinary Asphalt M2 - 99.00 - - 99.00 - - 33.00 - 424.55 165.00 70,050.54 161.70 148.50 24,012.45 - 594.00 - 586.25
C) Gravel Road M2 - 20.00 - - 60.00 - - 85.00 - - 60.00 - - 100.00 - - 100.00 - -
d) Coble and/or CARE Stone M2 259.31 99.00 25,672.09 122.89 66.00 8,110.87 696.30 429.00 298,712.70 771.89 13.20 10,188.90 1,140.43 132.00 150,536.83 1,389.83 132.00 183,457.30 4,380.65
e)Tiles M2 11.96 72.00 860.90 - 124.80 - - 96.00 - - 7.20 - - 120.00 - - 96.00 - 11.96
f) Reinforced Concrete M2 - - - - - - 4,200.00 - - - - - - - - -
602 Replacement of walls and fences - - - - - - - -
a)Masonry M2 - - - 900.00 - 126.50 1,200.00 151,800.00 - 700.00 - - - - - - 126.50
b) Reinforeced Concrete M2 - - - 1,800.00 - 3.08 2,800.00 8,624.00 - 2,000.00 - - - - - - 3.08
C) Corrugated Iron sheet M2 - - - 50.00 - 82.50 400.00 33,000.00 - 200.00 - - - - - - 82.50
Sub Total Section-VI - 27,513.09 - 8,110.87 - 560,776.70 - 91,129.44 - 174,549.28 - 212,556.47 -

Total 311,202.59 244,477.83 3,414,435.84 1,363,456.34 1,442,999.15 1,592,800.40

53 of 93
9.90
385.46
(200.79)
4,179.86
(188.83)
(200.79)
(200.79)
(74.29)
(197.71)
(118.29)
(200.79)

(200.79)
1,922.21
156.21
157.21
(200.79)

(200.79)
(200.79)
(200.79)
2,637.21
(200.79)

(200.79)
(200.79)
(200.79)
902.22
2,082.49
659.83
0.85
(200.79)
3,320.68
(200.79)
6,429.30
(200.79)
(200.79)
(200.79)
(200.79)
(200.79)
4,247.84
(200.79)
(200.79)
(200.79)
(83.89)
(200.79)
4,247.84
4,247.84
(121.79)
(200.79)
(200.79)

(200.79)

(200.79)
(136.79)
(200.79)
(153.13)
(200.79)
(200.79)
(200.79)
(200.79)
(200.79)
(200.79)
(200.79)

(200.79)

124.92

59.78
(120.71)
(99.04)

(200.79)

(142.71)
(41.29)

(192.87)

(190.21)
(199.03)

54 of 93
(200.79)
(187.59)

(130.74)

(195.29)

(200.79)
(200.79)
194.19

311.26
877.76
(200.79)

(200.79)

(200.79)
(112.79)
45.61

(191.99)

(174.39)
(103.13)
(194.19)

(187.59)

(161.19)

(189.79)

(181.99)

(183.19)
(200.79)
(200.79)

(200.79)
9.90
385.46
(200.79)
4,179.86
(188.83)
(200.79)
(200.79)
(74.29)
(197.71)
(118.29)
(200.79)

55 of 93
Proj
ect :Connection of Secondary Sewer to the Trunk Sewer System
Emp :AAWSA Water and Sanitation Development & Rehabilitation Project Office
loyer
Summary of Omitted Amount from Connection works

Quantity
S.N Description
Lot-1 Lot-2 Lot-3 Lot-4 Lot-5 Lot-6 Total for All Lots (1-6)
1 Section I: Preparation of Ground 5,623.42 1,228.92 241,913.10 197,184.03 82,013.22 179,171.84
Section II: Trench Excavation,Backfill &Cart
2 away 143,884.40 99,237.37 424,646.20 871,743.41 828,068.35 940,222.42
3 Section III: Gravity Sewers 62,147.68 35,514.67 109,068.00 149,216.97 321,830.80 221,985.67
4 Section IV:Manholes and Surfaces 72,034.00 100,386.00 198,107.00 54,182.50 36,537.50 38,864.00
Section V: River Crossing & Pipe Support
5
Structures; - - 1,879,924.84 - - -
6 Section VI: Finishing works 27,513.09 8,110.87 560,776.70 91,129.44 174,549.28 212,556.47

Total for each lot 311,202.59 244,477.83 3,414,435.84 1,363,456.34 1,442,999.15 1,592,800.40 8,369,372.14
VAT (15%) 1,255,405.82
Total including VAT 9,624,777.96

56 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 211.00 20.00 4,220.00
b) Ordinary Asphalt M 2
586.00 20.00 11,720.00
C) Gravel Road M2 80.00 -
d) Coble and/or CARE Stone M 2
4,381.00 10.00 43,810.00
e)Tiles M 2
12.00 15.00 180.00
f) Reinforced Concrete M 2
- -
Cutting and Removal of existing walls and
102
fences - -
a)Masonry M 2
127.00 100.00 12,700.00
b) Reinforeced Concrete M2 3.00 100.00 300.00
C) Corrugated Iron sheet M2 83.00 30.00 2,490.00
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price
shall include transportation to selected site by
engineer of any distance - -
b) Common excavation M3 2,123.00 55.00 116,765.00
c) Extra over for soft rock excavation M3 357.00 140.00 49,980.00
d)Extra over for hard rock: without blasting M 3
358.00 200.00 71,600.00
e)Extraover for hard rock: wirh blasting M 3
- -
f)Fill for working platforms:From site,incl.
M3
production,transportation and placing - -
from site excavated material M 3
- -
from the borrow selected material site M 3
- -
g) Cart away of any distance from site M3 2,838.00 60.00 170,280.00
Sub- Total Section I
Section II: Trench Excavation,Backfill &Cart
away
201 Trench Excavation,Backfill &Cart away
a) Type A trench
0-2m depth M 1,103.00 200.00 220,600.00
0-3m depth M 2,283.00 150.00 342,450.00
0-4m depth M 861.00 10.00 8,610.00
0-5m depth M 202.00 10.00 2,020.00
202 Trench rock excavation
a) Grade 1- Soft rock M3 3,521.00 100.00 352,100.00
b) Grade 2- Hard rock
i) with out blasting M3 6,630.00 100.00 663,000.00
ii) With blasting
Total Section II
Section III: Gravity Sewers
301 Pipe bedding and surrounding
a) Type 2 bedding
Type A Trench M 4,449.00 70.00 311,430.00
b) Type 4 Bedding
Type A Trench M
302 Casting of anchor blocks
a) Type A trench Pcs 117.00 800.00 93,600.00
57 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
303 uPVC Sewer pipe supply & Installation
a) DN200mm Supply (Optional) M 4,449.00 -
b) DN200mm Installation M 4,449.00 35.00 155,715.00
305 Connection to the main trunkline Manhole Pcs 78.00 300.00 23,400.00
Sub -Total Section III

58 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
Section IV:Manholes and Surfaces
Manholes: Supply& Construct RC Precast
401
circular manhole as per the drawing detail
a) Type A-1000mm internal diameter Depth
1.5m or less
i) with cast iron cover and Frame Pcs 64.00 6,000.00 384,000.00
402 Additional manhole depth
a) Type A-Depth greater than 1.5m M 48.00 2,000.00 96,000.00
403 Retaining wall and/or check dams
a)Masonry M3
b) Reinforced Concrete M3
404 Culvert inlet and Outlets
a)Masonry M3
b) Reinforced Concrete M3
Sub -Total Section IV
Section V: River Crossing & Pipe Support
Structures;
Normal Material Excavation for foundation as
501 per the drawing & site condition including cart M
away at any distance from the site. 326.00 350.00 114,100.00
Selected borrowed fill material and compacted
502 M 261.00 450.00 117,450.00
at every 15cm layer by layer.
503 Soft rock excavation M 80.00 400.00 32,000.00
504 Hard rock excavation M 102.00 800.00 81,600.00
Concrete, Retaining Protection Work and Form
505 -
Work
a) 10 cm thick lean concrete C-5 under footing M 58.00 400.00 23,200.00
b) Stone Masonry Retaining Wall M 160.00 2,300.00 368,000.00
c) C-25 concrete in footings M 8.00 4,500.00 36,000.00
d) Ditto, but in foundation columns and column
M 11.00 4,500.00 49,500.00
heads
d) Ditto, but in Bracing Beam M 2.00 5,000.00 10,000.00
e) Sawn zigba form work - -
i) Sides of footings M 13.00 400.00 5,200.00
ii) Sides of foundation columns and column
M 70.00 400.00 28,000.00
heads
iii) sides and bottom of bracing beam M 6.00 400.00 2,400.00
Mild steel rod reinforcement, cutting, bending &
506 - -
placing in position
a) 10mm dia. Deformed Kg 56.00 -
b) 12mm dia. Deformed Kg 395.00 56.00 22,120.00
c) 16mm dia. Deformed Kg 512.00 56.00 28,672.00
d) 20mm dia. Deformed Kg 1,079.00 56.00 60,424.00
e) 24mm dia. Deformed Kg 56.00 -
Cutting, welding, placing in position & including
two coats of anti-rust paint - -

59 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M 88.00 2,500.00 220,000.00
ii) Size 100x100x4mm M 246.00 1,700.00 418,200.00
b) 450x450x8mm End Support Anchor Plates No. 9.00 2,500.00 22,500.00
c) 16mm J-Bolts for end support plates
No. 26.00 500.00 13,000.00
anchoring
d) 6mm thick Pipe support plates Kg 98.00 75.00 7,350.00
e) 900x50x3mm Pipe Anchorring belts No. 7.00 900.00 6,300.00
f) 16mm Diameter Bolts for Pipe Anchorring belt
No. 13.00 200.00 2,600.00
Fixing
g) 300x100x3mm thick walk way plate M 40.00 1,500.00 60,000.00
h) 2x(300x400x20mm) thick RHS connection
M 11.00 2,500.00 27,500.00
plates including 10 diam. 20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer
M 9.00 6,000.00 54,000.00
Pipe above ground
j) supply and install 200x100x4mm pipe support M 18.00 950.00 17,100.00
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 211.00 99.00 20,889.00
b) Ordinary Asphalt M 2
586.00 99.00 58,014.00
C) Gravel Road M2 60.00 -
d) Coble and/or CARE Stone M 2
4,381.00 66.00 289,146.00
e)Tiles M 2
12.00 124.80 1,497.60
f) Reinforced Concrete M 2
-
602 Replacement of walls and fences -
a)Masonry M2 127.00 900.00 114,300.00
b) Reinforeced Concrete M 2
3.00 1,800.00 5,400.00
C) Corrugated Iron sheet M 2
83.00 50.00 4,150.00
Sub -Total Section V
Total 5,457,582.60
VAT (15%) 818,637.39
Total including VAT 6,276,219.99

60 of 93
B C D E
2 LOCATION :Bethel Area
:AAWSA Water and Sanitation
3 EMPLOYER Development & Rehabilitation Project
Office

4 CONTRACTOR : _________________________

5 CONSULTANT :SWS Consultancy


Manhole Designation
6 Length (m) REMARKS
(Sewer Section)
7 MW177-MWB261 101.37
8 MW175-MWB267 76.28
9 MW171A-MWB452 66.66
10 MW169-MW269G 76.28
11 MW57BG-MWB160A 58.82
12 MW57BG-MW57BH 81.34
13 Total Lot 1 460.75
14 MW147A-MWB292 7.85
15 MW146-MWB294 24.71
16 MW142-MW142A 7.89
17 MW127-MWB341 10.27
18 MW126-MWB330 37.43
19 MW57AS-MWB36 19.24
20 MW57AT-MWB63A 43.10
21 MW57AX-MWB101A 50.83
22 MW57AZ-MWB73 31.63
23 MW57BA-MWB75T 48.56
24 Total Lot 2 281.51
25 MW55Y-MW55Y1 21.00
26 MW55AX1-MW55AX2 9.00
27 MW55AW1-MW55AW2 20.00
28 MW55AU-MW55AU1 19.00
29 MW55AT-MW55AT1 18.00
30 MW55AS-MW55AS1 13.00
31 MW55AR-MW55AR1 33.00
32 MW55AP-MW55AP1 23.00
33 MW55AM-MW55AM1 23.00
34 MW55AL-MW55AL1 33.00
35 MW55AK-MW55AK1 18.00
36 MW57W08-MW57M09 7.50
37 MW57M09-MW57M09A2 35.00
38 MW57M09A2-MW57M09A1 67.50
39 MW57M09A-MW57M09X 15.00
40 MW57M09X-MW57M09W 48.50
41 MW57M09W-MW57M09V 78.00
42 MW57M09V-MW57M06 86.50
43 Total Lot 3 568.00
B C D E
2 LOCATION :Bethel Area
:AAWSA Water and Sanitation
3 EMPLOYER Development & Rehabilitation Project
Office

4 CONTRACTOR : _________________________

5 CONSULTANT :SWS Consultancy


Manhole Designation
6 Length (m) REMARKS
(Sewer Section)
7 MW177-MWB261 101.37
44 MW56K-MW56L 43.00
45 MW56L-MW56M 48.50
46 MW56M-MW56N01 58.00
47 MW56L-MW56L06 49.53
48 MW56J-MW56J01 40.79
49 MW56G-MW56G01 37.28
50 MW71-MW436A 67.01
51 MW78-MWB479F 44.28
52 MW81-MW81A 33.30
53 MW82-MWB423A 5.44
54 MW83-MW83A 74.48
55 MW85-MW424 50.84
56 MW87-MW484A 60.98
57 MW93-MW393 48.33
58 MW98-MW390 17.82
59 MW101-MW379A 33.96
60 MW105-MW374A 34.45
61 MW108-MWB371A 48.55
62 MW112-MWB350 55.49
63 MW114-MW347A 62.98
64 MW117-MW346 44.54
65 TOTAL -LOT 4 959.55
66 MW57C-MW57C2 3.00
67 MW57F02-MW57F02A 9.00
68 MW57F03-MW57F03A 59.00
69 MW57K-MWB92 14.50
70 MW57AB-(N)MWB114AAB 27.00
71 (N)MWB114AAB-(N)MWB114AA 34.50
72 (N)MWB114AA-MWB114A 24.95
73 MW57AE (ahead)-(N)MW57AE2AA 24.5
74 (N)MW57AE2AA-MW57AE2A 55.65
75 MW57AE2AA (right)-(N)MWB113AA 79.09
76 (N)MWB113AA-MWB113 12.18
B C D E
2 LOCATION :Bethel Area
:AAWSA Water and Sanitation
3 EMPLOYER Development & Rehabilitation Project
Office

4 CONTRACTOR : _________________________

5 CONSULTANT :SWS Consultancy


Manhole Designation
6 Length (m) REMARKS
(Sewer Section)
7 MW177-MWB261 101.37
77 (N)MW57AE2AA (left)-(N)MWB2AAC 87.07
78 (N)MWB2AAC-(N)MWB2AAB 66.35
79 (N)MWB2AAB-(N)MWB2AA 65.11
80 N)MWB2AA-MWB2 44.86
81 MW57F05CL-MWB558 76.00
82 MW57AL-MWB8 44.00
83 MW57F10CL-MWB563 41.50
84 MW57F11CL-MWB567A 28.50
85 MWB520-MWB519 49.00
86 57H-MWB492N 31.00
87 TOTAL -LOT5 876.76
88 MW27-MW28A 24.83
89 MW29-MW29A 29.77
90 MW03A-MW03AA01 19.69
91 MW03D01-MW03D01 43.55
92 MW03E-MW03E01 48.92
93 MW03P-MW03P01 204.75
94 MW03S03A-MW03S03A2 128.78
95 MW03S03B-MW03S05A1 53.68
96 MW03S03D-MW03S03BL6 46.28
97 MW03S08-MW03S03F1 88.54
98 MW03S038A-MW03S03G1 89.56
99 MW03S10-MW03S10A 52.02
100 MW03S11-MW03S11A 52.53
101 MW03S12-MW03S12Z 32.78
102 MW03S12-MW03S12A 58.12
103 TOTAL -LOT6 973.80
104 GRAND TOTAL -LOTS 1-6 4120.37
Contract

Item No. Description Unit


Quantity Unit Price Total Amount

Section V: River Crossing & Pipe Support Structures;

Normal Material Excavation for foundation as per the drawing &


501 M 296.10 350.00 103,635.00
site condition including cart away at any distance from the site.

Selected borrowed fill material and compacted at every 15cm


502 M 236.88 450.00 106,596.00
layer by layer.

503 Soft rock excavation extra over item 501 M 72.80 400.00 29,120.00

504 Hard rock excavation extra over item 501 M 92.50 800.00 74,000.00

505 Concrete, Retaining Protection Work and Form Work

a) 10 cm thick lean concrete C-5 under footing M 52.80 400.00 21,120.00

b) Stone Masonry Retaining Wall M 145.00 2,300.00 333,500.00

c) C-25 concrete in footings M 7.20 4,500.00 32,400.00

d) Ditto, but in foundation columns and column heads M 9.62 4,500.00 43,290.00

d) Ditto, but in Bracing Beam M 1.60 5,000.00 8,000.00

e) Sawn zigba form work

i) Sides of footings M 12.00 400.00 4,800.00

ii) Sides of foundation columns and column heads M 63.68 400.00 25,473.60

iii) sides and bottom of bracing beam M 5.00 400.00 2,000.00

Mild steel rod reinforcement, cutting, bending & placing in


506 -
position

a) 10mm dia. Deformed Kg 56.00 -

b) 12mm dia. Deformed Kg 359.07 56.00 20,107.92

c) 16mm dia. Deformed Kg 465.50 56.00 26,068.00

d) 20mm dia. Deformed Kg 980.50 56.00 54,908.00

e) 24mm dia. Deformed Kg 56.00 -

Cutting, welding, placing in position & including two coats of


anti-rust paint

507 a) Trusses & purlins in structural RHS

i) Size 200x100x4mm M 80.00 2,500.00 200,000.00

ii) Size 100x100x4mm M 224.00 1,700.00 380,800.00

b) 450x450x8mm End Support Anchor Plates No. 8.00 2,500.00 20,000.00

c) 16mm J-Bolts for end support plates anchoring No. 24.00 500.00 12,000.00

d) 6mm thick Pipe support plates Kg 88.78 75.00 6,658.61

e) 900x50x3mm Pipe Anchorring belts No. 6.00 900.00 5,400.00

f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. 12.00 200.00 2,400.00

g) 300x100x3mm thick walk way plate M 36.00 1,500.00 54,000.00

h) 2x(300x400x20mm) thick RHS connection plates including 10


M 10.00 2,500.00 25,000.00
diam. 20 bolt with nuts

i) Supply and Install DN 400mm DCI Sewer Pipe above ground M 8.00 6,000.00 48,000.00

j) supply and install 200x100x4mm pipe support M 16.00 950.00 15,200.00

Sub Total Section V 1,654,477.13


15% VAT 248,171.569
Sub Total 1,902,648.69

Consultant Checked By:-64


__________Signature:-____________Date:-_______________
Contractor Prepared By:- __________Signature:-____________Date:-_______________
Page of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 211.00 50.00 10,550.00
b) Ordinary Asphalt M 2
586.00 50.00 29,300.00
C) Gravel Road M2 25.00 -
d) Coble and/or CARE Stone M 2
4,381.00 30.00 131,430.00
e)Tiles M 2
12.00 30.00 360.00
f) Reinforced Concrete M 2
- -
Cutting and Removal of existing walls and
102
fences - -
a)Masonry M 2
127.00 100.00 12,700.00
b) Reinforeced Concrete M2 3.00 120.00 360.00
C) Corrugated Iron sheet M2 83.00 20.00 1,660.00
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price
shall include transportation to selected site by
engineer of any distance -
b) Common excavation M3 2,123.00 55.00 116,765.00
c) Extra over for soft rock excavation M3 357.00 140.00 49,980.00
d)Extra over for hard rock: without blasting M 3
358.00 200.00 71,600.00
e)Extraover for hard rock: wirh blasting M 3
- -
f)Fill for working platforms:From site,incl.
M3
production,transportation and placing - -
from site excavated material M 3
- -
from the borrow selected material site M 3
- -
g) Cart away of any distance from site M3 2,838.00 60.00 170,280.00
Sub- Total Section I
Section II: Trench Excavation,Backfill &Cart
away
201 Trench Excavation,Backfill &Cart away
a) Type A trench
0-2m depth M 1,103.00 122.00 134,566.00
0-3m depth M 2,283.00 224.00 511,392.00
0-4m depth M 861.00 326.00 280,686.00
0-5m depth M 202.00 441.00 89,082.00
202 Trench rock excavation
a) Grade 1- Soft rock M3 3,521.00 140.00 492,940.00
b) Grade 2- Hard rock
i) with out blasting M3 6,630.00 220.00 1,458,600.00
ii) With blasting
Total Section II
Section III: Gravity Sewers
301 Pipe bedding and surrounding
a) Type 2 bedding
Type A Trench M 4,449.00 74.00 329,226.00
b) Type 4 Bedding
Type A Trench M
302 Casting of anchor blocks
a) Type A trench Pcs 117.00 250.00 29,250.00
65 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
303 uPVC Sewer pipe supply & Installation
a) DN200mm Supply (Optional) M 4,449.00 -
b) DN200mm Installation M 4,449.00 20.00 88,980.00
305 Connection to the main trunkline Manhole Pcs 78.00 2,500.00 195,000.00
Sub -Total Section III

66 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
Section IV:Manholes and Surfaces
Manholes: Supply& Construct RC Precast
401
circular manhole as per the drawing detail
a) Type A-1000mm internal diameter Depth
1.5m or less
i) with cast iron cover and Frame Pcs 64.00 6,000.00 384,000.00
402 Additional manhole depth
a) Type A-Depth greater than 1.5m M 48.00 2,500.00 120,000.00
403 Retaining wall and/or check dams
a)Masonry M3
b) Reinforced Concrete M3
404 Culvert inlet and Outlets
a)Masonry M3
b) Reinforced Concrete M3
Sub -Total Section IV
Section V: River Crossing & Pipe Support
Structures;
Normal Material Excavation for foundation as
501 per the drawing & site condition including cart M
away at any distance from the site. 326.00 350.00 114,100.00
Selected borrowed fill material and compacted
502 M 261.00 450.00 117,450.00
at every 15cm layer by layer.
503 Soft rock excavation M 80.00 400.00 32,000.00
504 Hard rock excavation M 102.00 800.00 81,600.00
Concrete, Retaining Protection Work and Form
505
Work
a) 10 cm thick lean concrete C-5 under footing M 58.00 400.00 23,200.00
b) Stone Masonry Retaining Wall M 160.00 2,300.00 368,000.00
c) C-25 concrete in footings M 8.00 4,500.00 36,000.00
d) Ditto, but in foundation columns and column
M 11.00 4,500.00 49,500.00
heads
d) Ditto, but in Bracing Beam M 2.00 5,000.00 10,000.00
e) Sawn zigba form work - -
i) Sides of footings M 13.00 400.00 5,200.00
ii) Sides of foundation columns and column
M 70.00 400.00 28,000.00
heads
iii) sides and bottom of bracing beam M 6.00 400.00 2,400.00
Mild steel rod reinforcement, cutting, bending &
506 - -
placing in position
a) 10mm dia. Deformed Kg 56.00 -
b) 12mm dia. Deformed Kg 395.00 56.00 22,120.00
c) 16mm dia. Deformed Kg 512.00 56.00 28,672.00
d) 20mm dia. Deformed Kg 1,079.00 56.00 60,424.00
e) 24mm dia. Deformed Kg 56.00 -
Cutting, welding, placing in position & including
two coats of anti-rust paint - -

67 of 93
Bill of Quantities for Connection of Secondary to main Line around Bethel Areas
Item No Description Unit Qty Unit Price Total Amount
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M 88.00 2,500.00 220,000.00
ii) Size 100x100x4mm M 246.00 1,700.00 418,200.00
b) 450x450x8mm End Support Anchor Plates No. 9.00 2,500.00 22,500.00
c) 16mm J-Bolts for end support plates
No. 26.00 500.00 13,000.00
anchoring
d) 6mm thick Pipe support plates Kg 98.00 75.00 7,350.00
e) 900x50x3mm Pipe Anchorring belts No. 7.00 900.00 6,300.00
f) 16mm Diameter Bolts for Pipe Anchorring belt
No. 13.00 200.00 2,600.00
Fixing
g) 300x100x3mm thick walk way plate M 40.00 1,500.00 60,000.00
h) 2x(300x400x20mm) thick RHS connection
M 11.00 2,500.00 27,500.00
plates including 10 diam. 20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer
M 9.00 6,000.00 54,000.00
Pipe above ground
j) supply and install 200x100x4mm pipe support M 18.00 950.00 17,100.00
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 211.00 165.00 34,815.00
b) Ordinary Asphalt M 2
586.00 165.00 96,690.00
C) Gravel Road M2 60.00 -
d) Coble and/or CARE Stone M 2
4,381.00 13.20 57,829.20
e)Tiles M 2
12.00 7.20 86.40
f) Reinforced Concrete M 2
- -
602 Replacement of walls and fences -
a)Masonry M2 127.00 700.00 88,900.00
b) Reinforeced Concrete M 2
3.00 2,000.00 6,000.00
C) Corrugated Iron sheet M 2
83.00 200.00 16,600.00
Sub -Total Section V
Total 6,836,843.60
VAT (15%) 1,025,526.54
Total including VAT 7,862,370.14

68 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office
Bill of Quantities

Item No Description Unit Qty Unit Price Total Amount


Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 211
b) Ordinary Asphalt M 2
586
C) Gravel Road M2
d) Coble and/or CARE Stone M2 4381
e)Tiles M 2
12
f) Reinforced Concrete M2

102 Cutting and Removal of existing walls and fences

a)Masonry M2 127
b) Reinforeced Concrete M 2
3
C) Corrugated Iron sheet M2 83
103 Construction of Working Platforms
a) Removal of trees or girth of any size,the price
shall include transportation to selected site by No.
engineer of any distance
b) Common excavation M3 2123.00
c) Extra over for soft rock excavation M3 357.00
d)Extra over for hard rock: without blasting M 3
358.00
e)Extraover for hard rock: with blasting M3
f)Fill for working platforms:From site,incl.
M3
production,transportation and placing
from site excavated material M3
from the borrow selected material site M3
g) Cart away of any distance from site M3 2838.00
Sub Total Section-I
Section II: Trench Excavation,Backfill &Cart
away
201 Trench Excavation,Backfill &Cart away
a) Type A trench
0-2m depth M 1103
0-3m depth M 2283
0-4m depth M 861
0-5m depth M 202
202 Trench rock excavation
a) Grade 1- Soft rock M3 3521
b) Grade 2- Hard rock
i) with out blasting M3 6630
ii) With blasting
Sub Total Section-II
Section III: Gravity Sewers
301 Pipe bedding and surrounding
a) Type 2 bedding
Type A Trench M 4449
b) Type 4 Bedding
Type A Trench M
302 Casting of anchor blocks
a) Type A trench Pcs 117
303 uPVC Sewer pipe supply & Installation
a) DN200mm Supply (Optional: If supplied by the
M
Client) 4449
b) DN200mm Installation M 4449
305 Connection to the main trunkline Manhole Pcs 78
Sub Total Section-III

69 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office
Bill of Quantities

Item No Description Unit Qty Unit Price Total Amount


Section IV:Manholes and Surfaces
Manholes: Supply& Construct RC Precast
401
circular manhole as per the drawing detail
a) Type A-1000mm internal diameter Depth 1.5m
Pcs
or less with cast iron cover and Frame 64
Additional manhole depth for Type A-Depth
402 M
greater than 1.5m 48
403 Retaining wall and/or check dams
a)Masonry M3
b) Reinforced Concrete M3
404 Culvert inlet and Outlets
a)Masonry M3
b) Reinforced Concrete M3
Sub Total Section-IV
Section V: River Crossing & Pipe Support
Structures;
Normal Material Excavation for foundation as per
501 the drawing & site condition including cart away M
at any distance from the site. 326
Selected borrowed fill material and compacted at
502 M
every 15cm layer by layer. 261
503 Soft rock excavation M 80
504 Hard rock excavation M 102
Concrete, Retaining Protection Work and Form
505
Work

a) 10 cm thick lean concrete C-5 under footing M


58
b) Stone Masonry Retaining Wall M 160
c) C-25 concrete in footings M 8
d) Ditto, but in foundation columns and column
M
heads 11
d) Ditto, but in Bracing Beam M 2
e) Sawn zigba form work
i) Sides of footings M 13
ii) Sides of foundation columns and column
M
heads 70
iii) sides and bottom of bracing beam M 6
Mild steel rod reinforcement, cutting, bending &
506
placing in position
a) 10mm dia. Deformed Kg
b) 12mm dia. Deformed Kg 395
c) 16mm dia. Deformed Kg 512
d) 20mm dia. Deformed Kg 1079
e) 24mm dia. Deformed Kg
Cutting, welding, placing in position & including
two coats of anti-rust paint
507 a) Trusses & purlins in structural RHS
i) Size 200x100x4mm M 88
ii) Size 100x100x4mm M 246
b) 450x450x8mm End Support Anchor Plates No. 9

c) 16mm J-Bolts for end support plates anchoring No.


26
d) 6mm thick Pipe support plates Kg 98
e) 900x50x3mm Pipe Anchorring belts No. 7
f) 16mm Diameter Bolts for Pipe Anchorring belt
No. 13
Fixing

70 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office
Bill of Quantities

Item No Description Unit Qty Unit Price Total Amount


g) 300x100x3mm thick walk way plate M 40
h) 2x(300x400x20mm) thick RHS connection
M
plates including 10 diam. 20 bolt with nuts 11
i) Supply and Install DN 400mm DCI Sewer Pipe
M
above ground 9

j) supply and install 200x100x4mm pipe support M


18
Sub Total Section-V
Section VI: Finishing works
601 Permanenet restoration of trench surfaces
a) Concrete Asphalt M2 211
b) Ordinary Asphalt M2 586
C) Gravel Road M2
d) Coble and/or CARE Stone M2 4381
e)Tiles M2 12
f) Reinforced Concrete M 2

602 Replacement of walls and fences


a)Masonry M2 127
b) Reinforeced Concrete M2 3
C) Corrugated Iron sheet M 2
83
Sub -Total Section V
Total
VAT (15%)
Total including 15%
VAT

71 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office

Lot No. Sewer Section Length (m) Remarks


MW177-MWB261 112.00
MW175-MWB267 84.00
Lot 1 MW171A-MWB452 73.00
MW169-MW269G 84.00
MW57BG-MWB160A 65.00
MW57BG-MW57BH 89.00
SubTotal - 1 507.00
MW147A-MWB292 9.00
MW146-MWB294 27.00
MW142-MW142A 9.00
MW127-MWB341 11.00
MW126-MWB330 41.00
Lot 2

MW57AS-MWB36 21.00
MW57AT-MWB63A 47.00
MW57AX-MWB101A 56.00
MW57AZ-MWB73 35.00
MW57BA-MWB75T 53.00
SubTotal - 2 309.00
MW55Y-MW55Y1 23.00
MW55AX1-MW55AX2 10.00
MW55AW1-MW55AW2 22.00
MW55AU-MW55AU1 21.00
MW55AT-MW55AT1 20.00
MW55AS-MW55AS1 14.00
MW55AR-MW55AR1 36.00
MW55AP-MW55AP1 25.00
MW55AM-MW55AM1 25.00
Lot 3

MW55AL-MW55AL1 36.00
MW55AK-MW55AK1 20.00
MW57W08-MW57M09 8.00
MW57M09-MW57M09A2 39.00
MW57M09A2-MW57M09A1 74.00
MW57M09A-MW57M09X 17.00
MW57M09X-MW57M09W 53.00
MW57M09W-MW57M09V 86.00
MW57M09V-MW57M06 95.00
SubTotal-3 624.00
MW56K-MW56L 47.00
MW56L-MW56M 53.00
MW56M-MW56N01 64.00
MW56L-MW56L06 54.00
MW56J-MW56J01 45.00
MW56G-MW56G01 41.00
MW71-MW436A 74.00
MW78-MWB479F 49.00
MW81-MW81A 37.00
MW82-MWB423A 6.00
Lot 4

MW83-MW83A 82.00
MW85-MW424 56.00
MW87-MW484A 67.00
MW93-MW393 53.00
MW98-MW390 20.00
MW101-MW379A 37.00
MW105-MW374A 38.00
MW108-MWB371A 53.00
MW112-MWB350 61.00
MW114-MW347A 69.00
MW117-MW346 49.00
SubTotal -4 1055.00

72 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office

Lot No. Sewer Section Length (m) Remarks


MW57C-MW57C2 3.00
MW57F02-MW57F02A 10.00
MW57F03-MW57F03A 65.00
MW57K-MWB92 16.00
MW57AB-MW57AB2 30.00
MWB114AAB-MWB114AA 38.00
MWB114AA-MWB114A 27
MW57AE-MW57AE1 27
MW57AE2AA-MW57AE2A 61
MW57AE2AA (right)-MWB113AA 87
Lot 5

MWB113AA-MWB113 13
MW57AE2AA (left)-MWB2AAC 96.00
MWB2AAC-MWB2AAB 73.00
MWB2AAB-MWB2AA 72.00
N)MWB2AA-MWB2 49.00
MW57F06-MWB558 84.00
MW57AL-MWB8 48.00
MW57F10-MWB563 46.00
MW57F11-MWB567A 31.00
MWB520-MWB519 54.00
57H-MWB492N 34.00
SubTotal -5 964.00
MW27-MW28A 27.00
MW29-MW29A 33.00
MW03A-MW03AA01 22.00
MW03D01-MW03D01 48.00
MW03E-MW03E01 54.00
MW03P-MW03P01 150.00
MW03S03A-MW03S03A2 142.00
Lot 6

MW03S03B-MW03S05A1 59.00
MW03S03D-MW03S05B 51.00
MW03S08-MW03S05F1 97.00
MW03S038A-MW03S05G1 99.00
MW03S10-MW03S10A 57.00
MW03S11-MW03S11A 58.00
MW03S12-MW03S12Z 36.00
MW03S12-MW03S12A 64.00
SubTotal -6 997.00
Total 4456.00

73 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office

Lot No. Sewer Section Length (m) Remarks


MW177-MWB261 112.00
MW175-MWB267 84.00
Lot 1 MW171A-MWB452 73.00
MW169-MW269G 84.00
MW57BG-MWB160A 65.00
MW57BG-MW57BH 89.00
SubTotal - 1 507.00
MW147A-MWB292 9.00
MW146-MWB294 27.00
MW142-MW142A 9.00
MW127-MWB341 11.00
MW126-MWB330 41.00
Lot 2

MW57AS-MWB36 21.00
MW57AT-MWB63A 47.00
MW57AX-MWB101A 56.00
MW57AZ-MWB73 35.00
MW57BA-MWB75T 53.00
SubTotal - 2 309.00
MW55Y-MW55Y1 23.00
MW55AX1-MW55AX2 10.00
MW55AW1-MW55AW2 22.00
MW55AU-MW55AU1 21.00
MW55AT-MW55AT1 20.00
MW55AS-MW55AS1 14.00
MW55AR-MW55AR1 36.00
MW55AP-MW55AP1 25.00
MW55AM-MW55AM1 25.00
Lot 3

MW55AL-MW55AL1 36.00
MW55AK-MW55AK1 20.00
MW57W08-MW57M09 8.00
MW57M09-MW57M09A2 39.00
MW57M09A2-MW57M09A1 74.00
MW57M09A-MW57M09X 17.00
MW57M09X-MW57M09W 53.00
MW57M09W-MW57M09V 86.00
MW57M09V-MW57M06 95.00
SubTotal-3 624.00
MW56K-MW56L 47.00
MW56L-MW56M 53.00
MW56M-MW56N01 64.00
MW56L-MW56L06 54.00
MW56J-MW56J01 45.00
MW56G-MW56G01 41.00
MW71-MW436A 74.00
MW78-MWB479F 49.00
MW81-MW81A 37.00
MW82-MWB423A 6.00
Lot 4

MW83-MW83A 82.00
MW85-MW424 56.00
MW87-MW484A 67.00
MW93-MW393 53.00
MW98-MW390 20.00
MW101-MW379A 37.00
MW105-MW374A 38.00
MW108-MWB371A 53.00
MW112-MWB350 61.00
MW114-MW347A 69.00
MW117-MW346 49.00
SubTotal -4 1055.00

74 of 93
Project
:Connection of Secondary Sewer to the Trunk Sewer System
Employer :AAWSA Water and Sanitation Development & Rehabilitation Project Office

Lot No. Sewer Section Length (m) Remarks


MW57C-MW57C2 3.00
MW57F02-MW57F02A 10.00
MW57F03-MW57F03A 65.00
MW57K-MWB92 16.00
MW57AB-MW57AB2 30.00
MW57AE-MW57AE1 27
Lot 5

MW57F06-MWB558 84.00
MW57AL-MWB8 48.00
MW57F10-MWB563 46.00
MW57F11-MWB567A 31.00
MWB520-MWB519 54.00
57H-MWB492N 34.00
SubTotal -5 448.00
MW27-MW28A 27.00
MW29-MW29A 33.00
MW03A-MW03AA01 22.00
MW03D01-MW03D01 48.00
MW03E-MW03E01 54.00
MW03P-MW03P01 150.00
MW03S03A-MW03S03A2 142.00
Lot 6

MW03S03B-MW03S05A1 59.00
MW03S03D-MW03S05B 51.00
MW03S08-MW03S05F1 97.00
MW03S038A-MW03S05G1 99.00
MW03S10-MW03S10A 57.00
MW03S11-MW03S11A 58.00
MW03S12-MW03S12Z 36.00
MW03S12-MW03S12A 64.00
SubTotal -6 997.00
Total 3940.00

75 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-1)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project OfficeAlemayehu Building and General Water Works
:Endalemahu
Contractor
Contractor
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-1 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 - 20.00 -
b) Ordinary Asphalt M2 - 20.00 -
C) Gravel Road M 2
- 20.00 -
d) Coble and/or CARE Stone M2 259.31 20.00 5,186.28
e)Tiles M2 - 20.00 -
f) Reinforced Concrete M2 - - -
102 Cutting and Removal of existing walls and fences -
a)Masonry M2 - 500.00 -
b) Reinforeced Concrete M2 - 600.00 -
C) Corrugated Iron sheet M2 - 200.00 -
103 Construction of Working Platforms - - -
a) Removal of trees or girth of any size,the price shall include
No. -
transportation to selected site by engineer of any distance - 50.00
b) Common excavation M3 - 20.00 -
c) Extra over for soft rock excavation M3 - 50.00 -
d)Extra over for hard rock: without blasting M3 - 100.00 -
e)Extraover for hard rock: wirh blasting M3 - - -
f)Fill for working platforms:From site,incl. production,transportation and
M3 -
placing - -
from site excavated material M3 - - -
from the borrow selected material site M3 - - -
g) Cart away of any distance from site M3 - 20.00 -
Sub Total Section-I - 5,186.28
Section II: Trench Excavation,Backfill &Cart away -
201 Trench Excavation,Backfill &Cart away -
a) Type A trench -
0-2m depth M - 80.00 -
0-3m depth M 360.00 100.00 36,000.00
0-4m depth M 51.00 150.00 7,650.00
0-5m depth M - 200.00 -
202 Trench rock excavation
a) Grade 1- Soft rock M3 93.20 100.00 9,320.00
b) Grade 2- Hard rock -
i) with out blasting M3 217.51 300.00 65,253.00
ii) With blasting -
Sub Total Section-II - 118,223.00
Section III: Gravity Sewers -
301 Pipe bedding and surrounding -
a) Type 2 bedding -
Type A Trench M 411.40 70.00 28,798.00
b) Type 4 Bedding -
Type A Trench M -
302 Casting of anchor blocks -
a) Type A trench Pcs -
303 uPVC Sewer pipe supply & Installation -
DN200mm, PN6 M 411.40 -

305 Connection work to the main trunk sewer line Manhole Pcs 5.00 2,000.00 10,000.00
Sub Total Section-III - 49,083.00

76 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-1)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project OfficeAlemayehu Building and General Water Works
:Endalemahu
Contractor
Contractor
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-1 Unit Rate Amount
Section IV:Manholes and Surfaces -
Manholes: Supply& Construct RC Precast circular manhole as per the
401
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less -
i) with cast iron cover and Frame Pcs 2.00 17,800.00 35,600.00
402 Additional manhole depth -
a) Type A-Depth greater than 1.5m M 2.66 7,000.00 18,634.00
403 Retaining wall and/or check dams -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
404 Culvert inlet and Outlets - -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
Sub Total Section-IV - 54,234.00
Section V: River Crossing & Pipe Support Structures; -
Normal Material Excavation for foundation as per the drawing & site
501 M - -
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M - -
layer.
503 Soft rock excavation M - -
504 Hard rock excavation M - -
505 Concrete, Retaining Protection Work and Form Work - -
a) 10 cm thick lean concrete C-5 under footing M - -
b) Stone Masonry Retaining Wall M - -
c) C-25 concrete in footings M - -
d) Ditto, but in foundation columns and column heads M - -
d) Ditto, but in Bracing Beam M - -
e) Sawn zigba form work - -
i) Sides of footings M - -
ii) Sides of foundation columns and column heads M - -
iii) sides and bottom of bracing beam M - -

506 Mild steel rod reinforcement, cutting, bending & placing in position - -

a) 10mm dia. Deformed Kg - -


b) 12mm dia. Deformed Kg - -
c) 16mm dia. Deformed Kg - -
d) 20mm dia. Deformed Kg - -
e) 24mm dia. Deformed Kg - -
Cutting, welding, placing in position & including two coats of anti-rust
- -
paint
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M - -
ii) Size 100x100x4mm M - -
b) 450x450x8mm End Support Anchor Plates No. - -
c) 16mm J-Bolts for end support plates anchoring No. - -
d) 6mm thick Pipe support plates Kg - -
e) 900x50x3mm Pipe Anchorring belts No. - -
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. - -
g) 300x100x3mm thick walk way plate M - -
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M - -
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M - -
j) supply and install 200x100x4mm pipe support M - -
Sub Total Section-V

77 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-1)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project OfficeAlemayehu Building and General Water Works
:Endalemahu
Contractor
Contractor
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-1 Unit Rate Amount
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M 2
- 99.00 -
b) Ordinary Asphalt M2 - 99.00 -
C) Gravel Road M2 - 20.00 -
d) Coble and/or CARE Stone M2 259.31 99.00 25,672.09
e)Tiles M2 - 72.00 -
f) Reinforced Concrete M2 - - -
602 Replacement of walls and fences -
a)Masonry M2 - -
b) Reinforeced Concrete M2 - -
C) Corrugated Iron sheet M2 - -
Sub Total Section-VI - 25,672.09
Total
15% VAT
Grand Total

78 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-2)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project Office
Contractor :SABERCON Engineering (Lot-2)
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-2 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 - - -
b) Ordinary Asphalt M2 - 20.00 -
C) Gravel Road M 2
- 80.00 -
d) Coble and/or CARE Stone M2 122.89 10.00 1,228.92
e)Tiles M2 - 15.00 -
f) Reinforced Concrete M2 - - -
102 Cutting and Removal of existing walls and fences -
a)Masonry M2 - 100.00 -
b) Reinforeced Concrete M2 - 100.00 -
C) Corrugated Iron sheet M2 - 30.00 -
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price shall include
No. -
transportation to selected site by engineer of any distance - -
b) Common excavation M3 571.00 - -
c) Extra over for soft rock excavation M3 96.00 - -
d)Extra over for hard rock: without blasting M3 96.00 - -
e)Extraover for hard rock: wirh blasting M3 - - -
f)Fill for working platforms:From site,incl. production,transportation and
M3 -
placing - -
from site excavated material M3 - - -
from the borrow selected material site M3 - - -
g) Cart away of any distance from site M3 763.00 - -
Sub Total Section-I - 1,228.92
Section II: Trench Excavation,Backfill &Cart away -
201 Trench Excavation,Backfill &Cart away -
a) Type A trench -
0-2m depth M 53.42 200.00 10,683.20
0-3m depth M 188.91 150.00 28,336.42
0-4m depth M 13.03 10.00 130.31
0-5m depth M 54.21 10.00 542.08
202 Trench rock excavation
a) Grade 1- Soft rock M3 178.43 100.00 17,843.29
b) Grade 2- Hard rock -
i) with out blasting M3 417.02 100.00 41,702.06
ii) With blasting -
Sub Total Section-II - 99,237.37
Section III: Gravity Sewers -
301 Pipe bedding and surrounding -
a) Type 2 bedding -
Type A Trench M 309.66 70.00 21,676.44
b) Type 4 Bedding -
Type A Trench M -
302 Casting of anchor blocks -
a) Type A trench Pcs 18 800.00
303 uPVC Sewer pipe supply & Installation -
DN200mm, PN6 M 309.66 -

305 Connection work to the main trunk sewer line Manhole Pcs 10.00 300.00 3,000.00
Sub Total Section-III - 35,514.67

79 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-2 Unit Rate Amount
Section IV:Manholes and Surfaces -
Manholes: Supply& Construct RC Precast circular manhole as per the
401
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less -
i) with cast iron cover and Frame Pcs 11.00 6,000.00 66,000.00
402 Additional manhole depth -
a) Type A-Depth greater than 1.5m M 17.19 2,000.00 34,386.00
403 Retaining wall and/or check dams -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
404 Culvert inlet and Outlets - -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
Sub Total Section-IV - 100,386.00
Section V: River Crossing & Pipe Support Structures; -
Normal Material Excavation for foundation as per the drawing & site
501 M - -
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M - -
layer.
503 Soft rock excavation M - -
504 Hard rock excavation M - -
505 Concrete, Retaining Protection Work and Form Work - -
a) 10 cm thick lean concrete C-5 under footing M - -
b) Stone Masonry Retaining Wall M - -
c) C-25 concrete in footings M - -
d) Ditto, but in foundation columns and column heads M - -
d) Ditto, but in Bracing Beam M - -
e) Sawn zigba form work - -
i) Sides of footings M - -
ii) Sides of foundation columns and column heads M - -
iii) sides and bottom of bracing beam M - -

506 Mild steel rod reinforcement, cutting, bending & placing in position - -

a) 10mm dia. Deformed Kg - -


b) 12mm dia. Deformed Kg - -
c) 16mm dia. Deformed Kg - -
d) 20mm dia. Deformed Kg - -
e) 24mm dia. Deformed Kg - -
Cutting, welding, placing in position & including two coats of anti-rust
- -
paint
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M - -
ii) Size 100x100x4mm M - -
b) 450x450x8mm End Support Anchor Plates No. - -
c) 16mm J-Bolts for end support plates anchoring No. - -
d) 6mm thick Pipe support plates Kg - -
e) 900x50x3mm Pipe Anchorring belts No. - -
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. - -
g) 300x100x3mm thick walk way plate M - -
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M - -
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M - -
j) supply and install 200x100x4mm pipe support M - -
Sub Total Section-V

80 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-2 Unit Rate Amount
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 - 99.00 -
b) Ordinary Asphalt M 2
- 99.00 -
C) Gravel Road M2 - 60.00 -
d) Coble and/or CARE Stone M2 122.89 66.00 8,110.87
e)Tiles M2 - 124.80 -
f) Reinforced Concrete M2 - -
602 Replacement of walls and fences -
a)Masonry M2 - 900.00 -
b) Reinforeced Concrete M2 - 1,800.00 -
C) Corrugated Iron sheet M2 - 50.00 -
Sub Total Section-VI - 8,110.87
Total
15% VAT
Grand Total

81 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-3)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project Office
Contractor :ECABOD General Contractor (Lot-3)
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-3 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 85.80 100.00 8,580.00
b) Ordinary Asphalt M2 - 35.00 -
C) Gravel Road M 2
- 2.00 -
d) Coble and/or CARE Stone M2 696.30 17.00 11,837.10
e)Tiles M2 - 17.00 -
f) Reinforced Concrete M2 - -
102 Cutting and Removal of existing walls and fences -
a)Masonry M2 126.50 1,200.00 151,800.00
b) Reinforeced Concrete M2 3.08 1,200.00 3,696.00
C) Corrugated Iron sheet M2 82.50 800.00 66,000.00
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price shall include
No. -
transportation to selected site by engineer of any distance - 1,800.00
b) Common excavation M3 - 150.00 -
c) Extra over for soft rock excavation M3 - 200.00 -
d)Extra over for hard rock: without blasting M3 - 300.00 -
e)Extraover for hard rock: wirh blasting M3 - 350.00 -
f)Fill for working platforms:From site,incl. production,transportation and
M3 -
placing -
from site excavated material M3 - 350.00 -
from the borrow selected material site M3 - 350.00 -
g) Cart away of any distance from site M3 - 200.00 -
Sub Total Section-I - 241,913.10
Section II: Trench Excavation,Backfill &Cart away -
201 Trench Excavation,Backfill &Cart away -
a) Type A trench -
0-2m depth M 390.50 180.00 70,290.00
0-3m depth M 226.05 195.00 44,079.75
0-4m depth M 8.25 240.00 1,980.00
0-5m depth M - 245.00 -
202 Trench rock excavation
a) Grade 1- Soft rock M3 389.48 250.00 97,369.39
b) Grade 2- Hard rock -
i) with out blasting M3 843.71 250.00 210,927.06
ii) With blasting -
Sub Total Section-II - 424,646.20
Section III: Gravity Sewers -
301 Pipe bedding and surrounding -
a) Type 2 bedding -
Type A Trench M 624.80 100.00 62,480.00
b) Type 4 Bedding -
Type A Trench M -
302 Casting of anchor blocks -
a) Type A trench Pcs - 2,000.00
303 uPVC Sewer pipe supply & Installation -
DN200mm, PN6 M 624.80 -

305 Connection work to the main trunk sewer line Manhole Pcs 13.00 700.00 9,100.00
Sub Total Section-III - 109,068.00

82 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-3 Unit Rate Amount
Section IV:Manholes and Surfaces -
Manholes: Supply& Construct RC Precast circular manhole as per the
401
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less -
i) with cast iron cover and Frame Pcs 20.00 8,400.00 168,000.00
402 Additional manhole depth -
a) Type A-Depth greater than 1.5m M 13.09 2,300.00 30,107.00
403 Retaining wall and/or check dams -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
404 Culvert inlet and Outlets - -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
Sub Total Section-IV - 198,107.00
Section V: River Crossing & Pipe Support Structures; -
Normal Material Excavation for foundation as per the drawing & site
501 M 325.71 350.00 113,998.50
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M 260.57 450.00 117,255.60
layer.
503 Soft rock excavation M 80.08 400.00 32,032.00
504 Hard rock excavation M 101.75 800.00 81,400.00
505 Concrete, Retaining Protection Work and Form Work - - -
a) 10 cm thick lean concrete C-5 under footing M 58.08 400.00 23,232.00
b) Stone Masonry Retaining Wall M 159.50 2,300.00 366,850.00
c) C-25 concrete in footings M 7.92 4,500.00 35,640.00
d) Ditto, but in foundation columns and column heads M 10.58 4,500.00 47,619.00
d) Ditto, but in Bracing Beam M 1.76 5,000.00 8,800.00
e) Sawn zigba form work - - -
i) Sides of footings M 13.20 400.00 5,280.00
ii) Sides of foundation columns and column heads M 70.05 400.00 28,020.96
iii) sides and bottom of bracing beam M 5.50 400.00 2,200.00

506 Mild steel rod reinforcement, cutting, bending & placing in position - - -

a) 10mm dia. Deformed Kg - 56.00 -


b) 12mm dia. Deformed Kg 394.98 56.00 22,118.71
c) 16mm dia. Deformed Kg 512.05 56.00 28,674.80
d) 20mm dia. Deformed Kg ### 56.00 60,398.80
e) 24mm dia. Deformed Kg - 56.00 -
Cutting, welding, placing in position & including two coats of anti-rust
- - -
paint
507 a) Trusses & purlins in structural RHS - - -
i) Size 200x100x4mm M 88.00 2,500.00 220,000.00
ii) Size 100x100x4mm M 246.40 1,700.00 418,880.00
b) 450x450x8mm End Support Anchor Plates No. 8.80 2,500.00 22,000.00
c) 16mm J-Bolts for end support plates anchoring No. 26.40 500.00 13,200.00
d) 6mm thick Pipe support plates Kg 97.66 75.00 7,324.47
e) 900x50x3mm Pipe Anchorring belts No. 6.60 900.00 5,940.00
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. 13.20 200.00 2,640.00
g) 300x100x3mm thick walk way plate M 39.60 1,500.00 59,400.00
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M 11.00 2,500.00 27,500.00
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M 8.80 6,000.00 52,800.00
j) supply and install 200x100x4mm pipe support M 17.60 950.00 16,720.00
Sub Total Section-V

83 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-3 Unit Rate Amount
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 85.80 800.00 68,640.00
b) Ordinary Asphalt M 2
- 33.00 -
C) Gravel Road M2 - 85.00 -
d) Coble and/or CARE Stone M2 696.30 429.00 298,712.70
e)Tiles M2 - 96.00 -
f) Reinforced Concrete M2 - 4,200.00 -
602 Replacement of walls and fences -
a)Masonry M2 126.50 1,200.00 151,800.00
b) Reinforeced Concrete M2 3.08 2,800.00 8,624.00
C) Corrugated Iron sheet M2 82.50 400.00 33,000.00
Sub Total Section-VI - 560,776.70
Total
15% VAT
Grand Total

84 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-4)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project Office
Contractor :GOJO Engineering (Lot-4)
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-4 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 66.00 50.00 3,300.00
b) Ordinary Asphalt M2 424.55 50.00 21,227.44
C) Gravel Road M2 - 25.00 -
d) Coble and/or CARE Stone M2 771.89 30.00 23,156.60
e)Tiles M2 - 30.00 -
f) Reinforced Concrete M2 - -
102 Cutting and Removal of existing walls and fences -
a)Masonry M2 - 100.00 -
b) Reinforeced Concrete M2 - 120.00 -
C) Corrugated Iron sheet M2 - 20.00 -
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price shall include
No. -
transportation to selected site by engineer of any distance - 200.00
b) Common excavation M3 776.00 55.00 42,680.00
c) Extra over for soft rock excavation M3 131.00 140.00 18,340.00
d)Extra over for hard rock: without blasting M3 131.00 200.00 26,200.00
e)Extraover for hard rock: wirh blasting M3 - - -
f)Fill for working platforms:From site,incl. production,transportation and
M3 -
placing -
from site excavated material M3 - -
from the borrow selected material site M3 - -
g) Cart away of any distance from site M3 1,038.00 60.00 62,280.00
Sub Total Section-I - 197,184.03
Section II: Trench Excavation,Backfill &Cart away -
201 Trench Excavation,Backfill &Cart away -
a) Type A trench -
0-2m depth M 106.62 122.00 13,007.18
0-3m depth M 761.24 224.00 170,518.30
0-4m depth M 177.93 326.00 58,005.30
0-5m depth M 73.71 441.00 32,506.41
202 Trench rock excavation
a) Grade 1- Soft rock M3 1,029.06 140.00 144,068.72
b) Grade 2- Hard rock -
i) with out blasting M3 2,097.48 220.00 461,445.51
ii) With blasting -
Sub Total Section-II - 879,551.41
Section III: Gravity Sewers -
301 Pipe bedding and surrounding -
a) Type 2 bedding -
Type A Trench M 1,119.00 74.00 82,806.00
b) Type 4 Bedding -
Type A Trench M -
302 Casting of anchor blocks -
a) Type A trench Pcs 39 250.00
303 uPVC Sewer pipe supply & Installation -
DN200mm, PN6 M 1,119.00 -

305 Connection work to the main trunk sewer line Manhole Pcs 20.00 2,500.00 50,000.00
Sub Total Section-III - 155,186.00

85 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-4 Unit Rate Amount
Section IV:Manholes and Surfaces -
Manholes: Supply& Construct RC Precast circular manhole as per the
401
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less -
i) with cast iron cover and Frame Pcs 7.00 6,000.00 42,000.00
402 Additional manhole depth -
a) Type A-Depth greater than 1.5m M 4.87 2,500.00 12,182.50
403 Retaining wall and/or check dams -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
404 Culvert inlet and Outlets - -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
Sub Total Section-IV - 54,182.50
Section V: River Crossing & Pipe Support Structures; -
Normal Material Excavation for foundation as per the drawing & site
501 M - -
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M - -
layer.
503 Soft rock excavation M - -
504 Hard rock excavation M - -
505 Concrete, Retaining Protection Work and Form Work - -
a) 10 cm thick lean concrete C-5 under footing M - -
b) Stone Masonry Retaining Wall M - -
c) C-25 concrete in footings M - -
d) Ditto, but in foundation columns and column heads M - -
d) Ditto, but in Bracing Beam M - -
e) Sawn zigba form work - -
i) Sides of footings M - -
ii) Sides of foundation columns and column heads M - -
iii) sides and bottom of bracing beam M - -

506 Mild steel rod reinforcement, cutting, bending & placing in position - -

a) 10mm dia. Deformed Kg - -


b) 12mm dia. Deformed Kg - -
c) 16mm dia. Deformed Kg - -
d) 20mm dia. Deformed Kg - -
e) 24mm dia. Deformed Kg - -
Cutting, welding, placing in position & including two coats of anti-rust
- -
paint
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M - -
ii) Size 100x100x4mm M - -
b) 450x450x8mm End Support Anchor Plates No. - -
c) 16mm J-Bolts for end support plates anchoring No. - -
d) 6mm thick Pipe support plates Kg - -
e) 900x50x3mm Pipe Anchorring belts No. - -
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. - -
g) 300x100x3mm thick walk way plate M - -
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M - -
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M - -
j) supply and install 200x100x4mm pipe support M - -
Sub Total Section-V

86 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-4 Unit Rate Amount
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 66.00 165.00 10,890.00
b) Ordinary Asphalt M 2
424.55 165.00 70,050.54
C) Gravel Road M2 - 60.00 -
d) Coble and/or CARE Stone M2 771.89 13.20 10,188.90
e)Tiles M2 - 7.20 -
f) Reinforced Concrete M2 - -
602 Replacement of walls and fences -
a)Masonry M2 - 700.00 -
b) Reinforeced Concrete M2 - 2,000.00 -
C) Corrugated Iron sheet M2 - 200.00 -
Sub Total Section-VI - 91,129.44
Total
15% VAT
Grand Total

87 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-5)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project Office
Contractor :Firezgi Tsehaye Building and Water Works Contractor (Lot-5)
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-5 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 - - -
b) Ordinary Asphalt M2 117.15 80.00 9,372.00
C) Gravel Road M2 - 30.00 -
d) Coble and/or CARE Stone M2 406.40 40.00 16,255.80
e)Tiles M2 - 50.00 -
f) Reinforced Concrete M2 - - -
102 Cutting and Removal of existing walls and fences -
a)Masonry M2 - 1,000.00 -
b) Reinforeced Concrete M2 - 1,500.00 -
C) Corrugated Iron sheet M2 - 1,500.00 -
103 Construction of Working Platforms - -
a) Removal of trees or girth of any size,the price shall include
No. -
transportation to selected site by engineer of any distance - 350.00
b) Common excavation M3 185.00 70.00 12,950.00
c) Extra over for soft rock excavation M3 31.00 30.00 930.00
d)Extra over for hard rock: without blasting M3 31.00 70.00 2,170.00
e)Extraover for hard rock: wirh blasting M3 - -
f)Fill for working platforms:From site,incl. production,transportation and
M3 -
placing -
from site excavated material M3 - - -
from the borrow selected material site M3 - -
g) Cart away of any distance from site M3 247.00 30.00 7,410.00
Sub Total Section-I - 49,087.80
Section II: Trench Excavation,Backfill &Cart away -
201 Trench Excavation,Backfill &Cart away -
a) Type A trench -
0-2m depth M 226.70 180.00 40,806.00
0-3m depth M 140.25 280.00 39,270.00
0-4m depth M 73.15 400.00 29,260.00
0-5m depth M 17.60 180.00 3,168.00
202 Trench rock excavation
a) Grade 1- Soft rock M3 816.75 150.00 122,512.50
b) Grade 2- Hard rock -
i) with out blasting M3 761.76 230.00 175,203.65
ii) With blasting -
Sub Total Section-II - 410,220.15
Section III: Gravity Sewers -
301 Pipe bedding and surrounding -
a) Type 2 bedding -
Type A Trench M 458.00 150.00 68,700.00
b) Type 4 Bedding -
Type A Trench M -
302 Casting of anchor blocks -
a) Type A trench Pcs 28 2,000.00
303 uPVC Sewer pipe supply & Installation -
DN200mm, PN6 M 458.00 -

305 Connection work to the main trunk sewer line Manhole Pcs 13.00 2,500.00 32,500.00
Sub Total Section-III - 169,900.00

88 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-5 Unit Rate Amount
Section IV:Manholes and Surfaces -
Manholes: Supply& Construct RC Precast circular manhole as per the
401
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less -
i) with cast iron cover and Frame Pcs 3.00 4,000.00 12,000.00
402 Additional manhole depth -
a) Type A-Depth greater than 1.5m M 3.03 1,500.00 4,537.50
403 Retaining wall and/or check dams -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
404 Culvert inlet and Outlets - -
a)Masonry M3 - -
b) Reinforced Concrete M3 - -
Sub Total Section-IV - 16,537.50
Section V: River Crossing & Pipe Support Structures; -
Normal Material Excavation for foundation as per the drawing & site
501 M - -
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M - -
layer.
503 Soft rock excavation M - -
504 Hard rock excavation M - -
505 Concrete, Retaining Protection Work and Form Work - -
a) 10 cm thick lean concrete C-5 under footing M - -
b) Stone Masonry Retaining Wall M - -
c) C-25 concrete in footings M - -
d) Ditto, but in foundation columns and column heads M - -
d) Ditto, but in Bracing Beam M - -
e) Sawn zigba form work - -
i) Sides of footings M - -
ii) Sides of foundation columns and column heads M - -
iii) sides and bottom of bracing beam M - -

506 Mild steel rod reinforcement, cutting, bending & placing in position - -

a) 10mm dia. Deformed Kg - -


b) 12mm dia. Deformed Kg - -
c) 16mm dia. Deformed Kg - -
d) 20mm dia. Deformed Kg - -
e) 24mm dia. Deformed Kg - -
Cutting, welding, placing in position & including two coats of anti-rust
- -
paint
507 a) Trusses & purlins in structural RHS - -
i) Size 200x100x4mm M - -
ii) Size 100x100x4mm M - -
b) 450x450x8mm End Support Anchor Plates No. - -
c) 16mm J-Bolts for end support plates anchoring No. - -
d) 6mm thick Pipe support plates Kg - -
e) 900x50x3mm Pipe Anchorring belts No. - -
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. - -
g) 300x100x3mm thick walk way plate M - -
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M - -
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M - -
j) supply and install 200x100x4mm pipe support M - -
Sub Total Section-V

89 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-5 Unit Rate Amount
Section VI: Finishing works -
601 Permanenet restoration of trench surfaces -
a) Concrete Asphalt M2 - 148.50 -
b) Ordinary Asphalt M 2
117.15 148.50 17,396.78
C) Gravel Road M2 - 100.00 -
d) Coble and/or CARE Stone M2 406.40 132.00 53,644.14
e)Tiles M2 - 120.00 -
f) Reinforced Concrete M2 - -
602 Replacement of walls and fences -
a)Masonry M2 - -
b) Reinforeced Concrete M2 - -
C) Corrugated Iron sheet M2 - -
Sub Total Section-VI - 71,040.92
Total
15% VAT
Grand Total

90 of 93
Project
:Construction of Secondary New Sewer Line for Bethel Areas (Lot-6)
:AAWSA Water and Sanitation Development & Rehabilitation
Employer
Project Office
Contractor :Berhanu Feyisa Water Works General Contractor (Lot-6)
Consultant :SWS Consultancy
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-6 Unit Rate Amount
Section I: Preparation of Ground
101 Precutting of Paved Surfaces
a) Concrete Asphalt M2 48.99 2,000.00 97,977.00
b) Ordinary Asphalt M2 - 50.00 -
C) Gravel Road M 2
- 20.00 -
d) Coble and/or CARE Stone M2 1,389.83 30.00 41,694.84
e)Tiles M2 - 50.00 -
f) Reinforced Concrete M2 - 1,000.00 -
102 Cutting and Removal of existing walls and fences - -
a)Masonry M2 - 200.00 -
b) Reinforeced Concrete M2 - 200.00 -
C) Corrugated Iron sheet M2 - 200.00 -
103 Construction of Working Platforms - - -
a) Removal of trees or girth of any size,the price shall include
No. 50.00 -
transportation to selected site by engineer of any distance -
b) Common excavation M3 591.00 10.00 5,910.00
c) Extra over for soft rock excavation M3 99.00 10.00 990.00
d)Extra over for hard rock: without blasting M3 100.00 10.00 1,000.00
e)Extraover for hard rock: wirh blasting M3 - - -
f)Fill for working platforms:From site,incl. production,transportation and
M3 - -
placing -
from site excavated material M3 - - -
from the borrow selected material site M3 - - -
g) Cart away of any distance from site M3 790.00 40.00 31,600.00
Sub Total Section-I - - 179,171.84
Section II: Trench Excavation,Backfill &Cart away - -
201 Trench Excavation,Backfill &Cart away - -
a) Type A trench - -
0-2m depth M 178.38 300.00 53,512.80
0-3m depth M 418.78 100.00 41,878.10
0-4m depth M 334.14 20.00 6,682.72
0-5m depth M 56.12 20.00 1,122.44
202 Trench rock excavation -
a) Grade 1- Soft rock M3 627.49 150.00 94,123.09
b) Grade 2- Hard rock - -
i) with out blasting M3 1,280.87 580.00 742,903.27
ii) With blasting - -
Sub Total Section-II - - 940,222.42
Section III: Gravity Sewers - -
301 Pipe bedding and surrounding - -
a) Type 2 bedding - -
Type A Trench M 987.41 80.00 78,992.84
b) Type 4 Bedding - -
Type A Trench M - -
302 Casting of anchor blocks - -
a) Type A trench Pcs 32 6,000.00
303 uPVC Sewer pipe supply & Installation - -
DN200mm, PN6 M 987.41 - -

305 Connection work to the main trunk sewer line Manhole Pcs 16.00 4,000.00 64,000.00
Sub Total Section-III - - 142,992.84

91 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-6 Unit Rate Amount
Section IV:Manholes and Surfaces - -
Manholes: Supply& Construct RC Precast circular manhole as per the
401 -
drawing detail -
a) Type A-1000mm internal diameter Depth 1.5m or less - -
i) with cast iron cover and Frame Pcs 15.00 2,500.00 37,500.00
402 Additional manhole depth - -
a) Type A-Depth greater than 1.5m M 6.82 200.00 1,364.00
403 Retaining wall and/or check dams - -
a)Masonry M3 - - -
b) Reinforced Concrete M3 - - -
404 Culvert inlet and Outlets - - -
a)Masonry M3 - - -
b) Reinforced Concrete M3 - - -
Sub Total Section-IV - - 38,864.00
Section V: River Crossing & Pipe Support Structures; - -
Normal Material Excavation for foundation as per the drawing & site
501 M - - -
condition including cart away at any distance from the site.
Selected borrowed fill material and compacted at every 15cm layer by
502 M - - -
layer.
503 Soft rock excavation M - - -
504 Hard rock excavation M - - -
505 Concrete, Retaining Protection Work and Form Work - - -
a) 10 cm thick lean concrete C-5 under footing M - - -
b) Stone Masonry Retaining Wall M - - -
c) C-25 concrete in footings M - - -
d) Ditto, but in foundation columns and column heads M - - -
d) Ditto, but in Bracing Beam M - - -
e) Sawn zigba form work - - -
i) Sides of footings M - - -
ii) Sides of foundation columns and column heads M - - -
iii) sides and bottom of bracing beam M - - -

506 Mild steel rod reinforcement, cutting, bending & placing in position - - -

a) 10mm dia. Deformed Kg - - -


b) 12mm dia. Deformed Kg - - -
c) 16mm dia. Deformed Kg - - -
d) 20mm dia. Deformed Kg - - -
e) 24mm dia. Deformed Kg - - -
Cutting, welding, placing in position & including two coats of anti-rust
- - -
paint
507 a) Trusses & purlins in structural RHS - - -
i) Size 200x100x4mm M - - -
ii) Size 100x100x4mm M - - -
b) 450x450x8mm End Support Anchor Plates No. - - -
c) 16mm J-Bolts for end support plates anchoring No. - - -
d) 6mm thick Pipe support plates Kg - - -
e) 900x50x3mm Pipe Anchorring belts No. - - -
f) 16mm Diameter Bolts for Pipe Anchorring belt Fixing No. - - -
g) 300x100x3mm thick walk way plate M - - -
h) 2x(300x400x20mm) thick RHS connection plates including 10 diam.
M - - -
20 bolt with nuts
i) Supply and Install DN 400mm DCI Sewer Pipe above ground M - - -
j) supply and install 200x100x4mm pipe support M - - -
Sub Total Section-V

92 of 93
Secondary to Main Trunk line Connection Bill of Quantities
Item No. Descrption unit Lot-6 Unit Rate Amount
Section VI: Finishing works - -
601 Permanenet restoration of trench surfaces - -
a) Concrete Asphalt M2 48.99 594.00 29,099.17
b) Ordinary Asphalt M 2
- 594.00 -
C) Gravel Road M2 - 100.00 -
d) Coble and/or CARE Stone M2 1,389.83 132.00 183,457.30
e)Tiles M2 - 96.00 -
f) Reinforced Concrete M2 - - -
602 Replacement of walls and fences - -
a)Masonry M2 - - -
b) Reinforeced Concrete M2 - - -
C) Corrugated Iron sheet M2 - - -
Sub Total Section-VI - 212,556.47
Total
15% VAT
Grand Total