Você está na página 1de 41

1MW/1.

25MW PV Grid-Connected
Inverter Operation Manual

TBEA XIAN ELECTRIC TECHNOLOGY CO., LTD.


Content

1 About this manual ........................................................................................... 1

1.1 Scope of application ............................................................................. 1

1.2 Use of manual ...................................................................................... 1

1.3 Symbols explanation ............................................................................ 1

2 Safety instructions ........................................................................................... 3

3 Inverter general introductions ......................................................................... 5

3.1 PV grid-connected power generation system ....................................... 5

3.2 Circuit structure.................................................................................... 6

3.3 Technical characteristics ...................................................................... 6

4 Technical parameters ....................................................................................... 8

5 Inverter introductions and LCD operation guide .......................................... 10

5.1 Inverter introductions ......................................................................... 10

5.2 LCD operation guide.......................................................................... 11

5.2.1 Backlight function ................................................................... 12

5.2.2 LCD screen ............................................................................. 12

5.2.3 Menu structure ........................................................................ 14

5.2.4 Display content ....................................................................... 14

6 Running state and operation procedures ....................................................... 25

6.1 Running state ..................................................................................... 25

6.2 Inverter operation procedures ............................................................ 27

I
6.3 Grid connection conditions ................................................................ 30

7 System fault .................................................................................................. 32

7.1 Fault causes ........................................................................................ 32

7.2 Fault diagnosis ................................................................................... 33

8 Equipment maintenance ................................................................................ 34

9 Appendix ....................................................................................................... 36

9.1 Quality assurance ............................................................................... 36

9.2 Contact us........................................................................................... 36

II
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

1 About this manual

1.1 Scope of application

The manual provides the detailed product information and operating

instructions of the TC1000KH-M/TC1250KH-M PV grid-connected inverter of

TBEA Xi'an Electric Technology Co., Ltd.

1.2 Use of manual

This manual is for electrically qualified operators. Those operators should

have the appropriate professional knowledge to identify the electronic

components and symbols on the electric schematic diagram, and also they must

be experienced in the standard electric power distribution.

The content of this manual will be constantly updated and revised.

However, it is inevitable that slight inconsistence to the real product may occur.

The product purchased by the user shall prevail, and the user can obtain a copy

of the latest version of the manual through the sales channel.

1.3 Symbols explanation

This manual provides relevant information of the product, to ensure the

user's personal and property safety when using the product, as well as the

efficient use of the product. Please read the following symbols explanation

carefully prior to using the product, to better make use of this manual.

1
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Warning!

Warning indicates a hazardous situation which, if not avoided,

could result in minor or moderate injury.

Note!

Note provides tips that are valuable for the optimal

installation and operation of your product.

Electric shock hazard

Electric shock hazard indicates that the part has the electric

shock hazard and may cause danger to users safety; do not

touch!

Grounding!

Grounding indicates the mark of protecting the grounding.

Warning!

The capacitor needs to discharge for 20 minutes

after all the powers are disconnected, to prevent

the electric shock.

Warning!

Please wear hearing protectors to avoid hearing impairment.

2
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

2 Safety instructions

Warning!

When using this control equipment, please read the safety

instructions carefully.

During the implementation of wirings-layout and maintenance, please

make sure to cut off all the switches inside the inverter.

Do not expose the inverter to rain, snow and frost, fog, oil and dust, etc..

The location to install the inverter should be kept in good ventilation and

the air inlet should be not obstructed, in order to ensure that the control

system can work well.

Grounding terminals of the inverter must be grounded well, to ensure the

safe and stable running of the system.

Do not reversely connect the solar energy positive (+) and negative (-)

electrodes of the inverter.

Non-professionals are strictly prohibited to open the door panel of the

inverter on the equipment without permission, to prevent the risk of

electric shocks.

This inverter should keep off fire, and can be installed neither in

flammable or explosive environment; nor next to the equipment of no

fire protection, such as gasoline generators, diesel fuel barrels or other

3
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

flammable materials.

Due to the relatively-larger current when the system is at work, all wiring

terminals and bolts should be fastened tightly and a good contact in

wirings should be provided.

Do not touch any live parts of the inverter, do not connect or disconnect

the leading wire and terminal when the system is energized.

The inverter operation can only be operated by a qualified technician.

Without the external power input, a high voltage may exist inside the

equipment. Do not touch!

4
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

3 Inverter general introductions

3.1 PV grid-connected power generation system

The PV grid-connected power generation system is shown in Figure 3-1.

It is composed of the PV array, combiner box, DC power distribution,

grid-connected inverter, step-up transformer, data acquisition system and other

components. The solar energy is converted into the DC electric energy via the

PV module, and the electric energy transmitted by the PV array is distributed

through the combiner box and DC power distribution cabinet, and next, the DC

current is converted into the sine-wave current with the same frequency of the

grid and the controllable amplitude of the phases through the grid-connected

inverter, at last, the current is fed into the grid via the transformer which

matches the current to the voltage of the grid.


L1
L2 Grid
L3

Inverter LCL Breaker


Circuits Filter Contactor

Bus
PV

Bars
Input

Inverter LCL Breaker


Circuits Filter Contactor

Figure 3-1 PV grid-connected power generation system

5
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

3.2 Circuit structure

Figure 3-2 is the main circuit structure for the 1MW/1.25MW

grid-connected inverter. The DC current input into the inverter by the PV array

is converted into AC current through the three-phase full-bridge converter, and

next, the AC current is converted into the sine-wave current by being filtered

via the filter. At last, the current enters into the gird for power generation

through the transformer for matching.

AC side contactor
Broken circuit AC circuit
plan for DC input breaker

A
PV+ AC AC
DC output EMI B
AC filter filter
C
PV-
PE
AC
Lightening output
protection System control and filter
module of power grid monitoring
direct current

Operation/ A
malfunction LCD screen RS485
indicator light B
Ethernet

Figure 3-2 PV grid-connected inverter topological structure

3.3 Technical characteristics

Highest conversion efficiency up to 98.7%;

0-100% linearly adjustable active power, remote scheduling supported;

Advanced resonant (PR) control technology, grid-connected current THD

< 3%;

Meeting the State Grid zero voltage ride-through (ZVRT) requirements;


6
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Adjustable reactive power, power factor 0.9 (leading) -0.9 (lagging);

Suitable for high altitude areas, without derating at the altitude of 3000m

or below;

Using metal film DC-link capacitor, 25 years without replacement

Using multi-language, low temperature resistance LCD screen, with

friendly and easy-to-operate display interface;

Multiple communication interfaces available (standard RS485, Ethernet,

and optional: GPRS);

TUV certification, and CE certification.

7
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

4 Technical parameters

Electrical parameters 1000kW 1250kW


DC input power (kW) 1134 1417
Maximum array open-circuit
1000 1000
voltage (V)
DC input
Array input current (A) 2062 2576
DC working voltage range (V) 550-1000 550-1000
MPPT working voltage range (V) 550~850
AC output power (kW) 1000kW 1250kW
Working voltage range (Vac) 342-418 342-418
Rated working voltage (Vac) 380 380
AC output current (A) 1519 1899
Rated grid frequency (Hz) 50/60
Operating frequency range (Hz) 48-52/58-62
European efficiency (%) 98.2
AC output 0.9 (leading) ~ 0.9 (lagging),
Power factor
continuously adjustable
Current total harmonic distortion
<3
rate THD (%)
Output current DC component
< 0.5 (Rated output current)
(DCI) (%)
Self power consumption at night
<100
(W)
Standard RS485 and Ethernet (GPRS
Communication interface
optional)
Protection function
Over-/Under-voltage protection (Y/N) Y
Over-/Under-frequency protection (Y/N) Y

8
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Anti-islanding protection (Y/N) Y
Overcurrent protection (Y/N) Y
Anti-back discharge protection (Y/N) Y
Overload protection (Y/N) Y
Low voltage ride-through (Y/N) Y
Lightning protection (Y/N) Y
Safety requirements
Insulation resistance (M) 10
Insulation strength 2500VAC1min
Overvoltage category PV (II)AC()
Protection class
Pollution degree PD2
Enclosure protection class IP20
Mechanical parameters
Widthdepthheight (mm) 24007002150
Weight (kg) 2000
Cooling method Forced air cooling
Exhaust air rate (m3/h) 7000
Environmental characteristics
-25 ~ +60 (derating is required if above
Environment temperature (C)
50C)
Environment humidity (%) 0~95 (without condensation)
without derating at the altitude of
Altitude
3000m or below
Certification
TUV certification, and CE certification.

9
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

5 Inverter introductions and LCD operation guide

5.1 Inverter introductions

This section describes the appearance conditions and operations of the

buttons for the inverter, and provides the use guidance to the customers.

Figure 5-1 Inverter appearance

Table 5-1 Inverter appearance layout descriptions

Items Names
LED status indicator light

LCD screen

Start switch

Emergency stop button

Dust screen

10
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Table 5-2 Detailed descriptions of the indicator light and button functions

Items Names Descriptions


The GRID light is on normally when the grid meets the
grid-connected conditions; and the GRID light flashes at
1 GRID
an interval of 1 s when the grid does not meet the
grid-connected conditions.
The RUN light is on normally when the grid-connected is
running; and the RUN light flashes at an interval of 1s
2 RUN
during the start-up process; and the RUN light is out when
the machine stops.
Use red / yellow light
Yellow: There is a faulty module, and does not affect grid
connection
3 FAULT
Red: system-level fault (grid voltage is too high, etc.) or all
modules fail, thus can not connect the grid.
The "FAULT" light is off when there is no fault.
When the startup switch is rotated to ON, the inverter runs;
ON/OFF
4 when the startup switch is rotated to the OFF position, the
SWITCH
inverter is powered off to stop running.
Emergency stop button. When the inverter needs to stop in
5 EMERGENCY an emergency during the running process, press the rotary
button, the inverter will stop running immediately.

5.2 LCD operation guide

This section mainly introduces the LCD display screen and parameter

setting steps. The user can view the data in real time and set up the system

parameters via the LCD screen.

11
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

5.2.1 Backlight function

When the user does not do anything on the LCD in a certain time (1

minute), the LCD backlight will be turned off, stay at the energy-saving state.

5.2.2 LCD screen

LCD screen panel layout is as shown in Figure 5-2, which is divided into

A, B, C, D and E areas. The specific description for each area is as shown in

Table 5-3 and the function description of button icons is as shown in Table 5-4.

Take Figure 5-2 as an example for detailed operation, in C area

indicates that the current page is the main interface, means that the

previous page is product information, means that the next page is

operating data; the navigation icons in D area is corresponding to those in C

area, means to return to the main interface, means the left page is

product information, means the right page is operating data; F1,

F2, F3 and F4 keys in E area is corresponding to key indicator icons in

D area.

12
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Figure 5-2 LCD screen layout

Specific descriptions of each area in figure 5-2 are shown in table 5-3:
Table 5-3 Descriptions of each area on the LCD screen
S/N Description
A Title bar & Time
B Data display area
C Page navigation area
D Indicator icon area
E Key -operating area

Table 5-4 Key icons and description


Key icons Description
Back to the main interface
Left page
Right page
Page up
Page down or move the cursor position
Page switching
Confirm operation
Reducing operation
Increasing operation
Editing operation
Back to the previous level or cancel operation
13
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

5.2.3 Menu structure

Figure 5-3 is the overall structure framework diagram of the LCD

interface menu.
Power
Instant Power Daily Monthly Annual Events Lauguage
Set

Home

Info Default Clear Backup Contrast Comm. Time

Figure 5-3 Menu structure framework diagram

5.2.4 Display content

Interface display Description


Main interface: the main
interface includes such
information as input
parameter, output parameter,
generated power, generating
power, generating capacity,
operating state, power trend
diagram, and the current
date and time are also
displayed.
(Data in the picture are for
reference only; practical
operating data shall prevail)

14
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Operating data: select
operating data in the
navigation bar and enter into
the corresponding interface,
on which the detailed
parameters of inverter are
displayed in two or three
pages. The figures in the left
show the operation steps.
Press the page-turning key to
view the data.
Note: For the inverter
integrated with DC power
distribution cabinet function,
PV1-PV8 current will be
displayed.
(Data in the picture are for
reference only; practical
operating data shall prevail)

15
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Power curve: enter the
power curve interface, on
which the output power
curve of inverter during the
current day will be
displayed, with the abscissa
indicating the time, while
the ordinate indicating the
power value and based on
dynamic change of the
current maximum. Users can
view the actually measured
power curve as necessary,
and can view the historical
data by date, which is the
same with that on operating
data interface.
Note: data can be saved for
two months.
(Data in the picture are for
reference only; practical
operating data shall prevail)

Generating capacity: select


Daily, Monthly and
Yearly in the navigation
bar to view the generating
capacity information; as the
same with the operation of
operating data interface, the
historical data can be
viewed.
(Data in the picture are for
reference only; practical
operating data shall prevail)
16
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Event log: select Events


in the navigation bar to enter
into the event log interface
on which the detailed event
information can be viewed.
When the information is
more than one page, press
page turning key to view the
historical events with the
same operation as the
operating date interface;

17
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Power Set:
Users can set the active pow
er, reactive power, power
factor.

18
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Language settings: select


Language in the
navigation bar to enter into
language setting interface,
the pictures on the left
illustrate the operating
procedures and the
description are as follows:
(1) Press the editing key to
enter into the language
setting operation interface;
(2) Press or to
switch languages.
(3) Press the cursor moving
key to Enter or Cancel
the operation;
(4) Press Enter and the
hint words will be displayed,
e.g., Successful; press
Cancel to back to the
original state for language
setting.

19
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Time settings: select


Time in the navigation bar
to enter into the time setting
interface and set the display
time of the system; the
operation is the same with
that of language setting.

20
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Communication settings:
select Com. in the
navigation bar to enter into
the setting interface and set
the address and Baud rate
for the system; the operation
is the same with that of
language setting.

Contrast settings: select


Contrast in the navigation
bar to enter into the setting
interface and set the contrast
of the LCD screen; the
operation is the same with
that of language setting.

Backup data: select the


Backup in the navigation
bar to conduct the backup
operation on the data, the
pictures on the left illustrate
the operating procedures and
the description are as
follows:

(1) Insert the U-disk into


the USB port of the LCD,
the hint words USB has
been connected will be
displayed with the default
file name 00;
(2) Press the editing key to
modify the file name by
21
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
pressing + or ;
(3) Press the cursor moving
key to move the cursor;
(4) Press Enter for data
backup and the hint words
such as Loading will be
displayed.
Note: do not disconnect the
U-disk when Loading is
displayed.

22
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Reset events: select Clear


in the navigation bar to enter
into the interface for
resetting events, and the
historical events recorded in
the system can be
eliminated.

23
1MW/1.25MW PV Grid-Connected Inverter Operation Manual
Factory reset: select
Default in the navigation
bar to enter into the interface
for factory reset and the
historical data and setting
parameters can be
eliminated and back to the
state as delivered.

Product information: select


Product information in the
navigation bar and the
information of the inverters
will be displayed on the
display interface.
(Data in the picture are for
reference only; practical
operating data shall prevail)

24
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

6 Running state and operation procedures

6.1 Running state

Warning!

When there are lights on the PV array, the DC voltage should

be provided to the equipment!

Stop state

Stop state refers to the state under which the grid-connected operation is

stopped when receiving the stop command, or pressing down the emergency

stop button, or in case of unrecoverable fault. If the above conditions are not

met, it will enter the standby state.

Standby state

Standby state refers to the state under which the system stops running and

waits for meeting the startup conditions. It will enter the wait state after the

grid, PV, environment temperature, and inverter conditions meet the

grid-connected running conditions.

Wait state

Wait state refers to the state under which the timing confirmation is

delayed before the grid-connected running according to different shutdown

causes and grid-connected regulations. It will enter the self-test state after the

time of waiting for confirmation is up.

Self-test state

Self-test state refers to the state under which the inverter will test its own
25
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

hardware before starting the grid-connected running. The items need to be

tested include: phase sequence of the power grid, PV insulation impedance, DC

voltage sampling, AC voltage sampling, contactor state, Hall current sensor

signal and other key quantities.

Running state

In this state, the inverter is at the grid-connected running state, and

converts the DC electric energy of the PV array into the AC current to enter

into the grid, and the inverter always deliveries the maximum electric energy to

the grid in a maximum power tracing mode.


Stop

1
5 7


Running 6 Standby
8
9

11
10
4


Self- 3 Wait
test

Figure 6-1 System state switching diagram

26
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Table 6-1 System state switching descriptions

No. Switching descriptions


1 Stop command is removed or fault is cleared manually

2 Startup command is received

3 Startup delay time is up

Testing of PV voltage, grid voltage and frequency, PV earth impedance,


4
power circuit, and testing circuit are all OK

5 Stop command or occurrence of unrecoverable fault

6 Stop command or grid-connected conditions not satisfied

7 Stop command

8 Stop command or unrecoverable fault

9 Stop command

10 Stop command or waiting conditions not satisfied

11 Stop command or startup conditions not satisfied

6.2 Inverter operation procedures

Note!

Users should operate the inverter strictly in accordance

with the operation procedures in the manual!

27
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

The operation procedures of the inverter are as follows:

Start

Grid-connected preparation
operation

Grid-connected
operation

Stop operation

Trouble shooting
operation

End

Figure 6-2 Operation procedures

28
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Table 6-2 Grid-connection procedure descriptions


Operating
Operating instructions
steps
Connect the input and output lines according to the wiring
Operations for instructions well;
grid-connection Close the DC and AC circuit breakers;
preparation If necessary, adjust the technical parameters by using host computer
software, to improve the equipment running state.
First, make sure the "EMERGENCY" button on the operation panel is
popping up;
Then turn the startup switch to "ON" position, the GRID indicator
light on the operation panel is on normally at the moment;
Operations for
The input voltage of the grid-connected inverter is up to the startup
grid-connection
voltage range and maintains for 10s, the "RUN" indicator light is
flashing, indicating the inverter is in the grid-connection transition
process, and when the "RUN" indicator light is always ON, the
system is in the state of normal grid-connection and power generating.
If the system needs to stop running in the normal running, the user can
stop it by the following three ways:
Turn the startup switch to "OFF" position, the inverter stops output;
Stoping the system can be achieved by remote control;
Stop operations
In case of an emergency, the user can press the "EMERGENCY"
button on the operation panel, the system will stop running
immediately, and then disconnect the PV DC input circuit breaker and
the AC output circuit breaker.
The inverter stops immediately in case of inverter fault during
running;
If the "FAULT" indicator light is ON, the following faults may occur:
short circuit, IGBT module fault;
If the "GRID" indicator light is flashing, it may be caused by the grid
Trouble fault (grid under-voltage, overvoltage, under-frequency, and
shooting over-frequency). After the fault is cleared, the "GRID" indicator light
operations is normally ON;
The LCD screen will record the fault type in detail in case of inverter
fault;
Prior to clearing the fault, turn the startup switch to "OFF" position,
turn off the AC circuit breaker and DC circuit breaker, and then clear
the fault according to the method specified in Section 7.2.
29
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

6.3 Grid connection conditions

The whole process of the inverter entering the mode of grid connection

and power generation is automatic. The system constantly monitors the PV

input voltage, grid voltage, grid frequency, grid phase sequence, AC/DC

lighting protection state and IGBT module state, to determine whether the

conditions of grid connection and power generation are met. When all the

conditions are met, the inverter will enter the mode of grid connection and

power generation. And when the following faults occur in the grid, the inverter

is immediately disconnected with the grid, to enter the protection mode:

(1) After the system selects the low voltage ride-through mode and when the

grid voltage drops, the inverter enters the low voltage ride-through

protection mode. In the relevant standard, it requires the time for the

inverter to withstand the low voltage to be 1 to 3 seconds according to

different degree of the drop voltage. If the grid voltage does not return to

the allowed grid voltage range in the specified time, the inverter will

immediately disconnect with the grid;

(2) After the system selects the islanding protection mode and when the

inverter detects the occurrence of islanding effect, the inverter will

disconnect with the grid in 2 seconds;

(3) The running conditions of the inverter vary with different grid

frequency:
30
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Table 6-3 Inverter running requirements under different grid frequency

Frequency range Inverter response


Lower than 48Hz Inverter stops running in 0.2s

4849.5 Hz Inverter stops running after running for at least 10min

49.550.2 Hz Inverter runs normally

50.250.5 Hz Inverter stops running after running for at least 2min

Higher than 50.5 Hz Inverter stops running in 0.2s

(4) When the PV voltage exceeds the allowed range of 450Vdc-1000Vdc,

the inverter will immediately disconnect with the grid.

31
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

7 System fault

7.1 Fault causes

The system fault is generally because of the following causes:

External grid connection fault (e.g.: improper A, B, C wire connection, or

phase sequence connection error);

The PV voltage exceeds the allowed range:

Grid undervoltage (Uac < "Uac, min")

Grid overvoltage (Uac > "Uac, max")

Grid frequency is too low (fac < "fac, min");

Grid frequency is too high (fac > "fac, max");

Output short circuit;

IGBT module fault.

Note!

First, check whether the ordinary power outage occurs or

not, and whether the inverter output cables are

disconnected or not.

Warning!

If no any other faults are found, the professional

technicians are required to check the connections between

the inverter and power transmission grid.


32
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

7.2 Fault diagnosis

The general diagnostic modes for various faults during the system running
are as follows:

Table 7-1 Comparison table for faults


Fault types Fault causes Process methods Remarks
The PV array positive and
PV is connected Check the PV array line
negative electrodes are
reversely connections
connected reversely
The PV array voltage is Reduce the number of PV
PV overvoltage
above 1000V array in series connection
-5kohms
The PV array positive or
PV insulation Check the PV array line
negative electrode
resistance is low connections
grounding impedance is
less than-5kohms
Phase sequence The three-phase AC lines Check the line
fault are connected incorrectly connections
Restart
Grid voltage is The grid voltage exceeds automatically
Check the grid
abnormal the range of 85% to 110% after the grid
is recovered
Restart
The grid frequency
Grid frequency automatically
exceeds the range of 48Hz Check the grid
is abnormal after the grid
to 50.2Hz
is recovered
LCD screen Communication error
Contact the after-sales
communication between the LCD screen
service of our company
error and the inverter
Please replace the surge
protection module of the After the
DC surge The DC-side surge
same type, if the failure is replacement,
protection fault protection module fails
still there, contact the restart
manufacturer
Please replace the surge
protection module of the After the
AC surge The AC-side surge
same type, if the failure is replacement,
protection fault protection module fails
still there, contact the restart
manufacturer
33
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

8 Equipment maintenance

Note the electric shock hazard!

All maintenance work on the equipment should be

completed by a professional electrician.

The inverter must be regularly maintained, and the maintenance tasks

include:

(1) Check the connecting wirings inside the equipment regularly, and

replace them when necessary;

(2) Test the functions of the components and parts regularly;

(3) Check the contact connector regularly;

(4) Clean the inside of the inverter case regularly, if necessary.

The following table shows the regular maintenance for the inverter in the

general environment. When the installation is in the environment with a lot of

dust, the corresponding maintenance interval should be appropriately

shortened.

34
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

Table 8-1 Inverter regular maintenance

Maintenance
Maintenance work
cycles
Clear the inverter surface regularly. 12 months

Replace the dust screen regularly. 6-12 months

Check whether the connections between all the cables are loose or not, if

loose, they need to be tightened; check whether the color is changed or


12 months
the connections are detached on the connection terminals and insulation,

and replace the damaged or corrosive connection terminals.

Tests on the functions of the cooling fan: check the functions and running

noises of all the fans, and the fans can be started according to the 12 months

temperature regulator during the running.

Check whether the warning labels are affixed securely and clearly or not,
12 months
and replace them if necessary.

Fans are changed regularly. 5 years

Tests for protecting the functions of the equipment include: circuit


12 months
breakers and power switches in the circuits.

35
1MW/1.25MW PV Grid-Connected Inverter Operation Manual

9 Appendix

9.1 Quality assurance

This product can enjoy the free maintenance within the warranty period.
When the following situations occur, the company reserves the right not to
conduct the quality assurance:
Incorrect installation;
Incorrect modification;
Incorrect use;
Any installation and range of application exceeding the relevant
international standard specifications;
Damages caused by the non-normal natural environment.

9.2 Contact us

If you have any questions on this product, please contact us, the contact

details are as follows:

Company name: TBEA Xi'an Electric Technology Co., Ltd.

Address: TBEA New Energy XIAN Industrial Park, No. 70 Shanglinyuan 4th

Road, High-Tech Zone, Xian, Shaanxi, China

Postcode: 710119

Consumer hot line: 400-606-6029

E-mail: tbeapower@tbea.com.

Fax: 029-68760500-042

URL: http://www.tbeapower.com

36