Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
NDICE
CAPTULO VII MEMORIA DE DISEO..............................................................................1
VII 1. Estudios Bsicos.....................................................................................2
VII 1.1. Antecedentes...................................................................................2
VII 1.2. Topografa........................................................................................2
VII 1.3. Geotecnia.........................................................................................3
VII 2. Diseo Hidrulico....................................................................................3
VII 2.1. Descripcin del Mtodo Utilizado.....................................................3
VII 2.2. Sntesis planteo de alternativas.......................................................3
VII 2.3. Modelos Aplicados...........................................................................3
VII 2.4. Planos de Diseo Hidrulico............................................................3
VII 3. Diseo Estructural...................................................................................3
VII 3.1. Datos generales de la Estructura.....................................................3
VII 3.2. Anlisis de Cargas...........................................................................3
VII 3.3. Clculo de Solicitaciones.................................................................3
VII 3.4. Dimensionado y Verificaciones........................................................3
VII 3.5. Planos Estructurales........................................................................3
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Por otra parte, si bien es sabido que el mtodo puede mayorar en cierta medida los
caudales pico para cuencas mayores a 500 has., la gran difusin que ha tenido, lo
transforma en uno de los mtodos ms contrastados con la realidad. Mtodos ms
modernos exigen un mayor nmero de parmetros de clculo y, la subjetividad en su
eleccin ha conducido a dispersiones en los resultados obtenidos.
Frente a esto, el Mtodo Racional, sigue siendo una herramienta confiable y sencilla
para el clculo de desages pluviales.
Q = C x I x A , siendo
360
Q = caudal en m3/s.
C = coeficiente de escorrenta.
A = rea de la cuenca en ha.
I = Intensidad de lluvia en mm/h.
I = a x Tb
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Se recuerda que la recurrencia de 2 aos con una intensidad de 33.00 mm. para
una hora de duracin y la de 10 aos con 47.89 mm. , valores que utiliza esta
Direccin para el clculo de redes de desages pluviales urbanos.
Cabe hacer recordar que previo al planteo de las alternativas se tena consensuado
con el Municipio la traza ms conveniente de las conducciones secundarias y
terciarias y la ubicacin exacta del entubado del arroyo ya que se encontraba muy
condicionada por el desarrollo urbano en las mrgenes del mismo. En general, las
trazas se localizan uniendo los puntos bajos e interceptando los escurrimientos
provenientes de las zonas ms alejadas de la cuenca.
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
ltimas calles. Contina por Cobo, Doblas, Alagn, Ramos, Acassuso, Riglos, Lujn
y Cspedes en lo que sera la cuenca alta. A partir del cruce de la conduccin por la
calle Matas, el entubado transita por las calles laterales del arroyo existente,
prosiguiendo luego por calles Tinogasta, Cobo, Newbery y Echauri. En la
prolongacin de esta ltima el colector cruza la calle colectora y la Ruta Nacional
N3, la rama de salida de la Ruta Provincial N21 y esta ltima propiamente dicha.
Posteriormente del cruce de la vas del ex ferrocarril Belgrano, continua por las
calles Comodoro Py y Doblas. Entre las calles Martn Coronado y Riglos la traza del
conducto coincide con el cauce del arroyo. Posteriormente se desva por la calle
Finochietto, luego por Achega y Murgiondo hasta la calle Apip, donde transita por
esta ltima por sobre la traza del zanjn afluente Apip hasta la calle Chassaino
donde el entubado continua por calle Apip pero sobre la traza del arroyo Finochietto
hasta su desembocadura en el Ro de la Matanza.
El Colector Troncal recibe una red de ramales y sub-ramales que ingresan en las
calles Bezares, Cazn, de la Fuente, Caldern de la Barca, Cspedes, Llerena, La
Bastilla, Urdaneta, Icalma, Montgolfier, Iber, Tinogasta, Echauri, Fournier, Martn
Coronado, Ipela, De Luca y Patrn, Zufriategui, Soberana Nacional, Murgiondo,
Spiro, Garzn, Santo Tom, ramal existente calle Varela, Zelada, Saraza,
Garmendia, Urdininea y Tuy.
Este colector se inicia en la interseccin de las calles Azul y Zeppeln, contina por la
primera hasta la calle Atalco, previo cruce de la Ruta Provincial N21 y las vas del
ex ferrocarril Belgrano. Por Atalco circula hasta Achira, luego por calle Azul donde
cruza la Ruta Nacional N3 hasta su interseccin con la calle Magnasco. Por esta
ltima hasta Apip donde la traza del colector coincide con el cauce del zanjn para
desembocar en el Colector Troncal del entubado del Arroyo Finochietto. En su
recorrido recibe a una red de ramales y sub-ramales que ingresan en las siguientes
calles: Toay, El Jazmn, Achira, Carrafa, Bacn, Bavio, De Velazco, los conductos
existentes en colectora de la Ruta Nacional N3, Obligado y Lopez May.
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ante la sencillez del proceso de clculo del Mtodo Racional, la DiPSOH elabor
el presente modelo matemtico, el que debido a su velocidad de resolucin y a su
capacidad en cuanto al nmero de ramales permitidos, hace posible efectuar
numerosos clculos y verificaciones para distintas variantes en poco tiempo y con
simples cambios en los archivos de datos.
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
de seccin contemplada, solicitndose para todos los casos la pendiente del tramo
en o/oo y especficamente para seccin rectangular el nmero de celdas y altura; y,
para seccin de tipo canal, el ancho de fondo (m), coeficiente de rugosidad (s/m 1/3) y
talud.
Area L Tc I
Tramo (Has) Ce (m) (min) RR1 RR2 RR3 (por mil) n
1 26.26 0.3 75 16 2.78 0.013
2 2.25 0.5 75 8 1 2.78 0.013
3 3.64 0.5 220 8 2 2.78 0.013
4 6.03 0.6 131 6 3 2.78 0.013
5 8.42 0.5 240 21 5.43 0.013
6 4.19 0.5 75 5 4 5 2.78 0.013
7 2.76 0.6 135 4 6 2.78 0.013
8 2.90 0.5 94 5 7 2.78 0.013
9 3.78 0.6 86 6 4.47 0.013
10 2.04 0.6 98 4 8 9 2.05 0.013
11 4.55 0.6 150 11 10 2.05 0.013
150 2.50 0.6 400 10 2 0.013
151 1.90 0.6 100 3 150 10.65 0.013
152 3.13 0.6 440 6 11 151 2.05 0.013
153 4.00 0.6 250 4 6.6 0.013
12 8.81 0.6 353 11 152 153 2.05 0.013
13 41.18 0.3 83 26 12 1.75 0.013
14 8.89 0.6 116 10 13 1.75 0.013
15 1.31 0.6 68 3 14 1.75 0.013
16 4.89 0.6 75 6 15 1.75 0.013
17 5.09 0.5 98 7 16 1.75 0.013
18 2.41 0.6 79 6 17 1.75 0.013
19 2.70 0.6 71 7 18 1.75 0.013
20 0.01 0.6 75 1 19 1.75 0.013
21 19.51 0.4 75 18 5.62 0.013
22 8.68 0.5 75 20 5.98 0.013
23 0.87 0.6 113 2 21 22 5.98 0.013
24 0.90 0.6 158 2 23 5.98 0.013
25 3.32 0.6 75 7 24 5.98 0.013
26 2.45 0.6 161 5 25 5.98 0.013
27 2.94 0.6 158 4 19 26 1.75 0.013
28 5.27 0.6 245 9 2.7 0.013
29 4.05 0.5 310 5 10 0.013
30 1.06 0.6 75 1 12.3 0.013
31 1.89 0.6 75 4 30 12.3 0.013
32 2.19 0.6 75 5 31 12.3 0.013
34 6.30 0.6 161 9 5.29 0.013
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Qs Qt
Tramo (lts/s) (m3/s) I (por mil) Seccin Calculada Seccin Adoptada
1 1990 1.99 2.78 1.20 1.20
2 381 2.27 2.78 1.40 1.40
3 616 2.70 2.78 1.40 1.40
4 1357 3.52 2.78 1.60 1.60
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Dimensionado Alternativa 2
Tramo I (por mil)Seccin Adoptada
1 2.78 1.00
2 2.78 1.20
3 2.78 1.20
4 2.78 1.40
5 5.43 0.80
6 2.78 1.40
7 2.78 1.60
8 2.78 1.60
9 4.47 0.80
10 2.05 1.80
11 2.05 1.80
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
150 2 0.80
151 10.65 0.80
152 2.05 1.80
153 6.6 0.80
12 2.05 2.00
13 1.75 2.40
14 1.75 2.40
15 1.75 2.40
16 1.75 2.40
17 1.75 2.40
18 1.75 2.40
19 1.75 2.40
20 1.75 2.40
21 5.62 1.00
22 5.98 0.80
23 5.98 1.20
24 5.98 1.20
25 5.98 1.20
26 5.98 1.20
27 1.75 CR (tolva) 4.50 x 2.50
28 2.7 0.80
29 10 0.80
30 12.3 0.80
31 12.3 0.80
32 12.3 0.80
34 5.29 0.80
35 5.29 1.00
36 11.57 0.80
37 5.29 1.20
38 5.29 1.20
39 5.29 1.20
40 5.29 1.20
41 5.29 1.20
43 1.75 CR (tolva) 4.50 x 2.50
44 4 1.00
45 1.75 CR (tolva) 4.50 x 2.50
46 1.75 CR (tolva) 4.50 x 2.50
47 1.75 CR (tolva) 4.50 x 2.50
48 1.75 CR (tolva) 4.50 x 2.50
49 8.03 0.80
50 8.03 0.80
51 8.03 0.80
52 1 1.20
53 1 1.40
54 1 1.40
55 1.75 CR (tolva) 4.50 x 2.50
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
196 4 0.80
197 4 0.80
198 4 1.20
199 4 1.20
200 3 0.80
201 3 0.80
202 8 0.80
203 3 1.00
204 3 1.20
205 3 1.20
206 4 1.60
207 4 1.60
208 4 1.80
209 2 0.80
210 4 1.80
211 4 1.80
212 10 0.80
213 7 0.80
214 7 0.80
215 10 0.80
216 10 0.80
217 10 0.80
218 2 1.00
219 4 1.80
220 1 1.00
221 10 1.00
222 10 1.00
223 4 1.80
224 1 CR (tolva) 3.80 x 1.80
225 3 0.80
226 1 CR (tolva) 3.80 x 1.80
227 5.31 1.00 E
228 5.31 1.00 E
229 5.31 1.20 E
230 5.31 1.20 E
231 5.31 1.50 E
160 9 0.80
232 9 0.80
233 9 0.80
234 9 0.80
235 5.31 2 1.50 E
236 5.31 2 1.50 E
237 5.31 2 1.50 E
238 6.89 0.80
239 6.89 0.80
240 6.89 0.80
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
315 1 Existente
CR (tolva) 2 x 6.50 x
316 1.5 2.50
317 1 0.80
CR (tolva) 2 x 6.50 x
318 1.5 2.50
319 2.73 0.80
320 2.73 1.00
321 2.73 1.00
322 1 1.20
323 2.19 0.80
324 2.19 1.00
325 2.19 1.00
326 1 1.60
327 1 1.60
328 1 CR 2.00 x 1.60
329 1 CR 2.00 x 1.60
330 1.6 0.80
331 1.6 1.00
332 1 CR 2.00 x 1.60
333 1 CR 2.00 x 1.60
334 1 CR 2.00 x 1.60
335 1 1.00
336 1.5 Canal Rev. Bf=9.50
337 1 1.00
338 1.5 Canal Rev. Bf=9.50
339 1 1.20
340 1.5 Canal Rev. Bf=9.50
341 1.5 Canal Rev. Bf=9.50
342 1.5 Canal Rev. Bf=9.50
Una realidad fsica de las redes de desages urbanos es la existencia de estos dos
sistemas.
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Los principales supuestos que han sido asumidos en el desarrollo del modelo son
los siguientes:
b) La red formada por el sistema mayor tiene un arreglo dendrtico y converge hacia
los puntos de descarga. El sistema menor puede ser o no de tipo dendrtico.
f). Almacenamientos:
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos
Los resultados de este modelo se han presentado en los planos de las manchas de
inundacin para cada alternativa.
En los planos de perfiles longitudinales se observan las cotas de terreno natural, las
cotas de proyecto, las dimensiones de los conductos, las pendientes, y cmaras de
inspeccin para la Alternativa 2.
Ministerio de Infraestructura
Direccin Provincial de Saneamiento y Obras Hidrulicas
Direccin Tcnica Departamento Proyectos