COMPONENTES/METAS ASOCIADAS A LA CAPACIDAD DE

ITEM PPTO. EXP. TECNICO VALORIZ. ACUMULADA. DEDUCTIVO


PRODUCCION DEL SERVICIO

1 PISCINA SEMIOLIMPICA 1,049,268.02 1,025,473.70 23,794.32


2 PISCINA PATERA 312,026.52 305,253.16 6,773.35
3 VESTUARIOS , SS.HH. COMEDOR 761,532.81 723,356.06 38,176.79
4 CERCO PERIMETRICO 261,051.93 194,707.84 66,344.07
5 TRATAMIENTO Y EQUIPAMIENTO DE AREAS VERDES 210,669.53 136,776.55 73,892.97
6 SNACK MIRADOR 56,840.39 56,840.39
7 EFICIENTE CAPACIDAD OPERATIVA Y GESTION OPERATIVA 17,560.77 17,560.77
COSTO DIRECTO 2,668,949.97 2,403,128.08 265,821.89
7 GASTOS GENERALES 355,262.09
8 SUPERVISION 145,350.42
9 EXPEDIENTE TECNICO 107,730.06
10 LIQUIDACION DE OBRA 12,640.26
COSTO TOTAL: 3,289,932.80
VALORIZ. MAY. VALORIZ. PART. NUEV. VALOR, TOTAL
METRAD.

150,847.80 76,444.73 1,252,766.23


22,429.54 8,383.49 336,066.19
58,903.33 63,272.42 845,531.81
20,221.75 53,259.84 268,189.43
6,351.38 34,660.48 177,788.41

17,560.77
258,753.79 236,020.96 2,897,902.83
449,206.54
187,573.39
53,203.00
12,640.26
3,600,526.02
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

01 PISCINA SEMIOLIMPICA Parcial (S/.) Metrado

01.01 TRABAJOS PRELIMINARES 85,510.65 0.00


01.01.01 LIMPIEZA DE TERRENO MANUAL 977.74 589.00
01.01.02 TRAZO, NIVELES Y REPLANTEO 1,001.30 589.00
01.01.03 DEMOLICION DE ETRUCTURA DE CONCRETO CICLOPEO 12,398.05 50.16
01.01.04 DEMOLICION DE MUROS DE CONCRETO ARMADO 59,469.90 160.40
01.01.05 DEMOLICION DE VEREDAS 7,217.28 192.00
01.01.06 ELIMINACION DE MATERIAL CON MAQUINA 4,446.38 217.96
DEMOLICION DE ESTRUCTURAS EXISTENTES
ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA

01.02 MOVIMIENTO DE TIERRAS 19,268.87 0.00


01.02.01 CORTE DE TERRENO CON MAQUINARIA 949.26 78.00
01.02.02 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL 801.45 195.00
01.02.03 EXCAVACION MASIVA CAM, DE COMP Y CAM. DE BOMBAS 1,702.49 163.23
01.02.04 EXCAV. DE ZANJAS PARA CANAL DE REBOSE Y EVAC. DE AGUAS PLUVI. 2,908.64 196.00
01.02.05 EXCAVACION DE ZANJAS HASTA H=1.50M 2,323.27 165.24
01.02.06 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA 6,254.88 261.82
01.02.07 ELIMINACION DE MATERIAL CON MAQUINA 4,328.88 212.20
TRAZO Y REPLANTEO DURANTE EL PROCESO
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS
RELLENO CON MATERIAL PROPIO

01.03 OBRAS DE CONCRETO SIMPLE 74,455.06 0.00


01.03.01 CONCRETO CICLOPEO 1:10 +30% PG 49,432.50 250.00
01.03.02 SOLADO C S 1:10 e= 10 cm 4,146.35 255.16
01.03.03 EMPEDRADO DC/PIEDRA MEDIANA 6" 6,203.80 391.16
01.03.04 FALSO PISO DE 4" CON MEZCLA 1:6 C:H 14,672.41 391.16
PODIO DE CONCRETO F'C=175 kg/cm"

01.04 OBRAS DE CONCRETO ARMADO 148,456.42 0.00


01.04.01 CAMARAS DE COMPENSACION Y CASETA DE BOMBAS 44,921.65 0.00
01.04.01.01 ACERO fy= 4200 kg/cm2 16,838.64 3,700.80
01.04.01.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO 5,394.32 175.94
01.04.01.03 CONCRETO F'C= 210 KG/CM2 22,688.69 42.08
01.04.02 PISCINA 87,115.49 0.00
01.04.02.01 ACERO DE REFUERZO Fy=4200 Kg/cm2 24,509.87 5,351.50
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO 6,622.56 216.00
01.04.02.03 CONCRETO F'C= 210 KG/CM2 55,983.06 103.83
01.04.03 CANALES DE REBOSE Y LIMPIA 16,419.28 0.00
01.04.03.01 ACERO DE REFUERZO Fy=4200 Kg/cm2 2,748.00 600.00
01.04.03.02 ENCOFRADO Y DESENC. DE CANALES 2,887.68 128.00
01.04.03.03 CONCRETO F'C= 210 KG/CM2 10,783.60 20.00
01.05 REVOQUES Y REVESTIMIENTOS 71,792.86 0.00
01.05.01 TARRAJEO RAYADO IMPERMEABILIZADO 22,029.63 483.00
01.05.02 TARRAJEO IMPERMEABILIZADO EN MUROS Y LOSA 22,029.63 483.00
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

01.05.03 TARRAJEO PRIMARIO EN CANALES DE REBOSE Y DE RECIRCULACION 3,266.00 230.00


01.05.04 MEDIA CAA DE TERRAZO INFERIOR EN PISINA 2,134.40 80.00
01.05.05 BORDE BOLEADO DE TERRAZO 7,383.84 48.00
01.05.06 ENCHAPE DE MUROS CON CERAMICA P/PISCINA 14,949.36 216.00
BRUADO DE 1/2"

01.06 PISOS 62,378.36 0.00

01.06.01 PISO DE TERRAZO E= 2 CM. 30,782.50 350.00


01.06.02 BORDE BOLEADO DE TERRAZO E= 4 CM 4,614.90 30.00
01.06.03 BRUADO DE 1/2" 1,092.96 184.00
01.06.04 PSO CERAMICO P/PISCINA 36 X 36 CM 25,888.00 400.00
FALSO PISO DE 4" DE CONCRETO 1:10
PISO DE PEPELMA PARA PISCINA DE 2.5 CM X 2.5 CM DE COLOR
PISO DE CEMENTO PULIDO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE PEPELMA PARA PISCINA DE 0.30 CM x 0.30 CM DE COLOR

01.07 CARPINTERIA METALICA 6,188.22 0.00


01.07.01 ESCALERA DE GATO CAMARA DE COMPENSACION 444.08 1.00
01.07.02 ESCALERA ACERO CROMADO PARA PISCINA 5,144.14 2.00
01.07.03 TAPA METALICA DE 0.80CM X 0.80CM 600.00 1.00
01.08 PINTURA 53.16 0.00
01.08.01 PINTURA ANTICORROSIVA EN ELEMENTOS METALICOS 53.16 3.72
1.09 INSTALACIONES HIDRAULICAS 177,581.07 0.00
LIMPIEZA Y PRUEBA HIDRAULICA DE RED DE DESAGE
LIMPIEZA, DESINFECCIN Y PRUEBA HIDRAULICA DE AGUA
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
DUCHA CROMADA
ACCESORIOS SANITARIOS
SISTEMA GENERAL DE DESAGUE
MOVIMIENTO DE TIERRAS RED DE DESAGUE
TRAZO, NIVELES Y REPLANTEO EN RED DE DESAGE
EXCAVACION DE ZANJA MANUAL 0.40x0.80m PROMEDIO
RELLENO Y APISONADO C/MATERIAL PROPIO
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE PVC SAL PARA DESAGUE DE 2"
SUM. E INST. TUBERIA DE 4" PVC SAL
SUM. E INST. TUBERIA DE 2" PVC SAL
SUM. E INST. DE CODO 4"x45 PVC AL-P, P/DESAGUE
SUM. E INST. DE CODO 2"x45 PVC AL-P, P/DESAGUE
SUM. E INST. DE YEE 4" PVC SAL-P, P/DESAGUE
SUM. E INST. DE YEE CON REDUCCION DE 4"x2" PVC SAL-P, P/DESAGUE
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

SUM. E INST. DE YEE 2" PVC SAL-P, P/DESAGUE


REGISTRO DE BRONCE CROMADO DE 4"
SUMIDERO CROMADO DE 2"
SISTEMA GENERAL DE AGUA POTABLE
MOVIMIENTO DE TIERRAS RED DE AGUA
TRAZO, NIVELES Y REPLANTEO EN RED DE AGUA
EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO
RELLENO Y APISONADO C/MATERIAL PROPIO
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2"
SUMINISTRO E INSTALACIN TUBERIA DE 1/2" PVC SAP C-10
SUM. E INST. DE CODO DE1/2"x90 PVC SAP
SUM. E INST. DE CODO DE 1/2"x90 FG
SUM. E INST. DE TEE DE 1/2"x1/2" PVC SAP
VALVULA DE COMPUERTA DE BRONCE DE 1/2"
OTROS
REJILLA DE PLASTICO PARA CANALETAS DE PISCINA 0.25 M
SISTEMA DE RECIRCULACION DE AGUA,LINEA
FONDO,ASPIRACION,CANALETA
01.09.01 INSTALACIONES EXTERIORES 86,941.64 0.00
01.09.01.01 SISTEMA DE FONDO DE PISCINA 13,719.81 0.00
01.09.01.01.0 SUMINISTRO E INSTALACION DE TUB PVC SAP 6" 4,284.00 56.00
01.09.01.01.0 SUM. E INST. DE TEE PVC SAP 6" 473.04 2.00
01.09.01.01.0 SUM. E INST. DE CODO PVC SAP 6" X90 1,518.24 12.00
01.09.01.01.0 SUM. E INST. DE CODO PVC SAP 6" X 45 349.56 3.00
01.09.01.01.0 SUM E INST. DE SUMIDEROS 475.77 3.00
01.09.01.01.0 PRUEBA HIDRAULICA 179.20 56.00
01.09.01.01.0 SERVICIO DE INSTALACION DE SISTEMA DE FONDO 6,440.00 56.00
01.09.01.02 SISTEMA DE RETORNO DE PISCINA 56,743.36 0.00
01.09.01.02.0 SUM, E INST. DE TUB PVC SAP C-10 4" 3,689.46 103.00
01.09.01.02.0 SUM E INST. DE CODO PVC SAP 4" 643.76 13.00
01.09.01.02.0 SUM E INST. DE TEE PVC SAP 4" 799.76 13.00
01.09.01.02.0 SUM E INSTAL. DE REDUCCION DE 4"A 2" PV SAP 427.80 15.00
01.09.01.02.0 SUM. E INST. DE REJILLAS PARA CANALETA DE REBOSADERO 18,967.64 92.00
01.09.01.02.0 SUM. E INST. DE REJILLA PARA CANALETA DE DESAGE DE TERRAZ 15,461.00 100.00
01.09.01.02.0 SUM E INST. DE BOQUILLAS DE PISO 2" 2,676.30 15.00
01.09.01.02.0 SUM E INST. DE VALVULA ROMPE SIFON 1" EN CIRCUITO DE RETO 1,070.50 1.00
01.09.01.02.0 SUM E INST. DE PLATO VORTEX 4" EN CAM DE COMP. 832.54 1.00
01.09.01.02.1 PRUEBA HIDRAULICA 329.60 103.00
01.09.01.02.1 SERVICIO DE INSTALACION DE SIST. DE RETORNO 11,845.00 103.00
01.09.01.03 SISTEMA DE ASPIRACION DE PISCINA 16,478.47 0.00
01.09.01.03.0 SUM E INST. DE TUB. PVC SAP C-10 2" 1,004.08 88.00
01.09.01.03.0 SUM E INSTAL DE CODO PVC SAP 2" 77.14 7.00
01.09.01.03.0 SUM E INST. DE BOQUILLAS DE ASPIRACION 2" 1,189.44 2.00
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

01.09.01.03.0 SUMINISTRO DE EQUIPO PARA LIMPIEZA 3,806.21 1.00


01.09.01.03.0 PRUEBA HIDRAULICA 281.60 88.00
01.09.01.03.0 SERVICIO DE INSTALACION DE SISTEMA DE ASPIRACION EN PISCINA 10,120.00 88.00
01.09.02 INSTALACIONES EN SALA DE MAQUINAS 90,639.43 0.00
01.09.02.01 SUM E INSTALACION DE FILTROS 46,011.18 3.00
01.09.02.02 SUM. E INST. DE ELECTRO BOMBAS 31,268.94 3.00
01.09.02.03 SUM Y COLOC. DE TABLERO DE CONTROL P/FUNCIONAM. DE BOMBAS 6,081.98 1.00
01.09.02.04 SUM Y COLOC. DE EQUIPO P/LLENADO AUTOMATICO 2,427.33 1.00
01.09.02.05 SUMINISTRO Y COLOCACION DE BOMBA DE ACHIQUE 4,850.00 1.00
01.10 DESINFECCION Y CONTROL QUIMICO 11,000.00 0.00
01.10.01 SUM E INST. DE SIST. DE CLORACION A GAS 11,000.00 1.00
01.11 INSTALACIONES ELECTRICAS 58,706.11 0.00
01.11.01 ILUMINACION SUB ACUATICA 33,899.00 0.00
01.11.01.01 SUM Y COLOCACI. DE REFLECTOR SUB ACUATICO 33,899.00 10.00
01.11.02 ILUMINACION EXTERIOR 24,807.11
01.11.02.01 OBRAS PRELIMINARES 197.40 0.00
01.11.02.01.0 TRAZO Y REPLANTEO P/ALUMBRADO 197.40 60.00
01.11.02.02 MOVIMIENTO DE TIERRAS 923.49 0.00
01.11.02.02.0 EXCAV. DE ZANJAS P/POSTES INCLUY. ZANJA P/CABLES 412.37 17.60
01.11.02.02.0 RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/AGU 256.68 12.00
01.11.02.02.0 ELIMIN. DE MAT. MANUAL/VOLQ. 4M3 DM 5KM 254.44 8.40
01.11.02.03 OBRAS DE CONCRETO SIMPLE 2,284.78 0.00
01.11.02.03.0 CONCRETO C:H 1:12 E=2" -SOLADO 78.12 4.00
01.11.02.03.0 CONCRETO F'C=140 KG/CM2 P/BASE DE POSTE 2,206.66 4.80
01.11.02.04 ALIMENTACION ELECTRICA 3,187.32 0.00
01.11.02.04.0 ALIMENTADOR A POSTE CABLE CABLE NYY 1X16 MM2-TUBO 20MM. 2,753.10 105.00
01.11.02.04.0 EMPALMES 3M-O-P/6MM2 NYY 434.22 6.00
01.11.02.05 CAJAS DE DERIVACION 408.96 0.00
01.11.02.05.0 CAJA DE DERIVACION 300X150 MM 408.96 4.00
01.11.02.06 ARTEFACTOS DE ILUMNACION 9,891.84 0.00
01.11.02.06.0 RFLECTOR BIH-100RS V.S. 400W E40 9,891.84 8.00
01.11.02.07 VARIOS 7,913.32 0.00
01.11.02.07.0 POSTE DE 13 M /400 /180 /380 CAC 5,743.84 4.00
01.11.02.07.0 SOPORTE METALICO P /REFLECTOR S/DISEO 669.48 4.00
01.11.02.07.0 PRUEBA DE CONTINUIDAD YC/EQUIPOS ENCENDIDOS 1,500.00 1.00
01.12 EQUIPAMIENTO DE COMPETENCIA 305,652.19 0.00
01.12.01 PROVISION E INST. DE ARANDIVELES DE COMPETENCIA 53,062.40 8.00
01.12.02 PROVISION E INST. DE BANCOS DE SALIDA DE 42,404.22 6.00
01.12.03 PROVISION E INST. DE TEBLERO ELECTRONICO DE RESULTADOS 201,600.00 1.00
01.12.04 PROV. E INST. DE KIT DE SEALIZACION-ESTILO ESPALDA-2 LINEAS -4 P 3,337.00 1.00
01.12.05 ANCLAJES PARA ARANDIVELES DE COMPETENCIA 2,341.92 10.00
01.12.06 PROV. E INST. DE KIT PARA FALSA SALIDA-1 LINEA 02 POSTES 2,906.65 1.00
01.13 INSTALACIONES ELECTRICAS 28,225.05 0.00
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

01.13.01 TRAZO NIVELES Y REPLANTEO 500.08 0.00


01.13.02 EXCAVACION DE ZANJAS HASTA H=1.50M 1,923.41 0.00
01.13.03 REFINE NIVELACION Y CONFORMACION DE FONDOS 674.88 0.00
01.13.04 CAMA DE ARENA PARA TUBERIAS 545.83 0.00
01.13.05 TUBERIA PVC SEL(ELECTRICAS) D=1" 492.48 0.00
01.13.06 TUBERIA PVC SEL (ELECTRICAS) D=4" 893.00 0.00
01.13.07 RELLENO CON MATERIAL PROPIO 2,862.54 0.00
01.13.08 TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN) 994.82 0.00
01.13.09 SALIDA PARA ALUMBRADO EN EXTERIOR 8,585.50 0.00
01.13.10 ALIMENTADOR TG 4,635.20 0.00
01.13.11 MEDIDOR DE ENERGIA (SUMINISTRO TRIFSICO PROVISIONAL) 6,117.31 1.00
COSTO DIRECTO: 1,049,268.02
1,049,268.02
INSTALACIONES ELECTRICAS Y MECANICAS
SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y
CAJAS DE PASE
SALIDA PARA CENTROS DE LUZ EN TECHO
SALIDA PARA CENTROS DE LUZ EN PARED
SALIDA PARA ALUMBRADO EN EXTERIORES
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T.
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR EN
TECHO
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y
MEDIDORES DE ENERGIA
TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN)
ALIMENTADOR TG
MEDIDOR DE ENERGIA (SUMINISTRO TRIFSICO PROVISIONAL)
CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm.
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A
MOD. AHR-2X36
LUMINARIA SUMERGIBLE DICROICO LED INCLUYE ACCESORIOS
POZO DE PUESTA A TIERRA
EQUIPO DE BOMBEO

.01.14 PARTIDAS NUEVAS


.01.14.01 COLOCACION DE JUNTA WATER STOP PARA PISCINA SEMIOLIMPICA
.01.14.01.01 COLOCACION DE JUNTA WATER STOP DE 12"
.01.14.01.02 COLOCACION DE JUNTA WATER STOP DE 6"
.01.14.02 GRADAS DE CONCRETO ARMADO, ACCESO A PISCINA SEMIOLIMPICA
.01.14.02.01 TRAZO NIVELES Y REPLANTEO
.01.14.02.02 EXCAVACION MANUAL DE ZANJAS
.01.14.02.03 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL
.01.14.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

.01.14.02.05 SOLADO C S 1:10 e= 10 cm


.01.14.02.06 ENCOFRADO Y DESENCOFRADO TRABAJADO PARA GRADAS
.01.14.02.07 ACERO f'y = 4200 kg/cm2, G 60
.01.14.02.08 CONCRETO F'C= 210 KG/CM2
.01.14.03 INSTALACIONES SANITARIAS
.01.14.03.01 SUMINISTRO DE AGUA
.01.14.03.01. TRAZO NIVELES Y REPLANTEO
.01.14.03.01. EXCAVACION MANUAL DE ZANJAS
.01.14.03.01. CAMA DE ARENA PARA TUBERIAS
.01.14.03.01. RELLENO Y COMPACTADO DE ZANJAS
.01.14.03.01. SUM E INST. DE TUB PVC 3"
.01.14.03.01. SUMINISTRO E INST DE TUB PVC C-10 2"
.01.14.03.01. SUM E INST DE CODO PVC SAP 3"X90
.01.14.03.01. SUM E INST. DE TEE PVC SAP 3"
.01.14.03.01. SUM E INST DE CODO PVC SAP 2"X90
.01.14.03.01. SUM E INST DE REDUCCION PVC SAP 3"-2"
.01.14.03.01.1 SUM E INST DE REDUCCION PVC SAP 2"-1"
.01.14.03.02 CANAL DE RECIRCULACION
.01.14.03.02. TRAZO NIVELES Y REPLANTEO
.01.14.03.02. EXCAVACION MANUAL DE ZANJAS
.01.14.03.02. RELLENO Y COMPACTADO DE ZANJAS
.01.14.03.02. SUM. E INST.DE TUB PVC SAL 315 mm
.01.14.03.02. CAMA DE ARENA PARA TUBERIAS
.01.14.04 INST. DE TUB. EN SISTEMA ELECTRONICO DE CONTROL DE TIEMPOS
.01.14.04.01 TRAZO NIVELES Y REPLANTEO
.01.14.04.02 EXCAVACION MANUAL DE ZANJAS
.01.14.04.03 RELLENO Y COMPACTADO DE ZANJAS
.01.14.04.04 SUMINISTRO E INST DE TUB PVC -SEL 1"
.01.14.04.05 SUMINISTRO E INST DE TUB PVC -SEL 2"
.01.14.05 INSTALACIONES ELECTRICAS Y SIST. DE ILUMINACION SUBACUATICA
.01.14.05.01 TRAZO NIVELES Y REPLANTEO
.01.14.05.02 EXCAVACION MANUAL DE ZANJAS
.01.14.05.03 RELLENO Y COMPACTADO DE ZANJAS
.01.14.05.04 TUBERIA PVC SEL (ELECTRICAS) D=2"
.01.14.05.05 CABLE N 10 THW
.01.14.05.06 PROVISION E INSTALACION DE MEDIDOR DE ELECTRICO
.01.14.06 CARPINTERIA METALICA CAMARA DE COMPENSACION
.01.14.06.01 TAPA METALICA DE 1.20 X 12.20 M

.01.14.07 CABINA DE SISTEMA DE CLORACION A GAS


.01.14.07.01 OBRAS PRELIMINARES
.01.17.01.01. TRAZO NIVELES Y REPLANTEO
.01.17.01.01. EXCAVACION MANUAL DE ZANJAS
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

.01.17.01.01. ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA


.01.14.07.02 MUROS Y TABIQUES DE ALBAILERIA
.01.14.07.02. MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
.01.14.07.02. TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA
.01.14.07.02. TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
.01.14.07.02. ENCOFR. Y DESENCOFR. DE ESC. DE ACCESO
.01.14.07.02. PISO PULIDO DE CONCRETO
.01.14.07.02. EMPEDRADO
.01.14.07.02. FALSO PISO DE 4" DE CONCRETO 1:06
.01.14.07.03 CARPINTERIA METALICA
.01.14.07.03. REJA METALICA TUBO GALVANIZADO 4"

.01.14.08 OTROS
.01.14.08.01 FRAGUADO EN ENCHAPADO DE CERAMICO CELESTE

.01.14.09 CABINA PARA JUECES DE COMPETENCIA


.01.14.09.01 TRABAJOS PRELIMINARES
.01.14.09.01. LIMPIEZA DE TERRENO MANUAL
.01.14.09.01. TRAZO, NIVELES Y REPLANTEO
.01.14.09.02 MOVIMIENTO DE TIERRAS
.01.14.09.02. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS Y CIM. CORRIDOS
.01.14.09.02. RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/AGU
.01.14.09.02. ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
.01.14.09.03 OBRAS DE CONCRETO SIMPLE
.01.14.09.03. CONCRETO C:H 1:12 E=2" -SOLADO
.01.14.09.03. CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
.01.14.09.03. ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
.01.14.09.03. CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M
.01.14.09.04 OBRAS DE CONCRETO ARMADO
.01.14.09.04. ZAPATAS
.01.14.09.04. CONCRETO EN ZAPATAS F'C= 210 KG/CM2
.01.14.09.04. ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
.01.14.09.04. CURADO DE ESTRUCTURAS DE CONCRETO
.01.14.09.04. COLUMNAS
.01.14.09.04. ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
.01.14.09.04. ENCOFRADO Y DESENCOFRADO EN COLUMNAS
.01.14.09.04. CONCRETO EN COLUMNAS F'C = 210 KG/CM2
.01.14.09.04. CURADO EN COLUMNAS
.01.14.09.04. VIGAS
.01.14.09.04. CONCRETO EN VIGAS F'C= 210 KG/CM2
.01.14.09.04. ENCOFRADO Y DESENCOFRADO DE VIGAS
.01.14.09.04. ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
.01.14.09.04. CURADO EN VIGAS
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

.01.14.09.04. LOSAS MACIZAS


.01.14.09.04. ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS
.01.14.09.04. ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS MACIZAS
.01.14.09.04. CONCRETO EN LOSAS MACIZAS F'C= 210 KG/CM2
.01.14.09.04. CURADO EN LOSAS MACIZAS
.01.14.09.05 ARQUITECTURA
.01.14.09.05. MUROS Y TABIQUES DE ALBAILERIA
.01.14.09.05. MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M
.01.14.09.05. REVOQUES Y REVESTIMIENTOS
.01.14.09.05. TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA
.01.14.09.05. TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
.01.14.09.05. TARRAJEO PRIMARIO EN EXTERIORES CEMENTO ARENA E=1.5 CM
.01.14.09.05. TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA
.01.14.09.05. TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
.01.14.09.05. TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA
.01.14.09.05. BRUADO DE 1/2"
.01.14.09.05. CIELORRASOS
.01.14.09.05. CIELORRASO EN INTERIORES CON MEZCLA DE CEMENTO -ARENA
.01.14.09.05. PISOS Y PAVIMENTOS
.01.14.09.05. EMPEDRADO DC/PIEDRA MEDIANA 6"
.01.14.09.05. FALSO PISO DE 4" DE CONCRETO 1:10
.01.14.09.05. PISO CERAMICO ANTIDESLIZANTE 0.30 X 0.30 m.
.01.14.09.05. FRAGUADO DE PISO ANTIDESLIZANTE
.01.14.09.05. PINTURA
.01.14.09.05. PINTURA LATEX PREMIUM SUPERMATE EN MUROS INTERIORES
.01.14.09.05. PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES
.01.14.09.05. PINTURA EN COLUMNAS
.01.14.09.05. PINTURA EN VIGAS
.01.14.09.05. PINTURA EN PUERTAS C/BARNIZ 2 MANOS
.01.14.09.05. PINTURA EN CIELO RASO CON LATEX LAVABLE
.01.14.09.05. CARPINTERIA DE MADERA
.01.14.09.05. PUERTAS DE MADERA TABLERO REBAJADO
.01.14.09.05. BANCA DE MADERA 3.00X0.45 M
.01.14.09.05. MESA DE MADERA 3.0 X 0.60 M
.01.14.09.05. CERRAJERIA
.01.14.09.05. BISAGRAS
.01.14.09.05. BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA
.01.14.09.05. CERRADURAS
.01.14.09.05. CERRADURA PARA PUERTA 02 GOLPES
.01.14.09.05. VIDRIOS CRISTALES Y SIMILARES
.01.14.09.05. VIDRIO INCOLORO C/ESTRUCT. DE ALUMINIO
.01.14.09.06 INSTALACIONES ELECTRICAS
.01.14.09.06. SALIDA DE ALUMBRADO, , TOMACORRIENTES, FUERZA Y CAJAS DE PASE
ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

.01.14.09.06. SALIDA DE TECHO C /TUB SEL CABLE TW 14 CAJAS LIVIANAS


.01.14.09.06. SALIDA DE PARED C/TUB SEL 3/4" CABLE TW 12 CAJAS LIVIANAS
.01.14.09.06. SALIDA PARA INTERRUPTOR SIMPLE C/TUB. PVC SEL 3/4" CABLE T
.01.14.09.06. ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
.01.14.09.06. ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILAR
.01.14.09.06. ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2X18W

.01.15 ALMACEN

.01.15.01 TRABAJOS PRELIMINARES

.01.15.01.01 LIMPIEZA DE TERRENO MANUAL

.01.15.01.02 TRAZO, NIVELES Y REPLANTEO

.01.15.02 MOVIMIENTO DE TIERRAS

.01.15.02.01 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS

.01.15.02.02 EXCAVACION PARA CIMIENTOS CORRIDOS

.01.15.02.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA

.01.15.03 OBRAS DE CONCRETO SIMPLE

.01.15.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.

.01.15.03.02 CONCRETO C:H 1:12 E=2" -SOLADO

.01.15.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m

.01.15.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M

.01.15.04 OBRAS DE CONCRETO ARMADO

.01.15.04.01 ZAPATAS

.01.15.04.01. CONCRETO EN ZAPATAS F'C= 210 KG/CM2

.01.15.04.01. ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS

.01.15.04.01. CURADO DE ESTRUCTURAS DE CONCRETO

.01.15.04.02 COLUMNAS

.01.15.04.02. ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS

.01.15.04.02. ENCOFRADO Y DESENCOFRADO EN COLUMNAS

.01.15.04.02. CONCRETO EN COLUMNAS F'C = 210 KG/CM2

.01.15.04.02. CURADO EN COLUMNAS

.01.15.04.03 VIGAS

.01.15.04.03. CONCRETO EN VIGAS F'C= 210 KG/CM2

.01.15.04.03. ENCOFRADO Y DESENCOFRADO DE VIGAS

.01.15.04.03. ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS

.01.15.04.03. CURADO EN VIGAS

01.15.05 MUROS Y TABIQUES DE ALBAILERIA

01.15.05.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M

01.15.06 PISOS Y PAVIMENTOS

01.15.06.01 FALSO PISO DE 4" DE CONCRETO 1:10

01.15.07 CARPINTERIA METALICA

01.15.07.01 PUERTAS Y VENTANAS DE ESTRUCTURA METALICA

01.15.08 SALIDA DE ALUMBRADO, TOMACORRIENTES, FUERZA Y CAJAS DE PASE

01.15.08.01 SALIDA DE TECHO C /TUB SEL CABLE TW 14 CAJAS LIVIANAS


ITEM DESCRIPCION PPTO. EXP. TECNICO APROBADOPPTO. EJECUTADO

01.15.08.02 SALIDA PARA INTERRUPTOR SIMPLE C/TUB. PVC SEL 3/4" CABLE TWG 1

01.15.09 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS

01.15.09.01 ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A

01.15.10 COBERTURAS

01.15.10.01 COBERTURA CON PLANCHAS ONDULADAS DE POLICARBONATO 2.44m


1,049,268.02
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

Parcial(S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.)

85,510.66 0.00 95,057.85 9,547.19


977.74 0.00 651.00 1,080.66 62.00 102.92
1,001.30 0.00 651.00 1,106.70 62.00 105.40
12,398.05 0.00 66.16 16,352.77 16.00 3,954.72
59,469.90 0.00 0.00 166.60 61,768.62 6.20 2,298.71
7,217.28 0.00 240.00 9,021.60 48.00 1,804.32
4,446.38 0.00 280.76 5,727.50 62.80 1,281.12

19,268.87 0.00 28,119.60 8,850.73


949.26 0.00 117.00 1,423.89 39.00 474.63
801.45 0.00 195.00 801.45 0.00 0.00
1,702.49 0.00 193.20 2,015.12 29.97 312.63
2,908.64 0.00 225.70 3,349.39 29.70 440.75
2,323.27 0.00 244.03 3,431.06 78.79 1,107.78
6,254.88 0.00 371.37 8,872.09 109.55 2,617.21
4,328.88 0.00 403.27 8,226.61 191.07 3,897.73

74,455.06 0.00 92,262.59 17,807.53


49,432.50 0.00 0.00 252.00 49,827.96 2.00 395.46
4,146.35 0.00 0.00 281.00 4,566.28 25.84 419.93
6,203.80 0.00 710.12 11,262.50 318.96 5,058.71
14,672.41 0.00 709.30 26,605.84 318.14 11,933.43

148,456.42 0.00 0.00 171,684.10 23,227.68


44,921.65 0.00 0.00 4,477.53 49,385.79 4477.53 4,464.13
16,838.64 0.00 4236.30 19,275.17 535.50 2,436.53
5,394.32 0.00 196.56 6,026.53 20.62 632.21
22,688.69 0.00 44.67 24,084.09 2.59 1,395.40
87,115.49 0.00 0.00 6,557.45 93,350.18 6,234.69
24,509.87 0.00 6210.72 28,445.10 859.22 3,935.23
6,622.56 0.00 240.00 7,358.40 24.00 735.84
55,983.06 0.00 0.00 106.73 57,546.68 2.90 1,563.62
16,419.28 1,196.33 28,948.13 12,528.85
2,748.00 0.00 1012.50 4,637.25 412.50 1,889.25
2,887.68 0.00 144.80 3,266.69 16.80 379.01
10,783.60 0.00 39.03 21,044.20 19.03 10,260.60
71,792.86 0.00 78,114.79 6,321.93
22,029.63 0.00 495.00 22,576.95 12.00 547.32
22,029.63 0.00 495.00 22,576.95 12.00 547.32
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

3,266.00 0.00 243.30 3,454.86 13.30 188.86


2,134.40 0.00 80.00 2,134.40 0.00 0.00
7,383.84 0.00 64.56 9,930.71 16.56 2,546.87
14,949.36 252.00 17,440.92 36.00 2,491.56

62,378.36 0.00 67,971.98 5,593.62

30,782.50 0.00 413.60 36,376.12 63.60 5,593.62


4,614.90 0.00 30.00 4,614.90 0.00 0.00
1,092.96 0.00 184.00 1,092.96 0.00 0.00
25,888.00 0.00 400.00 25,888.00 0.00 0.00

5,516.18 672.04 5,516.18 0.00


222.04 1.00 222.04 1.00 222.04 0.00
5,144.14 0.00 2.00 5,144.14 0.00 0.00
150.00 3.00 450.00 1.00 150.00 0.00
53.16 0.00 53.16 0.00
53.16 0.00 3.72 53.16 0.00 0.00
177,581.07 0.00 214,422.04 36,840.97
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

86,941.64 0.00 98,022.57 11,080.93


13,719.81 0.00 22,099.80 8,379.99

4,284.00 0.00 143.90 11,008.35 87.90 6,724.35


473.04 0.00 9.00 2,128.68 7.00 1,655.64
1,518.24 0.00 12.00 1,518.24 0.00 0.00
349.56 0.00 3.00 349.56 0.00 0.00
475.77 0.00 3.00 475.77 0.00 0.00
179.20 0.00 56.00 179.20 0.00 0.00
6,440.00 0.00 56.00 6,440.00 0.00 0.00
56,743.36 0.00 58,428.86 1,685.50

3,689.46 0.00 141.76 5,077.84 38.76 1,388.38


643.76 0.00 19.00 940.88 6.00 297.12
799.76 0.00 13.00 799.76 0.00 0.00
427.80 0.00 15.00 427.80 0.00 0.00
18,967.64 0.00 92.00 18,967.64 0.00 0.00
15,461.00 0.00 100.00 15,461.00 0.00 0.00
2,676.30 0.00 15.00 2,676.30 0.00 0.00
1,070.50 0.00 1.00 1,070.50 0.00 0.00
832.54 0.00 1.00 832.54 0.00 0.00
329.60 0.00 103.00 329.60 0.00 0.00
11,845.00 0.00 103.00 11,845.00 0.00 0.00
16,478.47 0.00 17,493.90 1,015.43

1,004.08 0.00 171.20 1,953.39 83.20 949.31


77.14 0.00 13.00 143.26 6.00 66.12
1,189.44 0.00 2.00 1,189.44 0.00 0.00
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

3,806.21 0.00 1.00 3,806.21 0.00 0.00


281.60 0.00 88.00 281.60 0.00 0.00
10,120.00 0.00 88.00 10,120.00 0.00 0.00
90,639.43 116,399.47 25,760.04

46,011.18 0.00 4.00 61,348.24 1.00 15,337.06


31,268.94 0.00 4.00 41,691.92 1.00 10,422.98
6,081.98 0.00 1.00 6,081.98 0.00 0.00
2,427.33 0.00 1.00 2,427.33 0.00 0.00
4,850.00 0.00 1.00 4,850.00 0.00 0.00
11,000.00 0.00 11,000.00 0.00
11,000.00 0.00 1.00 11,000.00 0.00 0.00
58,569.78 136.32 58,823.72 253.94
33,899.00 0.00 33,899.00 0.00

33,899.00 0.00 10.00 33,899.00 0.00 0.00


24,670.78 136.32 24,924.72 253.94
197.40 0.00 197.40 0.00

197.40 0.00 60.00 197.40 0.00 0.00


923.48 0.00 1,151.20 227.72 0.00

412.37 0.00 0.00 22.80 534.20 5.20 121.84


256.68 0.00 0.00 16.95 362.56 4.95 105.88
254.44 0.00 8.40 254.44 0.00 0.00
2,284.78 0.00 2,284.78 0.00

78.12 0.00 4.00 78.12 0.00 0.00


2,206.66 0.00 4.80 2,206.66 0.00 0.00
3,187.32 0.00 3,213.54 26.22

2,753.10 0.00 106.00 2,779.32 1.00 26.22


434.22 0.00 6.00 434.22 0.00 0.00
272.64 136.32 4.00 272.64 0.00

272.64 2.00 136.32 4.00 272.64 0.00


9,891.84 0.00 9,891.84 0.00

9,891.84 0.00 8.00 9,891.84 0.00 0.00


7,913.32 0.00 7,913.32 0.00

5,743.84 0.00 4.00 5,743.84 0.00 0.00


669.48 0.00 4.00 669.48 0.00 0.00
1,500.00 0.00 1.00 1,500.00 0.00 0.00
304,773.97 878.22 347,178.19 42,404.22
53,062.40 0.00 8.00 53,062.40 0.00 0.00
42,404.22 0.00 12.00 84,808.44 6.00 42,404.22
201,600.00 0.00 1.00 201,600.00 0.00 0.00
3,337.00 0.00 1.00 3,337.00 0.00 0.00
1,463.70 6.00 878.22 10.00 1,463.70 0.00
2,906.65 0.00 1.00 2,906.65 0.00 0.00
6,117.31 22,107.74 6,117.31
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

0.00 152.00 500.08 0.00 0.00


0.00 136.80 1,923.41 0.00 0.00
0.00 456.00 674.88 0.00 0.00
0.00 13.68 545.83 0.00 0.00
0.00 76.00 492.48 0.00 0.00
0.00 76.00 893.00 0.00 0.00
0.00 123.12 2,862.54 0.00 0.00
0.00 2.00 994.82 0.00 0.00
0.00 14.00 8,585.50 0.00 0.00
0.00 20.00 4,635.20 0.00 0.00
6,117.31 0.00 1.00 6,117.31 0.00 0.00
1,025,473.70 23,794.32 1,176,321.50 150,847.80

76,444.73
7,023.04
4,208.02
2,815.02
5,242.35
27.92
157.66
28.57
156.62
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

320.65
539.08
837.77
3,174.08
7,642.23
2,882.75
132.40
493.50
82.19
852.68
900.93
274.03
35.38
44.69
16.19
25.38
25.38
4,759.48
87.80
327.19
565.45
3,724.25
54.79
2,035.57
254.93
573.57
396.65
127.00
683.42
12,839.66
322.97
1,203.11
2,080.00
1,077.41
6,016.83
2,139.34
500.00
500.00

2,816.28
240.84
29.55
115.53
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

95.76
1,293.75
279.38
155.91
222.34
16.77
224.92
142.24
252.19
1,281.69
1,281.69

4,814.11
4,814.11

19,853.49
75.00
22.80
52.20
474.06
180.49
146.79
146.78
1,281.44
145.68
774.70
229.07
131.99
8,010.19
735.48
528.64
197.19
9.65
2,475.95
745.27
1,240.90
482.87
6.91
1,905.35
564.76
535.50
795.60
9.49
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

2,893.41
1,166.52
961.34
752.20
13.35
8,536.95
1,425.00
1,425.00
2,933.27
397.63
567.04
466.03
798.00
257.82
319.05
127.70
482.13
482.13
987.76
148.40
224.45
546.83
68.08
651.51
171.91
178.07
65.53
78.33
39.12
118.55
1,172.40
606.00
238.80
327.60
106.64
21.66
21.66
84.98
84.98
778.24
778.24
1,475.85
372.28
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

147.36
166.80
58.12
1,103.57
430.37
673.20

13,678.00
151.88
46.17
105.71
325.77
88.52
91.23
146.02
1,186.57
768.49
159.32
164.48
94.28
2,499.40
735.48
528.64
197.19
9.65
1,622.51
816.95
287.29
510.95
7.32
141.41
33.50
48.05
59.30
0.56
2,016.25
2,016.25
893.62
893.62
676.04
676.04
107.24
49.12
PPTO. EJECUTADO DEDUCTIVOS ejecutado total PPTO. MAYORES
METRADOS PART. NUEVAS

58.12
430.37
430.37
5,390.86
5,390.86

1,025,473.70 0.00 23,794.32 1,176,321.50 150,847.80 76,444.73


EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

Metrado Parcial(S/.)

95,057.85 14,743.07 85,510.65 7,044.48 0.00


651.00 1,080.66 0.00 910.91 977.74 977.74 102.92 0.00
651.00 1,106.70 0.00 3564.23 1,001.30 1001.30 105.40 0.00
66.16 16,352.77 0.00 12,398.05 12398.05 3,954.72 0.00
166.60 61,768.62 0.00 59,469.90 59469.90 0.00
240.00 9,021.60 0.00 7,217.28 7217.28 1,804.32 0.00
280.76 5,727.50 0.00 4,446.38 4446.38 1,077.12 0.00
0.00 8990.38 0.00 0.00
0.00 1277.55 0.00 0.00
28,119.60 0.00 1445.62 19,268.87 0.00 8,850.73 0.00
117.00 1,423.89 0.00 50.61 949.26 949.26 474.63 0.00
195.00 801.45 0.00 851.34 801.45 801.45 0.00 0.00
193.20 2,015.12 0.00 1,702.49 1702.49 312.63 0.00
225.70 3,349.39 0.00 2,908.64 2908.64 440.75 0.00
244.03 3,431.06 0.00 2,323.27 2323.27 1,107.78 0.00
371.37 8,872.09 0.00 6,254.88 6254.88 2,617.21 0.00
403.27 8,226.61 0.00 594.28 4,328.88 4328.88 3,897.73 0.00
0.00 3564.23 0.00 0.00
0.00 2595.43 0.00 0.00
0.00 157.23 0.00 0.00
92,262.59 0.00 74,455.06 18,633.42 0.00
252.00 49,827.96 0.00 3070.28 49,432.50 49432.50 0.00
281.00 4,566.28 0.00 1890.08 4,146.35 4146.35 1,641.28 0.00
710.12 11,262.50 0.00 6,203.80 6203.80 5,058.71 0.00
709.30 26,605.84 0.00 14,672.41 14672.41 11,933.43 0.00
0.00 1180.2 0.00 0.00
171,684.10 0.00 47679.12 148,456.42 23,358.16 0.00
49,385.79 0.00 47679.12 44,921.65 4,464.13 0.00
4,236.30 19,275.17 0.00 9578.45 16,838.64 16838.64 2,436.53 0.00
196.56 6,026.53 0.00 9839.6 5,394.32 5394.32 632.21 0.00
44.67 24,084.09 0.00 28261.07 22,688.69 22688.69 1,395.40 0.00
93,350.18 0.00 87,115.49 6,365.17 0.00
6,210.72 28,445.10 0.00 24,509.87 24509.87 3,935.23 0.00
240.00 7,358.40 0.00 6,622.56 6622.56 735.84 0.00
106.73 57,546.68 0.00 55,983.06 55983.06 1,694.10 0.00
28,948.13 0.00 16,419.28 12,528.85 0.00
1,012.50 4,637.25 0.00 2,748.00 2748.00 1,889.25 0.00
144.80 3,266.69 0.00 2,887.68 2887.68 379.01 0.00
39.03 21,044.20 0.00 10,783.60 10783.60 10,260.60 0.00
1,629.86 78,114.79 0.00 193140 71,792.86 6,321.93 0.00
495.00 22,576.95 0.00 31261.62 22,029.63 22029.63 547.32 0.00
495.00 22,576.95 0.00 27847.42 22,029.63 22029.63 547.32 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

243.30 3,454.86 0.00 2863.03 3,266.00 3266.00 188.86 0.00


80.00 2,134.40 0.00 2,134.40 2134.40 0.00 0.00
64.56 9,930.71 0.00 7,383.84 7383.84 2,546.87 0.00
252.00 17,440.92 0.00 14,949.36 14949.36 2,491.56 0.00
0.00 551.17 0.00 0.00
67,971.98 0.00 158035.11 62,378.36 5,593.62 0.00
0.00 107802.48 0.00 0.00
413.60 36,376.12 0.00 50232.63 30,782.50 36376.12 5,593.62 0.00
30.00 4,614.90 0.00 251.55 4,614.90 4614.90 0.00 0.00
184.00 1,092.96 0.00 1,092.96 1092.96 0.00 0.00
400.00 25,888.00 0.00 44861.45 25,888.00 25888.00 0.00 0.00
0.00 5471.05 0.00 0.00
0.00 1048.17 0.00 0.00
0.00 276.72 0.00 0.00
0.00 1886.97 0.00 0.00
0.00 1886.97 0.00 0.00
0.00 1886.97 0.00 0.00
4.00 5,516.18 0.00 1921.2 6,188.22 0.00 672.04
1.00 222.04 0.00 92.2 444.08 222.04 0.00 222.04
2.00 5,144.14 0.00 1744.8 5,144.14 5144.14 0.00 0.00
1.00 150.00 0.00 84.2 600.00 150.00 0.00 450.00
53.16 0.00 35.1 53.16 0.00 0.00
3.72 53.16 0.00 35.1 53.16 53.16 0.00 0.00
214,422.04 0.00 6224.79 177,581.07 36,840.97 0.00
0.00 1178.58 0.00 0.00
0.00 5046.21 0.00 0.00
0.00 8768.45 0.00 0.00
0.00 1672.8 0.00 0.00
0.00 1114.08 0.00 0.00
0.00 558.72 0.00 0.00
0.00 4877.5 0.00 0.00
0.00 260.6 0.00 0.00
0.00 45 0.00 0.00
0.00 168.52 0.00 0.00
0.00 47.08 0.00 0.00
0.00 4616.9 0.00 0.00
0.00 751.8 0.00 0.00
0.00 2225.68 0.00 0.00
0.00 913.08 0.00 0.00
0.00 68.8 0.00 0.00
0.00 68.8 0.00 0.00
0.00 108.12 0.00 0.00
0.00 108.12 0.00 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

0.00 46.04 0.00 0.00


0.00 166.16 0.00 0.00
0.00 160.3 0.00 0.00
0.00 2218.15 0.00 0.00
0.00 195.45 0.00 0.00
0.00 45 0.00 0.00
0.00 101.4 0.00 0.00
0.00 49.05 0.00 0.00
0.00 2022.7 0.00 0.00
0.00 842.3 0.00 0.00
0.00 883.6 0.00 0.00
0.00 35.86 0.00 0.00
0.00 39.86 0.00 0.00
0.00 99.28 0.00 0.00
0.00 121.8 0.00 0.00
0.00 197324.74 0.00 0.00
0.00 7000 0.00 0.00

0.00
190324.74 0.00 0.00
98,022.57 0.00 86,941.64 11,080.93 0.00
22,099.80 0.00 13,719.81 8,379.99 0.00
143.90 11,008.35 0.00 4,284.00 11008.35 6,724.35 0.00
9.00 2,128.68 0.00 473.04 2128.68 1,655.64 0.00
12.00 1,518.24 0.00 1,518.24 1518.24 0.00 0.00
3.00 349.56 0.00 349.56 349.56 0.00 0.00
3.00 475.77 0.00 475.77 475.77 0.00 0.00
56.00 179.20 0.00 179.20 179.20 0.00 0.00
56.00 6,440.00 0.00 6,440.00 6440.00 0.00 0.00
58,428.86 0.00 56,743.36 1,685.50 0.00
141.76 5,077.84 0.00 3,689.46 5077.84 1,388.38 0.00
19.00 940.88 0.00 643.76 940.88 297.12 0.00
13.00 799.76 0.00 799.76 799.76 0.00 0.00
15.00 427.80 0.00 427.80 427.80 0.00 0.00
92.00 18,967.64 0.00 18,967.64 18967.64 0.00 0.00
100.00 15,461.00 0.00 15,461.00 15461.00 0.00 0.00
15.00 2,676.30 0.00 2,676.30 2676.30 0.00 0.00
1.00 1,070.50 0.00 1,070.50 1070.50 0.00 0.00
1.00 832.54 0.00 832.54 832.54 0.00 0.00
103.00 329.60 0.00 329.60 329.60 0.00 0.00
103.00 11,845.00 0.00 11,845.00 11845.00 0.00 0.00
17,493.90 0.00 16,478.47 1,015.43 0.00
171.20 1,953.39 0.00 1,004.08 1953.39 949.31 0.00
13.00 143.26 0.00 77.14 143.26 66.12 0.00
2.00 1,189.44 0.00 1,189.44 1189.44 0.00 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

1.00 3,806.21 0.00 3,806.21 3806.21 0.00 0.00


88.00 281.60 0.00 281.60 281.60 0.00 0.00
88.00 10,120.00 0.00 10,120.00 10120.00 0.00 0.00
116,399.47 0.00 90,639.43 25,760.04 0.00
4.00 61,348.24 0.00 46,011.18 61348.24 15,337.06 0.00
4.00 41,691.92 0.00 31,268.94 41691.92 10,422.98 0.00
1.00 6,081.98 0.00 6,081.98 6081.98 0.00 0.00
1.00 2,427.33 0.00 2,427.33 2427.33 0.00 0.00
1.00 4,850.00 0.00 4,850.00 4850.00 0.00 0.00
11,000.00 0.00 11,000.00 0.00 0.00
1.00 11,000.00 0.00 11,000.00 11000.00 0.00 0.00
58,823.72 0.01 58,706.11 583.56 136.32
33,899.00 0.00 33,899.00 0.00 0.00
10.00 33,899.00 0.00 33,899.00 33899.00 0.00 0.00
24,924.72 0.01 24,807.11 583.56 136.32
197.40 0.00 197.40 0.00 0.00
60.00 197.40 0.00 197.40 197.40 0.00 0.00
1,151.20 0.01 923.49 557.34 0.00
22.80 534.20 0.00 412.37 534.21 333.17 0.00
16.95 362.56 0.00 256.68 362.56 224.17 0.00
8.40 254.44 0.00 254.44 254.44 0.00 0.00
2,284.78 0.00 2,284.78 0.00 0.00
4.00 78.12 0.00 78.12 78.12 0.00 0.00
4.80 2,206.66 0.00 2,206.66 2206.66 0.00 0.00
3,213.54 0.00 3,187.32 26.22 0.00
106.00 2,779.32 0.00 2,753.10 2779.32 26.22 0.00
6.00 434.22 0.00 434.22 434.22 0.00 0.00
272.64 0.00 408.96 0.00 136.32
4.00 272.64 0.00 408.96 272.64 0.00 136.32
9,891.84 0.00 9,891.84 0.00 0.00
8.00 9,891.84 0.00 9,891.84 9891.84 0.00 0.00
7,913.32 0.00 7,913.32 0.00 0.00
4.00 5,743.84 0.00 5,743.84 5743.84 0.00 0.00
4.00 669.48 0.00 669.48 669.48 0.00 0.00
1.00 1,500.00 0.00 1,500.00 1500.00 0.00 0.00
347,178.19 0.00 305,652.19 42,404.22 878.22
8.00 53,062.40 0.00 53,062.40 0.00 0.00 0.00
12.00 84,808.44 0.00 42,404.22 0.00 42,404.22 0.00
1.00 201,600.00 0.00 201,600.00 0.00 0.00 0.00
1.00 3,337.00 0.00 3,337.00 0.00 0.00 0.00
10.00 1,463.70 0.00 2,341.92 0.00 0.00 878.22
1.00 2,906.65 0.00 2,906.65 0.00 0.00 0.00
6,117.31 0.00 28,225.05 0.00 22,107.74
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

0.00 0.00 0.00 500.08 0.00 0.00 500.08


0.00 0.00 0.00 1,923.41 0.00 0.00 1,923.41
0.00 0.00 0.00 674.88 0.00 0.00 674.88
0.00 0.00 0.00 545.83 0.00 0.00 545.83
0.00 0.00 0.00 492.48 0.00 0.00 492.48
0.00 0.00 0.00 893.00 0.00 0.00 893.00
0.00 0.00 0.00 2,862.54 0.00 0.00 2,862.54
0.00 0.00 0.00 994.82 0.00 0.00 994.82
0.00 0.00 0.00 8,585.50 0.00 0.00 8,585.50
0.00 0.00 0.00 4,635.20 0.00 0.00 4,635.20
1.00 6,117.31 0.00 6,117.31 0.00 0.00 0.00
1,176,321.50 0.00 1049268.02 149,631.08 23,794.32
1,049,268.02
0.00 216274.44

0.00
1731.68
0.00 176.68
0.00 175.08
0.00 562.32
0.00 134.1
0.00 152.9
0.00 283.92

0.00
127.07
0.00 119.61

0.00
3121
0.00 582.47
0.00 1490.56
0.00 905.21
0.00 142.76
0.00 211421.76
0.00 8202.6
0.00 1600
0.00 1619.16
0.00 200000
76,444.73 0.00
7,023.04 7,023.04
53.66 4,208.02 4,208.02
54.00 2,815.02 2,815.02
5,242.35 0.00 5,242.35
10.78 27.92 0.00 27.92
7.84 157.66 0.00 157.66
10.78 28.57 0.00 28.57
10.19 156.62 0.00 156.62
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

10.80 320.65 0.00 320.65


9.57 539.08 0.00 539.08
123.93 837.77 0.00 837.77
5.88 3,174.08 0.00 3,174.08
7,642.23 0.00 7,642.23
2,882.75 2,882.75
51.12 132.40 0.00 132.40
24.54 493.50 0.00 493.50
2.04 82.19 82.19
51.12 852.68 0.00 852.68
37.87 900.93 0.00 900.93
19.70 274.03 0.00 274.03
2.00 35.38 0.00 35.38
1.00 44.69 0.00 44.69
1.00 16.19 16.19
2.00 25.38 25.38
2.00 25.38 25.38
4,759.48 4,759.48
33.90 87.80 87.80
16.27 327.19 327.19
33.90 565.45 565.45
33.90 3,724.25 0.00 3,724.25
1.36 54.79 0.00 54.79
2,035.57 2,035.57
98.43 254.93 254.93
23.78 573.57 573.57
23.78 396.65 396.65
19.33 127.00 127.00
79.10 683.42 683.42
12,839.66 12,839.66
124.70 322.97 322.97
49.88 1,203.11 1,203.11
124.70 2,080.00 2,080.00
124.70 1,077.41 1,077.41
1,057.44 6,016.83 6,016.83
1.00 2,139.34 2,139.34
500.00 500.00
1.00 500.00 0.00 500.00
0.00
2,816.28 0.00 2,816.28
240.84 240.84
6.70 29.55 29.55
4.79 115.53 115.53
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

6.23 95.76 95.76


1,293.75 1,293.75
4.47 279.38 0.00 279.38
8.94 155.91 0.00 155.91
8.94 222.34 0.00 222.34
0.47 16.77 16.77
6.70 224.92 0.00 224.92
6.70 142.24 142.24
6.70 252.19 252.19
1,281.69 0.00 1,281.69
6.17 1,281.69 0.00 1,281.69
0.00
4,814.11 4,814.11
496.30 4,814.11 4,814.11
0.00
19,853.49 0.00 19,853.49
75.00 0.00 75.00
20.00 22.80 0.00 22.80
20.00 52.20 0.00 52.20
474.06 0.00 474.06
7.34 180.49 0.00 180.49
6.99 146.79 0.00 146.79
9.55 146.78 0.00 146.78
1,281.44 0.00 1,281.44
7.90 145.68 0.00 145.68
3.74 774.70 0.00 774.70
6.42 229.07 0.00 229.07
0.49 131.99 0.00 131.99
8,010.19 0.00 8,010.19
735.48 0.00 735.48
1.20 528.64 0.00 528.64
36.72 197.19 0.00 197.19
1.20 9.65 0.00 9.65
2,475.95 0.00 2,475.95
150.56 745.27 0.00 745.27
27.60 1,240.90 0.00 1,240.90
0.86 482.87 0.00 482.87
0.86 6.91 0.00 6.91
1,905.35 0.00 1,905.35
1.18 564.76 0.00 564.76
10.03 535.50 0.00 535.50
175.63 795.60 0.00 795.60
1.18 9.49 0.00 9.49
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

2,893.41 0.00 2,893.41


16.61 1,166.52 0.00 1,166.52
194.21 961.34 0.00 961.34
1.66 752.20 0.00 752.20
1.66 13.35 0.00 13.35
8,536.95 0.00 8,536.95
1,425.00 0.00 1,425.00
22.80 1,425.00 0.00 1,425.00
2,933.27 0.00 2,933.27
22.80 397.63 0.00 397.63
22.80 567.04 0.00 567.04
22.80 466.03 0.00 466.03
22.80 798.00 0.00 798.00
8.39 257.82 0.00 257.82
10.03 319.05 0.00 319.05
25.49 127.70 0.00 127.70
482.13 0.00 482.13
16.84 482.13 0.00 482.13
987.76 0.00 987.76
6.99 148.40 0.00 148.40
6.99 224.45 0.00 224.45
6.99 546.83 0.00 546.83
6.99 68.08 0.00 68.08
651.51 0.00 651.51
22.80 171.91 0.00 171.91
22.80 178.07 0.00 178.07
8.39 65.53 0.00 65.53
10.03 78.33 0.00 78.33
4.05 39.12 0.00 39.12
16.84 118.55 0.00 118.55
1,172.40 0.00 1,172.40
2.02 606.00 0.00 606.00
1.00 238.80 238.80
1.00 327.60 327.60
106.64 0.00 106.64
21.66 0.00 21.66
3.00 21.66 0.00 21.66
84.98 0.00 84.98
1.00 84.98 0.00 84.98
778.24 778.24
21.54 778.24 778.24
1,475.85 0.00 1,475.85
372.28 0.00 372.28
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

3.00 147.36 0.00 147.36


3.00 166.80 0.00 166.80
1.00 58.12 0.00 58.12
1,103.57 0.00 1,103.57
1.00 430.37 0.00 430.37
2.00 673.20 0.00 673.20
0.00
13,678.00 0.00 13,678.00
151.88 0.00 151.88
40.50 46.17 0.00 46.17
40.50 105.71 0.00 105.71
325.77 0.00 325.77
3.60 88.52 0.00 88.52
3.71 91.23 0.00 91.23
9.50 146.02 0.00 146.02
1,186.57 0.00 1,186.57
3.71 768.49 0.00 768.49
8.64 159.32 0.00 159.32
4.61 164.48 0.00 164.48
0.35 94.28 0.00 94.28
2,499.40 0.00 2,499.40
735.48 0.00 735.48
1.20 528.64 0.00 528.64
36.72 197.19 0.00 197.19
1.20 9.65 0.00 9.65
1,622.51 0.00 1,622.51
165.04 816.95 0.00 816.95
6.39 287.29 0.00 287.29
0.91 510.95 0.00 510.95
0.91 7.32 0.00 7.32
141.41 0.00 141.41
0.07 33.50 0.00 33.50
0.90 48.05 0.00 48.05
13.09 59.30 0.00 59.30
0.07 0.56 0.00 0.56
2,016.25 0.00 2,016.25
32.26 2,016.25 0.00 2,016.25
893.62 0.00 893.62
27.83 893.62 0.00 893.62
676.04 0.00 676.04
8.44 676.04 0.00 676.04
107.24 0.00 107.24
1.00 49.12 0.00 49.12
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
PIP. VIABLE
ADICIONAL DEDUCTIV
S/.
PPTO. MODIFICADO MONTO DE EJECUTADO S/. O S/.
INVERSION S/. S/.

1.00 58.12 0.00 58.12


430.37 0.00 430.37
1.00 430.37 0.00 430.37
5,390.86 0.00 5,390.86
36.72 5,390.86 0.00 5,390.86
1,252,766.23 639,144.47 1,049,268.02 757,270.94 227,292.53 23,794.32
EXP. TECNICO
MODIF. S/,

92,555.13
1,080.66
1,106.70
16,352.77
59,469.90
9,021.60
5,523.50
0.00
0.00
28,119.60
1,423.89
801.45
2,015.12
3,349.39
3,431.05
8,872.09
8,226.61
0.00
0.00
0.00
93,088.48
49,432.50
5,787.63
11,262.51
26,605.84
0.00
171,814.58
49,385.78
19,275.17
6,026.53
24,084.09
93,480.66
28,445.10
7,358.40
57,677.16
28,948.13
4,637.25
3,266.69
21,044.20
78,114.79
22,576.95
22,576.95
EXP. TECNICO
MODIF. S/,

3,454.86
2,134.40
9,930.71
17,440.92
0.00
67,971.98
0.00
36,376.12
4,614.90
1,092.96
25,888.00
0.00
0.00
0.00
0.00
0.00
0.00
5,516.18
222.04
5,144.14
150.00
53.16
53.16
214,422.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EXP. TECNICO
MODIF. S/,

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
98,022.57
22,099.80
11,008.35
2,128.68
1,518.24
349.56
475.77
179.20
6,440.00
58,428.86
5,077.84
940.88
799.76
427.80
18,967.64
15,461.00
2,676.30
1,070.50
832.54
329.60
11,845.00
17,493.90
1,953.39
143.26
1,189.44
EXP. TECNICO
MODIF. S/,

3,806.21
281.60
10,120.00
116,399.47
61,348.24
41,691.92
6,081.98
2,427.33
4,850.00
11,000.00
11,000.00
59,153.35
33,899.00
33,899.00
25,254.35
197.40
197.40
1,480.83
745.54
480.85
254.44
2,284.78
78.12
2,206.66
3,213.54
2,779.32
434.22
272.64
272.64
9,891.84
9,891.84
7,913.32
5,743.84
669.48
1,500.00
347,178.19
53,062.40
84,808.44
201,600.00
3,337.00
1,463.70
2,906.65
6,117.31
EXP. TECNICO
MODIF. S/,

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,117.31
1,175,104.78
1,175,104.78
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7,023.04
4,208.02
2,815.02
5,242.35
27.92
157.66
28.57
156.62
EXP. TECNICO
MODIF. S/,

320.65
539.08
837.77
3,174.08
7,642.23
2,882.75
132.40
493.50
82.19
852.68
900.93
274.03
35.38
44.69
16.19
25.38
25.38
4,759.48
87.80
327.19
565.45
3,724.25
54.79
2,035.57
254.93
573.57
396.65
127.00
683.42
12,839.66
322.97
1,203.11
2,080.00
1,077.41
6,016.83
2,139.34
500.00
500.00
0.00
2,816.28
240.84
29.55
115.53
EXP. TECNICO
MODIF. S/,

95.76
1,293.75
279.38
155.91
222.34
16.77
224.92
142.24
252.19
1,281.69
1,281.69
0.00
4,814.11
4,814.11
0.00
19,853.49
75.00
22.80
52.20
474.06
180.49
146.79
146.78
1,281.44
145.68
774.70
229.07
131.99
8,010.19
735.48
528.64
197.19
9.65
2,475.95
745.27
1,240.90
482.87
6.91
1,905.35
564.76
535.50
795.60
9.49
EXP. TECNICO
MODIF. S/,

2,893.41
1,166.52
961.34
752.20
13.35
8,536.95
1,425.00
1,425.00
2,933.27
397.63
567.04
466.03
798.00
257.82
319.05
127.70
482.13
482.13
987.76
148.40
224.45
546.83
68.08
651.51
171.91
178.07
65.53
78.33
39.12
118.55
1,172.40
606.00
238.80
327.60
106.64
21.66
21.66
84.98
84.98
778.24
778.24
1,475.85
372.28
EXP. TECNICO
MODIF. S/,

147.36
166.80
58.12
1,103.57
430.37
673.20
0.00
13,678.00
151.88
46.17
105.71
325.77
88.52
91.23
146.02
1,186.57
768.49
159.32
164.48
94.28
2,499.40
735.48
528.64
197.19
9.65
1,622.51
816.95
287.29
510.95
7.32
141.41
33.50
48.05
59.30
0.56
2,016.25
2,016.25
893.62
893.62
676.04
676.04
107.24
49.12
EXP. TECNICO
MODIF. S/,

58.12
430.37
430.37
5,390.86
5,390.86
1,252,766.23
PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

01 SUB PRESUPUESTO PISCINA PATERA 249,962.40

01.01 TRABAJOS PRELIMINARES 2,376.51

01.01.01 LIMPIEZA DE TERRENO MANUAL m2


### 1.11 456.51

01.01.02 TRAZO, NIVELES Y REPLANTEO m2


### 3.75 1,920.00

01.02 MOVIMIENTO DE TIERRAS 5,785.90

01.02.01 CORTE DE TERRENO CON MAQUINARIA m3


### 4.42 49.06

01.02.02 CORTE DE TERRENO EN CANTERA PARA RELLENO


01.02.03 CARGUIO DE MATERIALN EN CANTERA PARA RELLENO
01.02.04 TRANSPORTE DE MATERIAL PARA RELLENO
01.02.05 RELLENO MASIVO CON MTONIV. RODILLO Y CISTERNA
01.02.06 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2
### 2.09 859.55

01.02.07 EXCAVACION MASIVA CAM, DE COMP Y CAM. DE BOMBAS


01.02.08 EXCAV. DE ZANJAS PARA CANAL DE REBOSE Y EVAC. DE AGUAS PLUVI.
01.02.09 EXCAVACION DE ZANJAS HASTA H=1.50M
01.02.10 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
01.02.11 ELIMINACION DE MATERIAL CON MAQUINA m3
### 6.98 83.76
TRAZO Y REPLANTEO DURANTE EL PROCESO m2
### 3.75 1,920.00
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3
### 40.09 2,214.17
RELLENO CON MATERIAL PROPIO m3
### 25.36 659.36

01.03 OBRAS DE CONCRETO SIMPLE 3,205.67

01.03.01 SOLADO C S 1:10 e= 10 cm


01.03.02 EMPEDRADO DC/PIEDRA MEDIANA 6"
01.03.03 FALSO PISO DE 4" CON MEZCLA 1:6 C:H
SOLADO PISCINA PATERA DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2
### 28.51 2,741.52
SOLADO GLORIETA TIPO 01 DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2
### 28.51 164.22

SOLADO GLORIETA TIPO 02 DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2


### 28.51 299.93

01.04 OBRAS DE CONCRETO ARMADO 245,414.32

01.04.01 CAMARAS DE COMPENSACION Y CASETA DE BOMBAS


01.04.01.01 ACERO fy= 4200 kg/cm2
01.04.01.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO
01.04.01.03 CONCRETO F'C= 210 KG/CM2
01.04.02 PISCINA 78,663.82

01.04.02.01 ACERO DE REFUERZO Fy=4200 Kg/cm2 kg


### 7.14 25,450.17

01.04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO m2


### 49.49 5,938.80

01.04.02.03 CONCRETO F'C= 210 KG/CM2 m3


### 546.53 47,274.85
CONCRETO ARMADO GLORIETA TIPO 01 11,077.71
ZAPATAS 2,137.14
CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3
### 546.53 1,574.01
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS kg
### 7.14 563.13
PLACAS DE CONCRETO 4,179.87
CONCRETO F'C= 210 KG/CM2 m3
### 546.53 1,000.15
ENCOFRADO Y DESENCOFRADO m2
### 49.49 974.46
PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

ACERO fy= 4200 kg/cm2 kg


### 7.14 2,205.26
LOSAS MACIZAS 4,255.35
CONCRETO F'C= 210 KG/CM2 m3
### 546.53 1,114.92
ENCOFRADO Y DESENCOFRADO m2
### 49.49 616.65
ACERO fy= 4200 kg/cm2 kg
### 7.14 2,523.78
PARAPETOS DE CONCRETO ARMADO 505.35
CONCRETO F'C= 210 KG/CM2 m3
### 546.53 174.89
ENCOFRADO Y DESENCOFRADO m2
### 49.49 228.64
ACERO fy= 4200 kg/cm2 kg
### 7.14 101.82
CONCRETO ARMADO GLORIETA TIPO 02 148,852.79
ZAPATAS 2,960.20
CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3
### 546.53 2,300.89
ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS kg
### 7.14 659.31
VIGAS DE CIMENTACION 3,214.29
ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION kg
### 7.14 2,205.26
ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2
### 91.34 577.27
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3
### 546.53 431.76
LOSAS MACIZAS 2,514.46
CONCRETO F'C= 210 KG/CM2 m3
### 546.53 825.26
ENCOFRADO Y DESENCOFRADO m2
### 49.49 373.65
ACERO fy= 4200 kg/cm2 kg
### 7.14 1,315.55
PARAPETOS DE CONCRETO ARMADO 505.35
CONCRETO F'C= 210 KG/CM2 m3
### 546.53 174.89
ENCOFRADO Y DESENCOFRADO m2
### 49.49 228.64
ACERO fy= 4200 kg/cm2 kg
### 7.14 101.82
COLUMNAS 128,701.45
ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS kg
### 7.14 4.64
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
### 49.49 524.59
CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3
### 546.53 128,172.22
VIGAS 4,137.04
CONCRETO EN VIGAS F'C= 210 KG/CM2 m3
### 564.31 1,185.05
ENCOFRADO Y DESENCOFRADO DE VIGAS m2
### 66.94 785.21
ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS kg
### 7.14 2,166.78
PRUEBAS DE LABORATORIO 6,820.00
ROTURA DE BRIQUETAS und
### 30.00 120.00
DISEO DE MEZCLAS DE CONCRETO und
### 1,350.00 2,700.00
ESTUDIO DE SUELOS PARA VERIFICACION DE CAPACIDAD PORTANTE und
### 2,000.00 4,000.00

01.04.03 CANALES DE REBOSE Y LIMPIA


01.04.03.01 ACERO DE REFUERZO Fy=4200 Kg/cm2
01.04.03.02 ENCOFRADO Y DESENC. DE CANALES
01.04.03.03 CONCRETO F'C= 210 KG/CM2
ARQUITECTURA 72,077.35

01.05 REVOQUES Y REVESTIMIENTOS 5,656.51


PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

01.05.01 TARRAJEO RAYADO IMPERMEABILIZADO m2


### 56.32 4,729.75

01.05.02 TARRAJEO IMPERMEABILIZADO EN MUROS Y LOSA


01.05.03 TARRAJEO PRIMARIO EN CANALES DE REBOSE Y DE RECIRCULACION m
### 21.12 591.36

01.05.04 MEDIA CAA DE TERRAZO INFERIOR EN PISINA


01.05.05 BORDE BOLEADO DE TERRAZO
01.05.06 ENCHAPE DE MUROS CON CERAMICA P/PISCINA
BRUADO DE 1/2" ML
### 5.59 335.40
PISOS Y PAVIMENTOS 43,278.92

01.06 PISOS
01.06.01 PISO DE TERRAZO m2
### 66.71 9,751.00

01.06.02 BRUADO DE 1/2"


01.06.03 PSO CERAMICO P/PISCINA 36 X 36 CM m2
### 90.73 32,753.53
PISO DE PEPELMA PARA PISCINA DE 2.5 CM X 2.5 CM DE COLOR m2
### 131.68 460.88
BORDE BOLEADO EN PISCINA ML
### 4.48 313.51
ZOCALOS Y CONTRAZOCALOS 3,317.02
ZOCALOS
ZOCALO DE PEPELMA PARA PISCINA DE 0.30 CM x 0.30 CM DE COLOR m2
### 131.68 3,317.02

01.07 CARPINTERIA METALICA 18,453.40

01.07.01 ESCALERA DE GATO CAMARA DE COMPENSACION


01.07.02 ESCALERA ACERO CROMADO PARA PISCINA und
### 436.20 872.40

01.07.03 BORDE BOLEADO DE TERRAZO


01.07.04 TAPA METALICA DE 0.80CM X 0.80CM
ESCALERA METALICA EN GLORIETA TIPO 02 MIRADOR und
### 2,536.20 2,536.20
BARANDA METALICA EN GLORIETA TIPO 01 und
### 1,236.20 1,236.20
BARANDA METALICA EN GLORIETA TIPO 02 GLORIETA und
### 1,236.20 1,236.20
PUENTE METALICO TIPO 01 ZONA PICNIC und
### 5,036.20 5,036.20
PUENTE METALICO TIPO 02 ZONA PISCINA PATERA RECREACIONAL und
### 7,536.20 7,536.20

01.08 PINTURA 1,371.50

01.08.01 PINTURA ANTICORROSIVA EN ELEMENTOS METALICOS


PINTURA EN CIELO RASO CON LATEX LAVABLE m2
### 20.38 481.38
PINTURA EN COLUMNAS m2
### 21.05 236.60
PINTURA EN ESTRUCTURA METALICA ML
### 11.67 653.52
INSTALACIONES SANITARIAS 8,768.45
SISTEMA GENERAL DE AGUA POTABLE 1,672.80
APARATOS Y ACCESORIOS SANITARIOS 1,672.80
DUCHA CROMADA pza
### 69.63 1,114.08
ACCESORIOS SANITARIOS pza
### 17.46 558.72
PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

SISTEMA GENERAL DE DESAGUE 4,877.50


MOVIMIENTO DE TIERRAS RED DE DESAGUE 260.60
TRAZO, NIVELES Y REPLANTEO EN RED DE DESAGE m
### 3.75 45.00
EXCAVACION DE ZANJA MANUAL 0.40x0.80m PROMEDIO ML
### 15.32 168.52
RELLENO Y APISONADO C/MATERIAL PROPIO ML
### 4.28 47.08
SISTEMA DE DESAGUE Y VENTILACION 4,616.90
SALIDA DE PVC SAL PARA DESAGUE DE 2" pto
### 62.65 751.80
SUM. E INST. TUBERIA DE 4" PVC SAL ML
### 25.88 2,225.68
SUM. E INST. TUBERIA DE 2" PVC SAL ML
### 21.74 913.08
SUM. E INST. DE CODO 4"x45 PVC AL-P, P/DESAGUE und
### 17.20 68.80
SUM. E INST. DE CODO 2"x45 PVC AL-P, P/DESAGUE und
### 17.20 68.80
SUM. E INST. DE YEE 4" PVC SAL-P, P/DESAGUE und
### 27.03 108.12
SUM. E INST. DE YEE CON REDUCCION DE 4"x2" PVC SAL-P, P/DESAGUE pza
### 27.03 108.12

SUM. E INST. DE YEE 2" PVC SAL-P, P/DESAGUE und


### 23.02 46.04
REGISTRO DE BRONCE CROMADO DE 4" pza
### 41.54 166.16
SUMIDERO CROMADO DE 2" und
### 80.15 160.30
SISTEMA GENERAL DE AGUA POTABLE 2,218.15
MOVIMIENTO DE TIERRAS RED DE AGUA 195.45
TRAZO, NIVELES Y REPLANTEO EN RED DE AGUA m
### 3.75 45.00
EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO ML
### 8.45 101.40
RELLENO Y APISONADO C/MATERIAL PROPIO ML
### 4.28 49.05
SISTEMA DE AGUA FRIA 2,022.70
SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto
### 84.23 842.30
SUMINISTRO E INSTALACIN TUBERIA DE 1/2" PVC SAP C-10 ML
### 16.08 883.60
SUM. E INST. DE CODO DE1/2"x90 PVC SAP und
### 17.93 35.86
SUM. E INST. DE CODO DE 1/2"x90 FG und
### 19.93 39.86
SUM. E INST. DE TEE DE 1/2"x1/2" PVC SAP und
### 24.82 99.28
VALVULA DE COMPUERTA DE BRONCE DE 1/2" pza
### 60.90 121.80

01.09 INSTALACIONES HIDRAULICAS 6,224.79


LIMPIEZA Y PRUEBA HIDRAULICA DE RED DE DESAGE GLB
### 1,178.58 1,178.58
LIMPIEZA, DESINFECCIN Y PRUEBA HIDRAULICA DE AGUA GLB
### 5,046.21 5,046.21
OTROS 197,324.74
REJILLA DE PLASTICO PARA CANALETAS DE PISCINA 0.25 M GLB
### 7,000.00 7,000.00
SISTEMA DE RECIRCULACION DE AGUA,LINEA GLB
### 190,324.74 190,324.74
FONDO,ASPIRACION,CANALETA
01.09.01 INSTALACIONES EXTERIORES
01.09.01.01 SISTEMA DE FONDO DE PISCINA
01.09.01.01.01 SUM. E INST. DE TUB. PVC SAP 3" ESPIGA CAMPPANA
01.09.01.01.02 SUM E INST. DE TEE PVC SAP 3"
01.09.01.01.03 SUM. E INST. DE CODO PVC -SAP 3" X 90
01.09.01.01.04 SUM E INST. DE SUMIDEROS
PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

01.09.01.01.05 PRUEBA HIDRAULICA


01.09.01.01.06 SERVICIO DE INSTALACION DE SISTEMA DE FONDO
01.09.01.02 SISTEMA DE RETORNO DE PISCINA
01.09.01.02.01 SUM E INST. DE TUB. PVC SAP C-10 2"
01.09.01.02.02 SUM E INSTAL DE CODO PVC SAP 2"
01.09.01.02.03 SUM E INST. DE TEE PVC 2" SAP
01.09.01.02.04 SUM. E INST. DE REJILLAS PARA CANALETA DE REBOSADERO
01.09.01.02.05 SUM. E INST. DE REJILLA PARA CANALETA DE DESAGE DE TERRAZA
01.09.01.02.06 SUM E INST. DE BOQUILLAS DE PISO 2"
01.09.01.02.07 SUM E INST. DE VALVULA ROMPE SIFON 1" EN CIRCUITO DE RETORNO
01.09.01.02.08 SUM E INST. DE PLATO VORTEX 4" EN CAM DE COMP.
01.09.01.02.09 PRUEBA HIDRAULICA
01.09.01.02.10 SERVICIO DE INSTALACION DE SIST. DE RETORNO
01.09.01.03 SISTEMA DE ASPIRACION DE PISCINA
01.09.01.03.01 SUM E INST. DE TUB. PVC SAP C-10 2"
01.09.01.03.02 SUM E INSTAL DE CODO PVC SAP 2"
01.09.01.03.03 SUM E INST. DE BOQUILLAS DE ASPIRACION 2"
01.09.01.03.04 SUMINISTRO DE EQUIPO PARA LIMPIEZA
01.09.01.03.05 PRUEBA HIDRAULICA
01.09.01.03.06 SERVICIO DE INSTALACION DE SISTEMA DE ASPIRACION EN PISCINAS
01.09.02 INSTALACIONES EN SALA DE MAQUINAS
01.09.02.01 SUM E INSTALACION DE FILTROS
01.09.02.02 SUM. E INST. DE ELECTRO BOMBAS
01.09.02.03 SUM Y COLOC. DE TABLERO DE CONTROL P/FUNCIONAM. DE BOMBAS
01.09.02.04 SUM Y COLOC. DE EQUIPO P/LLENADO AUTOMATICO
01.09.02.05 SUMINISTRO Y COLOCACION DE BOMBA DE ACHIQUE
01.10 DESINFECCION Y CONTROL QUIMICO
01.10.01 SUM E INST. DE SIST. DE CLORACION A GAS
01.11 INSTALACIONES ELECTRICAS
01.11.01 ILUMINACION SUB ACUATICA
01.11.01.01 SUM Y COLOCACI. DE REFLECTOR SUB ACUATICO
COSTO DIRECTO:
INSTALACIONES ELECTRICAS Y MECANICAS 216,872.06

SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y 2,329.30


CAJAS DE PASE
SALIDA PARA CENTROS DE LUZ EN TECHO pto
### 88.34 176.68

SALIDA PARA CENTROS DE LUZ EN PARED pto


### 87.54 175.08

SALIDA PARA ALUMBRADO EN EXTERIORES pto


### 140.58 1,124.64

SALIDA PARA INTERRUPTOR SIMPLE pto


### 67.05 268.20

SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto


### 76.45 76.45

SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto


### 141.96 141.96
PRESUPUESTO PIP
VIABLE
ITEM Descripcin
Und.
MetrPrecio (S/.) Parcial (S/.)

SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR EN pto


### 127.07 127.07
TECHO
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto
### 119.61 239.22

TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y 3,121.00


MEDIDORES DE ENERGIA
TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN) EQ
### 582.47 582.47

ALIMENTADOR TG m
### 186.32 1,490.56

MEDIDOR DE ENERGIA (SUMINISTRO TRIFSICO PROVISIONAL) GLB


### 905.21 905.21

CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm. pto


### 71.38 142.76

ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS 211,421.76

EQUIPO DE BOMBEO GLB


### 200,000.00 200,000.00

POZO DE PUESTA A TIERRA und


### 1,619.16 1,619.16

LUMINARIA SUMERGIBLE DICROICO LED INCLUYE ACCESORIOS und


### 160.00 1,600.00

ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A EQ


### 234.36 8,202.60
MOD. AHR-2X36
1.12 PARTIDAS NUEVAS

.01.12.01 COLOCACION DE JUNTA WATER STOP PARA PISCINA NIOS


.01.12.01.01 COLOCACION DE JUNTA WATER STOP DE 12"
.01.12.01.02 COLOCACION DE JUNTA WATER STOP DE 6"
.01.12.02 GRADAS DE CONCRETO CICLOPEO
.01.12.02.01 CONCRETO CICLOPEO fc = 175 kg / cm2+30% PM
.01.12.02.02 ENCOFRADO Y DESENCOFRADO TRABAJADO PARA MUROS RECTOS
.01.12.03 PISOS Y PAVIMENTOS
.01.12.03.01 FRAGUADO EN ENCHAPADO DE CERAMICO CELESTE
.01.12.04 INSTALACIONES ELECTRICAS EN SIST. DE ILUMINACION SUBACUATICA
.01.12.04.01 TRAZO NIVELES Y REPLANTEO
.01.12.04.02 EXCAVACION MANUAL DE ZANJAS
.01.12.04.03 RELLENO Y COMPACTADO DE ZANJAS
.01.12.04.04 TUBERIA PVC SEL (ELECTRICAS) D=2"
751,229.79
PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

908.31 540.66 908.31 0.00


m2 270.33 1.66 448.75 270.33 448.75 0.00 0.00 337.92
m2 270.33 1.70 459.56 270.33 459.56 0.00 0.00 337.92
21,861.84 0.00 21,861.84 0.00
m3 121.65 12.17 1,480.48 121.65 1,480.48 0.00 0.00 152.06
m3 158.14 12.17 1,924.56 158.14 1,924.56 0.00 0.00 266.77
m3 158.14 2.65 419.07 158.14 419.07 0.00 0.00 266.77
m3 158.14 11.54 1,824.94 158.14 1,824.94 0.00 0.00 266.77
m3 121.65 8.99 1,093.63 121.65 1,093.63 0.00 0.00 205.21
m2 270.33 4.11 1,111.06 270.33 1,111.06 0.00 0.00 273.61
m3 219.62 10.43 2,290.64 219.62 2,290.64 0.00 0.00 239.92
ML 108.00 14.84 1,602.72 108.00 1,602.72 0.00 0.00 128.34
m3 83.20 14.06 1,169.79 83.20 1,169.79 0.00 0.00 83.20
m3 130.63 23.89 3,120.75 130.63 3,120.75 0.00 0.00 134.86
m3 285.50 20.40 5,824.20 285.50 5,824.20 0.00 0.00 311.90

19,495.24 789.52 18,161.44 1,333.80


m2 311.86 16.25 5,067.73 229.78 3,733.93 82.08 1,333.80 229.78
m2 270.33 15.86 4,287.43 270.33 4,287.43 0.00 0.00 302.17
m2 270.33 37.51 10,140.08 270.33 10,140.08 0.00 0.00 302.17

58,781.75 58,528.33 253.41


14,849.46 14,849.46 0.00
kg 1,199.52 4.55 5,457.82 1,199.52 5,457.82 0.00 0.00 1486.44
m2 53.96 30.66 1,654.41 53.96 1,654.41 0.00 0.00 60.20
m3 14.35 539.18 7,737.23 14.35 7,737.23 0.00 0.00 14.35
32,857.00 1,706.45 32,603.58 253.41
kg 1,617.48 4.58 7,408.06 1,617.48 7,408.06 0.00 0.00 1809.54
m2 47.47 30.66 1,455.43 47.47 1,455.43 0.00 0.00 57.13
m3 44.50 539.18 23,993.51 44.03 23,740.10 0.47 253.41 44.03
PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

11,075.29 452.23 11,075.29 0.00


kg 366.00 4.58 1,676.28 366.00 1,676.28 0.00 0.00 659.25
m2 88.00 22.56 1,985.28 88.00 1,985.28 0.00 0.00 117.00
m3 13.75 539.18 7,413.73 13.75 7,413.73 0.00 0.00 24.93

30,831.93 30,831.94 0.00


PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

m2 213.12 45.61 9,720.40 213.12 9,720.40 0.00 0.00 222.78


m2 213.12 45.61 9,720.40 213.12 9,720.40 0.00 0.00 222.78
m 137.50 14.20 1,952.50 137.50 1,952.50 0.00 0.00 145.40
ML 51.72 26.68 1,379.89 51.72 1,379.89 0.00 0.00 51.72
m2 31.03 153.83 4,773.34 31.03 4,773.34 0.00 0.00 42.30
m2 47.47 69.21 3,285.40 47.47 3,285.40 0.00 0.00 61.42

30,848.01 30,848.01 0.00


m2 220.00 87.95 19,349.00 220.00 19,349.00 0.00 0.00 220.00
ML 131.00 5.94 778.14 131.00 778.14 0.00 0.00 131.00
m2 165.65 64.72 10,720.87 165.65 10,720.87 0.00 0.00 178.07

10,173.08 4,986.94 5,186.14


und 1.00 222.04 222.04 1.00 222.04 0.00 0.00 1.00
und 2.00 2,572.07 5,144.14 0.00 0.00 2.00 5,144.14 0.00
m2 30.00 153.83 4,614.90 30.00 4,614.90 0.00 0.00 31.03
und 1.28 150.00 192.00 1.00 150.00 0.28 42.00 1.00

32.58 32.58 0.00


m2 2.28 14.29 32.58 2.28 32.58 0.00 0.00 2.28
PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

111,144.28 568.71 111,144.28 0.00

46,264.89 562.71 46,264.89 0.00


4,067.01 84.81 4,067.01 0.00
ML 25.27 22.33 564.28 25.27 564.28 0.00 0.00 25.27
und 1.00 39.52 39.52 1.00 39.52 0.00 0.00 1.00
und 6.00 26.52 159.12 6.00 159.12 0.00 0.00 6.00
pza 2.00 158.59 317.18 2.00 317.18 0.00 0.00 2.00
PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

m 25.27 3.20 80.86 25.27 80.86 0.00 0.00 25.27


m 25.27 115.00 2,906.05 25.27 2,906.05 0.00 0.00 25.27
30,670.51 318.50 30,670.51 0.00
m 60.50 11.41 690.31 60.50 690.31 0.00 0.00 60.50
pza 13.00 11.02 143.26 13.00 143.26 0.00 0.00 13.00
und 7.00 15.32 107.24 7.00 107.24 0.00 0.00 7.00
m 52.00 206.17 10,720.84 52.00 10,720.84 0.00 0.00 52.00
m 54.00 154.61 8,348.94 54.00 8,348.94 0.00 0.00 54.00
und 9.00 178.42 1,605.78 9.00 1,605.78 0.00 0.00 9.00
und 1.00 1,070.50 1,070.50 1.00 1,070.50 0.00 0.00 1.00
und 1.00 832.54 832.54 1.00 832.54 0.00 0.00 1.00
m 60.50 3.20 193.60 60.50 193.60 0.00 0.00 60.50
ML 60.50 115.00 6,957.50 60.50 6,957.50 0.00 0.00 60.50
11,527.37 159.40 11,527.37 0.00
m 49.80 11.41 568.22 49.80 568.22 0.00 0.00 49.80
pza 7.00 11.02 77.14 7.00 77.14 0.00 0.00 7.00
pza 2.00 594.72 1,189.44 2.00 1,189.44 0.00 0.00 2.00
und 1.00 3,806.21 3,806.21 1.00 3,806.21 0.00 0.00 1.00
m 49.80 3.20 159.36 49.80 159.36 0.00 0.00 49.80
m 49.80 115.00 5,727.00 49.80 5,727.00 0.00 0.00 49.80
64,879.39 64,879.39 0.00
und 2.00 15,337.06 30,674.12 2.00 30,674.12 0.00 0.00 2.00
und 2.00 10,422.98 20,845.96 2.00 20,845.96 0.00 0.00 2.00
und 1.00 6,081.98 6,081.98 1.00 6,081.98 0.00 0.00 1.00
und 1.00 2,427.33 2,427.33 1.00 2,427.33 0.00 0.00 1.00
und 1.00 4,850.00 4,850.00 1.00 4,850.00 0.00 0.00 1.00
11,000.00 1.00 11,000.00 0.00
und 1.00 11,000.00 11,000.00 1.00 11,000.00 0.00 0.00 1.00
16,949.50 5.00 16,949.50 0.00
16,949.50 5.00 16,949.50 0.00
und 5.00 3,389.90 16,949.50 5.00 16,949.50 0.00 0.00 5.00
312,026.52 305,253.16 6,773.35
PRESUPUESTO EXP. TECNICO PPTO. EJECUTADO DEDUCTIVO
APROBADO
ejecutado total
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

ML 16.00 78.42
ML 50.75 52.13

m3 0.89 356.60
m2 1.76 44.23

m2 197.19 9.70

m 60.50 2.59
m3 24.20 20.11
m 60.50 16.68
m 60.50 8.64

312,026.52 305,253.16 6,773.35


METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

1,135.41 227.10 1,135.41


560.95 67.59 112.20 337.92 560.95 m2 411.27 m2 270.33 100.00%
574.46 67.59 114.90 337.92 574.46 m2 512.00 m2 270.33 100.00%
27,013.19 5,151.35 27,013.19
1,850.62 30.41 370.14 152.06 1,850.62 m3 11.10 m3 121.65 100.00%
3,246.59 108.63 1,322.02 266.77 3,246.59 0.00 m3 158.14 100.00%
706.94 108.63 287.87 266.77 706.94 0.00 m3 158.14 100.00%
3,078.52 108.63 1,253.59 266.77 3,078.52 0.00 m3 158.14 100.00%
1,844.82 83.56 751.18 205.21 1,844.82 0.00 m3 121.65 100.00%
1,124.54 3.28 13.48 273.61 1,124.54 m2 411.27 m2 270.33 100.00%
2,502.37 20.30 211.73 239.92 2,502.37 0.00 m3 219.62 100.00%
1,904.57 20.34 301.85 128.34 1,904.57 0.00 ML 108.00 100.00%
1,169.82 0.00 0.03 83.20 1,169.82 0.00 m3 83.20 100.00%
3,221.74 4.23 100.99 134.86 3,221.74 0.00 m3 130.63 100.00%
6,362.68 26.40 538.48 311.90 6,362.68 m3 12.00 m3 285.50 100.00%
m2 512.00

m3 55.23

m3 26.00

19,860.74 1,699.30 19,860.74


3,733.93 229.78 3,733.93 0.00 m2 311.86 100.00%
4,792.42 31.84 504.98 302.17 4,792.42 0.00 m2 270.33 100.00%
11,334.40 31.84 1,194.32 302.17 11,334.40 0.00 m2 270.33 100.00%
m2 96.16

5.76
m2

10.52
m2
69,224.49 10,696.15 69,224.49
16,346.27 1,496.80 16,346.27

6,763.30 286.92 1,305.49 1,486.44 6,763.30 0.00 kg 1,199.52 100.00%


1,845.73 6.24 191.32 60.20 1,845.73 0.00 m2 53.96 100.00%
7,737.23 0.00 0.00 14.35 7,737.23 0.00 m3 14.35 100.00%
33,779.52 1,175.93 33,779.52

8,287.69 192.06 879.63 1,809.54 8,287.69 kg 3,564.45 kg 1,617.48 100.00%


1,751.73 9.66 296.30 57.13 1,751.73 m2 120.00 m2 47.47 100.00%
23,740.10 44.03 23,740.10 m3 86.50 m3 44.50 100.00%
0.00
0.00

m3 2.88

kg 78.87
0.00

m3 1.83

m2 19.69
METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

kg 308.86
0.00

m3 2.04

m2 12.46

kg 353.47
0.00

m3 0.32

m2 4.62

kg 14.26
0.00
0.00

m3 4.21

kg 92.34
0.00

kg 308.86

m2 6.32

m3 0.79
0.00

m3 1.51

m2 7.55

kg 184.25
0.00

m3 0.32

m2 4.62

kg 14.26
0.00

kg 0.65

m2 10.60

m3 234.52
0.00

m3 2.10

m2 11.73

kg 303.47
0.00

und 4.00

und 2.00

und 2.00
19,098.70 8,023.42 19,098.70

3,019.37 293.25 1,343.09 659.25 3,019.37 0.00 kg 366.00 100.00%


2,639.52 29.00 654.24 117.00 2,639.52 0.00 m2 88.00 100.00%
13,439.82 11.18 6,026.09 24.93 13,439.82 0.00 m3 13.75 100.00%
0.00

34,525.06 3,693.12 34,525.06


METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

10,161.18 9.66 440.78 222.78 10,161.18 m2 83.98 m2 213.12 100.00%


10,161.18 9.66 440.78 222.78 10,161.18 0.00 m2 213.12 100.00%
2,064.68 7.90 112.18 145.40 2,064.68 m 28.00 m 137.50 100.00%
1,379.89 0.00 0.00 51.72 1,379.89 0.00 ML 51.72 100.00%
6,507.32 11.27 1,733.97 42.30 6,507.32 0.00 m2 31.03 100.00%
4,250.81 13.95 965.41 61.42 4,250.81 0.00 m2 47.47 100.00%
ML 60.00
0.00

31,652.07 804.07 31,652.07


19,349.00 0.00 0.00 220.00 19,349.00 m2 146.17 m2 220.00 100.00%
778.14 0.00 0.00 131.00 778.14 0.00 ML 131.00 100.00%
11,524.93 12.42 804.07 178.07 11,524.93 m2 361.00 m2 165.65 100.00%
m2 3.50

ML 69.98
0.00
0.00

25.19
m2
0.00
0.00
0.00
0.00
0.00

5,145.38 158.44 5,145.38


222.04 0.00 0.00 1.00 222.04 0.00 und 1.00 100.00%
0.00 0.00 0.00 0.00 0.00 und 2.00 und 2.00 100.00%
4,773.34 1.03 158.44 31.03 4,773.34 0.00 m2 30.00 100.00%
150.00 1.00 150.00 0.00 und 1.28 100.00%
und 1.00

und 1.00

und 1.00

und 1.00

und 1.00

32.58 0.00 32.58


32.58 0.00 0.00 2.28 32.58 0.00 m2 2.28 100.00%
m2 23.62

m2 11.24

ML 56.00
0.00
0.00
0.00

pza 16.00

pza 32.00
METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

0.00
0.00

m 12.00

ML 11.00

ML 11.00
0.00

pto 12.00

ML 86.00

ML 42.00

und 4.00

und 4.00

und 4.00

4.00
pza
und 2.00

pza 4.00

und 2.00
0.00
0.00

m 12.00

ML 12.00

ML 11.46
0.00

pto 10.00

ML 54.95

und 2.00

und 2.00

und 4.00

pza 2.00
0.00
0.00

111,144.28 0.00 111,144.28


GLB 1.00

GLB 1.00
0.00

GLB 1.00

1.00
GLB
46,264.89 0.00 46,264.89
4,067.01 0.00 4,067.01

564.28 0.00 0.00 25.27 564.28 ML 25.27 100.00%


39.52 0.00 0.00 1.00 39.52 und 1.00 100.00%
159.12 0.00 0.00 6.00 159.12 und 6.00 100.00%
317.18 0.00 0.00 2.00 317.18 pza 2.00 100.00%
METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

80.86 0.00 0.00 25.27 80.86 m 25.27 100.00%


2,906.05 0.00 0.00 25.27 2,906.05 m 25.27 100.00%
30,670.51 0.00 30,670.51

690.31 0.00 0.00 60.50 690.31 m 60.50 100.00%


143.26 0.00 0.00 13.00 143.26 pza 13.00 100.00%
107.24 0.00 0.00 7.00 107.24 und 7.00 100.00%
10,720.84 0.00 0.00 52.00 10,720.84 m 52.00 100.00%
8,348.94 0.00 0.00 54.00 8,348.94 m 54.00 100.00%
1,605.78 0.00 0.00 9.00 1,605.78 und 9.00 100.00%
1,070.50 0.00 0.00 1.00 1,070.50 und 1.00 100.00%
832.54 0.00 0.00 1.00 832.54 und 1.00 100.00%
193.60 0.00 0.00 60.50 193.60 m 60.50 100.00%
6,957.50 0.00 0.00 60.50 6,957.50 ML 60.50 100.00%
11,527.37 0.00 11,527.37

568.22 0.00 0.00 49.80 568.22 m 49.80 100.00%


77.14 0.00 0.00 7.00 77.14 pza 7.00 100.00%
1,189.44 0.00 0.00 2.00 1,189.44 pza 2.00 100.00%
3,806.21 0.00 0.00 1.00 3,806.21 und 1.00 100.00%
159.36 0.00 0.00 49.80 159.36 m 49.80 100.00%
5,727.00 0.00 0.00 49.80 5,727.00 m 49.80 100.00%
64,879.39 0.00 64,879.39

30,674.12 0.00 0.00 2.00 30,674.12 und 2.00 80.00%


20,845.96 0.00 0.00 2.00 20,845.96 und 2.00 80.00%
6,081.98 0.00 0.00 1.00 6,081.98 und 1.00 80.00%
2,427.33 0.00 0.00 1.00 2,427.33 und 1.00 80.00%
4,850.00 0.00 0.00 1.00 4,850.00 und 1.00 80.00%
11,000.00 0.00 11,000.00
11,000.00 0.00 0.00 1.00 11,000.00 und 1.00 80.00%
16,949.50 0.00 16,949.50
16,949.50 0.00 16,949.50

16,949.50 0.00 0.00 5.00 16,949.50 und 5.00 100.00%


327,682.70 0.00 22,429.54 327,682.70

2.00
pto
2.00
pto
8.00
pto
4.00
pto
1.00
pto
1.00
pto
METRADOS METRADOS

PART. EXP. TECNICO


PPTO. MODIFICADO PIP VIABLE
PPTO. MAYORES NUEVAS APROBADO
ejecutado total METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)
AVANCE
UND CANT. UND CANT.
FISICO

1.00
pto
2.00
pto
0.00

1.00
EQ
8.00
m
1.00
GLB
2.00
pto
0.00

1.00
GLB
1.00
und
10.00
und
35.00
EQ

3,900.32 3,900.32
1,254.72 1,254.72

2,645.60 2,645.60

395.21 395.21
317.37 317.37

77.84 77.84

1,912.74 1,912.74
1,912.74 1,912.74

2,175.22 2,175.22
156.70 156.70

486.66 486.66

1,009.14 1,009.14

522.72 522.72

327,682.70 22,429.54 8,383.49 336,066.19


EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

2,376.51 908.31 227.10


m2 67.59 m2 0.00 m2 337.92 456.51 448.75 448.75 112.20
m2 67.59 m2 0.00 m2 337.92 1,920.00 459.56 459.56 114.90
5,785.90 21,861.84 5,151.35
m3 30.41 m3 0.00 m3 152.06 49.06 1,480.48 1480.48 370.14
m3 108.63 m3 0.00 m3 266.77 0.00 1,924.56 1924.56 1,322.02
m3 108.63 m3 0.00 m3 266.77 0.00 419.07 419.07 287.87
m3 108.63 m3 0.00 m3 266.77 0.00 1,824.94 1824.94 1,253.59
m3 83.56 m3 0.00 m3 205.21 0.00 1,093.63 1093.63 751.18
m2 3.28 m2 0.00 m2 273.61 859.55 1,111.06 1111.06 13.48
m3 20.30 m3 0.00 m3 239.92 0.00 2,290.64 2290.64 211.73
ML 20.34 ML 0.00 ML 128.34 0.00 1,602.72 1602.72 301.85
m3 0.00 m3 0.00 m3 83.20 0.00 1,169.79 1169.79 0.03
m3 4.23 m3 0.00 m3 134.86 0.00 3,120.75 3120.75 100.99
m3 26.40 m3 0.00 m3 311.90 83.76 5,824.20 5824.20 538.48
1,920.00
2,214.17
659.36
3,205.67 19,495.24 1,699.30
m2 0.00 m2 82.08 m2 229.78 0.00 5,067.73 5067.73 0.00
m2 31.84 m2 0.00 m2 302.17 0.00 4,287.43 4287.43 504.98
m2 31.84 m2 0.00 m2 302.17 0.00 10,140.08 10140.08 1,194.32
2,741.52

164.22

299.93
245,414.32 58,781.75 10,696.15
0.00 14,849.46 1,496.80
kg 286.92 kg 0.00 kg 1,486.44 0.00 5,457.82 5457.82 1,305.49
m2 6.24 m2 0.00 m2 60.20 0.00 1,654.41 1654.41 191.32
m3 0.00 m3 0.00 m3 14.35 0.00 7,737.23 7737.23 0.00
78,663.82 32,857.00 1,175.93
kg 192.06 kg 0.00 kg 1,809.54 25,450.17 7,408.06 7408.06 879.63
m2 9.66 m2 0.00 m2 57.13 5,938.80 1,455.43 1455.43 296.30
m3 0.00 m3 0.47 m3 44.03 47,274.85 23,993.51 23993.51 0.00
11,077.71
2,137.14
1,574.01
563.13
4,179.87
1,000.15
974.46
EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

2,205.26
4,255.35
1,114.92
616.65
2,523.78
505.35
174.89
228.64
101.82
148,852.79
2,960.20
2,300.89
659.31
3,214.29
2,205.26
577.27
431.76
2,514.46
825.26
373.65
1,315.55
505.35
174.89
228.64
101.82
128,701.45
4.64
524.59
128,172.22
4,137.04
1,185.05
785.21
2,166.78
6,820.00
120.00
2,700.00
4,000.00
0.00 11,075.29 8,023.42
kg 293.25 kg 0.00 kg 659.25 0.00 1,676.28 1676.28 1,343.09
m2 29.00 m2 0.00 m2 117.00 0.00 1,985.28 1985.28 654.24
m3 11.18 m3 0.00 m3 24.93 0.00 7,413.73 7413.73 6,026.09
72,077.35
5,656.51 30,831.93 3,693.12
EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

m2 9.66 m2 0.00 m2 222.78 4,729.75 9,720.40 9720.40 440.78


m2 9.66 m2 0.00 m2 222.78 0.00 9,720.40 9720.40 440.78
m 7.90 m 0.00 m 145.40 591.36 1,952.50 1952.50 112.18
ML 0.00 ML 0.00 ML 51.72 0.00 1,379.89 1379.89 0.00
m2 11.27 m2 0.00 m2 42.30 0.00 4,773.34 4773.34 1,733.97
m2 13.95 m2 0.00 m2 61.42 0.00 3,285.40 3285.40 965.41
335.40
43,278.92
0.00 30,848.01 804.07
m2 0.00 m2 0.00 m2 220.00 9,751.00 19,349.00 19349.00 0.00
ML 0.00 ML 0.00 ML 131.00 0.00 778.14 778.14 0.00
m2 12.42 m2 0.00 m2 178.07 32,753.53 10,720.87 10720.87 804.07
460.88
313.51
3,317.02
0.00

3,317.02
0.00
0.00
0.00
0.00
0.00
18,453.40 10,173.08 158.44
und 0.00 und 0.00 und 1.00 0.00 222.04 222.04 0.00
und 0.00 und 2.00 und 0.00 872.40 5,144.14 5144.14 0.00
m2 1.03 m2 0.00 m2 31.03 0.00 4,614.90 4614.90 158.44
und 0.00 und 0.28 und 1.00 0.00 192.00 192.00 0.00
2,536.20
1,236.20
1,236.20
5,036.20
7,536.20
1,371.50 32.58 0.00
m2 0.00 m2 0.00 m2 2.28 0.00 32.58 32.58 0.00
481.38
236.60
653.52
8,768.45
1,672.80
1,672.80
1,114.08
558.72
EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

4,877.50
260.60
45.00
168.52
47.08
4,616.90
751.80
2,225.68
913.08
68.80
68.80
108.12

108.12
46.04
166.16
160.30
2,218.15
195.45
45.00
101.40
49.05
2,022.70
842.30
883.60
35.86
39.86
99.28
121.80
0.00
0.00
6,224.79 111,144.28 0.00 0.00
1,178.58
5,046.21
197,324.74
7,000.00

190,324.74
0.00 46,264.89 0.00
0.00 4,067.01 0.00
ML 0.00 ML 0.00 ML 25.27 0.00 564.28 564.28 0.00
und 0.00 und 0.00 und 1.00 0.00 39.52 39.52 0.00
und 0.00 und 0.00 und 6.00 0.00 159.12 159.12 0.00
pza 0.00 pza 0.00 pza 2.00 0.00 317.18 317.18 0.00
EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

m 0.00 m 0.00 m 25.27 0.00 80.86 80.86 0.00


m 0.00 m 0.00 m 25.27 0.00 2,906.05 2906.05 0.00
0.00 30,670.51 0.00
m 0.00 m 0.00 m 60.50 0.00 690.31 690.31 0.00
pza 0.00 pza 0.00 pza 13.00 0.00 143.26 143.26 0.00
und 0.00 und 0.00 und 7.00 0.00 107.24 107.24 0.00
m 0.00 m 0.00 m 52.00 0.00 10,720.84 10720.84 0.00
m 0.00 m 0.00 m 54.00 0.00 8,348.94 8348.94 0.00
und 0.00 und 0.00 und 9.00 0.00 1,605.78 1605.78 0.00
und 0.00 und 0.00 und 1.00 0.00 1,070.50 1070.50 0.00
und 0.00 und 0.00 und 1.00 0.00 832.54 832.54 0.00
m 0.00 m 0.00 m 60.50 0.00 193.60 193.60 0.00
ML 0.00 ML 0.00 ML 60.50 0.00 6,957.50 6957.50 0.00
0.00 11,527.37 0.00
m 0.00 m 0.00 m 49.80 0.00 568.22 568.22 0.00
pza 0.00 pza 0.00 pza 7.00 0.00 77.14 77.14 0.00
pza 0.00 pza 0.00 pza 2.00 0.00 1,189.44 1189.44 0.00
und 0.00 und 0.00 und 1.00 0.00 3,806.21 3806.21 0.00
m 0.00 m 0.00 m 49.80 0.00 159.36 159.36 0.00
m 0.00 m 0.00 m 49.80 0.00 5,727.00 5727.00 0.00
0.00 64,879.39 0.00
und 0.00 und 0.00 und 2.00 0.00 30,674.12 24539.30 0.00
und 0.00 und 0.00 und 2.00 0.00 20,845.96 16676.77 0.00
und 0.00 und 0.00 und 1.00 0.00 6,081.98 4865.58 0.00
und 0.00 und 0.00 und 1.00 0.00 2,427.33 1941.86 0.00
und 0.00 und 0.00 und 1.00 0.00 4,850.00 3880.00 0.00
0.00 11,000.00 0.00
und 0.00 und 0.00 und 1.00 0.00 11,000.00 8800.00 0.00
0.00 16,949.50 0.00
0.00 16,949.50 0.00
und 0.00 und 0.00 und 5.00 0.00 16,949.50 16949.50 0.00
0 0.00 0.00 0.00

216,872.06

2,329.30

176.68

175.08

1,124.64

268.20

76.45

141.96
EJECUCION NO REGISTRADA METRADOS EJECUCION NO REGISTRADA

EXPEDIENTE
METRADOS METRADOS EXPEDIENTE TECNICO
TECNICO
ADICIONALES DEDUCTIVOS APROBADO PPTO.
MODIFICADO PIP. VIABLE
ADICIONA
S/.
MONTO DE L S/.
EJECUTAD
UND CANT. UND CANT. UND CANT. INVERSION
O S/.
S/.

127.07

239.22

3,121.00

582.47

1,490.56

905.21

142.76

211,421.76

200,000.00

1,619.16

1,600.00

8,202.60

0.00
0.00 3,900.32
ML 16.00 ML 16.00 0.00 1,254.72
ML 50.75 ML 50.75 0.00 2,645.60
0.00 395.21
m3 0.89 m3 0.89 0.00 317.37
m2 1.76 m2 1.76 0.00 77.84
0.00 1,912.74
m2 197.19 m2 197.19 0.00 1,912.74
0.00 2,175.22
m 60.50 m 60.50 0.00 156.70
m3 24.20 m3 24.20 0.00 486.66
m 60.50 m 60.50 0.00 1,009.14
m 60.50 m 60.50 0.00 522.72
211,590.28 312,026.52 296,850.64 30,813.03
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 1,135.41
0.00 560.95
0.00 574.46
0.00 27,013.19
0.00 1,850.62
0.00 3,246.59
0.00 706.94
0.00 3,078.52
0.00 1,844.82
0.00 1,124.54
0.00 2,502.37
0.00 1,904.57
0.00 1,169.82
0.00 3,221.74
0.00 6,362.68

1,333.80 19,860.74
1,333.80 3,733.93
0.00 4,792.42
0.00 11,334.40

253.41 69,224.49
0.00 16,346.27
0.00 6,763.30
0.00 1,845.73
0.00 7,737.23
253.41 33,779.52
0.00 8,287.69
0.00 1,751.73
253.41 23,740.10
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 19,098.70
0.00 3,019.37
0.00 2,639.52
0.00 13,439.82

0.00 34,525.06
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 10,161.18
0.00 10,161.18
0.00 2,064.68
0.00 1,379.89
0.00 6,507.32
0.00 4,250.81

0.00 31,652.07
0.00 19,349.00
0.00 778.14
0.00 11,524.93

5,186.14 5,145.38
0.00 222.04
5,144.14 0.00
0.00 4,773.34
42.00 150.00

0.00 32.58
0.00 32.58
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 111,144.28

0.00 46,264.89
0.00 4,067.01
0.00 564.28
0.00 39.52
0.00 159.12
0.00 317.18
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 80.86
0.00 2,906.05
0.00 30,670.51
0.00 690.31
0.00 143.26
0.00 107.24
0.00 10,720.84
0.00 8,348.94
0.00 1,605.78
0.00 1,070.50
0.00 832.54
0.00 193.60
0.00 6,957.50
0.00 11,527.37
0.00 568.22
0.00 77.14
0.00 1,189.44
0.00 3,806.21
0.00 159.36
0.00 5,727.00
0.00 64,879.39
0.00 30,674.12
0.00 20,845.96
0.00 6,081.98
0.00 2,427.33
0.00 4,850.00
0.00 11,000.00
0.00 11,000.00
0.00 16,949.50
0.00 16,949.50
0.00 16,949.50
EJECUCION NO REGISTRADA

PPTO. DEDUCTIVO EXP. TECNICO


S/. MODIF. S/,

0.00 3,900.32
0.00 1,254.72
0.00 2,645.60
0.00 395.21
0.00 317.37
0.00 77.84
0.00 1,912.74
0.00 1,912.74
0.00 2,175.22
0.00 156.70
0.00 486.66
0.00 1,009.14
0.00 522.72
6,773.35 336,066.19
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

01 ATRIO DE INGRESO
ESTRUCTURAS

01.01 TRABAJOS PRELIMINARES


01.01.01 LIMPIEZA DE TERRENO MANUAL 18.20 1.66
01.01.02 TRAZO, NIVELES Y REPLANTEO 18.20 1.70
01.02 MOVIMIENTO DE TIERRAS
01.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO 1.00 5,286.36
01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS 11.71 23.89
01.02.03 EXCAVACION PARA CIMIENTOS CORRIDOS 5.22 23.89
01.02.04 RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/A 10.55 21.39
01.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA 22.01 23.89
CORTE DE TERRENO CON MAQUINARIA
NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL
ELIMINACION DE MATERIAL CON MAQUINA
DEMOLICION DE ESTRUCTURAS EXISTENTES

01.03 OBRAS DE CONCRETO SIMPLE


01.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. 5.22 197.73
01.03.02 CONCRETO C:H 1:12 E=2" -SOLADO 4.35 19.53
01.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m 5.22 22.56
01.03.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M 0.39 301.35
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 1.73 448.88
01.04.01.02 ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS 46.00 4.55
01.04.01.03 CURADO DE ESTRUCTURAS DE CONCRETO 1.73 7.32
01.04.02 COLUMNAS
01.04.02.01 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS 180.00 4.69
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 14.40 60.95
01.04.02.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 0.72 554.56
01.04.02.04 CURADO EN COLUMNAS 0.72 2.93
01.04.03 VIGAS
01.04.03.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 0.76 459.74
01.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS 6.30 70.47
01.04.03.03 ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS 155.00 4.67
01.04.03.04 CURADO EN VIGAS 0.76 2.93
01.04.04 LOSAS MACIZAS
01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS 27.00 69.57
01.04.04.02 ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS MACIZAS 210.00 5.09
01.04.04.03 CONCRETO EN LOSAS MACIZAS F'C= 210 KG/CM2 2.70 456.15
01.04.04.04 CURADO EN LOSAS MACIZAS 2.70 2.93
PLASTOFORMO 0.30 X0.15 X3.00 PARA LOSA ALIJERADA

01.04.05 PLACAS
01.04.06 ACERO DE REFUERZO Fy=4200 Kg/cm2 215.00 4.58
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

01.04.07 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO 3.12 30.66


01.04.08 CONCRETO F'C= 210 KG/CM2 3.12 539.18
ARQUITECTURA

01.05 MUROS Y TABIQUES DE ALBAILERIA


01.05.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M 31.99 56.81
01.06 REVOQUES Y REVESTIMIENTOS
01.06.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 63.98 17.25
01.06.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 63.98 23.55
01.06.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 14.40 29.84
01.06.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 6.30 37.47
01.06.05 BRUADO DE 1/2" 34.20 5.94
TARRAJEO EN MUROS EXISTENTES
TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA

01.07 CIELORRASOS
01.07.01 CIELORRASO EN INTERIORES CON MEZCLA DE CEMENTO -ARENA 27.00 27.90
01.08 PISOS Y PAVIMENTOS
01.08.01 EMPEDRADO DC/PIEDRA MEDIANA 6" 27.00 15.86
01.08.02 FALSO PISO DE 4" DE CONCRETO 1:10 27.00 37.51
01.08.03 PISO CERAMICO ANTIDESLIZANTE 0.30 X 0.30 m. 27.00 77.48
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CERAMICO 0.25X0.40 cm

01.09 CARPINTERIA DE MADERA


01.09.01 PUERTAS DE MADERA TABLERO REBAJADO 2.70 300.00
01.10 CARPINTERIA MADERA-METALICA Y HERRERIA
01.10.01 VENTANA METALICA SEGUN DISEO 0.90 82.04
01.10.02 PUERTA METALICA SEGUN DISEO 5.40 300.00
VENTANA DE ALUMINIO
REJA METALICA FACHADA (SEGUN DISEO)

01.11 CERRAJERIA
01.11.01 BISAGRAS
01.11.02 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA 3.00 7.15
01.11.03 CERRADURAS
01.11.03.01 CERRADURA CON MANIJAS A AMBOS LADOS 1.00 59.41
01.12 VIDRIOS, CRISTALES Y SIMILARES
01.12.01 VIDRIO INCOLORO 6 mm C/SISTEMA CORREDISO EN VENTANAS 0.90 178.52
ESPEJOS
VIDRIO INCOLORO 6 mm C/SISTEMA CORREDISO EN VENTANAS

01.13 PINTURA
01.13.01 PINTURA EN CIELO RASO CON LATEX LAVABLE 27.00 11.51
01.13.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES 63.98 12.28
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

01.13.03 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 5.40 31.10


PINTURA EN COLUMNAS
PINTURA LATEX PREMIUM SUPERMATE EN MUROS INTERIORES
PINTURA DE PUERTAS
PINTURA EN PUERTAS C/BARNIZ 2 MANOS

01.13.04 PINTURA EN ESTRUCTURA METALICA 6.30 15.20

01.14 SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZ


01.14.01 SALIDA DE TECHO C /TUB SEL CABLE TW 14 CAJAS LIVIANAS 7.00 48.38
01.14.02 SALIDA DE PARED C/TUB SEL 3/4" CABLE TW 14 CAJAS LIVIANAS 6.00 48.38
01.14.03 SALIDA PARA INTERRUPTOR SIMPLE C/TUB. PVC SEL 3/4" CABLE T 2.00 57.38
01.14.04 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. 2.00 81.92
SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR
EN TECHO
SALIDA PARA ALUMBRADO EN EXTERIORES
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA

01.15 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS


01.15.01 ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILAR 3.00 429.73
01.15.02 ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2X18 4.00 336.22

02 MURO PERIMETRICO
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL 116.32 1.66
02.01.02 TRAZO, NIVELES Y REPLANTEO 116.32 1.70
02.02 MOVIMIENTO DE TIERRAS
02.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO 1.00 5,286.36
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS 13.00 23.89
02.02.03 EXCAVACION PARA CIMIENTOS CORRIDOS 34.90 23.89
02.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL 34.90 4.11
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA 45.36 23.89
02.03 OBRAS DE CONCRETO SIMPLE
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

02.03.01 CONCRETO C:H 1:12 E=2" -SOLADO 34.90 19.53


02.03.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS 107.16 30.66
02.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. 62.81 197.73
02.03.04 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m 40.71 22.56
02.03.05 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M 4.07 301.35
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 5.62 448.88
02.04.01.02 ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS 170.00 4.55
02.04.01.03 CURADO DE ESTRUCTURAS DE CONCRETO 5.62 7.32
02.04.02 COLUMNAS
02.04.02.01 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS 760.00 4.69
02.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 78.80 60.95
02.04.02.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 3.94 554.56
02.04.02.04 CURADO EN COLUMNAS 3.94 2.93
02.04.03 VIGAS
02.04.03.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 7.62 459.74
02.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS 140.54 70.47
02.04.03.03 ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS 590.00 4.67
02.04.03.04 CURADO EN VIGAS 7.62 2.93
02.05 MUROS Y TABIQUES DE ALBAILERIA
02.05.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M 178.77 56.81
02.06 REVOQUES Y REVESTIMIENTOS
02.06.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 269.34 17.25
02.06.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 27.78 29.84
02.06.03 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 140.54 37.47
02.06.04 REVOQUE DE MURO TIPO ZAMPEADO 72.70 11.19
02.07 CARPINTERIA MADERA-METALICA Y HERRERIA
02.07.01 REJA METALICA C/TUB.MET. RECT. 2"X4" 75.50 202.19
02.08 INSTALACIONES ELECTRICAS
02.08.01 SALIDA DE TECHO C /TUB SEL CABLE TW 14 CAJAS LIVIANAS 24.00 48.38
02.08.02 SALIDA DE PARED C/TUB SEL 3/4" CABLE TW 14 CAJAS LIVIANAS 5.00 48.38
02.08.03 SALIDA PARA INTERRUPTOR SIMPLE C/TUB. PVC SEL 3/4" CABLE T 1.00 57.38
03 MURO DE CONTENCION
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL 168.00 1.66
03.01.02 TRAZO, NIVELES Y REPLANTEO 168.00 1.70
03.02 MOVIMIENTO DE TIERRAS
03.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO 1.00 5,286.36
03.02.02 CORTE EN TERRENO CON MAQUINARIA 273.00 4.67
03.02.03 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL 105.00 4.11
03.02.04 ELIMINACION DE MATERIAL CON MAQUINA 354.90 20.40
03.02.05 RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/A 147.84 21.39
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

03.03 OBRAS DE CONCRETO SIMPLE


03.03.01 CONCRETO C:H 1:12 E=2" -SOLADO 105.00 19.53
03.03.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO 59.60 30.66
03.03.03 CONCRETO CICLOPEO 1:10 +30% PG 35.80 197.73
03.03.04 CURADO DE ESTRUCTURAS DE CONCRETO 35.80 7.32
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 210 KG/CM2 65.60 539.18
03.04.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO 224.70 30.66
03.04.03 ACERO fy= 4200 kg/cm2 2,430.54 4.55
03.04.04 CURADO DE ESTRUCTURAS DE CONCRETO 65.60 7.32
04 AREA DE ESTACIONAMIENTO EXTERIOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL 629.66 1.66
04.01.02 TRAZO, NIVELES Y REPLANTEO 629.66 1.70
04.01.03 DEMOLICION DE VEREDAS 32.04 37.59
04.01.04 DEMOLICION DE PAVIMENTO RIGIDO 256.81 48.94
04.02 SARDINELES
04.02.01 TRAZO NIVELES Y REPLANTEO 82.71 3.29
04.02.02 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO 82.71 5.04
04.02.03 ENCOFRADO Y DESENCOFRADO DE SARDINELES 33.08 34.80
04.02.04 CONCRETO F'C=175KG/CM2 6.20 503.22
04.02.05 SELLADO DE JUNTAS CON ASFALTO 4.14 7.38
04.02.06 CURADO DE CONCRETO EN SARDINELES 82.71 0.73
04.02.07 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 4.84 23.89
04.03 VEREDAS
04.03.01 TRAZO, NIVELES Y REPLANTEO 162.34 1.70
04.03.02 NIVELACION Y COMPACTACION DE FONDO DE VEREDAS 162.34 6.16
04.03.03 EMPEDRADO DC/PIEDRA MEDIANA 6" 162.34 15.86
04.03.04 CONCRETO F'C= 140 KG/CM2 P/VEREDAS E=0.08 m PASTA C:A 1:2 12.99 430.72
04.03.05 SELLADO DE JUNTAS CON ASFALTO 25.20 7.38
04.03.06 CURADO DE VEREDAS 162.34 0.73
04.03.07 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 16.88 23.89
04.11 ILUMINACION
04.11.01 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO 47.04 5.04
04.11.02 TENDIDO Y COLOC. DE TUB PVC SEL 2" 47.04 6.38
04.11.03 INSTALACION DE CABLE NYY 3-1 X 16 mm. 47.04 30.26
04.11.04 RELLENO Y COMPACTADO DE ZANJAS 47.04 16.43
04.11.05 PROVISION E INSTALACION DE POSTES DE FG 6.00 377.03
04.11.06 PROVISION E INTALACION DE LUMINARIAS DE V DE M. DE 80 WATT 18.00 298.09
4.12 TRATAMIENTO DE AREAS VERDES
04.12.01 ACONDICIONAMIENTO DE AREAS VERDES 181.20 8.97
04.12.02 COLOCACION DE PLANTONES 23.00 47.11
4.13 SEALIZACION
PRESUPUESTO
ITEM Descripcin
Metrado Precio (S/.)

04.13.01 PINTURA SOBRE EL PAVIMENTO DE 0.50 M DE ANCHO 35.00 11.93


04.13.02 SEALIZACION INFORMATIVA VERTICAL 4.00 400.00
COSTO DIRECTO:

.5.00 PARTIDAS NUEVAS


5.01. ATRIO DE INGRESO

5.01.01. TRABAJOS PRELIMINARES

5.01.01.01 DEMOLICION DE VEREDAS 14.40 37.67

5.01.02 CONCRETO ARMADO

5.01.02.01 PLACAS DE CONCRETO ARMADO EN PUERTA DE INGRESO

5.01.02.01.01 ACERO f'y = 4200 kg/cm2, G 60 TRABAJADO PARA MUROS RECT 300.32 5.92

5.01.02.01.02 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTOS 21.00 46.75

5.01.02.01.03 CONCRETO F'C= 210 KG/CM2 2.45 539.81

5.01.03 ARQUITECTURA

5.01.03.01 REVOQUES Y REVESTIMIENTOS

5.01.03.01.01 PISO DE TERRAZO DE E=2 CM 31.24 88.87

5.01.03.01.02 FRAGUADO DE PISO ANTIDESLIZANTE 4.41 9.74

5.01.04 OTROS

5.01.04.01 LETRERO PARA PUERTA PRINCIPAL 1.00 477.57

5.01.04.02 CASILLERO DE LLAVES 1.00 275.20

5.01.04.03 PLACA RECORDATORIA 1.00 500.00


5.02 MURO PERIMETRICO
5.02.01 ARQUITECTURA
5.02.01.01 REVOQUES Y REVESTIMIENTOS
5.02.01.01.01 TARRAJEO ESCARCHADO EN EXTERIORES 107.59 10.68
5.02.01.02 PINTURA
5.02.01.02.01 MURAL ARTISTICO 70.00 366.67
5.02.01.02.02 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORE 279.94 7.81
5.02.01.02.03 PINTURA EN REJA METALICA 52.90 40.87
5.02.01.02.04 PINTURA EN COLUMNAS 19.01 7.81
5.02.01.02.05 PINTURA EN VIGA Y ALERO 100.56 14.44
5.02.01.02.06 PINTURA EN MURO REVOQUE C/BARNIZ 60.09 14.11
5.02.01.02.07 PINTURA OLEO MATE EN ALERO 8.33 21.52
5.02.02 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2 32.00 336.60
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

36,676.51 33,355.74 3,320.77

61.15 61.15 0.00


30.21 18.20 30.21 0.00 0.00 21.00
30.94 18.20 30.94 0.00 0.00 21.00
6,442.30 0.00 6,442.30 0.00
5,286.36 1.00 5,286.36 0.00 0.00 1.00
279.75 11.71 279.75 0.00 0.00 14.64
124.71 5.22 124.71 0.00 0.00 7.83
225.66 10.55 225.66 0.00 0.00 10.55
525.82 22.01 525.82 0.00 0.00 29.21

1,352.40 0.00 1,352.40 0.00


1,032.15 5.22 1,032.15 0.00 0.00 6.62
84.96 4.35 84.96 0.00 0.00 5.22
117.76 5.22 117.76 0.00 0.00 5.22
117.53 0.39 117.53 0.00 0.00 0.39
11,590.64 0.00 11,590.65 0.00
998.52 0.00 998.53 0.00
776.56 1.73 776.56 0.00 0.00 1.73
209.30 46.00 209.30 0.00 0.00 55.08
12.66 1.73 12.66 0.00 0.00 1.73
2,123.27 0.00 2,123.27 0.00
844.20 180.00 844.20 0.00 0.00 202.86
877.68 14.40 877.68 0.00 0.00 18.00
399.28 0.72 399.28 0.00 0.00 1.13
2.11 0.72 2.11 0.00 0.00 1.13
1,519.44 0.00 1,519.44 0.00
349.40 0.76 349.40 0.00 0.00 1.10
443.96 6.30 443.96 0.00 0.00 7.56
723.85 155.00 723.85 0.00 0.00 205.56
2.23 0.76 2.23 0.00 0.00 1.10
4,186.81 0.00 4,186.81 0.00
1,878.39 27.00 1,878.39 0.00 0.00 27.00
1,068.90 210.00 1,068.90 0.00 0.00 261.00
1,231.61 2.70 1,231.61 0.00 0.00 3.24
7.91 2.70 7.91 0.00 0.00 3.24

2,762.60 0.00 2,762.60 0.00


984.70 215.00 984.70 0.00 0.00 284.22
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

95.66 3.12 95.66 0.00 0.00 12.24


1,682.24 3.12 1,682.24 0.00 0.00 3.17

1,817.35 0.00 1,817.35 0.00


1,817.35 31.99 1,817.35 0.00 0.00 36.28
3,479.30 0.00 3,479.29 0.00
1,103.66 63.98 1,103.66 0.00 0.00 72.56
1,506.73 63.98 1,506.73 0.00 0.00 72.56
429.70 14.40 429.70 0.00 0.00 18.00
236.06 6.30 236.06 0.00 0.00 7.56
203.15 34.20 203.15 0.00 0.00 34.20

753.30 0.00 753.30 0.00


753.30 27.00 753.30 0.00 0.00 27.00
3,532.95 0.00 1,692.03 1,840.92
428.22 27.00 428.22 0.00 0.00 69.21
1,012.77 27.00 1,012.77 0.00 0.00 69.21
2,091.96 3.24 251.04 23.76 1,840.92 3.24

810.00 0.00 810.00 0.00


810.00 2.70 810.00 0.00 0.00 2.70
1,693.84 0.00 1,620.00 73.84
73.84 0.00 0.00 0.90 73.84 0.00
1,620.00 5.40 1,620.00 0.00 0.00 5.40

80.86 0.00 80.86 0.00


21.45 0.00 21.45 0.00
21.45 3.00 21.45 0.00 0.00 3.00
59.41 0.00 59.41 0.00
59.41 1.00 59.41 0.00 0.00 1.00
160.67 0.00 0.00 160.67
160.67 0.00 0.00 0.90 160.67 0.90

1,360.14 0.00 1,346.46 13.68


310.77 27.00 310.77 0.00 0.00 27.00
785.67 63.98 785.67 0.00 0.00 72.56
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

167.94 5.40 167.94 0.00 0.00 5.40

95.76 5.40 82.08 0.90 13.68 5.40

907.54 0.00 535.34 372.20


338.66 7.00 338.66 0.00 0.00 7.00
290.28 0.00 0.00 6.00 290.28
114.76 2.00 114.76 0.00 0.00 2.00
163.84 1.00 81.92 1.00 81.92 1.00

2,634.07 0.00 1,774.61 859.46


1,289.19 1.00 429.73 2.00 859.46 1.00
1,344.88 4.00 1,344.88 0.00 0.00 5.00

95,102.18 92,217.09 2,885.08


390.83 390.84 0.00
193.09 116.32 193.09 0.00 0.00 150.00
197.74 116.32 197.74 0.00 0.00 150.00
7,657.78 0.00 5,014.60 2,643.18
5,286.36 0.50 2,643.18 0.50 2,643.18 0.50
310.57 13.00 310.57 0.00 0.00 24.19
833.76 34.90 833.76 0.00 0.00 36.00
143.44 34.90 143.44 0.00 0.00 36.00
1,083.65 45.36 1,083.65 0.00 0.00 46.80
18,531.46 0.00 18,531.46 0.00
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

681.60 34.90 681.60 0.00 0.00 36.00


3,285.53 107.16 3,285.53 0.00 0.00 130.00
12,419.42 62.81 12,419.42 0.00 0.00 64.80
918.42 40.71 918.42 0.00 0.00 42.00
1,226.49 4.07 1,226.49 0.00 0.00 4.20
30,085.82 30,085.81 0.00
3,337.35 3,337.34 0.00
2,522.71 5.62 2,522.71 0.00 0.00 6.05
773.50 170.00 773.50 0.00 0.00 238.68
41.14 5.62 41.14 0.00 0.00 6.05
10,563.77 0.00 10,563.77 0.00
3,564.40 760.00 3,564.40 0.00 0.00 790.56
4,802.86 78.80 4,802.86 0.00 82.40
2,184.97 3.94 2,184.97 0.00 0.00 4.12
11.54 3.94 11.54 0.00 0.00 4.12
16,184.70 0.00 16,184.70 0.00 0.00
3,503.22 7.62 3,503.22 0.00 0.00 11.28
9,903.85 140.54 9,903.85 0.00 0.00 144.00
2,755.30 590.00 2,755.30 0.00 0.00 980.10
22.33 7.62 22.33 0.00 0.00 11.28
10,155.92 10,155.92 0.00
10,155.92 178.77 10,155.92 0.00 0.00 178.77
11,554.62 0.00 11,554.62 0.00
4,646.12 269.34 4,646.12 0.00 0.00 269.34
828.96 27.78 828.96 0.00 0.00 35.07
5,266.03 140.54 5,266.03 0.00 0.00 144.00
813.51 72.70 813.51 0.00 0.00 75.00
15,265.35 0.00 15,265.35 0.00
15,265.35 75.50 15,265.35 0.00 0.00 78.57
1,460.40 0.00 1,218.50 241.90
1,161.12 24.00 1,161.12 0.00 0.00 32.00
241.90 0.00 0.00 5.00 241.90 0.00
57.38 1.00 57.38 0.00 0.00 1.00
82,977.00 69,135.02 13,841.98
564.48 564.48 0.00
278.88 168.00 278.88 0.00 0.00 210.00
285.60 168.00 285.60 0.00 0.00 210.00
17,395.08 0.00 17,395.08 0.00
5,286.36 1.00 5,286.36 0.00 0.00 1.00
1,274.91 273.00 1,274.91 0.00 0.00 305.76
431.55 105.00 431.55 0.00 0.00 117.60
7,239.96 354.90 7,239.96 0.00 0.00 397.49
3,162.30 147.84 3,162.30 0.00 0.00 258.72
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

11,218.78 0.00 0.00 11,218.78


2,050.65 0.00 0.00 105.00 2,050.65 0.00
1,827.34 0.00 0.00 59.60 1,827.34 0.00
7,078.73 0.00 0.00 35.80 7,078.73 0.00
262.06 0.00 0.00 35.80 262.06 0.00
53,798.66 51,175.46 2,623.20
35,370.21 60.80 32,782.14 4.80 2,588.06 60.80
6,889.30 224.70 6,889.30 0.00 0.00 254.10
11,058.96 2,430.54 11,058.96 0.00 2777.04
480.19 60.80 445.06 4.80 35.14 60.80
46,296.24 0.00 46,296.25
15,888.32 0.00 15,888.32
1,045.24 0.00 0.00 629.66 1,045.24 0.00
1,070.42 0.00 0.00 629.66 1,070.42 0.00
1,204.38 0.00 0.00 32.04 1,204.38 0.00
12,568.28 0.00 0.00 256.81 12,568.28 0.00
5,166.68 0.00 0.00 5,166.68
272.12 0.00 0.00 82.71 272.12 0.00
416.86 0.00 0.00 82.71 416.86 0.00
1,151.18 0.00 0.00 33.08 1,151.18 0.00
3,119.96 0.00 0.00 6.20 3,119.96 0.00
30.55 0.00 0.00 4.14 30.55 0.00
60.38 0.00 0.00 82.71 60.38 0.00
115.63 0.00 0.00 4.84 115.63 0.00
10,153.50 0.00 0.00 10,153.51
275.98 0.00 0.00 162.34 275.98 0.00
1,000.01 0.00 0.00 162.34 1,000.01 0.00
2,574.71 0.00 0.00 162.34 2,574.71 0.00
5,595.05 0.00 0.00 12.99 5,595.05 0.00
185.98 0.00 0.00 25.20 185.98 0.00
118.51 0.00 0.00 162.34 118.51 0.00
403.26 0.00 0.00 16.88 403.26 0.00
10,361.30 0.00 0.00 10,361.29
237.08 0.00 0.00 47.04 237.08 0.00
300.12 0.00 0.00 47.04 300.12 0.00
1,423.43 0.00 0.00 47.04 1,423.43 0.00
772.87 0.00 0.00 47.04 772.87 0.00
2,262.18 0.00 0.00 6.00 2,262.18 0.00
5,365.62 0.00 0.00 18.00 5,365.62 0.00
2,708.89 0.00 0.00 2,708.89
1,625.36 0.00 0.00 181.20 1,625.36 0.00
1,083.53 0.00 0.00 23.00 1,083.53 0.00
2,017.55 0.00 0.00 2,017.55
ESUPUESTO PPTO. EJECUTADO DEDUCTIVO
ejecutado total
Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.) Metrado

417.55 0.00 0.00 35.00 417.55 0.00


1,600.00 0.00 0.00 4.00 1,600.00 0.00
261,051.93 194,707.84 66,344.07

261,051.92

261,051.93 194,707.84 66,344.07


PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

39,773.34 6,417.60 0.00 39,773.34

70.56 9.41 0.00 70.56


34.86 2.80 4.65 21.00 34.86
35.70 2.80 4.76 21.00 35.70
6,746.68 0.00 304.38 0.00 6,746.68
5286.36 0.00 0.00 1.00 5286.36
349.75 2.93 70.00 14.64 349.75
187.06 2.61 62.35 7.83 187.06
225.66 0.00 0.00 10.55 225.66
697.85 7.20 172.03 29.21 697.85

1,645.67 293.28 0.00 1,645.67


1307.98 1.40 275.83 6.62 1307.98
101.95 0.87 16.99 5.22 101.95
117.76 0.00 0.00 5.22 117.76
117.98 0.00 0.45 0.39 117.98
13,797.77 2,207.12 0.00 13,797.77
1,039.84 41.31 0.00 1,039.84
776.56 0.00 0.00 1.73 776.56
250.61 9.08 41.31 55.08 250.61
12.66 0.00 0.00 1.73 12.66
2,675.69 552.42 2,675.69
951.41 22.86 107.21 202.86 951.41
1097.10 3.60 219.42 18.00 1097.10
623.88 0.41 224.60 1.13 623.88
3.30 0.41 1.19 1.13 3.30
2,002.81 483.37 2,002.81
506.86 0.34 157.46 1.10 506.86
532.75 1.26 88.79 7.56 532.75
959.97 50.56 236.12 205.56 959.97
3.23 0.34 1.00 1.10 3.23
4,694.30 507.49 4,694.30
1878.39 0.00 0.00 27.00 1878.39
1328.49 51.00 259.59 261.00 1328.49
1477.93 0.54 246.32 3.24 1477.93
9.49 0.54 1.58 3.24 9.49

3,385.13 622.53 3,385.13


1301.73 69.22 317.03 284.22 1301.73
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

375.28 9.12 279.62 12.24 375.28


1708.12 0.05 25.88 3.17 1708.12

2,061.07 243.71 2,061.07


2061.07 4.29 243.71 36.28 2061.07
3,983.99 504.70 3,983.99
1251.66 8.58 148.01 72.56 1251.66
1708.79 8.58 202.06 72.56 1708.79
537.12 3.60 107.42 18.00 537.12
283.27 1.26 47.21 7.56 283.27
203.15 0.00 0.00 34.20 203.15

753.30 0.00 753.30


753.30 0.00 0.00 27.00 753.30
3,944.77 2,252.75 3,944.77
1097.67 42.21 669.45 69.21 1097.67
2596.07 42.21 1583.30 69.21 2596.07
251.04 0.00 0.00 3.24 251.04

810.00 0.00 810.00


810.00 0.00 0.00 2.70 810.00
1,620.00 0.00 1,620.00
0.00 0.00 0.00 0.00 0.00
1620.00 0.00 0.00 5.40 1620.00

80.86 0.00 80.86


21.45 0.00 21.45
21.45 0.00 0.00 3.00 21.45
59.41 0.00 59.41
59.41 0.00 0.00 1.00 59.41
160.67 160.67 160.67
160.67 0.90 160.67 0.90 160.67

1,451.83 105.36 1,451.83


310.77 0.00 0.00 27.00 310.77
891.04 8.58 105.36 72.56 891.04
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

167.94 0.00 0.00 5.40 167.94

82.08 0.00 0.00 5.40 82.08

535.34 0.00 535.34


338.66 0.00 0.00 7.00 338.66
0.00 0.00 0.00 0.00 0.00
114.76 0.00 0.00 2.00 114.76
81.92 0.00 0.00 1.00 81.92

2,110.83 336.22 2,110.83


429.73 0.00 0.00 1.00 429.73
1681.10 1.00 336.22 5.00 1681.10

99,956.84 7,739.75 99,956.84


504.00 113.16 504.00
249.00 33.68 55.91 150.00 249.00
255.00 33.68 57.26 150.00 255.00
5,347.18 332.58 5,347.18
2643.18 0.00 0.00 0.50 2643.18
577.95 11.19 267.38 24.19 577.95
860.04 1.10 26.28 36.00 860.04
147.96 1.10 4.52 36.00 147.96
1118.05 1.44 34.40 46.80 1118.05
19,714.97 1,183.52 19,714.97
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

703.08 1.10 21.48 36.00 703.08


3985.80 22.84 700.27 130.00 3985.80
12812.90 1.99 393.48 64.80 12812.90
947.52 1.29 29.10 42.00 947.52
1265.67 0.13 39.18 4.20 1265.67
34,815.62 4,729.81 34,815.62
3,845.09 507.75 3,845.09
2714.83 0.43 192.12 6.05 2714.83
1085.99 68.68 312.49 238.68 1085.99
44.27 0.43 3.13 6.05 44.27
11,026.87 463.09 11,026.87
3707.73 30.56 143.33 790.56 3707.73
5022.28 3.60 219.42 82.40 5022.28
2284.79 0.18 99.82 4.12 2284.79
12.07 0.18 0.53 4.12 12.07
19,943.66 3,758.97 19,943.66
5185.87 3.66 1682.65 11.28 5185.87
10147.68 3.46 243.83 144.00 10147.68
4577.07 390.10 1821.77 980.10 4577.07
33.05 3.66 10.72 11.28 33.05
10,155.92 0.00 10,155.92
10155.92 0.00 0.00 178.77 10155.92
11,927.53 372.92 11,927.53
4646.12 0.00 0.00 269.34 4646.12
1046.49 7.29 217.53 35.07 1046.49
5395.68 3.46 129.65 144.00 5395.68
839.25 2.30 25.74 75.00 839.25
15,886.07 620.72 15,886.07
15886.07 3.07 620.72 78.57 15886.07
1,605.54 387.04 1,605.54
1548.16 8.00 387.04 32.00 1548.16
0.00 0.00 0.00 0.00 0.00
57.38 0.00 0.00 1.00 57.38
75,196.68 6,064.39 75,199.41
705.60 141.12 705.60
348.60 42.00 69.72 210.00 348.60
357.00 42.00 71.40 210.00 357.00
20,840.37 3,445.29 20,840.37
5286.36 0.00 0.00 1.00 5286.36
1427.90 32.76 152.99 305.76 1427.90
483.34 12.60 51.79 117.60 483.34
8108.76 42.59 868.80 397.49 8108.76
5534.02 110.88 2371.72 258.72 5534.02
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
53,650.71 2,477.98 53,653.44
32779.45 0.00 0.00 60.80 32782.14
7790.71 29.40 901.40 254.10 7790.71
12635.53 346.50 1576.58 2,777.04 12635.53
445.02 0.00 60.80 445.06
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
214,926.86 20,221.75 214,929.59

214,929.59 214,929.59
53,259.84 53,259.84
8,696.64 8,696.64
542.45 542.45
542.45 14.40 542.45
4,082.17 4,082.17
4,082.17 4,082.17
1,777.89 300.32 1,777.89
981.75 21.00 981.75
1,322.53 2.45 1,322.53
2,819.25 2,819.25
2,819.25 2,819.25
2,776.30 31.24 2,776.30
42.95 4.41 42.95
1,252.77 1,252.77
477.57 1.00 477.57
275.20 1.00 275.20
500.00 1.00 500.00
44,563.20 44,563.20
33,792.00 33,792.00
1,149.06 1,149.06
1,149.06 107.59 1,149.06
32,642.94 32,642.94
25,666.90 70.00 25,666.90
2,186.33 279.94 2,186.33
2,162.02 52.90 2,162.02
148.47 19.01 148.47
1,452.09 100.56 1,452.09
847.87 60.09 847.87
179.26 8.33 179.26
10,771.20 10,771.20
10,771.20 32.00 10,771.20

214,926.86 20,221.75 53,259.84 268,189.43


EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

0
74896.36
224.48
m2 0.00 m2 21.00 66.98
m2 0.00 m2 21.00 157.5
7526.02
mes 0.00 mes 1.00 157.5
m3 0.00 m3 14.64 3497.45
m3 0.00 m3 7.83 695.96
m3 0.00 m3 10.55 53.26
m3 0.00 m3 29.21 0
10.17
87.78
251.28
2772.62
38846.89
m3 0.00 m3 6.62 16951.56
m2 0.00 m2 5.22 1569.52
m2 0.00 m2 5.22 15025.56
m3 0.00 m3 0.39 5300.25
28298.97
5839.07
m3 0.00 m3 1.73 4722.02
kg 0.00 kg 55.08 1117.05
m3 0.00 m3 1.73 0
14680.83
kg 0.00 kg 202.86 5800.96
m2 0.00 m2 18.00 4485.77
m3 0.00 m3 1.13 4394.1
m3 0.00 m3 1.13 0
6322.02
m3 0.00 m3 1.10 2595.83
m2 0.00 m2 7.56 1071.04
kg 0.00 kg 205.56 2655.15
m3 0.00 m3 1.10 0
1457.05
m2 0.00 m2 27.00 256.36
kg 0.00 kg 261.00 244.62
m3 0.00 m3 3.24 498.79
m3 0.00 m3 3.24 0
457.28
0 0.00 0 0.00 0
kg 0.00 kg 284.22 0
EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

m2 0.00 m2 12.24 0
m3 0.00 m3 3.17 0
85726.69
24930.61
m2 0.00 m2 36.28 24930.61
35640.79
m2 0.00 m2 72.56 0
m2 0.00 m2 72.56 11777.95
m2 0.00 m2 18.00 2729.17
m2 0.00 m2 7.56 370.92
ML 0.00 ML 34.20 58.14
4575.89
16128.72
0
m2 0.00 m2 27.00 0
578.57
m2 0.00 m2 69.21 0
m2 0.00 m2 69.21 243.38
m2 23.76 m2 3.24 335.19
139.51
139.51
0
0
1304.08
m2 0.00 m2 2.70 1304.08
3944.07
m2 0.90 m2 0.00 0
m2 0.00 m2 5.40 1097.14
719.93
2127
0
51.36
0 0.00 0 0.00 0
pza 0.00 pza 3.00 51.36
0 0.00 0 0.00 252.7
pza 0.00 pza 1.00 252.7
630.15
m2 0.90 m2 0.90 0
114.38
515.77
17681.98
m2 0.00 m2 27.00 168.14
m2 0.00 m2 72.56 8087.41
EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

m2 0.00 m2 5.40 0
1907.97
7518.46
572.87
47.72
ML 0.90 ML 5.40 525.15
0
0
0
0
0
5237.09
4010.81
pto 0.00 pto 7.00 88.34
pto 6.00 pto 0.00 1050.48
pto 0.00 pto 2.00 0
pto 1.00 pto 1.00 567.84

127.07
1124.64
268.2
305.8
478.44
1226.28
EQ 2.00 EQ 1.00 468.72
EQ 0.00 EQ 5.00 757.56
0
0
0
0
0
0
0
0
0
m2 0.00 m2 150.00 0
m2 0.00 m2 150.00 0
0
mes 0.50 mes 0.50 0
m3 0.00 m3 24.19 0
m3 0.00 m3 36.00 0
m2 0.00 m2 36.00 0
m3 0.00 m3 46.80 0
0
EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

m2 0.00 m2 36.00 0
m2 0.00 m2 130.00 0
m3 0.00 m3 64.80 0
m2 0.00 m2 42.00 0
m3 0.00 m3 4.20 0
0
0
m3 0.00 m3 6.05 0
kg 0.00 kg 238.68 0
m3 0.00 m3 6.05 0
0
kg 0.00 kg 790.56 0
m2 0.00 m2 82.40 0
m3 0.00 m3 4.12 0
m3 0.00 m3 4.12 0
0
m3 0.00 m3 11.28 0
m2 0.00 m2 144.00 0
kg 0.00 kg 980.10 0
m3 0.00 m3 11.28 0
0
m2 0.00 m2 178.77 0
0
m2 0.00 m2 269.34 0
m2 0.00 m2 35.07 0
m2 0.00 m2 144.00 0
m2 0.00 m2 75.00 0
0
m2 0.00 m2 78.57 0
0
pto 0.00 pto 32.00 0
pto 5.00 pto 0.00 0
pto 0.00 pto 1.00 0
0
0
m2 0.00 m2 210.00 0
m2 0.00 m2 210.00 0
0
mes 0.00 mes 1.00 0
m3 0.00 m3 305.76 0
m2 0.00 m2 117.60 0
m3 0.00 m3 397.49 0
m3 0.00 m3 258.72 0
EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

0
m2 105.00 m2 0.00 0
m2 59.60 m2 0.00 0
m3 35.80 m3 0.00 0
m3 35.80 m3 0.00 0
0
m3 4.80 m3 60.80 0
m2 0.00 m2 254.10 0
kg 0.00 kg 2,777.04 0
m3 4.80 m3 60.80 0
0
0
m2 629.66 m2 0.00 0
m2 629.66 m2 0.00 0
m2 32.04 m2 0.00 0
m2 256.81 m2 0.00 0
0
m 82.71 m 0.00 0
ML 82.71 ML 0.00 0
m2 33.08 m2 0.00 0
m3 6.20 m3 0.00 0
m 4.14 m 0.00 0
m 82.71 m 0.00 0
m3 4.84 m3 0.00 0
0
m2 162.34 m2 0.00 0
m2 162.34 m2 0.00 0
m2 162.34 m2 0.00 0
m3 12.99 m3 0.00 0
m 25.20 m 0.00 0
m2 162.34 m2 0.00 0
m3 16.88 m3 0.00 0
0
ML 47.04 ML 0.00 0
m 47.04 m 0.00 0
m 47.04 m 0.00 0
m 47.04 m 0.00 0
und 6.00 und 0.00 0
und 18.00 und 0.00 0
0
m2 181.20 m2 0.00 0
und 23.00 und 0.00 0
0
EJECUCION NO REGISTRADA METRADOS

EXPEDIENTE TECNICO
METRADOS DEDUCTIVOS
MODIFICADO
PIP. VIABLE
S/.
UND CANT. UND CANT.

m2 35.00 m2 0.00 0
und 4.00 und 0.00 0
0

0
0
0

m2 14.40
0
0
kg 300.32 0
m2 21.00 0
m3 2.45 0
0
0
m2 31.24 0
m2 4.41 0
0
GLB 1.00 0
UND 1.00

0
0

M2 107.59
0
M2 70.00 0
m2 279.94 0
m2 52.90 0
m2 19.01 0
m2 100.56 0
m2 60.09 0
m2 8.33 0
0.00 0
EQ 32.00 0
165,860.14
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

36,676.51 36676.51 6,417.60 3,320.77 39,773.34

61.15 61.15 9.41 0.00 70.56


30.21 30.21 4.65 0.00 34.86
30.94 30.94 4.76 0.00 35.70
6,442.30 6442.3 304.38 0.00 6,746.68
5,286.36 5286.36 0.00 0.00 5,286.36
279.75 279.75 70.00 0.00 349.75
124.71 124.71 62.35 0.00 187.06
225.66 225.66 0.00 0.00 225.66
525.82 525.82 172.03 0.00 697.85

1,352.40 1352.4 293.28 0.00 1,645.67


1,032.15 1032.15 275.83 0.00 1,307.98
84.96 84.96 16.99 0.00 101.95
117.76 117.76 0.00 0.00 117.76
117.53 117.53 0.45 0.00 117.98
11,590.64 11590.64 2,207.12 0.00 13,797.77
998.52 998.52 41.31 0.00 1,039.84
776.56 776.56 0.00 0.00 776.56
209.30 209.3 41.31 0.00 250.61
12.66 12.66 0.00 0.00 12.66
2,123.27 2123.27 552.42 0.00 2,675.69
844.20 844.2 107.21 0.00 951.41
877.68 877.68 219.42 0.00 1,097.10
399.28 399.28 224.60 0.00 623.88
2.11 2.11 1.19 0.00 3.30
1,519.44 1519.44 483.37 0.00 2,002.81
349.40 349.4 157.46 0.00 506.86
443.96 443.96 88.79 0.00 532.75
723.85 723.85 236.12 0.00 959.97
2.23 2.23 1.00 0.00 3.23
4,186.81 4186.81 507.49 0.00 4,694.30
1,878.39 1878.39 0.00 0.00 1,878.39
1,068.90 1068.9 259.59 0.00 1,328.49
1,231.61 1231.61 246.32 0.00 1,477.93
7.91 7.91 1.58 0.00 9.49

2,762.60 2762.6 622.53 0.00 3,385.13


984.70 984.7 317.03 0.00 1,301.73
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

95.66 95.66 279.62 0.00 375.28


1,682.24 1682.24 25.88 0.00 1,708.12

1,817.35 1817.35 243.71 0.00 2,061.07


1,817.35 1817.35 243.71 0.00 2,061.07
3,479.30 3479.3 504.70 0.00 3,983.99
1,103.66 1103.66 148.01 0.00 1,251.66
1,506.73 1506.73 202.06 0.00 1,708.79
429.70 429.7 107.42 0.00 537.12
236.06 236.06 47.21 0.00 283.27
203.15 203.15 0.00 0.00 203.15

753.30 753.3 0.00 0.00 753.30


753.30 753.3 0.00 0.00 753.30
3,532.95 3532.95 2,252.75 1,840.92 3,944.77
428.22 428.22 669.45 0.00 1,097.67
1,012.77 1012.77 1,583.30 0.00 2,596.07
2,091.96 2091.96 0.00 1,840.92 251.04

810.00 810 0.00 0.00 810.00


810.00 810 0.00 0.00 810.00
1,693.84 1693.84 0.00 73.84 1,620.00
73.84 73.84 0.00 73.84 0.00
1,620.00 1620 0.00 0.00 1,620.00

80.86 80.86 0.00 0.00 80.86


21.45 21.45 0.00 0.00 21.45
21.45 21.45 0.00 0.00 21.45
59.41 59.41 0.00 0.00 59.41
59.41 59.41 0.00 0.00 59.41
160.67 160.67 160.67 160.67 160.67
160.67 160.67 160.67 160.67 160.67

1,360.14 1360.14 105.36 13.68 1,451.83


310.77 310.77 0.00 0.00 310.77
785.67 785.67 105.36 0.00 891.04
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

167.94 167.94 0.00 0.00 167.94

95.76 95.76 0.00 13.68 82.08

907.54 907.54 0.00 372.20 535.34


338.66 338.66 0.00 0.00 338.66
290.28 290.28 0.00 290.28 0.00
114.76 114.76 0.00 0.00 114.76
163.84 163.84 0.00 81.92 81.92

2,634.07 2634.07 336.22 859.46 2,110.83


1,289.19 1289.19 0.00 859.46 429.73
1,344.88 1344.88 336.22 0.00 1,681.10

95,102.18 95102.18 7,739.75 2,885.08 99,956.84


390.83 390.83 113.16 0.00 504.00
193.09 193.09 55.91 0.00 249.00
197.74 197.74 57.26 0.00 255.00
7,657.78 7657.78 332.58 2,643.18 5,347.18
5,286.36 5286.36 0.00 2,643.18 2,643.18
310.57 310.57 267.38 0.00 577.95
833.76 833.76 26.28 0.00 860.04
143.44 143.44 4.52 0.00 147.96
1,083.65 1083.65 34.40 0.00 1,118.05
18,531.46 18531.46 1,183.52 0.00 19,714.97
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

681.60 681.6 21.48 0.00 703.08


3,285.53 3285.53 700.27 0.00 3,985.80
12,419.42 12419.42 393.48 0.00 12,812.90
918.42 918.42 29.10 0.00 947.52
1,226.49 1226.49 39.18 0.00 1,265.67
30,085.82 30085.82 4,729.81 0.00 34,815.62
3,337.35 3337.35 507.75 0.00 3,845.09
2,522.71 2522.71 192.12 0.00 2,714.83
773.50 773.5 312.49 0.00 1,085.99
41.14 41.14 3.13 0.00 44.27
10,563.77 10563.77 463.09 0.00 11,026.87
3,564.40 3564.4 143.33 0.00 3,707.73
4,802.86 4802.86 219.42 0.00 5,022.28
2,184.97 2184.97 99.82 0.00 2,284.79
11.54 11.54 0.53 0.00 12.07
16,184.70 16184.7 3,758.97 0.00 19,943.66
3,503.22 3503.22 1,682.65 0.00 5,185.87
9,903.85 9903.85 243.83 0.00 10,147.68
2,755.30 2755.3 1,821.77 0.00 4,577.07
22.33 22.33 10.72 0.00 33.05
10,155.92 10155.92 0.00 0.00 10,155.92
10,155.92 10155.92 0.00 0.00 10,155.92
11,554.62 11554.62 372.92 0.00 11,927.53
4,646.12 4646.12 0.00 0.00 4,646.12
828.96 828.96 217.53 0.00 1,046.49
5,266.03 5266.03 129.65 0.00 5,395.68
813.51 813.51 25.74 0.00 839.25
15,265.35 15265.35 620.72 0.00 15,886.07
15,265.35 15265.35 620.72 0.00 15,886.07
1,460.40 1460.4 387.04 241.90 1,605.54
1,161.12 1161.12 387.04 0.00 1,548.16
241.90 241.9 0.00 241.90 0.00
57.38 57.38 0.00 0.00 57.38
82,977.00 82977 6,064.39 13,841.98 75,199.41
564.48 564.48 141.12 0.00 705.60
278.88 278.88 69.72 0.00 348.60
285.60 285.6 71.40 0.00 357.00
17,395.08 17395.08 3,445.29 0.00 20,840.37
5,286.36 5286.36 0.00 0.00 5,286.36
1,274.91 1274.91 152.99 0.00 1,427.90
431.55 431.55 51.79 0.00 483.34
7,239.96 7239.96 868.80 0.00 8,108.76
3,162.30 3162.3 2,371.72 0.00 5,534.02
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

11,218.78 11218.78 0.00 11,218.78 0.00


2,050.65 2050.65 0.00 2,050.65 0.00
1,827.34 1827.34 0.00 1,827.34 0.00
7,078.73 7078.73 0.00 7,078.73 0.00
262.06 262.06 0.00 262.06 0.00
53,798.66 53798.66 2,477.98 2,623.20 53,653.44
35,370.21 35370.21 0.00 2,588.06 32,782.14
6,889.30 6889.3 901.40 0.00 7,790.71
11,058.96 11058.96 1,576.58 0.00 12,635.53
480.19 480.19 0.00 35.14 445.06
46,296.24 46296.24 0.00 46,296.25 0.00
15,888.32 15888.32 0.00 15,888.32 0.00
1,045.24 1045.24 0.00 1,045.24 0.00
1,070.42 1070.42 0.00 1,070.42 0.00
1,204.38 1204.38 0.00 1,204.38 0.00
12,568.28 12568.28 0.00 12,568.28 0.00
5,166.68 5166.68 0.00 5,166.68 0.00
272.12 272.12 0.00 272.12 0.00
416.86 416.86 0.00 416.86 0.00
1,151.18 1151.18 0.00 1,151.18 0.00
3,119.96 3119.96 0.00 3,119.96 0.00
30.55 30.55 0.00 30.55 0.00
60.38 60.38 0.00 60.38 0.00
115.63 115.63 0.00 115.63 0.00
10,153.50 10153.5 0.00 10,153.51 0.00
275.98 275.98 0.00 275.98 0.00
1,000.01 1000.01 0.00 1,000.01 0.00
2,574.71 2574.71 0.00 2,574.71 0.00
5,595.05 5595.05 0.00 5,595.05 0.00
185.98 185.98 0.00 185.98 0.00
118.51 118.51 0.00 118.51 0.00
403.26 403.26 0.00 403.26 0.00
10,361.30 10361.3 0.00 10,361.29 0.00
237.08 237.08 0.00 237.08 0.00
300.12 300.12 0.00 300.12 0.00
1,423.43 1423.43 0.00 1,423.43 0.00
772.87 772.87 0.00 772.87 0.00
2,262.18 2262.18 0.00 2,262.18 0.00
5,365.62 5365.62 0.00 5,365.62 0.00
2,708.89 2708.89 0.00 2,708.89 0.00
1,625.36 1625.36 0.00 1,625.36 0.00
1,083.53 1083.53 0.00 1,083.53 0.00
2,017.55 2017.55 0.00 2,017.55 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO. PPTO.
EXP. TECNICO
ADICIONAL DEDUCTIVO
MODIF. S/,
MONTO DE EJECUTADO S/. S/.
INVERSION S/. S/.

417.55 417.55 0.00 417.55 0.00


1,600.00 1600 0.00 1,600.00 0.00

53,259.84 53,259.84
8,696.64 8,696.64
542.45
542.45
4,082.17 4,082.17
4,082.17 4,082.17
1,777.89 1,777.89
981.75 981.75
1,322.53 1,322.53
2,819.25 2,819.25
2,819.25 2,819.25
2,776.30 2,776.30
42.95 42.95
1,252.77 1,252.77
477.57 477.57

44,563.20 44,563.20
33,792.00 33,792.00
1,149.06 1,149.06
1,149.06 1,149.06
32,642.94 32,642.94
25,666.90 25,666.90
2,186.33 2,186.33
2,162.02 2,162.02
148.47 148.47
1,452.09 1,452.09
847.87 847.87
179.26 179.26
10,771.20 10,771.20
10,771.20 10,771.20
261,051.93 194,707.84 73,481.59 66,344.07 268,189.43
ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

01 VESTUARIOS Y COMEDOR
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVICIONALES (OFICINA, ALMACEN Y GUARDIANIA)
01.01.02 CERCO PROVISIONAL DE OBRA
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA
01.01.04 INSTALACION PROVISIONAL DE AGUA
01.01.05 INSTALACION PROVISIONAL DE DESAGUE
01.01.06 INSTALACION PROVISIONAL SUMINISTRO TRIFASICO DE ENERGIA ELECTRICA
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 189.22 1.11

01.02.02 TRAZO, NIVELES Y REPLANTEO m2 220.00 3.75

01.02.03 DEMOLICION DE COLUMNAS, VIGAS Y LOSAS DE CONCRETO ARMADO


01.02.04 DEMOLICION DE MUROS DE LADRILLO KK CABEZA
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE DE TERRENO CON MAQUINARIA m3 12.00 4.42

01.03.02 CORTE DE TERRENO EN CANTERA PARA RELLENO


01.03.03 CARGUIO DE MATERIALN EN CANTERA PARA RELLENO
01.03.04 TRANSPORTE DE MATERIAL PARA RELLENO
01.03.05 RELLENO MASIVO CON MTONIV. RODILLO Y CISTERNA
01.03.06 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO
01.03.07 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 58.63 40.09

01.03.08 EXCAVACION PARA VIGAS DE CONEXION m3 15.84 40.09

01.03.09 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2 181.62 2.09

01.03.10 RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/AGUA m3 4.00 25.36

01.03.11 ELIMINACION DE MATERIAL CON MAQUINA


01.03.12 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA m3 12.00 6.98

01.03.13 ELIMINACION DE ESTRUCTURAS EXISTENTES


TRAZO Y REPLANTEO DURANTE EL PROCESO m2 220.00 3.75

01.04 OBRAS DE CONCRETO SIMPLE


01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 14.84 237.95

01.04.02 CONCRETO C:H 1:12 E=2" -SOLADO m2 100.85 58.39

01.04.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m m2 152.20 43.86

01.04.04 CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M m3 11.25 324.77

01.05 OBRAS DE CONCRETO ARMADO


01.05.01 ZAPATAS
01.05.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 20.28 546.53

01.05.01.02 ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS kg 452.00 7.14

01.05.01.03 CURADO DE ESTRUCTURAS DE CONCRETO


01.05.02 VIGAS DE CIMENTACION
01.05.02.01 ACERO f'y = 4200 kg/cm, G 60 EN VIGAS DE CIMENTACION kg 384.71 7.14

01.05.02.02 ENCOFRADO Y DESC. PARA VIGAS DE CIMENTACION m2 18.00 91.34

01.05.02.03 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 8.90 546.53

01.05.02.04 CURADO DE ESTRUCTURAS DE CONCRETO


ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

01.05.03 COLUMNAS
01.05.03.01 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS kg 1,612.00 7.14

01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 204.64 49.49

01.05.03.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 m3 13.42 546.53

01.05.03.04 CURADO EN COLUMNAS


01.05.04 VIGAS
01.05.04.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 m3 14.20 564.31

01.05.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 144.00 66.94

01.05.04.03 ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS kg 822.16 7.14

01.05.04.04 CURADO EN VIGAS


01.05.05 LOSAS ALIGERADAS
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 426.00 49.49

01.05.05.02 PLASTOFORMO 0.30 X0.15 X3.00 PARA LOSA ALIJERADA und 186.00 14.29

01.05.05.03 ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS kg 474.00 7.14

01.05.05.04 CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2 m3 8.05 542.16

01.05.05.05 CURADO EN LOSAS ALIGERADAS


01.05.06 ESCALERAS Y RAMPAS
01.05.06.01 ACERO DE REFUERZO Fy=4200 Kg/cm2 kg 162.00 7.14

01.05.06.02 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 13.41 106.04

01.05.06.03 CONCRETO EN GRADAS F'C= 210 KG/CM2 m3 3.37 593.29

01.05.06.04 CURADO EN ESCALERAS


01.06 ARQUITECTURA
01.06.01 MUROS Y TABIQUES DE ALBAILERIA
01.06.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M m2 362.51 70.34

01.06.02 COLUMNAS DE ARRIOSTRE


01.06.02.01 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
01.06.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
01.06.02.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2
01.06.02.04 CURADO EN COLUMNAS
01.06.03 MUROS CON EL SISTEMA DE CONSTRUCCION EN SECO (SISTEMA DRY-WALL O SIMILAR)
01.06.03.01 TABIQUE DE MELAMINA m2 58.20 86.47

01.06.03.02 PUERTA DE MALAMINA CON ESTRUCTURA DE ALUMINIO


01.06.04 REVOQUES Y REVESTIMIENTOS
01.06.04.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 76.84 29.30

01.06.04.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 323.50 32.49

01.06.04.03 TARRAJEO PRIMARIO EN EXTERIORES CEMENTO ARENA E=1.5 CM MEZCLAm2 341.02 41.98

01.06.04.04 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA


01.06.04.05 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 115.20 30.11

01.06.04.06 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 55.98 30.91

01.06.04.07 BRUADO DE 1/2" ML 24.00 5.59

01.06.05 CIELORRASOS
01.06.05.01 CIELO RASO ENLUCIDO CON YESO m2 426.00 41.87

01.06.06 PISOS Y PAVIMENTOS


ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

01.06.06.01 EMPEDRADO DC/PIEDRA MEDIANA 6" m2 91.80 45.07

01.06.06.02 FALSO PISO DE 4" DE CONCRETO 1:10


01.06.06.03 PISO CERAMICO ANTIDESLIZANTE 0.30 X 0.30 m. m2 276.09 84.43

01.06.07 ZOCALOS Y CONTRAZOCALOS


01.06.07.01 ZOCALO DE CERAMICO 0.25X0.40 cm m2 28.39 87.74

01.07 CARPINTERIA DE MADERA


01.07.01 PUERTAS DE MADERA TABLERO REBAJADO m2 7.92 326.02

01.07.02 BANCAS DE MADERA 2.0 X 0.4 MT pza 4.00 112.00

01.08 CARPINTERIA MADERA-METALICA Y HERRERIA


01.08.01 COBERTURA CON PLANCHAS ONDULADAS DE POLICARBONATO 2.44m x1.10m x0.8mm
01.08.02 VENTANA METALICA SEGUN DISEO
01.08.03 CASILLEROS METALICOS
01.08.04 BARANDA METALICA SEGUNDO NIVEL m 93.24 27.50

01.08.05 BARANDA METALICA TERRAZA


01.08.06 MESA METALICA PARA COMEDOR SEGUN DISEO
VENTANA DE ALUMINIO m2 42.24 199.98
MAMPARAS DE ALUMINIO m2 7.80 249.98
CASILLEROS METALICOS pza 1.00 5,000.00

01.09 CERRAJERIA
01.09.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA pza 20.00 7.08

01.10 CERRADURAS
01.10.01 CERRADURA PARA PUERTA BAO SEG. INT. PER. pza 4.00 66.35

01.10.02 CERRADURA CON MANIJAS A AMBOS LADOS pza 8.00 66.35


VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS m2 4.00 57.19
VIDRIO INCOLORO 6 mm C/SISTEMA CORREDISO EN VENTANAS m2 55.85 143.27

01.11 PINTURA
01.11.01 PINTURA LATEX PREMIUM SUPERMATE EN MUROS INTERIORES m2 323.50 20.74

01.11.02 PINTURA EN CIELO RASO CON LATEX LAVABLE m2 314.58 20.38

01.11.03 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES m2 341.02 21.05

01.11.04 PINTURA EN COLUMNAS m2 115.20 21.05

01.11.05 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 7.92 11.93

01.11.06 PINTURA EN ESTRUCTURA METALICA ML 93.24 11.67

01.12 INSTALACIONES SANITARIAS


01.12.01 APARATOS Y ACCESORIOS SANITARIOS
01.12.01.01 INODORO BLANCO CON GRIFERIA Y ACCESORIOS pza 5.00 377.28

01.12.01.02 URINARIO ACADEMY BLANCO TUBO BRONCE CROMADO Y TRAMPA INCO pza 3.00 189.00

01.12.01.03 DUCHA SIMPLE C/GRIFERIA pza 8.00 59.28

01.12.01.04 LAVATORIO DE PARED INC. GRIFERIA MODELO MALIBU pza 4.00 257.28

01.12.01.05 LAVADERO DE ACERO INOXIDABLE C/AJUSTADORES 48 x 64 cm pza 2.00 324.28

01.12.02 COLOCACIN DE ACCESORIOS SANITARIOS


01.12.02.01 COLOCACION DE APARATOS SANITARIOS pza 22.00 142.89
ACCESORIOS SANITARIOS pza 54.00 17.46
ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)
SISTEMA GENERAL DE DESAGUE

01.12.03 MOVIMIENTO DE TIERRAS RED DE DESAGUE


01.12.03.01 TRAZO, NIVELES Y REPLANTEO EN RED DE DESAGE m 19.42 3.75

01.12.03.02 EXCAVACION DE ZANJA MANUAL 0.40x0.80m PROMEDIO ML 19.42 15.32

01.12.03.03 RELLENO Y APISONADO C/MATERIAL PROPIO ML 15.90 4.28

01.12.04 SISTEMA DE DESAGUE Y VENTILACION


01.12.04.01 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 8.00 78.69

01.12.04.02 SALIDA DE PVC SAL PARA DESAGUE DE 2" pto 62.00 62.65

01.12.04.03 SUM. E INST. TUBERIA DE 4" PVC SAL ML 86.00 25.88

01.12.04.04 SUM. E INST. TUBERIA DE 2" PVC SAL ML 124.00 21.74

01.12.04.05 SUM. E INST. DE CODO 4"x45 PVC AL-P, P/DESAGUE und 22.00 17.20

01.12.04.06 SUM E INST DE CODO 2"X90 PVC SAL-P P/DESAGE


01.12.04.07 SUM E INST- DE CODO 4" X90 PVC SAL-P P/DESAGE
01.12.04.08 SUM. E INST. DE TEE 4" PVC SAL-P P/DESAGE
01.12.04.09 SUM. E INST. DE CODO 2"x45 PVC AL-P, P/DESAGUE und 24.00 17.20

01.12.04.10 SUM. E INST. DE YEE 4" PVC SAL-P, P/DESAGUE und 45.00 27.03

01.12.04.11 SUM. E INST. DE YEE CON REDUCCION DE 4"x2" PVC SAL-P, P/DESAGUE pza 16.00 27.03

01.12.04.12 SUM. E INST. DE YEE 2" PVC SAL-P, P/DESAGUE und 4.00 23.02

01.12.04.13 REGISTRO DE BRONCE CROMADO DE 4" pza 12.00 41.54

01.12.04.14 SUMIDERO CROMADO DE 2" und 32.00 80.15

01.12.05 SISTEMA GENERAL DE AGUA POTABLE


01.12.05.01 MOVIMIENTO DE TIERRAS RED DE AGUA
01.12.05.01.01 TRAZO, NIVELES Y REPLANTEO EN RED DE AGUA m 12.00 3.75

01.12.05.01.02 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO ML 12.00 8.45

01.12.05.01.03 RELLENO Y APISONADO C/MATERIAL PROPIO ML 11.46 4.28

01.12.05.02 SISTEMA DE AGUA FRIA


01.12.05.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" pto 26.00 84.23

01.12.05.02.02 SUMINISTRO E INSTALACIN TUBERIA DE 1/2" PVC SAP C-10 ML 118.40 16.08

01.12.05.02.03 SUM. E INST. DE CODO DE1/2"x90 PVC SAP und 42.00 17.93

01.12.05.02.04 SUM. E INST. DE CODO DE 1/2"x90 FG und 24.00 19.93

01.12.05.02.05 SUM. E INST. DE TEE DE 1/2"x1/2" PVC SAP und 42.00 24.82

01.12.05.02.06 VALVULA DE COMPUERTA DE BRONCE DE 1/2" pza 6.00 60.90

01.12.06 RED DE DRENAJE PLUVIAL


01.12.06.01 CANALES P/EVACUACION DE AGUAS PLUVIALES
01.12.06.01.01 MONTANTE BAJADA DE AGUA PLUVIAL DE 4" PVC SAP C-7.5 ML 7.00 36.59

01.12.06.01.02 CANALETA DE FG ML 4.00 89.16

01.12.06.01.03 ABRAZADERA P/TUBERIAS und 2.00 60.33

01.13 INSTALACIONES ELECTRICAS Y MECANICAS


01.13.01 SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y CAJAS DE PASE
01.13.01.01 SALIDA DE TECHO C /TUB SEL CABLE TW 14 CAJAS LIVIANAS pto 29.00 88.34

01.13.01.02 SALIDA DE PARED C/TUB SEL 3/4" CABLE TW 14 CAJAS LIVIANAS pto 2.00 87.54

01.13.01.03 SALIDA P/ALUMBRADO EN EXT. C/TUB PVC SEL 3/4" CABLE TW14 CAJA LIV pto 8.00 140.58

01.13.01.04 SALIDA PARA INTERRUPTOR SIMPLE C/TUB. PVC SEL 3/4" CABLE TWG 14 C pto 31.00 67.05
ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

01.13.01.05 SALIDA PARA INTERRUPTOR DOBLE C/TUB. PVC SEL 3/4" CABLE TWG14 CApto 26.00 76.45

01.13.01.06 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. pto 4.00 141.96

01.13.01.07 SALIDA P/TOMACO. BIPOLAR SIMPLE TUB PVC SEL CABLE TW 12 CAJA LIV. pto 16.00 127.07
SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA pto 4.00 119.61

01.13.02 TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA


01.13.02.01 TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN) EQ 1.00 582.47

01.13.02.02 ALIMENTADOR TG m 8.00 186.32

01.13.02.03 CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm. GLB 1.00 905.21
CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm. pto 2.00 71.38

01.13.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS


01.13.03.01 ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MODEQ 46.00 234.36

01.13.03.02 ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2X18W EQ 24.00 189.39

01.13.03.03 POZO DE PUESTA A TIERRA und 4.00 1,619.16

01.14 RAMPA P/PERSONAS C/DISCAPACIDAD


01.14.01 ESTRUCTURAS
01.14.01.01 TRABAJOS PRELIMINARES
01.14.01.01.01 LIMPIEZA DE TERRENO MANUAL
01.14.01.01.02 TRAZO, NIVELES Y REPLANTEO
01.14.01.02 MOVIMIENTO DE TIERRAS
01.14.01.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO
01.14.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS
01.14.01.02.03 RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/AGUA
01.14.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
01.14.01.03 OBRAS DE CONCRETO SIMPLE
01.14.01.03.01 CONCRETO C:H 1:12 E=2" -SOLADO
01.14.01.04 OBRAS DE CONCRETO ARMADO
01.14.01.04.01 ZAPATAS
01.14.01.04.01.0 CONCRETO EN ZAPATAS F'C= 210 KG/CM2
01.14.01.04.01.0 ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS
01.14.01.04.01.0 CURADO DE ESTRUCTURAS DE CONCRETO
01.14.01.04.02 COLUMNAS
01.14.01.04.02.0 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS
01.14.01.04.02.0 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
01.14.01.04.02.0 CONCRETO EN COLUMNAS F'C = 210 KG/CM2
01.14.01.04.02.0 CURADO EN COLUMNAS
01.14.01.04.03 VIGAS
01.14.01.04.03.0 CONCRETO EN VIGAS F'C= 210 KG/CM2
01.14.01.04.03.0 ENCOFRADO Y DESENCOFRADO DE VIGAS
01.14.01.04.03.0 ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS
01.14.01.04.03.0 CURADO EN VIGAS
01.14.02 ARQUITECTURA
01.14.02.01 REVOQUES Y REVESTIMIENTOS
01.14.02.01.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

01.14.02.01.02 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA


01.14.02.02 CARPINTERIA MADERA-METALICA Y HERRERIA
01.14.02.02.01 BARANDA METALICA SEGUNDO NIVEL
COSTO DIRECTO:
.01.15 PARTIDAS NUEVAS
.01.15.01 ARQUITECTURA
.01.15.01.01 REVOQUES Y REVESTIMIENTOS
.01.15.01.01.01 TARRAJEO EN FONDE DE ESCALERA CON MEZCLA DE CEMENTO -ARENA
.01.15.01.01.02 TARRAJEO EN COSTADO DE ESCALERA CON MEZCLA DE CEMENTO -ARENA
.01.15.01.01.03 ENCHAPADO DE PASOS Y CONTRAPASOS EN ESCALERAS DE CONCRETO
.01.15.01.01.04 ENCHAPADO DE DESCANSOS EN ESCALERAS DE CONCRETO
.01.15.01.01.05 CONTRAZOCALO H=10 CM
.01.15.01.01.06 FRAGUADO DE PISO ANTIDESLIZANTE
.01.15.01.01.07 FRAGUADO EN ZOCALO DE CERAMICO
.01.15.01.01.08 BORDE ANTIDESLIZANTE EN ESCALERA DE CONCRETO
.01.15.02 CARPINTERIA DE MADERA
.01.15.02.01 BANCAS DE MADERA 0.6 X 0.45 MT
.01.15.03 PISOS Y PAVIMENTOS
.01.15.03.01 PISO PULIDO DE CONCRETO
.01.15.04 ESTRUCTURAS
.01.15.04.01 OBRAS DE CONCRETO ARMADO
.01.15.04.01.01 MESAS DE ATENCION EN STAND DE COMEDOR
.01.15.04.01.01. ACERO f'y = 4200 kg/CM2, G 60.
.01.15.04.01.01. ENCOFRADO Y DESENCOFRADO
.01.15.04.01.01. CONCRETO F'C= 210 kg/cm2.
.01.15.04.01.01. CURADO
.01.15.05 INSTALACIONES SANITARIAS
.01.15.05.01 OBRAS DE CONCRETO ARMADO
.01.15.05.01.01 CONCRETO ARMADO PARA SOPORTE DE LAVATORIOS
.01.15.05.01.01. ACERO f'y = 4200 kg/CM2, G 60.
.01.15.05.01.01. ENCOFRADO Y DESENCOFRADO
.01.15.05.01.01. CONCRETO F'C= 210 kg/cm2.
.01.15.05.01.01. CURADO
.01.15.05.02 SISTEMA DE AGUA FRIA
.01.15.05.02.01 SUM E INST. DE TUB PVC SAP C-10 1"
.01.15.05.03 SISTEMA DE DESAGUE Y VENTILACION
.01.15.05.03.01 SUM. E INST.DE TUB PVC SAL 160 mm
.01.15.05.03.02 MONTANTE BAJADA DE AGUA PLUVIAL DE FG 4"
.01.15.06 INSTALACIONES ELECTRICAS
.01.15.06.01 TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA
.01.15.06.01.01 CAJA METALICA CUADRADA DE PASE DE 800X600X300 mm.
.01.15.06.01.02 TUBERIA PVC SEL (ELECTRICAS) D=2"
.01.15.06.01.03 TUBERIA PVC SEL (ELECTRICAS) D=1"
ITEM Descripcin PRESUPUESTO PIP VIABLE

Und.
Metrado Precio (S/.)

.01.15.06.02 OBRAS DE CONCRETO SIMPLE


.01.15.06.02.01 CONCRETO 1:8 +25% P.M. PARA MURO DE T.G DE 0.35 M
.01.15.07 VEREDAS
.01.15.07.01 TRAZO NIVELES Y REPLANTEO
.01.15.07.02 NIVELACION Y COMPACTACION DE FONDO DE VEREDAS
.01.15.07.03 CONCRETO F'C= 140 KG/CM2 P/VEREDAS E=0.08 m PASTA C:A 1:2
.01.15.07.04 CURADO DE VEREDAS
.01.15.08 RAMPA P/PERSONAS C/DISCAPACIDAD
.01.15.08.01 PINTURA
.01.15.08.01.01 PINTURA EN VIGAS
.01.15.08.02 PISOS Y PAVIMENTOS
.01.15.08.02.01 PISO CEMENTO PULIDO BRUADO C:A 1:2 E = 2 cm
.01.15.08.03 CONCRETO CICLOPEO
.01.15.08.03.01 CONCRETO CICLOPEO fc = 175 kg / cm2+30% PM EN RAMPA
.01.15.08.04 MURO DE CONTENCION
.01.15.08.04.01 TRABAJOS PRELIMINARES
.01.15.08.04.01. LIMPIEZA DE TERRENO MANUAL
.01.15.08.04.01. TRAZO, NIVELES Y REPLANTEO
.01.15.08.04.02 MOVIMIENTO DE TIERRAS
.01.15.08.04.02. CORTE EN TERRENO CON MAQUINARIA
.01.15.08.04.02. NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL
.01.15.08.04.02. ELIMINACION DE MATERIAL CON MAQUINA
.01.15.08.04.02. RELLENO COMPACTADO C/CMPACTADORA 4 HP MAT. PROPIO C/AGUA
.01.15.08.04.03 OBRAS DE CONCRETO SIMPLE
.01.15.08.04.03. CONCRETO C:H 1:12 E=2" -SOLADO
.01.15.08.04.03. ENCOFRADO Y DESENCOFRADO EN MUROS DE SOSTENIMIENTO
.01.15.08.04.03. CONCRETO CICLOPEO fc = 175 kg / cm2+30% PM
.01.15.08.04.03. CURADO DE ESTRUCTURAS DE CONCRETO
.01.15.09 FALSA ZAPATA DE CONCRETO CICLOPEO
.01.15.09.01 CONCRETO CICLOPEO fc = 175 kg / cm2+30% PM
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

15,375.00 0.00 14,575.00 800.00


GLB 1.00 4,000.00 4,000.00 1.00 4,000.00 0.00 0.00
GLB 1.00 5,000.00 5,000.00 1.00 5,000.00 0.00 0.00
GLB 2.00 800.00 1,600.00 1.00 800.00 1.00 800.00
GLB 1.00 1,275.00 1,275.00 1.00 1,275.00 0.00 0.00
GLB 1.00 2,500.00 2,500.00 1.00 2,500.00 0.00 0.00
GLB 1.00 1,000.00 1,000.00 1.00 1,000.00 0.00 0.00
1,035.03 6,447.14 0.00 6,447.13 0.00
210.03 m2 291.48 1.66 483.86 291.48 483.86 0.00 0.00
825.00 m2 291.48 1.70 495.52 291.48 495.52 0.00 0.00
m3 7.75 581.90 4,509.73 7.75 4,509.73 0.00 0.00
m2 128.25 7.47 958.03 128.25 958.03 0.00 0.00
4,428.34 61,453.13 0.00 61,453.14 0.00
53.04 m3 174.89 12.17 2,128.41 174.89 2,128.41 0.00 0.00
m3 429.00 12.17 5,220.93 429.00 5,220.93 0.00 0.00
m3 429.00 2.65 1,136.85 429.00 1,136.85 0.00 0.00
m3 429.00 11.54 4,950.66 429.00 4,950.66 0.00 0.00
m3 330.00 8.99 2,966.70 330.00 2,966.70 0.00 0.00
mes 5.00 5,286.36 26,431.80 5.00 26,431.80 0.00 0.00
2,350.48 m3 134.78 23.89 3,219.89 134.78 3,219.89 0.00 0.00
635.03 m3 137.96 23.89 3,295.86 137.96 3,295.86 0.00 0.00
379.59 m2 181.62 4.11 746.46 181.62 746.46 0.00 0.00
101.44 m3 95.26 21.39 2,037.61 95.26 2,037.61 0.00 0.00
m3 174.89 20.40 3,567.76 174.89 3,567.76 0.00 0.00
83.76 m3 230.73 23.89 5,512.14 230.73 5,512.14 0.00 0.00
m3 39.81 5.98 238.06 39.81 238.06 0.00 0.00
825.00
19,748.96 18,923.04 0.00 18,923.04 0.00
3,531.18 m3 75.48 197.73 14,924.66 75.48 14,924.66 0.00 0.00
5,888.63 m2 96.24 19.53 1,879.57 96.24 1,879.57 0.00 0.00
6,675.49 m2 46.90 22.56 1,058.06 46.90 1,058.06 0.00 0.00
3,653.66 m3 3.52 301.35 1,060.75 3.52 1,060.75 0.00 0.00
112,128.00 222,110.47 0.00 217,348.79 4,761.71
14,310.91 19,126.59 0.00 19,126.59 0.00
11,083.63 m3 34.10 448.88 15,306.81 34.10 15,306.81 0.00 0.00
3,227.28 kg 789.48 4.55 3,592.13 789.48 3,592.13 0.00 0.00
m3 31.10 7.32 227.65 31.10 227.65 0.00 0.00
9,255.07 41,492.27 0.00 41,492.28 0.00
2,746.83 kg 2,523.78 12.04 30,386.31 2,523.78 30,386.31 0.00 0.00
1,644.12 m2 82.78 47.16 3,903.90 82.78 3,903.90 0.00 0.00
4,864.12 m3 15.42 459.74 7,089.19 15.42 7,089.19 0.00 0.00
m3 15.42 7.32 112.87 15.42 112.87 0.00 0.00
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)
28,971.74 40,220.43 0.00 37,903.03 2,317.41
11,509.68 kg 3,678.48 4.69 17,252.07 3,403.08 15,960.45 275.40 1,291.63
10,127.63 m2 207.26 60.95 12,632.50 207.26 12,632.50 0.00 0.00
7,334.43 m3 18.54 554.56 10,281.54 16.70 9,261.15 1.84 1,020.39
m3 18.54 2.93 54.32 16.70 48.93 1.84 5.39
23,522.78 50,366.11 0.00 48,176.77 2,189.34
8,013.20 m3 34.39 459.74 15,810.46 34.39 15,810.46 0.00 0.00
9,639.36 m2 199.70 70.47 14,072.86 193.05 13,604.23 6.65 468.63
5,870.22 kg 4,364.46 4.67 20,382.03 3,996.00 18,661.32 368.46 1,720.71
m3 34.39 2.93 100.76 34.39 100.76 0.00 0.00
31,489.43 62,484.86 0.00 62,484.86 0.00
21,082.74 m2 380.24 69.57 26,453.30 380.24 26,453.30 0.00 0.00
2,657.94 und 278.00 22.96 6,382.88 278.00 6,382.88 0.00 0.00
3,384.36 kg 2,775.48 5.09 14,127.19 2,775.48 14,127.19 0.00 0.00
4,364.39 m3 33.81 456.15 15,422.43 33.81 15,422.43 0.00 0.00
m3 33.81 2.93 99.06 33.81 99.06 0.00 0.00
4,578.07 8,420.21 0.00 8,165.25 254.96
1,156.68 kg 404.82 4.58 1,854.08 404.82 1,854.08 0.00 0.00
1,422.00 m2 32.83 76.06 2,497.05 32.83 2,497.05 0.00 0.00
1,999.39 m3 7.98 506.98 4,045.70 7.48 3,792.21 0.50 253.49
m3 7.98 2.93 23.38 7.48 21.92 0.50 1.47
164,783.82 175,779.56 0.00 164,576.18 11,203.38
25,498.95 14,067.86 0.00 14,067.86 0.00
25,498.95 m2 247.63 56.81 14,067.86 247.63 14,067.86 0.00 0.00
9,186.97 0.00 9,186.98 0.00
kg 537.60 4.69 2,521.34 537.60 2,521.34 0.00 0.00
m2 66.19 60.95 4,034.28 66.19 4,034.28 0.00 0.00
m3 4.72 554.56 2,617.52 4.72 2,617.52 0.00 0.00
m3 4.72 2.93 13.83 4.72 13.83 0.00 0.00
5,032.55 13,050.43 0.00 13,050.43 0.00
5,032.55 m2 40.79 165.07 6,733.21 40.79 6,733.21 0.00 0.00
m2 21.00 300.82 6,317.22 21.00 6,317.22 0.00 0.00
32,411.12 40,421.58 0.00 39,201.25 1,220.33
2,251.41 m2 495.26 17.25 8,543.24 465.35 8,027.29 29.91 515.95
10,510.52 m2 495.26 23.55 11,663.37 465.35 10,958.99 29.91 704.38
14,316.02 m2 150.00 13.46 2,019.00 150.00 2,019.00 0.00 0.00
m2 150.00 21.13 3,169.50 150.00 3,169.50 0.00 0.00
3,468.67 m2 207.26 29.84 6,184.64 207.26 6,184.64 0.00 0.00
1,730.34 m2 199.70 37.47 7,482.76 199.70 7,482.76 0.00 0.00
134.16 ML 228.80 5.94 1,359.07 228.80 1,359.07 0.00 0.00
17,836.62 7,304.41 0.00 7,304.41 0.00
17,836.62 m2 380.24 19.21 7,304.41 380.24 7,304.41 0.00 0.00
27,447.71 59,004.81 0.00 59,004.81 0.00
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)
4,137.43 m2 205.16 15.86 3,253.84 205.16 3,253.84 0.00 0.00
m2 205.16 37.51 7,695.55 205.16 7,695.55 0.00 0.00
23,310.28 m2 620.23 77.48 48,055.42 620.23 48,055.42 0.00
2,490.94 32,743.50 0.00 22,760.45 9,983.05
2,490.94 m2 389.85 83.99 32,743.50 270.99 22,760.45 118.86 9,983.05
3,030.08 2,151.00 0.00 2,151.00 0.00
2,582.08 m2 4.77 300.00 1,431.00 4.77 1,431.00 0.00 0.00
448.00 pza 4.00 180.00 720.00 4.00 720.00 0.00 0.00
17,961.10 102,873.65 0.00 102,689.06 184.59
m2 225.00 145.69 32,780.25 225.00 32,780.25 0.00 0.00
m2 2.25 82.04 184.59 0.00 0.00 2.25 184.59
pza 10.00 50.00 500.00 10.00 500.00 0.00 0.00
2,564.10 m 37.16 213.60 7,937.38 37.16 7,937.38 0.00 0.00
m 60.45 164.82 9,963.37 60.45 9,963.37 0.00 0.00
und 29.00 1,776.14 51,508.06 29.00 51,508.06 0.00 0.00
8,447.16
1,949.84
5,000.00
141.60 42.90 0.00 42.90 0.00
141.60 pza 6.00 7.15 42.90 6.00 42.90 0.00 0.00
796.20 1,307.02 0.00 118.82 1,188.20
265.40 pza 20.00 59.41 1,188.20 0.00 0.00 20.00 1,188.20
530.80 pza 2.00 59.41 118.82 2.00 118.82 0.00 0.00
8,230.39
228.76
8,001.63
23,906.56 15,081.15 0.00 15,081.16 0.00
6,709.39 m2 105.40 12.01 1,265.85 105.40 1,265.85 0.00 0.00
6,411.14 m2 380.24 11.51 4,376.56 380.24 4,376.56 0.00 0.00
7,178.47 m2 180.00 12.28 2,210.40 180.00 2,210.40 0.00 0.00
2,424.96 m2 406.97 12.28 4,997.59 406.97 4,997.59 0.00 0.00
94.49 m2 4.77 31.10 148.35 4.77 148.35 0.00 0.00
1,088.11 ML 137.00 15.20 2,082.40 137.00 2,082.40 0.00 0.00
31,822.73 27,550.80 0.00 23,771.72 3,779.08
8,691.74 9,658.88 0.00 8,098.50 1,560.38
1,886.40 pza 6.00 603.46 3,620.76 5.00 3,017.30 1.00 603.46
567.00 pza 3.00 250.00 750.00 2.00 500.00 1.00 250.00
474.24 pza 8.00 88.19 705.52 8.00 705.52 0.00 0.00
1,029.12 pza 6.00 353.46 2,120.76 4.00 1,413.84 2.00 706.92
648.56 pza 4.00 615.46 2,461.84 4.00 2,461.84 0.00 0.00
3,627.00 0.00 2,691.00 936.00
3,143.58 pza 31.00 117.00 3,627.00 23.00 2,691.00 8.00 936.00
942.84
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)
15,469.04
438.39 1,605.60 0.00 1,605.60 0.00
72.83 m 60.00 2.98 178.80 60.00 178.80 0.00 0.00
297.51 ML 60.00 14.84 890.40 60.00 890.40 0.00 0.00
68.05 ML 60.00 8.94 536.40 60.00 536.40 0.00 0.00
15,030.65 6,422.18 0.00 5,778.52 643.66
629.52 pto 8.00 93.41 747.28 7.00 653.87 1.00 93.41
3,884.30 pto 22.00 56.07 1,233.54 22.00 1,233.54 0.00 0.00
2,225.68 ML 25.00 44.02 1,100.50 12.50 550.25 12.50 550.25
2,695.76 ML 35.00 23.62 826.70 35.00 826.70 0.00 0.00
378.40 und 8.00 10.65 85.20 8.00 85.20 0.00 0.00
pza 52.00 12.02 625.04 52.00 625.04 0.00 0.00
pza 3.00 39.02 117.06 3.00 117.06 0.00 0.00
pza 5.00 39.02 195.10 5.00 195.10 0.00 0.00
412.80 und 6.00 14.15 84.90 6.00 84.90 0.00 0.00
1,216.35 und 1.00 24.08 24.08 1.00 24.08 0.00 0.00
432.48 pza 7.00 23.08 161.56 7.00 161.56 0.00 0.00
92.08 und 13.00 14.22 184.86 13.00 184.86 0.00 0.00
498.48 pza 2.00 26.29 52.58 2.00 52.58 0.00 0.00
2,564.80 und 14.00 70.27 983.78 14.00 983.78 0.00 0.00
6,928.52 3,854.04 0.00 3,854.04 0.00
195.45 508.80 0.00 508.80 0.00
45.00 m 30.00 2.98 89.40 30.00 89.40 0.00 0.00
101.40 ML 30.00 5.04 151.20 30.00 151.20 0.00 0.00
49.05 ML 30.00 8.94 268.20 30.00 268.20 0.00 0.00
6,733.07 3,345.24 0.00 3,345.24 0.00
2,189.98 pto 24.00 59.20 1,420.80 24.00 1,420.80 0.00 0.00
1,903.87 ML 30.00 25.14 754.20 30.00 754.20 0.00 0.00
753.06 und 20.00 14.45 289.00 20.00 289.00 0.00 0.00
478.32 und 24.00 19.45 466.80 24.00 466.80 0.00 0.00
1,042.44 und 22.00 9.84 216.48 22.00 216.48 0.00 0.00
365.40 pza 4.00 49.49 197.96 4.00 197.96 0.00 0.00
733.43 2,383.10 0.00 1,744.06 639.04
733.43 2,383.10 0.00 1,744.06 639.04
256.13 ML 8.00 69.74 557.92 0.00 0.00 8.00 557.92
356.64 ML 25.00 68.14 1,703.50 25.00 1,703.50 0.00 0.00
120.66 und 6.00 20.28 121.68 2.00 40.56 4.00 81.12
35,930.79 43,253.73 0.00 35,049.61 8,204.12
11,007.23 6,262.78 0.00 3,662.79 2,599.99
2,561.86 pto 54.00 48.38 2,612.52 49.00 2,370.62 5.00 241.90
175.08 pto 4.00 48.38 193.52 0.00 0.00 4.00 193.52
1,124.64 pto 8.00 48.38 387.04 8.00 387.04 0.00 0.00
2,078.55 pto 13.00 57.38 745.94 13.00 745.94 0.00 0.00
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)
1,987.70 pto 4.00 53.11 212.44 0.00 0.00 4.00 212.44
567.84 pto 22.00 81.92 1,802.24 1.00 81.92 21.00 1,720.32
2,033.12 pto 4.00 77.27 309.08 1.00 77.27 3.00 231.81
478.44
3,121.00 2,444.77 0.00 2,351.49 93.28
582.47 EQ 1.00 497.41 497.41 1.00 497.41 0.00 0.00
1,490.56 m 8.00 231.76 1,854.08 8.00 1,854.08 0.00 0.00
905.21 pto 2.00 46.64 93.28 0.00 0.00 2.00 93.28
142.76
21,802.56 34,546.18 0.00 29,035.33 5,510.85
10,780.56 EQ 54.00 429.73 23,205.42 49.00 21,056.77 5.00 2,148.65
4,545.36 EQ 30.00 336.22 10,086.60 20.00 6,724.40 10.00 3,362.20
6,476.64 und 1.00 1,254.16 1,254.16 1.00 1,254.16 0.00 0.00
69,184.22 61,128.52 8,055.71
44,949.60 36,893.89 8,055.71
349.44 349.44 0.00
m2 104.00 1.66 172.64 104.00 172.64 0.00 0.00
m2 104.00 1.70 176.80 104.00 176.80 0.00 0.00
3,704.00 0.00 3,704.00 0.00
mes 0.50 5,286.36 2,643.18 0.50 2,643.18 0.00 0.00
m3 21.87 23.89 522.47 21.87 522.47 0.00 0.00
m3 14.58 21.39 311.87 14.58 311.87 0.00 0.00
m3 9.48 23.89 226.48 9.48 226.48 0.00 0.00
237.29 0.00 237.29 0.00
m2 12.15 19.53 237.29 12.15 237.29 0.00 0.00
40,658.87 0.00 32,603.16 8,055.71
3,952.24 0.00 3,384.73 567.51
m3 7.29 448.88 3,272.34 6.05 2,715.72 1.24 556.61
kg 137.70 4.55 626.54 137.30 624.72 0.40 1.82
m3 7.29 7.32 53.36 6.05 44.29 1.24 9.08
9,086.69 0.00 8,474.64 612.05
kg 979.92 4.69 4,595.82 849.42 3,983.78 130.50 612.05
m2 43.68 60.95 2,662.30 43.68 2,662.30 0.00 0.00
m3 3.28 554.56 1,818.96 3.28 1,818.96 0.00 0.00
m3 3.28 2.93 9.61 3.28 9.61 0.00 0.00
27,619.94 0.00 20,743.79 6,876.15
m3 18.23 459.74 8,381.06 18.23 8,381.06 0.00 0.00
m2 117.18 70.47 8,257.67 117.18 8,257.67 0.00 0.00
kg 2,340.00 4.67 10,927.80 867.59 4,051.65 ### 6,876.15
m3 18.23 2.93 53.41 18.23 53.41 0.00 0.00
24,234.62 0.00 24,234.63 0.00
5,694.14 0.00 5,694.15 0.00
m2 43.68 29.84 1,303.41 43.68 1,303.41 0.00 0.00
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

m2 117.18 37.47 4,390.73 117.18 4,390.73 0.00 0.00


18,540.48 0.00 18,540.48 0.00
m 86.80 213.60 18,540.48 86.80 18,540.48 0.00 0.00
761,532.81 0.00 723,356.06 38,176.79

m2 20.87 29.600
m2 7.28 29.60
m 79.20 48.99
m2 6.53 78.23
m 110.87 18.21
m2 670.30 9.74
m2 270.99 9.70
ML 39.60 6.06

pza 6.00 88.80

m2 7.77 33.57

kg 245.82 4.71
m2 37.46 51.95
m3 4.04 412.55
m3 4.04 3.52

kg 35.07 4.71
m2 4.45 51.95
m3 0.66 412.55
m3 0.66 3.52

ML 20.00 36.89

ML 22.00 44.33
ML 10.80 81.83

pto 1.00 874.22


m 3.20 8.64
m 3.20 6.57
PRESUPUESTO EXPEDIENTE TECNICO PPTO. EJECUTADO DEDUCTIVO
PUESTO PIP VIABLE
APROBADO
Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

m3 0.43 280.56

m2 6.65 4.41
m2 6.65 6.26
m3 1.00 431.35
m2 1.00 1.25

m2 74.23 7.81

m2 47.69 34.88

m3 14.51 356.60

m2 32.28 1.14
m2 32.28 2.61

m3 23.88 4.64
m2 23.88 2.65
m3 31.05 20.41
m3 19.82 21.00

m2 23.88 18.44
m2 55.95 31.27
m3 46.11 356.60
m3 46.11 8.04

m3 23.76 356.60

369,877.67 761,532.81 723,356.06 38,176.79


PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

14,575.00 0.00 14,575.00


1.00 4000.00 0.00 0.00 0.00 1.00 4000.00
1.00 5000.00 0.00 0.00 0.00 1.00 5000.00
1.00 800.00 0.00 0.00 0.00 1.00 800.00
1.00 1275.00 0.00 0.00 0.00 1.00 1275.00
1.00 2500.00 0.00 0.00 0.00 1.00 2500.00
1.00 1000.00 0.00 0.00 0.00 1.00 1000.00
7,287.85 840.72 7,287.86
358.82 595.64 67.34 111.78 0.00 358.82 595.64
358.82 609.99 67.34 114.47 0.00 358.82 609.99
8.55 4975.25 0.80 465.52 0.00 8.55 4975.25
148.19 1106.98 19.94 148.95 0.00 148.19 1106.98
67,614.74 6,161.60 67,614.73

215.29 2620.08 40.40 491.67 0.00 215.29 2620.08


489.06 5951.86 60.06 730.93 0.00 489.06 5951.86
489.06 1296.01 60.06 159.16 0.00 489.06 1296.01
489.06 5643.75 60.06 693.09 0.00 489.06 5643.75
376.20 3382.04 46.20 415.34 0.00 376.20 3382.04
5.00 26431.80 0.00 0.00 0.00 5.00 26431.80
151.69 3623.87 16.91 403.98 0.00 151.69 3623.87
173.82 4152.56 35.86 856.70 0.00 173.82 4152.56
203.39 835.93 21.77 89.47 0.00 203.39 835.93
113.52 2428.17 18.26 390.56 0.00 113.52 2428.17
215.29 4391.92 40.40 824.16 0.00 215.29 4391.92
275.60 6583.98 44.87 1071.84 0.00 275.60 6583.98
45.61 272.76 5.80 34.70 0.00 45.61 272.76

22,929.19 4,006.16 22,929.20


93.35 18457.11 17.87 3532.45 0.00 93.35 18457.11
105.11 2052.80 8.87 173.23 0.00 105.11 2052.80
53.54 1207.86 6.64 149.80 0.00 53.54 1207.86
4.02 1211.43 0.50 150.68 0.01 4.02 1211.43
224,931.93 7,583.15 224,931.91
19,273.86 147.27 19,273.86
34.10 15306.81 0.00 0.00 0.00 34.10 15306.81
817.02 3717.44 27.54 125.31 0.00 817.02 3717.44
34.10 249.61 3.00 21.96 0.00 34.10 249.61
42,899.10 1,406.82 42,899.09
2638.98 31773.32 115.20 1387.01 0.00 2,638.98 31773.32
83.20 3923.71 0.42 19.81 0.00 83.20 3923.71
15.42 7089.19 0.00 0.00 0.00 15.42 7089.19
15.42 112.87 0.00 0.00 0.00 15.42 112.87
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

38,838.19 935.16 38,838.18


3403.12 15960.63 0.04 0.19 0.00 3,403.12 15960.63
222.60 13567.47 15.34 934.97 0.00 222.60 13567.47
16.70 9261.15 0.00 0.00 0.00 16.70 9261.15
16.70 48.93 0.00 0.00 0.00 16.70 48.93
48,176.95 0.18 48,176.95
34.39 15810.46 0.00 0.00 0.00 34.39 15810.46
193.05 13604.41 0.00 0.18 0.00 193.05 13604.41
3996.00 18661.32 0.00 0.00 0.00 3,996.00 18661.32
34.39 100.76 0.00 0.00 0.00 34.39 100.76
65,614.40 3,129.54 65,614.40
380.24 26453.30 0.00 0.00 0.00 380.24 26453.30
278.00 6382.88 0.00 0.00 0.00 278.00 6382.88
3390.32 17256.73 614.84 3129.54 0.00 3,390.32 17256.73
33.81 15422.43 0.00 0.00 0.00 33.81 15422.43
33.81 99.06 0.00 0.00 0.00 33.81 99.06
10,129.43 1,964.18 10,129.43

679.98 3114.31 275.16 1260.23 0.00 679.98 3114.31


42.08 3200.91 9.25 703.86 0.00 42.08 3200.91
7.48 3792.21 0.00 0.00 0.00 7.48 3792.21
7.51 22.00 0.03 0.09 0.00 7.51 22.00
181,308.06 16,731.86 181,308.04
15,851.58 1,783.72 15,851.58
279.03 15851.58 31.40 1783.72 0.00 279.03 15851.58
11,631.91 2,444.93 11,631.90

552.60 2591.69 15.00 70.35 0.00 552.60 2591.69


94.91 5784.46 28.72 1750.18 0.00 94.91 5784.46
5.84 3238.63 1.12 621.11 0.00 5.84 3238.63
5.84 17.12 1.12 3.29 0.00 5.84 17.12
18,116.66 5,066.23 18,116.66
55.08 9092.06 14.29 2358.85 0.00 55.08 9092.06
30.00 9024.60 9.00 2707.38 0.00 30.00 9024.60
41,725.20 2,523.95 41,725.20
465.35 8027.29 0.00 0.00 0.00 465.35 8027.29
465.35 10958.99 0.00 0.00 0.00 465.35 10958.99
187.77 2527.38 37.77 508.38 0.00 187.77 2527.38
187.77 3967.58 37.77 798.08 0.00 187.77 3967.58
222.60 6642.38 15.34 457.75 0.00 222.60 6642.38
208.15 7799.38 8.45 316.62 0.00 208.15 7799.38
303.40 1802.20 74.60 443.12 0.00 303.40 1802.20
7,385.28 80.87 7,385.28
384.45 7385.28 4.21 80.87 0.00 384.45 7385.28
63,836.97 4,832.16 63,836.97
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

260.22 4127.09 55.06 873.25 0.00 260.22 4127.09


260.22 9760.85 55.06 2065.30 0.00 260.22 9760.85
644.67 49949.03 24.44 1893.61 0.00 644.67 49949.03
22,760.45 0.00 22,760.45
270.99 22760.45 0.00 0.00 0.00 270.99 22760.45
2,151.00 0.00 2,151.00
4.77 1431.00 0.00 0.00 0.00 4.77 1431.00
4.00 720.00 0.00 0.00 0.00 4.00 720.00
110,895.72 8,206.67 110,895.72
258.81 37706.03 33.81 4925.78 0.00 258.81 37706.03
0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.00 500.00 0.00 0.00 0.00 10.00 500.00
51.54 11008.94 14.38 3071.57 0.00 51.54 11008.94
61.72 10172.69 1.27 209.32 0.00 61.72 10172.69
29.00 51508.06 0.00 0.00 0.00 29.00 51508.06

42.90 0.00 42.90

6.00 42.90 0.00 0.00 0.00 6.00 42.90


118.82 0.00 118.82
0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00 118.82 0.00 0.00 0.00 2.00 118.82

17,601.39 2,520.24 17,601.39


290.93 3494.07 185.53 2228.22 0.00 290.93 3494.07
380.24 4376.56 0.00 0.00 0.00 380.24 4376.56
180.00 2210.40 0.00 0.00 0.00 180.00 2210.40
430.75 5289.61 23.78 292.02 0.00 430.75 5289.61
4.77 148.35 0.00 0.00 0.00 4.77 148.35
137.00 2082.40 0.00 0.00 0.00 137.00 2082.40
25,805.08 2,033.36 25,805.08
8,098.50 0.00 8,098.50
5.00 3017.30 0.00 0.00 0.00 5.00 3017.30
2.00 500.00 0.00 0.00 0.00 2.00 500.00
8.00 705.52 0.00 0.00 0.00 8.00 705.52
4.00 1413.84 0.00 0.00 0.00 4.00 1413.84
4.00 2461.84 0.00 0.00 0.00 4.00 2461.84
2,691.00 0.00 2,691.00
23.00 2691.00 0.00 0.00 0.00 23.00 2691.00
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

2,010.48 404.88 2,010.48


75.13 223.89 15.13 45.09 0.00 75.13 223.89
75.13 1114.93 15.13 224.53 0.00 75.13 1114.93
75.13 671.66 15.13 135.26 0.00 75.13 671.66
7,143.64 1,365.12 7,143.64

7.00 653.87 0.00 0.00 0.00 7.00 653.87


27.00 1513.89 5.00 280.35 0.00 27.00 1513.89
12.50 550.25 0.00 0.00 0.00 12.50 550.25
79.12 1868.81 44.12 1042.11 0.00 79.12 1868.81
8.00 85.20 0.00 0.00 0.00 8.00 85.20
52.00 625.04 0.00 0.00 0.00 52.00 625.04
3.00 117.06 0.00 0.00 0.00 3.00 117.06
5.00 195.10 0.00 0.00 0.00 5.00 195.10
6.00 84.90 0.00 0.00 0.00 6.00 84.90
1.00 24.08 0.00 0.00 0.00 1.00 24.08
7.00 161.56 0.00 0.00 0.00 7.00 161.56
16.00 227.52 3.00 42.66 0.00 16.00 227.52
2.00 52.58 0.00 0.00 0.00 2.00 52.58
14.00 983.78 0.00 0.00 0.00 14.00 983.78
4,015.19 161.15 4,015.19
508.80 0.00 508.80

30.00 89.40 0.00 0.00 0.00 30.00 89.40


30.00 151.20 0.00 0.00 0.00 30.00 151.20
30.00 268.20 0.00 0.00 0.00 30.00 268.20
3,506.39 161.15 3,506.39
24.00 1420.80 0.00 0.00 0.00 24.00 1420.80
36.41 915.35 6.41 161.15 0.00 36.41 915.35
20.00 289.00 0.00 0.00 0.00 20.00 289.00
24.00 466.80 0.00 0.00 0.00 24.00 466.80
22.00 216.48 0.00 0.00 0.00 22.00 216.48
4.00 197.96 0.00 0.00 0.00 4.00 197.96
26.50 1,846.27 102.21 1,846.27
1,846.27 102.21 1,846.27

0.00 0.00 0.00 0.00 0.00 0.00 0.00


26.50 1805.71 1.50 102.21 0.00 26.50 1805.71
2.00 40.56 0.00 0.00 0.00 2.00 40.56
43,000.60 7,950.99 43,000.60
6,481.17 2,818.38 6,481.17

49.00 2370.62 0.00 0.00 0.00 49.00 2370.62


0.00 0.00 0.00 0.00 0.00 0.00 0.00
20.00 967.60 12.00 580.56 0.00 20.00 967.60
52.00 2983.76 39.00 2237.82 0.00 52.00 2983.76
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 81.92 0.00 0.00 0.00 1.00 81.92
1.00 77.27 0.00 0.00 0.00 1.00 77.27

7,484.10 5,132.61 7,484.10

2.00 994.82 1.00 497.41 0.00 2.00 994.82


28.00 6489.28 20.00 4635.20 0.00 28.00 6489.28
0.00 0.00 0.00 0.00 0.00 0.00

29,035.33 0.00 29,035.33

49.00 21056.77 0.00 0.00 0.00 49.00 21056.77


20.00 6724.40 0.00 0.00 0.00 20.00 6724.40
1.00 1254.16 0.00 0.00 0.00 1.00 1254.16
63,997.09 2,868.58 63,997.10
39,762.46 2,868.58 39,762.48
388.08 38.64 388.08

115.50 191.73 11.50 19.09 0.00 115.50 191.73


115.50 196.35 11.50 19.55 0.00 115.50 196.35
6,433.74 2,729.75 6,433.75

1.00 5286.36 0.50 2643.18 0.00 1.00 5286.36


23.54 562.37 1.67 39.90 0.00 23.54 562.37
15.12 323.42 0.54 11.55 0.00 15.12 323.42
10.95 261.60 1.47 35.12 0.00 10.95 261.60
337.48 100.19 337.48

17.28 337.48 5.13 100.19 0.00 17.28 337.48


32,603.16 0.00 32,603.17
3,384.73 0.00 3,384.73

6.05 2715.72 0.00 0.00 0.00 6.05 2715.72


137.30 624.72 0.00 0.00 0.00 137.30 624.72
6.05 44.29 0.00 0.00 0.00 6.05 44.29
8,474.64 0.00 8,474.65

849.42 3983.78 0.00 849.42 3983.78


43.68 2662.30 0.00 43.68 2662.30
3.28 1818.96 0.00 3.28 1818.96
3.28 9.61 0.00 3.28 9.61
20,743.79 0.00 20,743.79

18.23 8381.06 0.00 0.00 0.00 18.23 8381.06


117.18 8257.67 0.00 0.00 0.00 117.18 8257.67
867.59 4051.65 0.00 0.00 0.00 867.59 4051.65
18.23 53.41 0.00 0.00 0.00 18.23 53.41
24,234.63 0.00 24,234.62
5,694.15 0.00 5,694.14

43.68 1303.41 0.00 43.68 1303.41


PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

117.18 4390.73 0.00 117.18 4390.73


18,540.48 0.00 18,540.48

86.80 18540.48 0.00 0.00 0.00 86.80 18540.48


782,259.37 58,903.33 782,259.35

17433.97 17433.97
16640.33 16640.33
617.75 20.87 617.75
215.49 7.28 215.49
3880.01 79.20 3880.01
510.84 6.53 510.84
2018.94 110.87 2018.94
6528.72 670.30 6528.72
2628.60 270.99 2628.60
239.98 39.60 239.98
532.80 532.80
532.80 6.00 532.80
260.84 260.84
260.84 7.77 260.84
4784.78 4784.78
4784.78 4784.78
4784.78 4784.78
1157.81 245.82 1157.81
1946.05 37.46 1946.05
1666.70 4.04 1666.70
14.22 4.04 14.22
670.96 670.96
670.96 670.96
670.96 670.96

165.18 35.07 165.18


231.18 4.45 231.18
272.28 0.66 272.28
2.32 0.66 2.32
737.80 737.80
737.80 20.00 737.80
1859.02 1859.02
975.26 22.00 975.26
883.76 10.80 883.76
1043.53 1043.53
922.89 922.89

874.22 1.00 874.22


27.65 3.20 27.65
21.02 3.20 21.02
PART. NUEVAS PPTO. MODIFICADO
ejecutado total PPTO. MAYORES METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

120.64 120.64

120.64 0.43 120.64


503.56 503.56

29.33 6.65 29.33


41.63 6.65 41.63
431.35 1.00 431.35
1.25 1.00 1.25
7,417.44 7,417.44

579.74 579.74
579.74 74.23 579.74
1663.43 1663.43
1663.43 47.69 1663.43
5174.27 5174.27
5174.27 14.51 5174.27
28821.36 28821.36
121.05 121.05
36.80 32.28 36.80
84.25 32.28 84.25
1224.03 1224.03
110.80 23.88 110.80
63.28 23.88 63.28
633.73 31.05 633.73
416.22 19.82 416.22
19003.46 19003.46
440.35 23.88 440.35
1749.56 55.95 1749.56
16442.83 46.11 16442.83
370.72 46.11 370.72
8472.82 8472.82
8472.82 23.76 8472.82
782,259.37 58,903.33 63272.42 845531.77
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 15,375.00 15375.00


0.00 0.00 GLB 1.00 0.00 4,000.00 4000.00
0.00 0.00 GLB 1.00 0.00 5,000.00 5000.00
0.00 1.00 GLB 1.00 0.00 1,600.00 1600.00
0.00 0.00 GLB 1.00 0.00 1,275.00 1275.00
0.00 0.00 GLB 1.00 0.00 2,500.00 2500.00
0.00 0.00 GLB 1.00 0.00 1,000.00 0.00
0.00 1,035.03 6,447.14 6447.14
0.00 0.00 m2 358.82 210.03 483.86 483.86
0.00 0.00 m2 358.82 825.00 495.52 495.52
0.00 0.00 m3 8.55 0.00 4,509.73 4509.73
0.00 0.00 m2 148.19 0.00 958.03 0.00
0.00 4,428.34 61,453.13 61453.13
0.00 0.00 m3 215.29 53.04 2,128.41 2128.41
0.00 0.00 m3 489.06 0.00 5,220.93 5220.93
0.00 0.00 m3 489.06 0.00 1,136.85 1136.85
0.00 0.00 m3 489.06 0.00 4,950.66 4950.66
0.00 0.00 m3 376.20 0.00 2,966.70 2966.70
0.00 0.00 mes 5.00 0.00 26,431.80 26431.80
0.00 0.00 m3 151.69 2,350.48 3,219.89 3219.89
0.00 0.00 m3 173.82 635.03 3,295.86 3295.86
0.00 0.00 m2 203.39 379.59 746.46 746.46
0.00 0.00 m3 113.52 101.44 2,037.61 2037.61
0.00 0.00 m3 215.29 0.00 3,567.76 3567.76
0.00 0.00 m3 275.60 83.76 5,512.14 5512.14
0.00 0.00 m3 45.61 0.00 238.06 0.00
0.00 825.00
0.00 19,748.96 18,923.04 18923.04
0.00 0.00 m3 93.35 3,531.18 14,924.66 14924.66
0.00 0.00 m2 105.11 5,888.63 1,879.57 1879.57
0.00 0.00 m2 53.54 6,675.49 1,058.06 1058.06
0.01 0.00 m3 4.02 3,653.66 1,060.75 0.00
0.00 112,128.00 222,110.47 0.00
0.00 14,310.91 19,126.59 19126.59
0.00 0.00 m3 34.10 11,083.63 15,306.81 15306.81
0.00 0.00 kg 817.02 3,227.28 3,592.13 3592.13
0.00 0.00 m3 34.10 0.00 227.65 0.00
0.00 9,255.07 41,492.27 41492.27
0.00 0.00 kg 2,638.98 2,746.83 30,386.31 30386.31
0.00 0.00 m2 83.20 1,644.12 3,903.90 3903.90
0.00 0.00 m3 15.42 4,864.12 7,089.19 7089.19
0.00 0.00 m3 15.42 0.00 112.87 0.00
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 28,971.74 40,220.43 40220.43


0.00 275.40 kg 3,403.12 11,509.68 17,252.07 17252.07
0.00 0.00 m2 222.60 10,127.63 12,632.50 12632.50
0.00 1.84 m3 16.70 7,334.43 10,281.54 10281.54
0.00 1.84 m3 16.70 0.00 54.32 0.00
0.00 23,522.78 50,366.11 50366.11
0.00 0.00 m3 34.39 8,013.20 15,810.46 15810.46
0.00 6.65 m2 193.05 9,639.36 14,072.86 14072.86
0.00 368.46 kg 3,996.00 5,870.22 20,382.03 20382.03
0.00 0.00 m3 34.39 0.00 100.76 0.00
0.00 31,489.43 62,484.86 62484.86
0.00 0.00 m2 380.24 21,082.74 26,453.30 26453.30
0.00 0.00 und 278.00 2,657.94 6,382.88 6382.88
0.00 0.00 kg 3,390.32 3,384.36 14,127.19 14127.19
0.00 0.00 m3 33.81 4,364.39 15,422.43 15422.43
0.00 0.00 m3 33.81 0.00 99.06 0.00
0.00 4,578.07 8,420.21 8420.21
0.00 0.00 kg 679.98 1,156.68 1,854.08 1854.08
0.00 0.00 m2 42.08 1,422.00 2,497.05 2497.05
0.00 0.50 m3 7.48 1,999.39 4,045.70 4045.70
0.00 0.50 m3 7.51 0.00 23.38 0.00
0.00 164,783.82 175,779.56 0.00
0.00 25,498.95 14,067.86 14067.86
0.00 0.00 m2 279.03 25,498.95 14,067.86 14067.86
0.00 0.00 0 0.00 0.00 9,186.97 9186.97
0.00 0.00 kg 552.60 0.00 2,521.34 2521.34
0.00 0.00 m2 94.91 0.00 4,034.28 4034.28
0.00 0.00 m3 5.84 0.00 2,617.52 2617.52
0.00 0.00 m3 5.84 0.00 13.83 0.00
0.00 5,032.55 13,050.43 13050.43
0.00 0.00 m2 55.08 5,032.55 6,733.21 6733.21
0.00 0.00 m2 30.00 0.00 6,317.22 0.00
0.00 32,411.12 40,421.58 40421.58
0.00 29.91 m2 465.35 2,251.41 8,543.24 8543.24
0.00 29.91 m2 465.35 10,510.52 11,663.37 11663.37
0.00 0.00 m2 187.77 14,316.02 2,019.00 2019.00
0.00 0.00 m2 187.77 0.00 3,169.50 3169.50
0.01 0.00 m2 222.60 3,468.67 6,184.64 6184.64
0.00 0.00 m2 208.15 1,730.34 7,482.76 7482.76
-0.01 0.00 ML 303.40 134.16 1,359.07 0.00
0.00 17,836.62 7,304.41 7304.41
0.00 0.00 m2 384.45 17,836.62 7,304.41 0.00
0.00 27,447.71 59,004.81 59004.81
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 0.00 m2 260.22 4,137.43 3,253.84 3253.84


0.00 0.00 m2 260.22 0.00 7,695.55 7695.55
0.00 0.00 m2 644.67 23,310.28 48,055.42 0.00
0.00 2,490.94 32,743.50 32743.50
0.00 118.86 m2 270.99 2,490.94 32,743.50 0.00
0.00 3,030.08 2,151.00 2151.00
0.00 0.00 m2 4.77 2,582.08 1,431.00 1431.00
0.00 0.00 pza 4.00 448.00 720.00 0.00
0.01 17,961.10 102,873.65 102873.65
0.00 0.00 m2 258.81 0.00 32,780.25 32780.25
0.00 2.25 m2 0.00 0.00 184.59 184.59
0.00 0.00 pza 10.00 0.00 500.00 500.00
0.01 0.00 m 51.54 2,564.10 7,937.38 7937.38
0.00 0.00 m 61.72 0.00 9,963.37 9963.37
0.00 0.00 und 29.00 0.00 51,508.06 0.00
0.00 8,447.16
0.00 1,949.84
0.00 5,000.00
0.00 141.60 42.90 42.90
0.00 0.00 pza 6.00 141.60 42.90 0.00
0.00 796.20 1,307.02 1307.02
0.00 20.00 pza 0.00 265.40 1,188.20 1188.20
0.00 0.00 pza 2.00 530.80 118.82 0.00
0.00 8,230.39
0.00 228.76
0.00 8,001.63
0.00 23,906.56 15,081.15 15081.15
0.00 0.00 m2 290.93 6,709.39 1,265.85 1265.85
0.00 0.00 m2 380.24 6,411.14 4,376.56 4376.56
0.00 0.00 m2 180.00 7,178.47 2,210.40 2210.40
0.00 0.00 m2 430.75 2,424.96 4,997.59 4997.59
0.00 0.00 m2 4.77 94.49 148.35 148.35
0.00 0.00 ML 137.00 1,088.11 2,082.40 0.00
0.00 31,822.73 27,550.80 0.00
0.00 8,691.74 9,658.88 9658.88
0.00 1.00 pza 5.00 1,886.40 3,620.76 3620.76
0.00 1.00 pza 2.00 567.00 750.00 750.00
0.00 0.00 pza 8.00 474.24 705.52 705.52
0.00 2.00 pza 4.00 1,029.12 2,120.76 2120.76
0.00 0.00 pza 4.00 648.56 2,461.84 0.00
0.00 0.00 3,627.00 3627.00
0.00 8.00 pza 23.00 3,143.58 3,627.00 0.00
0.00 942.84
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 15,469.04
0.00 438.39 1,605.60 1605.60
0.00 0.00 m 75.13 72.83 178.80 178.80
0.00 0.00 ML 75.13 297.51 890.40 890.40
0.00 0.00 ML 75.13 68.05 536.40 0.00
0.00 15,030.65 6,422.18 6422.18
0.00 1.00 pto 7.00 629.52 747.28 747.28
0.00 0.00 pto 27.00 3,884.30 1,233.54 1233.54
0.00 12.50 ML 12.50 2,225.68 1,100.50 1100.50
0.00 0.00 ML 79.12 2,695.76 826.70 826.70
0.00 0.00 und 8.00 378.40 85.20 85.20
0.00 0.00 pza 52.00 0.00 625.04 625.04
0.00 0.00 pza 3.00 0.00 117.06 117.06
0.00 0.00 pza 5.00 0.00 195.10 195.10
0.00 0.00 und 6.00 412.80 84.90 84.90
0.00 0.00 und 1.00 1,216.35 24.08 24.08
0.00 0.00 pza 7.00 432.48 161.56 161.56
0.00 0.00 und 16.00 92.08 184.86 184.86
0.00 0.00 pza 2.00 498.48 52.58 52.58
0.00 0.00 und 14.00 2,564.80 983.78 0.00
0.00 6,928.52 3,854.04 0.00
0.00 195.45 508.80 508.80
0.00 0.00 m 30.00 45.00 89.40 89.40
0.00 0.00 ML 30.00 101.40 151.20 151.20
0.00 0.00 ML 30.00 49.05 268.20 0.00
0.00 6,733.07 3,345.24 3345.24
0.00 0.00 pto 24.00 2,189.98 1,420.80 1420.80
0.00 0.00 ML 36.41 1,903.87 754.20 754.20
0.00 0.00 und 20.00 753.06 289.00 289.00
0.00 0.00 und 24.00 478.32 466.80 466.80
0.00 0.00 und 22.00 1,042.44 216.48 216.48
0.00 0.00 pza 4.00 365.40 197.96 0.00
0.00 733.43 2,383.10 0.00
0.00 733.43 2,383.10 2383.10
0.00 8.00 ML 0.00 256.13 557.92 557.92
0.00 0.00 ML 26.50 356.64 1,703.50 1703.50
0.00 4.00 und 2.00 120.66 121.68 0.00
0.00 35,930.79 43,253.73 0.00
0.00 11,007.23 6,262.78 6262.78
0.00 5.00 pto 49.00 2,561.86 2,612.52 2612.52
0.00 4.00 pto 0.00 175.08 193.52 193.52
0.00 0.00 pto 20.00 1,124.64 387.04 387.04
0.00 0.00 pto 52.00 2,078.55 745.94 745.94
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 4.00 pto 0.00 1,987.70 212.44 212.44


0.00 21.00 pto 1.00 567.84 1,802.24 1802.24
0.00 3.00 pto 1.00 2,033.12 309.08 0.00
0.00 478.44
0.00 3,121.00 2,444.77 2444.77
0.00 0.00 EQ 2.00 582.47 497.41 497.41
0.00 0.00 m 28.00 1,490.56 1,854.08 1854.08
0.00 2.00 pto 0.00 905.21 93.28 0.00
0.00 142.76
0.00 21,802.56 34,546.18 34546.18
0.00 5.00 EQ 49.00 10,780.56 23,205.42 23205.42
0.00 10.00 EQ 20.00 4,545.36 10,086.60 10086.60
0.00 0.00 und 1.00 6,476.64 1,254.16 0.00
-0.01 69,184.22 0.00
-0.01 44,949.60 0.00
0.00 349.44 349.44
0.00 0.00 m2 115.50 172.64 172.64
0.00 0.00 m2 115.50 176.80 0.00
0.00 3,704.00 3704.00
0.00 0.00 mes 1.00 2,643.18 2643.18
0.00 0.00 m3 23.54 522.47 522.47
0.00 0.00 m3 15.12 311.87 311.87
0.00 0.00 m3 10.95 226.48 0.00
0.00 237.29 237.29
0.00 0.00 m2 17.28 237.29 0.00
-0.01 40,658.87 0.00
0.00 3,952.24 3952.24
0.01 1.24 m3 6.05 3,272.34 3272.34
0.00 0.40 kg 137.30 626.54 626.54
-0.01 1.24 m3 6.05 53.36 0.00
0.00 9,086.69 9086.69
-0.01 130.50 kg 849.42 4,595.82 4595.82
0.00 0.00 m2 43.68 2,662.30 2662.30
0.00 0.00 m3 3.28 1,818.96 1818.96
0.00 0.00 m3 3.28 9.61 0.00
0.00 27,619.94 27619.94
0.00 0.00 m3 18.23 8,381.06 8381.06
0.00 0.00 m2 117.18 8,257.67 8257.67
0.00 1,472.41 kg 867.59 10,927.80 10927.80
0.00 0.00 m3 18.23 53.41 0.00
0.00 24,234.62 0.00
0.00 5,694.14 5694.14
0.00 0.00 m2 43.68 1,303.41 1303.41
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00 0.00 m2 117.18 4,390.73 0.00


0.00 18,540.48 18540.48
0.00 0.00 m 86.80 18,540.48 0.00
0.00
0.00
0.00
0.00
0.00 m2 20.87
0.00 m2 7.28
0.00 m 79.20
0.00 m2 6.53
0.00 m 110.87
0.00 m2 670.30
0.00 m2 270.99
0.00 ML 39.60
0.00
0.00 pza 6.00
0.00
0.00 m2 7.77
0.00
0.00
0.00
0.00 kg 245.82
0.00 m2 37.46
0.00 m3 4.04
0.00 m3 4.04
0.00
0.00
0.00
0.00 kg 35.07
0.00 m2 4.45
0.00 m3 0.66
0.00 m3 0.66
0.00
0.00 ML 20.00
0.00
0.00 ML 22.00
0.00 ML 10.80
0.00
0.00
0.00 pto 1.00
0.00 m 3.20
0.00 m 3.20
EJECUCION NO REGISTRADA
METRADOS

METRADOS EXPEDIENTE TECNICO EXPEDIENTE TECNICO


DEDUCTIVOS MODIFICADO APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
CANT. UND CANT.
INVERSION S/. S/.

0.00
0.00 m3 0.43
0.00
0.00 m2 6.65
0.00 m2 6.65
0.00 m3 1.00
0.00 m2 1.00
0.00
0.00
0.00 m2 74.23
0.00
0.00 m2 47.69
0.00
0.00 m3 14.51
0.00
0.00
0.00 m2 32.28
0.00 m2 32.28
0.00
0.00 m3 23.88
0.00 m2 23.88
0.00 m3 31.05
0.00 m3 19.82
0.00
0.00 m2 23.88
0.00 m2 55.95
0.00 m3 46.11
0.00 m3 46.11
0.00
0.00 m3 23.76
0.00 369,877.67 761,532.81 761,532.81
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

0.00 800.00 14,575.00


0.00 0.00 4,000.00
0.00 0.00 5,000.00
0.00 800.00 800.00
0.00 0.00 1,275.00
0.00 0.00 2,500.00
0.00 0.00 1,000.00
840.72 0.00 7,287.86
111.78 0.00 595.64
114.47 0.00 609.99
465.52 0.00 4,975.25
148.95 0.00 1,106.98
6,161.60 0.00 67,614.73
491.67 0.00 2,620.08
730.93 0.00 5,951.86
159.16 0.00 1,296.01
693.09 0.00 5,643.75
415.34 0.00 3,382.04
0.00 0.00 26,431.80
403.98 0.00 3,623.87
856.70 0.00 4,152.56
89.47 0.00 835.93
390.56 0.00 2,428.17
824.16 0.00 4,391.92
1,071.84 0.00 6,583.98
34.70 0.00 272.76

4,006.16 0.00 22,929.20


3,532.45 0.00 18,457.11
173.23 0.00 2,052.80
149.80 0.00 1,207.86
150.68 0.00 1,211.43
7,583.15 4,761.71 224,931.91
147.27 0.00 19,273.86
0.00 0.00 15,306.81
125.31 0.00 3,717.44
21.96 0.00 249.61
1,406.82 0.00 42,899.09
1,387.01 0.00 31,773.32
19.81 0.00 3,923.71
0.00 0.00 7,089.19
0.00 0.00 112.87
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

935.16 2,317.41 38,838.18


0.19 1,291.63 15,960.63
934.97 0.00 13,567.47
0.00 1,020.39 9,261.15
0.00 5.39 48.93
0.18 2,189.34 48,176.95
0.00 0.00 15,810.46
0.18 468.63 13,604.41
0.00 1,720.71 18,661.32
0.00 0.00 100.76
3,129.54 0.00 65,614.40
0.00 0.00 26,453.30
0.00 0.00 6,382.88
3,129.54 0.00 17,256.73
0.00 0.00 15,422.43
0.00 0.00 99.06
1,964.18 254.96 10,129.43
1,260.23 0.00 3,114.31
703.86 0.00 3,200.91
0.00 253.49 3,792.21
0.09 1.47 22.00
16,731.86 11,203.38 181,308.04
1,783.72 0.00 15,851.58
1,783.72 0.00 15,851.58
2,444.93 0.00 11,631.90
70.35 0.00 2,591.69
1,750.18 0.00 5,784.46
621.11 0.00 3,238.63
3.29 0.00 17.12
5,066.23 0.00 18,116.66
2,358.85 0.00 9,092.06
2,707.38 0.00 9,024.60
2,523.95 1,220.33 41,725.20
0.00 515.95 8,027.29
0.00 704.38 10,958.99
508.38 0.00 2,527.38
798.08 0.00 3,967.58
457.75 0.00 6,642.38
316.62 0.00 7,799.38
443.12 0.00 1,802.20
80.87 0.00 7,385.28
80.87 0.00 7,385.28
4,832.16 0.00 63,836.97
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

873.25 0.00 4,127.09


2,065.30 0.00 9,760.85
1,893.61 0.00 49,949.03
0.00 9,983.05 22,760.45
0.00 9,983.05 22,760.45
0.00 0.00 2,151.00
0.00 0.00 1,431.00
0.00 0.00 720.00
8,206.67 184.59 110,895.72
4,925.78 0.00 37,706.03
0.00 184.59 0.00
0.00 0.00 500.00
3,071.57 0.00 11,008.94
209.32 0.00 10,172.69
0.00 0.00 51,508.06

0.00 0.00 42.90


0.00 0.00 42.90
0.00 1,188.20 118.82
0.00 1,188.20 0.00
0.00 0.00 118.82

2,520.24 0.00 17,601.39


2,228.22 0.00 3,494.07
0.00 0.00 4,376.56
0.00 0.00 2,210.40
292.02 0.00 5,289.61
0.00 0.00 148.35
0.00 0.00 2,082.40
2,033.36 3,779.08 25,805.08
0.00 1,560.38 8,098.50
0.00 603.46 3,017.30
0.00 250.00 500.00
0.00 0.00 705.52
0.00 706.92 1,413.84
0.00 0.00 2,461.84
0.00 936.00 2,691.00
0.00 936.00 2,691.00
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

404.88 0.00 2,010.48


45.09 0.00 223.89
224.53 0.00 1,114.93
135.26 0.00 671.66
1,365.12 643.66 7,143.64
0.00 93.41 653.87
280.35 0.00 1,513.89
0.00 550.25 550.25
1,042.11 0.00 1,868.81
0.00 0.00 85.20
0.00 0.00 625.04
0.00 0.00 117.06
0.00 0.00 195.10
0.00 0.00 84.90
0.00 0.00 24.08
0.00 0.00 161.56
42.66 0.00 227.52
0.00 0.00 52.58
0.00 0.00 983.78
161.15 0.00 4,015.19
0.00 0.00 508.80
0.00 0.00 89.40
0.00 0.00 151.20
0.00 0.00 268.20
161.15 0.00 3,506.39
0.00 0.00 1,420.80
161.15 0.00 915.35
0.00 0.00 289.00
0.00 0.00 466.80
0.00 0.00 216.48
0.00 0.00 197.96
102.21 639.04 1,846.27
102.21 639.04 1,846.27
0.00 557.92 0.00
102.21 0.00 1,805.71
0.00 81.12 40.56
7,950.99 8,204.12 43,000.60
2,818.38 2,599.99 6,481.17
0.00 241.90 2,370.62
0.00 193.52 0.00
580.56 0.00 967.60
2,237.82 0.00 2,983.76
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

0.00 212.44 0.00


0.00 1,720.32 81.92
0.00 231.81 77.27

5,132.61 93.28 7,484.10


497.41 0.00 994.82
4,635.20 0.00 6,489.28
0.00 93.28 0.00

0.00 5,510.85 29,035.33


0.00 2,148.65 21,056.77
0.00 3,362.20 6,724.40
0.00 0.00 1,254.16
2,868.58 8,055.71 63,997.10
2,868.58 8,055.71 39,762.48
38.64 0.00 388.08
19.09 0.00 191.73
19.55 0.00 196.35
2,729.75 0.00 6,433.75
2,643.18 0.00 5,286.36
39.90 0.00 562.37
11.55 0.00 323.42
35.12 0.00 261.60
100.19 0.00 337.48
100.19 0.00 337.48
0.00 8,055.71 32,603.17
0.00 567.51 3,384.73
0.00 556.61 2,715.72
0.00 1.82 624.72
0.00 9.08 44.29
0.00 612.05 8,474.65
0.00 612.05 3,983.78
0.00 0.00 2,662.30
0.00 0.00 1,818.96
0.00 0.00 9.61
0.00 6,876.15 20,743.79
0.00 0.00 8,381.06
0.00 0.00 8,257.67
0.00 6,876.15 4,051.65
0.00 0.00 53.41
0.00 0.00 24,234.62
0.00 0.00 5,694.14
0.00 0.00 1,303.41
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

0.00 0.00 4,390.73


0.00 0.00 18,540.48
0.00 0.00 18,540.48
782,259.35
0.00 0.00 0.00
17433.97 0.00 17,433.97
16640.33 0.00 16,640.33
617.75 0.00 617.75
215.49 0.00 215.49
3880.01 0.00 3,880.01
510.84 0.00 510.84
2018.94 0.00 2,018.94
6528.72 0.00 6,528.72
2628.60 0.00 2,628.60
239.98 0.00 239.98
532.80 0.00 532.80
532.80 0.00 532.80
260.84 0.00 260.84
260.84 0.00 260.84
4784.78 0.00 4,784.78
4784.78 0.00 4,784.78
4784.78 0.00 4,784.78
1157.81 0.00 1,157.81
1946.05 0.00 1,946.05
1666.70 0.00 1,666.70
14.22 0.00 14.22
670.96 0.00 670.96
670.96 0.00 670.96
670.96 0.00 670.96
165.18 0.00 165.18
231.18 0.00 231.18
272.28 0.00 272.28
2.32 0.00 2.32
737.80 0.00 737.80
737.80 0.00 737.80
1859.02 0.00 1,859.02
975.26 0.00 975.26
883.76 0.00 883.76
1043.53 0.00 1,043.53
922.89 0.00 922.89
874.22 0.00 874.22
27.65 0.00 27.65
21.02 0.00 21.02
EJECUCION NO REGISTRADA

PPTO. EXP.
PPTO.
DEDUCTIVO TECNICO
ADICIONAL S/.
S/. MODIF. S/,

120.64 0.00 120.64


120.64 0.00 120.64
503.56 0.00 503.56
29.33 0.00 29.33
41.63 0.00 41.63
431.35 0.00 431.35
1.25 0.00 1.25
7417.44 0.00 7,417.44
579.74 0.00 579.74
579.74 0.00 579.74
1663.43 0.00 1,663.43
1663.43 0.00 1,663.43
5174.27 0.00 5,174.27
5174.27 0.00 5,174.27
28821.36 0.00 28,821.36
121.05 0.00 121.05
36.80 0.00 36.80
84.25 0.00 84.25
1224.03 0.00 1,224.03
110.80 0.00 110.80
63.28 0.00 63.28
633.73 0.00 633.73
416.22 0.00 416.22
19003.46 0.00 19,003.46
440.35 0.00 440.35
1749.56 0.00 1,749.56
16442.83 0.00 16,442.83
370.72 0.00 370.72
8472.82 0.00 8,472.82
8472.82 0.00 8,472.82
122,175.75 38,176.79 845,531.77
ITEM Descripcin PRESUPUESTO PIP VIA

Und. Metrado

01 EQUIPAMIENTO Y TRATAMIENTO DE AREAS VERDES


SUB PRESUPUESTO GRADERIAS Y COBERTURA
ESTRUCTURAS

01.01 TRABAJOS PRELIMINARES

01.01.01 LIMPIEZA DE TERRENO MANUAL m2 42.21

01.01.02 TRAZO, NIVELES Y REPLANTEO m2 42.21


MOVIMIENTO DE TIERRAS
TRAZO Y REPLANTEO DURANTE EL PROCESO m2 42.21
CORTE DE TERRENO CON MAQUINARIA m3 2.00
EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 58.24
EXCAVACION PARA CIMIENTOS CORRIDOS m3 28.20
RELLENO CON MATERIAL PROPIO m3 4.00
ELIMINACION DE MATERIAL CON MAQUINA m3 2.00
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 25.20
OBRAS DE CONCRETO ARMADO
CONCRETO ARMADO
ACERO fy= 4200 kg/cm2 kg 862.87
ENCOFRADO Y DESENCOFRADO m2 400.96
CONCRETO F'C= 210 KG/CM2 m3 175.00
ARQUITECTURA
COBERTURAS
COBERTURA CON PLANCHAS ONDULADAS DE POLICARBONATO 2.44m x1.10m x0.8mm m2 80.00
ESTRUCTURA METALICA PARA CUBIERTA GLB 1.00
PINTURA
PINTURA EN ESTRUCTURA METALICA ML 168.00
INSTALACIONES ELECTRICAS Y MECANICAS
INSTALACIONES ELECTRICAS GLB 1.00

01.02 SARDINELES
01.02.01 TRAZO NIVELES Y REPLANTEO
01.02.02 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO
01.02.03 ENCOFRADO Y DESENCOFRADO DE SARDINELES
01.02.04 CONCRETO F'C=175KG/CM2
01.02.05 SELLADO DE JUNTAS CON ASFALTO
01.02.06 CURADO DE CONCRETO EN SARDINELES
01.02.07 ELIMINACION DE MATERIAL EXCEDENTE MANUAL
01.03 VEREDAS
01.03.01 TRAZO, NIVELES Y REPLANTEO
01.03.02 NIVELACION Y COMPACTACION DE FONDO DE VEREDAS
01.03.03 EMPEDRADO DC/PIEDRA MEDIANA 6"
01.03.04 CONCRETO F'C= 140 KG/CM2 P/VEREDAS E=0.08 m PASTA C:A 1:2
01.03.05 SELLADO DE JUNTAS CON ASFALTO
ITEM Descripcin PRESUPUESTO PIP VIA

Und. Metrado

01.03.06 CURADO DE VEREDAS


01.04 ILUMINACION
01.04.01 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO
01.04.02 TENDIDO Y COLOC. DE TUB PVC SEL 2"
01.04.03 INSTALACION DE CABLE NYY 3-1 X 16 mm.
01.04.04 RELLENO Y COMPACTADO DE ZANJAS
01.04.05 PROVISION E INSTALACION DE POSTES DE FG
01.04.06 PROVISION E INTALACION DE LUMINARIAS DE V DE M. DE 80 WATT
01.05 TRATAMIENTO DE AREAS VERDES
01.05.01 JARDINES
01.05.01.01 ACONDICIONAMIENTO DE AREAS VERDES
01.05.01.02 COLOCACION DE PLANTONES
01.05.02 RIEGO
01.05.03 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO
01.05.04 SUMINISTRO E INSTALACIN TUBERIA DE 1/2" PVC SAP C-10
01.05.05 RELLENO Y COMPACTADO DE ZANJAS
01.05.06 PROVISION E INSTALACION DE ASPERSORES
01.06 SEALIZACION
01.06.01 SEALIZACION INFORMATIVA VERTICAL
01.07 CARPINTERIA METALICA
01.07.01 TRIBUNAS METALICAS TELESCOPICAS

01.07.02 COBERTURA CON PLANCHAS ONDULADAS DE POLICARBONATO 2.44m x1.10m x0.8mm

01.08 OTROS
01.08.01 SILLAS PLAYERAS TIPO PEREZOSA
C

SUB PRESUPUESTO GENERAL


OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVICIONALES (OFICINA, ALMACEN Y GUARDIANIA) GLB 1.00
CERCO PROVISIONAL DE OBRA GLB 1.00
CARTEL DE IDENTIFICACION DE LA OBRA GLB 1.00
INSTALACION PROVISIONAL DE AGUA GLB 1.00
INSTALACION PROVISIONAL DE DESAGUE GLB 1.00
INSTALACION PROVISIONAL SUMINISTRO TRIFASICO DE ENERGIA ELECTRICA GLB 1.00
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2 1,120.00
TRAZO, NIVELES Y REPLANTEO m2 1,120.00
MOVIMIENTO DE TIERRAS
TRAZO Y REPLANTEO DURANTE EL PROCESO m2 1,120.00
CORTE DE TERRENO CON MAQUINARIA m3 124.00
NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL m2 142.00
ELIMINACION DE MATERIAL CON MAQUINA m3 141.00
ITEM Descripcin PRESUPUESTO PIP VIA

Und. Metrado
DEMOLICION DE ESTRUCTURAS EXISTENTES m2 88.00
OBRAS DE CONCRETO ARMADO
MACETAS EN CONCRETO ARMADO
ACERO fy= 4200 kg/cm2 kg 53.32
ENCOFRADO Y DESENCOFRADO m2 14.28
CONCRETO F'C= 210 KG/CM2 m3 1.43
ARQUITECTURA
PISOS Y PAVIMENTOS
PISO DE TERRAZO DE E=0.05 M m2 65.00
SARDINELES EXTERIORES m 72.46
VEREDA DE CONCRETO F'C= 175 KG/CM2. m2 247.54
VARIOS, LIMPIEZA, JARDINERIA
LIMPIEZA PERMANENTE DE OBRA GLB 1.00
LIMPIEZA FINAL DE OBRA GLB 1.00
INSTALACIONES ELECTRICAS Y MECANICAS
TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDIDORES DE ENERGIA

TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN) EQ 1.00


ALIMENTADOR TG m 4.00
MEDIDOR DE ENERGIA (SUMINISTRO TRIFSICO PROVISIONAL) GLB 1.00
CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm. pto 1.00
ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS
ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A MOD. AHR-2X36 EQ 4.00
ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2X18W EQ 10.00
POZO DE PUESTA A TIERRA und 1.00
TRANSPORTE DE MATERIALES
TRANSPORTE DE MATERIALES GLB 1.00
COSTO DIRECTO

01 PARTIDAS NUEVAS
01.01 OBRAS DE CONCRETO ARMADO
01.01.01 MACETEROS LONGITUDINALES EN CONCRETO ARMADO
01.01.01.01 ACERO f'y = 4200 kg/cm2, G 60 EN MACETEROS
01.01.01.02 ENCOFRADO Y DESENCOFRADO DE MACETEROS
01.01.01.03 CONCRETO EN MACETEROS F'C=175KG/CM2
01.01.01.04 CURADO EN MACETEROS
01.02 ARQUITECTURA
01.02.01 REVOQUES Y REVESTIMIENTOS
01.02.01.01 TARRAJEO EN MUROS CON TERRAZO
01.02.01.02 TARRAJEO PRIMARIO CON CEMENTO-ARENA
01.02.02 PINTURA
01.02.02.01 PINTURA EN ESTRUCTURA METALICA TRIBUNAS
01.03 ACONDICIONAMIENTO AREAS PARA TRIBUNAS
01.03.01 OBRAS DE CONCRETO SIMPLE
01.03.01.01 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO
ITEM Descripcin PRESUPUESTO PIP VIA

Und. Metrado

01.03.01.02 DADOS DE CONCRETO 30 CM X 30 CM


.01.04 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
.01.04.01 OBRAS PRELIMINARES
.01.04.01.01 TRAZO NIVELES Y REPLANTEO
.01.04.02 MOVIMIENTO DE TIERRAS
.01.04.02.01 EXCAVACION MANUAL DE ZANJAS
.01.04.02.02 RELLENO Y COMPACTADO DE ZANJAS
.01.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
.01.04.02.04 CAMA DE ARENA PARA TUBERIAS
.01.04.03 OBRAS SANITARIAS
.01.04.03.01 SUM. E INST.DE TUB PVC SAL 160 mm
.01.04.03.02 SUM. E INST.DE TUB PVC SAL 315 mm
.01.04.04 OBRAS DE CONCRETO ARMADO
.01.04.04.01 BUZONES
.01.04.04.01.01 ENCOFRADO DE BUZONES
.01.04.04.01.02 ACERO fy= 4200 kg/cm2
.01.04.04.01.03 CONCRETO F'C= 175 KG/CM2
.01.04.05 REPOSICION DE PAVIMENTO
.01.04.05.01 CONCRETO F'C= 210 KG/CM2
.01.05 COLECTOR DE DESAGE
.01.05.01 OBRAS PRELIMINARES
.01.05.01.01 TRAZO NIVELES Y REPLANTEO
.01.05.02 MOVIMIENTO DE TIERRAS
.01.05.02.01 EXCAVACION MANUAL DE ZANJAS
.01.05.02.02 RELLENO Y COMPACTADO DE ZANJAS
.01.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA
.01.05.02.04 CAMA DE ARENA PARA TUBERIAS
.01.05.03 OBRAS SANITARIAS
.01.05.03.01 SUM. E INST.DE TUB PVC SAL 160 mm
.01.05.04 OBRAS DE CONCRETO ARMADO
.01.05.04.01 BUZONES
.01.05.04.01.01 ENCOFRADO DE BUZONES
.01.05.04.01.02 ACERO fy= 4200 kg/cm2
.01.05.04.01.03 CONCRETO F'C= 175 KG/CM2
.01.05.05 REPOSICION DE PAVIMENTO
.01.05.05.01 CONCRETO F'C= 210 KG/CM2
PRESUPUESTO PIP VIABLE PRESUPUESTO PPTO. EJECUTADO DEDUCTIVO
Precio (S/.) Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

131,596.54
205.14
337.68
337.68 0
1.11 46.85 m2 100.50 1.66 166.83 100.50 166.83 0.00 0 0.00
3.75 158.29 m2 100.50 1.70 170.85 100.50 170.85 0.00 0 0.00
3,747.91
0.00
3.75 158.29
0.00
4.42 8.84
0.00
40.09 2,334.84
0.00
40.09 1,130.54
0.00
25.36 101.44
0.00
6.98 13.96
0.00
5,996.34
0.00
237.95 5,996.34
0.00
121,647.15
0.00
121,647.15
0.00
7.14 6,160.89
0.00
49.49 19,843.51
0.00
546.53 95,642.75
0.00
36,369.36
0.00
34,408.80
0.00
95.11 7,608.80
0.00
26,800.00 26,800.00
0.00
1,960.56
0.00
11.67 1,960.56
0.00
2,000.00
0.00
2,000.00 2,000.00
0.00
169,965.90
0.00
1,910.52 1899.45 11.07 0.00
m 35.08 3.29 115.41 35.08 115.41 0.00 0 0.00
ML 35.08 5.04 176.80 35.08 176.80 0.00 0 0.00
m2 3.16 34.80 109.97 3.16 109.97 0.00 0 0.00
m3 2.89 503.22 1,454.31 2.89 1454.31 0.00 0 0.00
m 1.50 7.38 11.07 0.00 0.00 1.50 11.07 0.00
m 2.89 0.73 2.11 2.89 2.11 0 0.00
m3 1.71 23.89 40.85 1.71 40.85 0.00 0 0.00
6,948.33 3767.18 3181.14 -0.01
m2 100.50 1.70 170.85 32.58 55.39 67.92 115.46 0.00
m2 100.50 6.16 619.08 32.58 200.69 67.92 418.39 0.00
m2 100.50 15.86 1,593.93 32.58 516.72 67.92 1077.21 0.00
m3 10.05 430.72 4,328.74 6.52 2808.29 3.53 1520.44 -0.01
m 22.00 7.38 162.36 22.00 162.36 0.00 0 0.00
PRESUPUESTO PIP VIABLE PRESUPUESTO PPTO. EJECUTADO DEDUCTIVO
Precio (S/.) Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

m2 100.50 0.73 73.37 32.50 23.73 68.00 49.64 0.00


39,627.35 26160.29 13467.06 0.00
ML 135.00 5.04 680.40 135.00 680.40 0.00 0 0.00
m 135.00 6.38 861.30 135.00 861.30 0.00 0 0.00
m 135.00 30.26 4,085.10 135.00 4085.10 0.00 0 0.00
m 135.00 16.43 2,218.05 135.00 2218.05 0.00 0 0.00
und 25.00 377.03 9,425.75 13.00 4901.39 12.00 4524.36 0.00
und 75.00 298.09 22,356.75 45.00 13414.05 30.00 8942.7 0.00
18,549.52 13,143.66 5,405.86 0.00
13,294.88 7,889.02 5,405.86 0.00
m2 1,377.11 8.97 12,352.68 774.45 6946.82 602.66 5405.86 0.00
und 20.00 47.11 942.20 20.00 942.20 0.00 0 0.00
5,254.64 5,254.64 0.00 0.00
ML 100.00 5.04 504.00 100.00 504.00 0.00 0 0.00
ML 103.00 25.14 2,589.42 103.00 2589.42 0.00 0 0.00
m 100.00 16.43 1,643.00 100.00 1643.00 0.00 0 0.00
und 6.00 86.37 518.22 6.00 518.22 0.00 0 0.00
1,600.00 0.00 1600.00 0.00
und 4.00 400.00 1,600.00 0.00 0.00 4.00 1600 0.00
135,396.13 85168.29 50227.84 0.00
MOD 19.00 5,094.12 96,788.28 12.00 61129.44 7.00 35658.84 0.00

m2 265.00 145.69 38,607.85 165.00


24038.85 100.00 14569 0.00
6,300.00 6300 0 0.00
und 35.00 180.00 6,300.00 35.00 6300.00 0.00 0.00 0.00
COSTO DIRECTO: 210,669.53 136,776.55 73,892.97 -0.01
210,669.52

14,264.96
4,000.00 4,000.00
5,000.00 5,000.00
489.96 489.96
1,275.00 1,275.00
2,500.00 2,500.00
1,000.00 1,000.00
14,422.72
5,443.20
1.11 1,243.20
3.75 4,200.00
7,110.56
3.75 4,200.00
4.42 548.08
2.09 296.78
6.98 984.18
PRESUPUESTO PIP VIABLE PRESUPUESTO PPTO. EJECUTADO DEDUCTIVO
Precio (S/.) Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)
12.29 1,081.52
1,868.96
1,868.96
7.14 380.70
49.49 706.72
546.53 781.54
32,320.63
28,320.63
66.71 4,336.15
41.58 3,012.89
84.72 20,971.59
4,000.00
2,000.00 2,000.00
2,000.00 2,000.00
6,754.84
2,304.34

582.47 582.47
186.32 745.28
905.21 905.21
71.38 71.38
4,450.50
234.36 937.44
189.39 1,893.90
1,619.16 1,619.16
198,208.07
198,208.07 198,208.07
265,971.22

kg 115.03 4.84
m2 28.97 27.08
m3 3.56 503.85
m3 3.56 8.04

m2 14.54 38.08
m2 14.54 17.57

ML 21.60 67.40

m2 14.16 35.34
PRESUPUESTO PIP VIABLE PRESUPUESTO PPTO. EJECUTADO DEDUCTIVO
Precio (S/.) Parcial (S/.) Und. Metrado Precio (S/.) Parcial (S/.) Metrado Parcial(S/.) Metrado Parcial(S/.)

M3 0.53 539.81

m 91.88 2.59

m3 71.06 20.11
M3 57.43 21.00
M4 17.71 15.37
m3 13.62 40.29

ML 32.4 44.33
ML 59.48 109.86

m2 16.26 38.99
kg 130.38 4.69
m3 2.40 503.85

M3 4.37 539.81

m 91.17 2.59

m3 76.30 20.11
M3 65.71 21.00
M3 13.76 15.37
m3 8.37 40.29

ML 91.17 44.33

m2 15.52 38.99
kg 115.03 4.69
m3 2.57 503.85

M3 3.31 539.81

435,937.12 210,669.53 136,776.55 73,892.97


PPTO. MAYORES PART. NUEVAS PPTO. MODIFICADO
ejecutado total METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

2602.16 2264.48 2602.16


774.45 1285.59 673.95 1118.76 774.45 1285.59
774.45 1316.57 673.95 1145.72 774.45 1316.57

2539.19 639.75 2539.19


37.60 123.7 2.52 8.29 37.60 123.7
37.60 189.5 2.52 12.7 37.60 189.5
11.28 392.54 8.12 282.58 11.28 392.54
3.38 1700.88 0.49 246.58 3.38 1700.88
0.00 0 0.00 0 0.00 0
37.60 27.45 34.71 25.34 37.60 27.45
4.40 105.12 2.69 64.26 4.40 105.12
3767.18 0 3767.18
32.58 55.39 0.00 0 32.58 55.39
32.58 200.69 0.00 0 32.58 200.69
32.58 516.72 0.00 0 32.58 516.72
6.52 2808.29 0.00 0 6.52 2808.29
22.00 162.36 0.00 0 22.00 162.36
PPTO. MAYORES PART. NUEVAS PPTO. MODIFICADO
ejecutado total METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

32.50 23.73 0.00 0 32.50 23.73


28194.14 2033.85 28194.14
170.00 856.8 35.00 176.4 170.00 856.8
170.00 1084.6 35.00 223.3 170.00 1084.6
170.00 5144.2 35.00 1059.1 170.00 5144.2
170.00 2793.1 35.00 575.05 170.00 2793.1
13.00 4901.39 0.00 0 13.00 4901.39
45.00 13414.05 0.00 0 45.00 13414.05
14,556.96 1,413.30 14,556.96
9,302.32 1,413.30 9,302.32

774.45 6946.82 0.00 0 774.45 6946.82


50.00 2355.5 30.00 1413.3 50.00 2355.5
5,254.64 0.00 5,254.64

100.00 504 0.00 0 100.00 504


103.00 2589.42 0.00 0 103.00 2589.42
100.00 1643 0.00 0 100.00 1643
6.00 518.22 0.00 0 6.00 518.22
0.00 0.00 0.00
0.00 0 0.00 0 0.00 0
85168.29 0 0 85168.29
12.00 61129.44 0.00 0 12.00 61129.44

165.00 24038.85 0.00 0 165.00 24038.85


6300 0 6300
35.00 6300 0.00 0 35.00 6300
143127.92 6351.38 143127.92
143,127.93 143,127.93
PPTO. MAYORES PART. NUEVAS PPTO. MODIFICADO
ejecutado total METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

34,660.48 34,660.48
3,163.59 3,163.59
3,163.59 3,163.59

556.75 115.03 556.75


784.51 28.97 784.51
1793.71 3.56 1793.71
28.62 3.56 28.62
2,264.99 2,264.99
809.15 809.15

553.68 14.54 553.68


255.47 14.54 255.47
1,455.84 1,455.84

1455.84 21.60 1455.84


786.51 786.51
786.51 786.51

500.41 14.16 500.41


PPTO. MAYORES PART. NUEVAS PPTO. MODIFICADO
ejecutado total METRADOS
Metrado Parcial(S/.) Metrado Parcial(S/.) Parcial (S/.) Metrado Parcial(S/.)

286.1 0.53 286.1


16,478.40 16,478.40
237.97 237.97

237.97 91.88 237.97


3,456.00 3,456.00

1429.02 71.06 1429.02


1206.03 57.43 1206.03
272.2 17.71 272.2
548.75 13.62 548.75
7,970.76 7,970.76

1436.29 32.40 1436.29


6534.47 59.48 6534.47
2,454.70 2,454.70
2,454.70 2,454.70

633.98 16.26 633.98


611.48 130.38 611.48
1209.24 2.40 1209.24
2,358.97 2,358.97

2358.97 4.37 2358.97


11,966.99 11,966.99
236.13 236.13

236.13 91.17 236.13


3,463.02 3,463.02

1534.39 76.30 1534.39


1379.91 65.71 1379.91
211.49 13.76 211.49
337.23 8.37 337.23
4,041.57 4,041.57

4041.57 91.17 4041.57


2,439.50 2,439.50
2,439.50 2,439.50

605.12 15.52 605.12


539.49 115.03 539.49
1294.89 2.57 1294.89
1,786.77 1,786.77

1786.77 3.31 1786.77

143,127.92 6,351.38 34,660.48 177788.40


METRADOS EJECUCION NO REGISTRADA
METRADOS
EXP. TECNICO
METRADOS ADICIONALES DEDUCTIVO
APROBADO
S

AVANCE FISICO UND CANT. UND CANT.

100.00%
100.00% m2 673.95 m2 0.00
100.00% m2 673.95 m2 0.00

100.00% m 2.52 m 0.00


100.00% ML 2.52 ML 0.00
100.00% m2 8.12 m2 0.00
100.00% m3 0.49 m3 0.00
100.00% m 0.00 m 1.50
100.00% m 34.71 m 0.00
100.00% m3 2.69 m3 0.00

100.00% m2 0.00 m2 67.92


100.00% m2 0.00 m2 67.92
100.00% m2 0.00 m2 67.92
100.00% m3 0.00 m3 3.53
100.00% m 0.00 m 0.00
METRADOS EJECUCION NO REGISTRADA
METRADOS
EXP. TECNICO
METRADOS ADICIONALES DEDUCTIVO
APROBADO
S

AVANCE FISICO UND CANT. UND CANT.

100.00% m2 0.00 m2 68.00

100.00% ML 35.00 ML 0.00


100.00% m 35.00 m 0.00
100.00% m 35.00 m 0.00
100.00% m 35.00 m 0.00
100.00% und 0.00 und 12.00
100.00% und 0.00 und 30.00

100.00% m2 0.00 m2 602.66


100.00% und 30.00 und 0.00

100.00% ML 0.00 ML 0.00


100.00% ML 0.00 ML 0.00
100.00% m 0.00 m 0.00
100.00% und 0.00 und 0.00

100.00% und 0.00 und 4.00

100.00% MOD 0.00 MOD 7.00

100.00% m2 0.00 m2 100.00

100.00% und 0.00 und 0.00


METRADOS EJECUCION NO REGISTRADA
METRADOS
EXP. TECNICO
METRADOS ADICIONALES DEDUCTIVO
APROBADO
S

AVANCE FISICO UND CANT. UND CANT.

kg 115.03
m2 28.97
m3 3.56
m3 3.56

m2 14.54
m2 14.54

ML 21.60

m2 14.16
METRADOS EJECUCION NO REGISTRADA
METRADOS
EXP. TECNICO
METRADOS ADICIONALES DEDUCTIVO
APROBADO
S

AVANCE FISICO UND CANT. UND CANT.

M3 0.53

m 91.88

m3 71.06
M3 57.43
M4 17.71
m3 13.62

ML 32.40
ML 59.48

m2 16.26
kg 130.38
m3 2.40

M3 4.37

m 91.17

m3 76.30
M3 65.71
M3 13.76
m3 8.37

ML 91.17

m2 15.52
kg 115.03
m3 2.57

M3 3.31
METRADOS

EXPEDIENTE TECNICO
EXPEDIENTE TECNICO MODIFICADO
APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
UND CANT.
INVERSION S/. S/.

131,596.54

205.14
337.68 337.68
m2 774.45 46.85 166.83 166.83
m2 774.45 158.29 170.85 170.85
3,747.91
158.29
8.84
2,334.84
1,130.54
101.44
13.96
5,996.34
5,996.34
121,647.15
121,647.15
6,160.89
19,843.51
95,642.75
36,369.36
34,408.80
7,608.80
26,800.00
1,960.56
1,960.56
2,000.00
2,000.00
169,965.90
0.00 1,910.52 0
m 37.60 0.00 115.41 115.41
ML 37.60 0.00 176.80 176.8
m2 11.28 0.00 109.97 109.97
m3 3.38 0.00 1,454.31 1454.31
m 0.00 0.00 11.07 11.07
m 37.60 0.00 2.11 2.11
m3 4.40 0.00 40.85 40.85
0.00 6,948.33 0
m2 32.58 0.00 170.85 170.85
m2 32.58 0.00 619.08 619.08
m2 32.58 0.00 1,593.93 1593.93
m3 6.52 0.00 4,328.74 4328.74
m 22.00 0.00 162.36 162.36
METRADOS

EXPEDIENTE TECNICO
EXPEDIENTE TECNICO MODIFICADO
APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
UND CANT.
INVERSION S/. S/.

m2 32.50 0.00 73.37 73.37


0.00 39,627.35 0
ML 170.00 0.00 680.40 680.4
m 170.00 0.00 861.30 861.3
m 170.00 0.00 4,085.10 4085.1
m 170.00 0.00 2,218.05 2218.05
und 13.00 0.00 9,425.75 9425.75
und 45.00 0.00 22,356.75 22356.75
0.00 18,549.52 0
0.00 13,294.88 0
m2 774.45 0.00 12,352.68 12352.68
und 50.00 0.00 942.20 942.2
0.00 5,254.64 0
ML 100.00 0.00 504.00 504
ML 103.00 0.00 2,589.42 2589.42
m 100.00 0.00 1,643.00 1643
und 6.00 0.00 518.22 518.22
0.00 1,600.00 0
und 0.00 0.00 1,600.00 1600
0.00 135,396.13 0
MOD 12.00 0.00 96,788.28 96788.28

0.00
m2 165.00 38,607.85 38607.85
0.00 6,300.00 0
und 35.00 0.00 6,300.00 6300
0.00
0.00
0.00
14,264.96
4,000.00
5,000.00
489.96
1,275.00
2,500.00
1,000.00
14,422.72
5,443.20
1,243.20
4,200.00
7,110.56
4,200.00
548.08
296.78
984.18
METRADOS

EXPEDIENTE TECNICO
EXPEDIENTE TECNICO MODIFICADO
APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
UND CANT.
INVERSION S/. S/.

1,081.52
1,868.96
1,868.96
380.70
706.72
781.54
32,320.63
28,320.63
4,336.15
3,012.89
20,971.59
4,000.00
2,000.00
2,000.00
6,754.84

2,304.34

582.47
745.28
905.21
71.38
4,450.50
937.44
1,893.90
1,619.16
198,208.07
198,208.07
265,971.22
0.00
0.00
0.00

kg 115.03 0.00

m2 28.97 0.00

m3 3.56 0.00

m3 3.56 0.00
0.00
0.00

m2 14.54 0.00

m2 14.54 0.00
0.00

ML 21.60 0.00
0.00
0.00

m2 14.16 0.00
METRADOS

EXPEDIENTE TECNICO
EXPEDIENTE TECNICO MODIFICADO
APROBADO
PIP. VIABLE
S/.
MONTO DE EJECUTADO
UND CANT.
INVERSION S/. S/.

M3 0.53 0.00

m 91.88

m3 71.06
M3 57.43
M4 17.71
m3 13.62

ML 32.40
ML 59.48

m2 16.26
kg 130.38
m3 2.40

M3 4.37

m 91.17

m3 76.30
M3 65.71
M3 13.76
m3 8.37

ML 91.17

m2 15.52
kg 115.03
m3 2.57

M3 3.31

435,937.12 210,669.53 136,776.55


EJECUCION NO REGISTRADA

PPTO.
PPTO. ADICIONAL EXP. TECNICO
DEDUCTIVO
S/. MODIF. S/,
S/.

2264.48 0 2602.16
1118.76 0 1285.59
1145.72 0 1316.57

639.75 11.07 2539.19


8.29 0 123.7
12.7 0 189.5
282.58 0 392.54
246.58 0 1700.88
0 11.07 0
25.34 0 27.45
64.26 0 105.12
0 3181.14 3767.18
0 115.46 55.39
0 418.39 200.69
0 1077.21 516.72
0 1520.44 2808.29
0 0 162.36
EJECUCION NO REGISTRADA

PPTO.
PPTO. ADICIONAL EXP. TECNICO
DEDUCTIVO
S/. MODIF. S/,
S/.

0 49.64 23.73
2033.85 13467.06 28194.14
176.4 0 856.8
223.3 0 1084.6
1059.1 0 5144.2
575.05 0 2793.1
0 4524.36 4901.39
0 8942.7 13414.05
1413.3 5405.86 14556.96
1413.3 5405.86 9302.32
0 5405.86 6946.82
1413.3 0 2355.5
0 0 5254.64
0 0 504
0 0 2589.42
0 0 1643
0 0 518.22
0 1600 0
0 1600 0
0 50227.84 85168.29
0 35658.84 61129.44

0 14569 24038.85
0 0 6300
0 0 6300
EJECUCION NO REGISTRADA

PPTO.
PPTO. ADICIONAL EXP. TECNICO
DEDUCTIVO
S/. MODIF. S/,
S/.

34660.48 34660.48
3163.59 3163.59
3163.59 3163.59
556.75 556.75
784.51 784.51
1793.71 1793.71
28.62 28.62
2264.99 2264.99
809.15 809.15
553.68 553.68
255.47 255.47
1455.84 1455.84
1455.84 1455.84
786.51 786.51
786.51 786.51
500.41 500.41
EJECUCION NO REGISTRADA

PPTO.
PPTO. ADICIONAL EXP. TECNICO
DEDUCTIVO
S/. MODIF. S/,
S/.

286.1 286.1
16478.4 16478.4
237.97 237.97
237.97 237.97
3456 3456
1429.02 1429.02
1206.03 1206.03
272.2 272.2
548.75 548.75
7970.76 7970.76
1436.29 1436.29
6534.47 6534.47
2454.7 2454.7
2454.7 2454.7
633.98 633.98
611.48 611.48
1209.24 1209.24
2358.97 2358.97
2358.97 2358.97
11966.99 11966.99
236.13 236.13
236.13 236.13
3463.02 3463.02
1534.39 1534.39
1379.91 1379.91
211.49 211.49
337.23 337.23
4041.57 4041.57
4041.57 4041.57
2439.5 2439.5
2439.5 2439.5
605.12 605.12
539.49 539.49
1294.89 1294.89
1786.77 1786.77
1786.77 1786.77
0 0
41,011.86 73,892.97 177788.40
EXPEDIENTE TECNICO
ITEM Descripcin APROBADO
PIP. VIABLE
S/.
MONTO DE
INVERSION S/.

01 SUB PRESUPUESTO SNACK MIRADOR 56,840.39


01.01 ESTRUCTURAS 23,628.65 11,738.37
01.01.01 TRABAJOS PRELIMINARES 289.49 195.67
01.01.01.01 LIMPIEZA DE TERRENO MANUAL 56.99 92.00
01.01.01.02 TRAZO, NIVELES Y REPLANTEO 232.50 103.67
01.01.02 MOVIMIENTO DE TIERRAS 1,848.90 711.37
01.01.02.01 TRAZO Y REPLANTEO DURANTE EL PROCESO 232.50 90.25
01.01.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS 751.69 220.27
01.01.02.03 RELLENO CON MATERIAL PROPIO 101.44 107.18
01.01.02.04 NIVELACION INTERIOR Y APISONADO CON COMPACTADO MANUAL 107.30 227.78
01.01.02.05 ELIMINACION DE MATERIAL CON MAQUINA 20.94 65.89
635.03 0.00
01.01.03 OBRAS DE CONCRETO SIMPLE 5,741.43 451.26
01.01.03.01 SOLADO C S 1:10 e= 10 cm 350.34 451.26
CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G.
3,531.18 0.00
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.50 m
1,197.38 0.00
CONCRETO 1:8 +25% P.M. PARA SOBRECIMIENTOS DE 0.15 M
662.53 0.00
01.01.04 OBRAS DE CONCRETO ARMADO 15,748.83 10,380.07
01.01.04.01 ZAPATAS 857.76 1,215.13
01.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 655.84 1,036.91
01.01.04.01.02 ACERO f'y = 4200 kg/cm2, G 60 EN ZAPATAS 201.92 178.22
01.01.04.02 COLUMNAS 10,969.18 2,240.21
01.01.04.02.01 ACERO f'y = 4200 kg/cm2, G 60 EN COLUMNAS 6,447.42 728.08
01.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 2,029.58 896.57
01.01.04.02.03 CONCRETO EN COLUMNAS F'C = 210 KG/CM2 2,492.18 615.56
01.01.04.03 VIGAS 2,473.46 1,398.54
01.01.04.03.01 CONCRETO EN VIGAS F'C= 210 KG/CM2 411.95 285.04
01.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS 823.36 654.67
01.01.04.03.03 ACERO f'y = 4200 kg/cm2, G 60 EN VIGAS 1,238.15 458.83
01.01.04.04 LOSAS LLENA 0.00 5,526.19
01.01.04.04.01 ENCOFRADO Y DESENCOFRADO EN LOSAS LLENAS 0.00 1,931.96
01.01.04.04.02 ACERO FY=4200 KG/CM2 EN LOSAS LLENAS 0.00 1,660.15
01.01.04.04.03 CONCRETO EN LOSAS LLENAS FC=210KG/CM2 0.00 1,934.08
LOSAS ALIGERADAS
1,448.43 0.00
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
395.92 0.00
PLASTOFORMO 0.30 X0.15 X3.00 PARA LOSA ALIJERADA
342.96 0.00
ACERO f'y = 4200 kg/cm2, G 60 EN LOSAS ALIGERADAS
438.47 0.00
CONCRETO EN LOSAS ALIGERADAS F'C= 210 KG/CM2
271.08 0.00
01.02 ARQUITECTURA 26,994.95 35,215.13
01.02.01 MUROS Y TABIQUES DE ALBAILERIA 2,860.02 2,309.89
EXPEDIENTE TECNICO
ITEM Descripcin APROBADO
PIP. VIABLE
S/.
MONTO DE
INVERSION S/.

01.02.01.01 MUROS DE BLOQUES HUECOS DE CONCRETO 2,860.02 2,309.89


01.02.01.01.01 MURO DE BLOQUE HUECO DE CONCRETO DE E=0.15M 2,860.02 2,309.89
01.02.02 REVOQUES Y REVESTIMIENTOS 4,111.99 3,310.94
01.02.02.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 1,021.69 601.51
01.02.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 566.30 410.48
01.02.02.03 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-ARENA 2,195.55 1,105.10
01.02.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 144.53 303.77
01.02.02.05 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 116.84 141.64
01.02.02.06 BRUADO DE 1/2" 67.08 748.44
01.02.03 CIELORRASOS 1,012.42 677.41
01.02.03.01 CIELORRASO EN INTERIORES CON MEZCLA DE CEMENTO -ARENA 1,012.42 677.41
01.02.04 PISOS Y PAVIMENTOS 5,174.96 4,672.39
01.02.04.01 FALSO PISO DE 4" DE CONCRETO 1:10 1,090.24 910.74
01.02.04.02 PISO CERAMICO ANTIDESLIZANTE 0.30 X 0.30 m. 4,084.72 3,761.65
01.02.05 ZOCALOS Y CONTRAZOCALOS 6,396.25 6,122.87
01.02.05.01 ZOCALO DE CERAMICO 0.25X0.40 cm 6,396.25 6,122.87
01.02.06 CARPINTERIA MADERA-METALICA Y HERRERIA 4,426.06 15,269.88
01.02.06.01 ESCALERA METALICA EN SNAK MIRADOR 2,536.20 2,540.93
01.02.06.02 PUERTA PLEGABLE DE MADERA PREFABRICADA 189.86 728.95
01.02.06.03 GLORIETA DE MADERA SEGUN DISEO 1,700.00 12,000.00
01.02.07 CERRAJERIA 307.88 280.54
01.02.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" PARA PUERTA 42.48 42.90
01.02.07.02 CERRADURA CON MANIJAS A AMBOS LADOS 265.40 237.64
01.02.08 PINTURA 2,705.37 2,571.21
01.02.08.01 PINTURA LATEX PREMIUM SUPERMATE EN MUROS INTERIORES 340.76 197.32
01.02.08.02 PINTURA EN CIELO RASO CON LATEX LAVABLE 163.04 279.46
01.02.08.03 PINTURA LATEX PREMIUM SUPERMATE EN MUROS EXTERIORES 1,100.92 642.24
01.02.08.04 PINTURA EN COLUMNAS 101.04 125.01
01.02.08.05 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 19.33 50.38
01.02.08.06 PINTURA EN ESTRUCTURA METALICA 980.28 1,276.80
01.03 INSTALACIONES SANITARIAS 4,690.36 5,180.98
01.03.01 APARATOS Y ACCESORIOS SANITARIOS 1,289.96 1,741.68
01.03.01.01 LAVADERO DE ACERO INOXIDABLE C/AJUSTADORES 48 x 64 cm 648.56 1,230.92
01.03.01.02 COLOCACION DE APARATOS SANITARIOS 571.56 468.00
01.03.01.03 COLOCACIN DE ACCESORIOS SANITARIOS 0.00 0.00
01.03.01.04 ACCESORIOS SANITARIOS 69.84 42.76
01.03.02 SISTEMA GENERAL DE DESAGUE 1,785.83 1,938.67
01.03.02.01 MOVIMIENTO DE TIERRAS RED DE DESAGUE 171.80 0.00
01.03.02.02 TRAZO, NIVELES Y REPLANTEO EN RED DE DESAGE 15.00 11.92
01.03.02.03 EXCAVACION DE ZANJA MANUAL 0.40x0.80m PROMEDIO 122.56 118.72
EXPEDIENTE TECNICO
ITEM Descripcin APROBADO
PIP. VIABLE
S/.
MONTO DE
INVERSION S/.

01.03.02.04 RELLENO Y APISONADO C/MATERIAL PROPIO 34.24 71.52


01.03.02.05 SISTEMA DE DESAGUE Y VENTILACION 1,614.03 0.00
01.03.02.06 SALIDA DE PVC SAL PARA DESAGUE DE 4" 78.69 93.41
01.03.02.07 SALIDA DE PVC SAL PARA DESAGUE DE 2" 125.30 112.14
01.03.02.08 SUM. E INST. TUBERIA DE 4" PVC SAL 362.32 616.28
01.03.02.09 SUM. E INST. TUBERIA DE 2" PVC SAL 304.36 330.68
01.03.02.10 SUM. E INST. DE CODO 4"x45 PVC AL-P, P/DESAGUE 68.80 42.60
01.03.02.11 SUM. E INST. DE CODO 2"x45 PVC AL-P, P/DESAGUE 68.80 56.60
01.03.02.12 SUM. E INST. DE YEE 4" PVC SAL-P, P/DESAGUE 108.12 96.32
01.03.02.13 SUM. E INST. DE YEE CON REDUCCION DE 4"x2" PVC SAL-P, P/DESAGU 162.18 138.48
01.03.02.14 SUM. E INST. DE YEE 2" PVC SAL-P, P/DESAGUE 92.08 56.88
01.03.02.15 REGISTRO DE BRONCE CROMADO DE 4" 83.08 52.58
01.03.02.16 SUMIDERO CROMADO DE 2" 160.30 140.54
01.03.03 SISTEMA GENERAL DE AGUA POTABLE 1,614.57 1,500.63
01.03.03.01 MOVIMIENTO DE TIERRAS RED DE AGUA 195.45 0.00
01.03.03.02 TRAZO, NIVELES Y REPLANTEO EN RED DE AGUA 45.00 35.76
01.03.03.03 EXCAVACION DE ZANJA MANUAL 0.40x0.50m PROMEDIO 101.40 60.48
01.03.03.04 RELLENO Y APISONADO C/MATERIAL PROPIO 49.05 102.45
01.03.03.05 SISTEMA DE AGUA FRIA 1,419.12 0.00
01.03.03.06 SALIDA DE AGUA FRIA CON TUBERIA DE PVC 1/2" 336.92 236.80
01.03.03.07 SUMINISTRO E INSTALACIN TUBERIA DE 1/2" PVC SAP C-10 289.44 452.52
01.03.03.08 SUM. E INST. DE CODO DE1/2"x90 PVC SAP 322.74 260.10
01.03.03.09 SUM. E INST. DE CODO DE 1/2"x90 FG 199.30 194.50
01.03.03.10 SUM. E INST. DE TEE DE 1/2"x1/2" PVC SAP 148.92 59.04
01.03.03.11 VALVULA DE COMPUERTA DE BRONCE DE 1/2" 121.80 98.98
01.04 INSTALACIONES ELECTRICAS Y MECANICAS 6,085.92 4,705.91
01.04.01 SALIDA DE ALUMBRADO, VENTILACION, TOMACORRIENTES, FUERZA Y 1,873.88 1,144.04
01.04.01.01 SALIDA PARA CENTROS DE LUZ EN TECHO 353.36 193.52
01.04.01.02 SALIDA PARA CENTROS DE LUZ EN PARED 175.08 96.76
01.04.01.03 SALIDA PARA ALUMBRADO EN EXTERIORES 281.16 96.76
01.04.01.04 SALIDA PARA INTERRUPTOR SIMPLE 134.10 114.76
01.04.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE 152.90 106.22
01.04.01.06 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. 283.92 163.84
01.04.01.07 SALIDA DE TOMACORRIENTE BIPOLAR DOBLE C/L.T. P/EMPOTRAR EN 254.14 192.40
01.04.01.08 SALIDA DE TOMACORRIENTE SIMPLE P/LUZ DE EMERGENCIA 239.22 179.78
01.04.02 TABLEROS DE DISTRIBUCION ELECTRICA, ALIMENTADORES Y MEDID 1,745.38 775.81
01.04.02.01 TABLERO DE DISTRIBUCION TD-SD (12 POLOS RIEL DIN) 582.47 497.41
01.04.02.02 ALIMENTADOR TG 186.32 231.76
01.04.02.03 CAJA MATALICA CUADRADA DE PASE DE 300X300X100 mm. 905.21 46.64
71.38 0.00
EXPEDIENTE TECNICO
ITEM Descripcin APROBADO
PIP. VIABLE
S/.
MONTO DE
INVERSION S/.

01.04.03 ARTEFACTOS DE ALUMBRADO Y EQUIPOS ELECTRICOS 2,466.66 2,786.06


01.04.03.01 ARTEFACTO FLUORESCENTE LINEAL HERMETICO DOBLE SIIMILARE A 468.72 859.46
01.04.03.02 ARTEFACTO TIPO SPOT CIRCULAR SIMILAR A MOD. FCN/250 2X18W 378.78 672.44
01.04.03.03 POZO DE PUESTA A TIERRA 1,619.16 1,254.16
61,399.88 56,840.39
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO.
PPTO. EXP. TECNICO
DEDUCTIVO
ADICIONAL S/. MODIF. S/,
EJECUTADO S/.
S/.

0.00 56,840.39 0.00


0.00 11,738.37 0.00
0.00 195.67 0.00
0.00 92.00 0.00
0.00 103.67 0.00
0.00 711.37 0.00
0.00 90.25 0.00
0.00 220.27 0.00
0.00 107.18 0.00
0.00 227.78 0.00
0.00 65.89 0.00
0.00 0.00 0.00
0.00 451.26 0.00
0.00 451.26 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 10,380.07 0.00
0.00 1,215.13 0.00
0.00 1,036.91 0.00
0.00 178.22 0.00
0.00 2,240.21 0.00
0.00 728.08 0.00
0.00 896.57 0.00
0.00 615.56 0.00
0.00 1,398.54 0.00
0.00 285.04 0.00
0.00 654.67 0.00
0.00 458.83 0.00
0.00 5,526.19 0.00
0.00 1,931.96 0.00
0.00 1,660.15 0.00
0.00 1,934.08 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 35,215.13 0.00
0.00 2,309.89 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO.
PPTO. EXP. TECNICO
DEDUCTIVO
ADICIONAL S/. MODIF. S/,
EJECUTADO S/.
S/.

0.00 2,309.89 0.00


0.00 2,309.89 0.00
0.00 3,310.94 0.00
0.00 601.51 0.00
0.00 410.48 0.00
0.00 1,105.10 0.00
0.00 303.77 0.00
0.00 141.64 0.00
0.00 748.44 0.00
0.00 677.41 0.00
0.00 677.41 0.00
0.00 4,672.39 0.00
0.00 910.74 0.00
0.00 3,761.65 0.00
0.00 6,122.87 0.00
0.00 6,122.87 0.00
0.00 15,269.88 0.00
0.00 2,540.93 0.00
0.00 728.95 0.00
0.00 12,000.00 0.00
0.00 280.54 0.00
0.00 42.90 0.00
0.00 237.64 0.00
0.00 2,571.21 0.00
0.00 197.32 0.00
0.00 279.46 0.00
0.00 642.24 0.00
0.00 125.01 0.00
0.00 50.38 0.00
0.00 1,276.80 0.00
0.00 5,180.98 0.00
0.00 1,741.68 0.00
0.00 1,230.92 0.00
0.00 468.00 0.00
0.00 0.00 0.00
0.00 42.76 0.00
0.00 1,938.67 0.00
0.00 0.00 0.00
0.00 11.92 0.00
0.00 118.72 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO.
PPTO. EXP. TECNICO
DEDUCTIVO
ADICIONAL S/. MODIF. S/,
EJECUTADO S/.
S/.

0.00 71.52 0.00


0.00 0.00 0.00
0.00 93.41 0.00
0.00 112.14 0.00
0.00 616.28 0.00
0.00 330.68 0.00
0.00 42.60 0.00
0.00 56.60 0.00
0.00 96.32 0.00
0.00 138.48 0.00
0.00 56.88 0.00
0.00 52.58 0.00
0.00 140.54 0.00
0.00 1,500.63 0.00
0.00 0.00 0.00
0.00 35.76 0.00
0.00 60.48 0.00
0.00 102.45 0.00
0.00 0.00 0.00
0.00 236.80 0.00
0.00 452.52 0.00
0.00 260.10 0.00
0.00 194.50 0.00
0.00 59.04 0.00
0.00 98.98 0.00
0.00 4,705.91 0.00
0.00 1,144.04 0.00
0.00 193.52 0.00
0.00 96.76 0.00
0.00 96.76 0.00
0.00 114.76 0.00
0.00 106.22 0.00
0.00 163.84 0.00
0.00 192.40 0.00
0.00 179.78 0.00
0.00 775.81 0.00
0.00 497.41 0.00
0.00 231.76 0.00
0.00 46.64 0.00
0.00 0.00 0.00
EJECUCION NO REGISTRADA

EXPEDIENTE TECNICO
APROBADO PPTO.
PPTO. EXP. TECNICO
DEDUCTIVO
ADICIONAL S/. MODIF. S/,
EJECUTADO S/.
S/.

0.00 2,786.06 0.00


0.00 859.46 0.00
0.00 672.44 0.00
0.00 1,254.16 0.00
0.00 0.00 56840.39 0