Escolar Documentos
Profissional Documentos
Cultura Documentos
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET 0
0
PROP / KAB / KODYA 0
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Baja Tulangan U 24 Polos TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET 0
0
PROP / KAB / KODYA 0
ITEM PEMBAYARAN NO. : 7.3 (6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Anyaman Kawat Yang Dilas (Welded Wire Mesh) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET 0
0
PROP / KAB / KODYA 0
ITEM PEMBAYARAN NO. : 7.9.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK :
NAMA PAKET 0
0
PROP / KAB / KODYA 0
ITEM PEMBAYARAN NO. : 7.15.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN :Pembongkaran Pasangan Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK :
NAMA PAKET 0
PROP / KAB / KODYA 0 0
ITEM PEMBAYARAN NO. : 8.4.(10).(e) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Kerb Pracetak Jenis 5 (Penghalang Berparit)
TOTAL t=30
HARGA
cm (Rp.) :
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
2 Mortar M3 0,0158
3 Pengecatan Ls 1,00
C. PERALATAN