Escolar Documentos
Profissional Documentos
Cultura Documentos
PROYECTO:
1.00
1.00
8.00 TANTO EN CALLES PEATONALES
POZO 12.00 1.00 1.00 COMO EN CALLES DE ACCESO
0.2550 1.00 1.00 Y DISTRIBUIDORES LOCALES,
0.3450
LAS TUBERIAS PARA AGUA
POTABLE SE INSTALARAN EN
EL AREA VERDE La Campirana
ANDEN
ANDEN
VERDE
ZONA
LOTE CALZADA LOTE
HIDRANTE
BORDILLO
ANDEN ACERA
BORDILLO
VIVIENDA UNIFAMILIAR
TUBERIA PARA A.P.
0.15
TAPA Y MARCO
NIVEL DE CALLE
3.00
DE Fo. Fo.
LOSA SUPERIOR LOSA DE CUBIERTA
DALA DE CONCRETO
CONCRETO F'c= 200 Kg/cm2 CAJA DE OPERACION
CON 2 3/8"
DE VALVULAS TERRENO
pend. NATURAL
E= 1/4"
APLANADO CON MORTERO @ 15cm
CEM-ARENA PROP. 1:4
DE 1 CM. ESP. DALA DE CONCRETO 3/8" @ 15 cm
AMBOS SENTIDOS 4 3/8"
CON 2 3/8"
MURO DE BLOCK
VAR.
PLANTILLA DE
PEDACERA DE TABIQUE
H
h ( PROTECCION PERIMETRAL )
DN
Vs 1/2" @ 20cm
30 cm AMBOS SENTIDOS FABIO ANDRES FAJARDO RESTREPO S.A.S
E Vs 1/2" @ 10cm
AMBOS SENTIDOS
d (FRANJA CENTRAL
LECHO SUPERIOR)
L2
10 MIN. UBICACION:
b
MORICHAL
FINCA LA CAMPIRANA
MUNICIPIO DE YOPAL
DEPARTAMENTO DEL CASANARE
DETALLE DE INSTALACION MACROMEDIDOR
2D
3D
b1 b1 h
DISEO:
3D
INGENIERO CIVIL
MATRICULA PROFESIONAL No.
A25202098803 CND
2D
REPRESENTANTE LEGAL:
D a
b
3D
MODERNICEMOS
NIT. 900668092-1
b1
OBSERVACIONES
b1
h
b1
b1
ESPECIFICACIONES
h
D a
b
D
b
CONTIENE:
DETALLES ACCESORIOS,
VLVULAS, ACOMETIDA,
0.70
0.70
LOCALIZACIN TUBERA Y
ANCLAJES ACCESORIOS
DIBUJO: PLANO-N.
JHON ORDUZ
AC-2
FECHA:
OCTUBRE 2015
ESCALA:
SIN ESCALA