1-A Scrum Project involves a collaborative effort to create a new product, service or other result as defined
in the
Seleccione una:
a. Product Vision
c. Business case
d. Product Backlog
Respuesta correcta
a. Stakeholder Meeting
d. Retrospect meeting
Respuesta incorrecta.
Seleccione una:
Respuesta correcta
During which meeting are the Product Owners and Stakeholders provided a demonstration of the
Deliverables?
Seleccione una:
a. Stakeholder Meeting
Seleccione una:
b. Stakeholder Meting
Respuesta correcta
Seleccione una:
a. Product Backlog
c. Acceptance criteria
Respuesta correcta
Which of the following processes creates an environment of introspection, learning and adaptability?
Seleccione una:
b. Retrospect Sprint
c. Ship Deliverables
Respuesta incorrecta.
Seleccione una:
a. 6-10 members
c. 15-20 members
d. 1-4 members
Respuesta correcta
Seleccione una:
a. Initiate
b. Closing a project
According to the SBOK, how many principles form the Foundation of Scrum?
Seleccione una:
a. 8
b. 6
c. 4
d. 5
Respuesta correcta
How many processes are presented in the SBOK as part of the Scrum Framework?
Seleccione una:
a. 19
b. 15
c. 10
d. 12
Respuesta correcta
Respuesta correcta
Which principle is used to help effectively manage Project planning and execution?
Seleccione una:
a. Value-based Prioritization
b. Time-Boxing
c. Self-organization
d. Collaboration
Respuesta incorrecta.
Which role in Scrum is responsible for achieving maximum Business value through the Project.
Seleccione una:
a. Scrum Master
b. Product Owner
c. Team Leader
d. Scrum Team
Respuesta correcta
Seleccione una:
a. Scrum Master
b. Product Owner
c. Team Leader
d. Scrum Team
Respuesta correcta
Which is a role that generally consists of a set of documents and a group of experts who are tipically
involved in defining Objectives?
Seleccione una:
d. Stakeholders
Respuesta correcta
Seleccione una:
b. Vendors
c. Stakeholders
Respuesta correcta
Seleccione una:
a. This principle highlights the focus of Scrum to deliver maximum Business value, beginning early in
the project and continuing throughout.
b. This principle focuses on today´s workers, who deliver significantly greater value when
encouraged to self-orginize rather tan be subject to the command and control style of traditional
Project management.
c. A-
This principle describes how time is considered a limiting constraint in Scrum, and used to help
effectively manage Project planning and execution. Time-boxed elements in Scrum include Sprints,
Daily Standup Meetings, Sprint Planning Meetings, and Sprint Review Meetings.
d. This principle focuses on the three core dimensions related to collaborative work: awareness,
articulation, and appropriation. It also advocates project managment as a shared value-creation
process with teams working and interacting together to deliver the greatest value.
Respuesta correcta
La respuesta correcta es: This principle focuses on today´s workers, who deliver significantly greater value when
encouraged to self-orginize rather tan be subject to the command and control style of traditional Project
management.
Pregunta 19 Correcta Puntúa 1,00 sobre 1,00 Marcar pregunta
Seleccione una:
a. This principle highlights the focus of Scrum to deliver maximum Business value, beginning early in
the project and continuing throughout.
b. This principle focuses on today´s workers, who deliver significantly greater value when
encouraged to self-organize rather than be subject to the command and control style of traditional
Project management.
c. This principle focuses on the three core dimensions related to collaborative work: awareness,
articulation, and appropriation. It also advocates project management as a shared value-creation
process with teams working and interacting together to deliver the greatest value
d. This principle describes how time is considered a limiting constraint in Scrum, and used to help
effectively manage Project planning and execution. Time-boxed elements in Scrum include Sprints,
Daily Standup Meetings, Sprint Planning Meetings, and Sprint Review Meetings.
Respuesta correcta
La respuesta correcta es: This principle focuses on the three core dimensions related to collaborative work:
awareness, articulation, and appropriation. It also advocates project management as a shared value-creation
process with teams working and interacting together to deliver the greatest value
Which of the following statements is the best description of the Product Owner role?
Seleccione una:
a. He/she is a facilitator who ensures that the Scrum Team is provided with an environment
conducive to completing the Project successfully. They guide, facilitate, and teach Scrum practices to
everyone involved in the Project, clear impediments for the team and ensure that Scrum processes
are being followed.
b. He/she is the person responsable for achieving máximum Business value for the Project. He or
she is also responsable for articulating customer requirements and maintaining Business justification
for the Project. They represent the Voice of the Customer.
Respuesta correcta
La respuesta correcta es: He/she is the person responsable for achieving máximum Business value for the
Project. He or she is also responsable for articulating customer requirements and maintaining Business
justification for the Project. They represent the Voice of the Customer.
Seleccione una:
a. It is a collective term that includes customers, users and sponsors, who frequently interface with
the Scrum Core Team, and influence the Project throughout development.
b. It is an optional role, which generally consist of a set of documents and/or a group of experts who
are tipically involved with defining Objectives related to quality, government regulations, security, and
other key organizational parameters.
c. It is a role in bigger projects with multiple Scrum Teams. This rol is responsible for coordinating the
work of multiple Product Owners.
d. It is responsable to coordinate Scrum-related activities in large projects which may require multiple
Scrum Teams to work in parallel.
Respuesta correcta
La respuesta correcta es: It is a collective term that includes customers, users and sponsors, who frequently
interface with the Scrum Core Team, and influence the Project throughout development.
Which of the following best describes the role of a Chief Product Owner?
Seleccione una:
a. It is an optional role, which generally consist of a set of documents and/or a group of experts who
are typically involved with defining Objectives related to quality, government regulations, security, and
other key organizational parameters.
b. It is responsable to coordinate Scrum-related activities in large projects which may require multiple
Scrum Teams to work in parallel.
c. It is a role in bigger projects with multiple Scrum Teams. This rol is responsible for coordinating the
work of multiple Product Owners
d. It is a collective term that includes customers, users and sponsors, who frequently interface with
the Scrum Core Team, and influence the Project throughout development.
Respuesta correcta
La respuesta correcta es: It is a role in bigger projects with multiple Scrum Teams. This rol is responsible for
coordinating the work of multiple Product Owners
Seleccione una:
a. Scrum Master
c. Product Owner
d. Scrum Team
Respuesta correcta
Which role is primarily responsIble for the Business Justification aspect in a Scrum Project?
Seleccione una:
b. Scrum Team
c. Product Owner
d. Scrum Master
Respuesta correcta
Deliverables from Scrum projects, which are potentially shippable, are referred to as
Seleccione una:
a.
Closed
b. Done
c.
Delivered
d. Completed
Respuesta incorrecta.
Risk is defined as ________ events that can affect the success of failure of a Project.
Seleccione una:
a. Actual
b. Dangerous
c. Unexpected
d. Uncertain
Respuesta correcta
La respuesta correcta es: Uncertain
Seleccione una:
a. 7
b. 1
c. 2
d. 5
Respuesta correcta
Seleccione una:
a. Initiate
c. Implement
Respuesta correcta
Seleccione una:
a. Stakeholder
b. Scrum Master
c. Scrum Team
d. Product Owner
Respuesta correcta
Seleccione una:
b. Develop Epic(s)
Respuesta correcta
Seleccione una:
a. Stakeholder
b. Product Owner
c. Scrum Master
d. Scrum Team
Respuesta incorrecta.
La respuesta correcta es: Product Owner
Seleccione una:
a. People
b. Products
c. Partners
d. Processes
Respuesta correcta
Scrum follows the _________ style of management and is very different from the traditional
management of projects
Seleccione una:
a. Autocratic
b. Persuasive
c. Decentralized
d. Paternalistic
Respuesta incorrecta.
c. Create Deliverables
Respuesta correcta
Seleccione una:
a. Collaborative
b. Transformational
c. Transactional
Respuesta correcta
The Product Owner selects team member in collaboration with the _______________
Seleccione una:
b. Scrum Master
Which of the following is the best description of the Demonstrate and Validate Sprint Process?
Seleccione una:
b. To retrospect the Project and identify, document, and internalize the lessons learned
c. To secure approval and acceptance of the product or service by the Product Owner.
Respuesta correcta
La respuesta correcta es: To secure approval and acceptance of the product or service by the Product Owner.
Seleccione una:
Respuesta incorrecta.
b. 6-10 members
c. 15-20 members
d. 1-4 members
Respuesta correcta
What kind of software development projects can be executed by Scrum Project Management
Framework?
Seleccione una:
a. Customer projects
Respuesta correcta
Seleccione una:
Respuesta correcta
Which ones of the following main roles are defined by Scrum Framework?
1. Scrum Tester
2. Scrum Team
3. Scrum Manager
4. Scrum Master
Seleccione una:
a. 1,2,4,5
b. 2,4,5
c. 1,2,3,4
d. 1,2,3,4,5
e. 2,3,4,5
Respuesta correcta
1- Self-organization
3- Communication
4- Continous improvement
Seleccione una:
a. 1,4
b. 1,2,3,4
c. 1,2
d. 1,3,4
e. 1
Respuesta correcta
Line in the Agile Manifesto reads, "_________ over following a plan”. Please select which option best
completes the statement.
Seleccione una:
a. Completing requirements
b. Communicating frequently
c. Responding to change
Respuesta correcta
________________ can change the priority of ítems in the ___________backlog at any time.
Seleccione una:
Respuesta incorrecta.
________________ constitute the Sprint Backlog and are often estimated in hours.
Seleccione una:
a. Use Cases
b. Stories
c. Tasks
d. Features
Respuesta incorrecta.
____________ is an agile development methodology which is intended to improve software quality and
responsiveness to changing Customer requirements by executing frequent "releases” in short
development cycles (timeboxing), by programming in pairs or conducting extensive code reviews, by
unit testing all codes, and by maintaining a flattened management structures.
Seleccione una:
a. XP
b. Agile Modelling
c. Lean
d. Scrum
Respuesta incorrecta.
Transparency is one of the ideas within the Scrum Principle. How can transparency be promoted in
Scrum?
Seleccione una:
a. Proof of Concept
b. Gantt charts
d. Burndown chart
Respuesta correcta
Seleccione una:
a. User Story
b. Accepted deliverables
c. Burndown chart
Respuesta incorrecta.
Respuesta correcta
La respuesta correcta es: A steatement that expresses the desired end user functionality
Seleccione una:
a. The ítems with the highest Business value are at the top
Respuesta correcta
La respuesta correcta es: The ítems with the highest Business value are at the top
Who is responsible for creating User Stories in the Develop User Stories Process?
Seleccione una:
a. Scrum Team
b. Stakeholders
c. Scrum Master
d. Product Owner
Respuesta correcta
The responsibility for estimating ítems in the Prioritized Product Backlog in the Plan and Estimate
phase lies with the
Seleccione una:
a. Product Owner
c. Scrum Master
d. Scrum Team
Respuesta correcta
Seleccione una:
a. Impediment Log
b. Product Owner
c. Accepted Deliverables
Respuesta correcta
c. Never
d. Whenever the Product Owner decides that an ítem has to be assigned higher priority
Respuesta correcta
La respuesta correcta es: Whenever the Product Owner decides that an ítem has to be assigned higher priority
Which of the following tools is used by the Scrum Team to estimate Tasks in the Estimate Tasks
Process?
Seleccione una:
b. JAD Sessions
c. Paired Comparison
d. Wideband Delphi
Respuesta correcta
Seleccione una:
c. Team velocity is a measure of the amount of work that a team can complete in a Sprint.
d. Historical team velocity is used as an indicator when assigning tasks for each Sprint.
Respuesta correcta
Seleccione una:
a. What the team member has learned from completing his or her work
b. What the team member has accomplished since the last meeting.
d. What the team member plans to work on until the next meeting
Respuesta correcta
La respuesta correcta es: What the team member has learned from completing his or her work
Seleccione una:
a. 1 hour
c. 15 minutes
d. 5 minutes
Respuesta correcta
Ensuring that the Daily Standup Meetings are run in a timely and structured manner is the responsibility
of the
Seleccione una:
b. Scrum Master
c. Product Owner
d. Group collectively
Respuesta correcta
Seleccione una:
Respuesta correcta
La respuesta correcta es: Measure the work left to be completed during a Sprint
The meeting in which the team discusses the tasks to be completed in the next Sprint is known as the
Seleccione una:
The meeting at the end of the Sprint in which the team presents its work to the Product Owner is known
as the
Seleccione una:
Respuesta correcta
The meeting in which the team analyzes the previous Sprint and identifies potential Process
improvements is known as the
Seleccione una:
Respuesta correcta
Seleccione una:
a. The Scrum Master can accept or reject the end product deliverable
b. The team presents the end product deliverable to the Product Owner
d. Each team member can accept or reject the end product deliverable
Respuesta correcta
La respuesta correcta es: The team presents the end product deliverable to the Product Owner
Which of the following activities is NOT part of the Retrospect Sprint Meeting?
Seleccione una:
a. Based on suggested changes, the team proceeds to reprioritize the Prioritized Product Backlog
b. The team discusses the positives and negatives from the previous Sprint
c. The team identifies issues faced in the previous Sprint and discusses how to mitigate these issues
in future Sprints
Respuesta correcta
La respuesta correcta es: Based on suggested changes, the team proceeds to reprioritize the Prioritized Product
Backlog
The advantages of the Groom the Prioritized Product Backlog Process are the following:
Seleccione una:
a. The latest Business and technical requirements are added to the next Sprint
Respuesta incorrecta.
The responsibility of Grooming the Prioritized Product Backlog lies with the
Seleccione una:
a. Scrum Team
b. Scrum Master
c. External Stakeholders
d. Product Owner
Respuesta correcta
Which of the following activities can be performed together during the Sprint Planning Meeting?
Seleccione una:
Respuesta correcta
Seleccione una:
a. The Product Owner explains the top Prioritized Product Backlog ítems to the team.
c. The Scrum Team, in consultation with the Product Owner, estimates the tasks for a given sprint
d. Based on estimates, the team commits to a few tasks to be completed in the next Sprint.
Respuesta correcta
You are a member of a Scrum Team, and you are instructed by the general manager of your Company
to work on an urgent task that is not part of the current Sprint. What do you do?
Seleccione una:
a. Talk to the Scrum Master, and tell him or her to re-assign your tasks to someone else.
b. Inform the Scrum Master of the situation, and let he or her discuss the situation with the GM
c. Talk to the Product Owner, and tell him or her to re-assign your tasks to someone else.
e. Take responsibility for the task, and tell the Product Owner to postpone the deadline for the current
Sprint.
Respuesta correcta
La respuesta correcta es: Inform the Scrum Master of the situation, and let he or her discuss the situation with
the GM
For any ongoing Sprint, when can new User Stories be added?
Seleccione una:
d. When the Scrum Master adds the User Story to the Sprint Backlog
Respuesta correcta
La respuesta correcta es: New User Stories can never be added to the Sprint
Acceptance criteria
Seleccione una:
Respuesta correcta
La respuesta correcta es: Helps the team adhere to the quality norms regarding functionality
In which of the following processes in the Initiate phase is the length of the Sprint determined?
Seleccione una:
b. Develop Epic(s)
Which of the following is NOT true regarding implementing Scrum for large projects?
Seleccione una:
d. A prioritized Product Backlog is not needed to track the progress of all projects.
Respuesta correcta
La respuesta correcta es: A chief Product Owner is needed to monitor all the projects
Seleccione una:
c. Discussing problems that may have come up for any of the Scrum teams
Respuesta incorrecta.
La respuesta correcta es: Whether any of your decisions could impact other teams
a. The Chief Product Owner is responsable for the success or failure of the Project
d. Large teams have Chief Scrum Masters and Chief Product Owners to monitor the progress of the
Project.
Respuesta incorrecta.
La respuesta correcta es: Large teams have Chief Scrum Masters and Chief Product Owners to monitor the
progress of the Project.
Seleccione una:
b. Solving problems, removing impediments, and facilitating and conducting meetings for the
program
c. Communicating the Sprint goals and Objectives to members of the Project Scrum Teams
Respuesta correcta
La respuesta correcta es: Defining the strategic Objectives and priorities for the Program
Which of the following processes ensures synchronization and facilitates the flow of information among
multiple Scrum Teams working in parallel in large Scrum Projects?
Seleccione una:
b. Retrospect Project
Respuesta correcta
Seleccione una:
b. Focuses on providing control through frequent inspections and adaptations of processes that are
perfectly defined
d. Is employed in situations in which the processes generate unpredictable and unrepeatable outputs
Respuesta correcta
La respuesta correcta es: Is employed in situations in which the processes generate unpredictable and
unrepeatable outputs
Seleccione una:
b. Time-boxing
c. Self-organization
d. Value-based Priorization
Respuesta correcta
Seleccione una:
Respuesta correcta
Seleccione una:
Respuesta correcta
Seleccione una:
c. Features with the least or no interdependencies will be completed first to ensure smooth and
uninterrupted delivery.
Respuesta correcta
La respuesta correcta es: Features that provide máximum Business value will be completed first
Seleccione una:
a. Project sponsor
b. Stakeholder
c. Product Owner
d. Project manager
Respuesta correcta
Who among the following is responsible for providing the Scrum Team with a favorable environment for
creating deliverables?
Seleccione una:
a. Scrum Master
b. External Stakeholders
c. Product Owner
Who among the following is responsible for creating an awareness of Scrum practices among Scrum
Team members?
Seleccione una:
a. Scrum Master
b. Scrum Team
d. Product Owner
Respuesta correcta
Who among the following is responsible for achieving the maximum Business value of the Project?
Seleccione una:
a. Scrum Master
b. Scrum Team
c. External Stakeholders
d. Product Owner
Respuesta correcta
Who among the following is responsIble for creating deliverables in the Create Deliverables Process?
Seleccione una:
c. Scrum Team
Respuesta correcta
Seleccione una:
c. Individual responsibility can be assigned to each member of the team depending on their expertise
d. Both A and B
Respuesta correcta
Who among the following is responsIble for deciding on the Acceptance Criteria for various tasks?
Seleccione una:
a. Product Owner
c. Scrum Master
d. Scrum Team
Respuesta correcta
Seleccione una:
b. Product Owner
Respuesta correcta
Jason is responsable for resolving conflicts among Scrum Team members. What role is he playing on a
Scrum Project?
Seleccione una:
a. Scrum Team
b. Scrum Master
c. Product Owner
Respuesta correcta
a. Impediment Log
c. Accepted Deliverables
Respuesta incorrecta.
Seleccione una:
a. Task List
Respuesta correcta
Seleccione una:
a. Accepted Deliverables
b. Impediment Log
Which of the following is NOT an input to the Create Sprint Backlog Process?
Seleccione una:
b. Length of Sprint
d. Impediment Log
Respuesta incorrecta.
Which of the following is NOT an output to the Create Project Vision Process?
Seleccione una:
a. Business Case
d. Project Budget
Respuesta correcta
b.
Impediment Log
c. Accepted Deliverables
Respuesta correcta
Seleccione una:
b. Product Backlog
c. Task List
Respuesta correcta
Finalizar revisión
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 10
Finalizar revisión
http://www.mapolearning.com E-mail: info@mapoconsultores.com