Você está na página 1de 9

Planning and Pre-Production

Unit 12: Specialism Documentary

Contents

o Production Schedule
o List of questions for each interviewee
o Script
o Props List
o Location Recces
o List of items downloaded with references
o Clearances and Confirmations
o Contingency Plan
Production Schedule
Please include location, time of film, what you are filming and teams members
including actors

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday
List of Questions for Interviewees

Interviewee 1

Interviewee 2

Interviewee 3
Script
In order to complete this correctly, you need to add stage directions for your actors

(Delete page if doing a music video)


Props List

Item Item Description Who uses it When it is used


Location Recce
Please produce a location recce for EVERY location used

Insert photo of location (do not draw) Type of room/area:

Location Address:

Sat Nav details (Post code):

Nearest Train Station:

Nearest Bus stop:

Lighting Information: Solutions:

Sound Information: Solutions:

Power Information Solutions:

Hazards Solutions:
Downloaded Footage
Provide links and descriptions of the footage you have
downloaded for your documentary.

Link Description
Clearances and Confirmations
You need confirmation emails from everyone that is featuring in your music
video. Please screenshot these emails including the dates and times they are
agreeing to paste them below.

If you are filming somewhere that requires permission, please obtain


permission and paste the confirmation below.
Contingency Plan
What are your plans for if something goes wrong? What back up actors,
locations and equipment do you have?

Você também pode gostar