Yakov Polyakov Project: BRIDGE OVER F STREET Engineer: YP Project #

yakov@yakpol.net Date: 9/28/17


http://yakpol.net Subject: BRIDGE OVER F STREET Checker: Page: 1
Date:

TENDON VERTICAL PROFILE

Web Slope Vertical: 3 Horizontal: 1

Input Correct Angle


Point Segment Station A1 A2 A3
Elevation Elevation Change
Inflection 0 3.5 3.5
Inflection Tangent 10 1 1 0 -0.25 3.5 0.0000
Low Sag 40 1 1 0 0 1 0.0000
Inflection Sag 85 6 6 0.00247 -0.1975 4.95062 0.2342
High Crown 100 6 6 0 0 6 0.0000
Inflection Crown 118 1 1 -0.0154 3.08642 -148.32 0.5856
Low Sag 160 2 2 0.00057 -0.1814 16.5125 0.0502
Inflection Sag 200 4.9 4.9 0.00181 -0.58 48.4 0.1528
High Crown 220 4.85 4.85 -0.0001 0.055 -1.2 0.0053
Inflection Crown 240 3.5 3.5 -0.0034 1.485 -158.5 0.1423
Inflection Tangent 250 3.5 3.5 0 0 3.5 0.0000

Cable Profile
7.000
6.000
5.000
Elevation

4.000
3.000
2.000
1.000
0.000
0 50 100 150 200 250 300

Station
Yakov Polyakov Project: BRIDGE OVER F STREET Engineer: YP Project #
yakov@yakpol.net Date: 9/28/17
http://yakpol.net Subject: UNIT A CONTINUOUS CIP GIRDER Checker: Page: 1
Date:

TENDON HORIZONTAL ALIGNMENT

Angle
Station Segment Radius
Change
0
10 Tangent 0 0.0000
240 Curve 500 0.4600
250 Tangent 0 0.0000
Yakov Polyakov Project: BRIDGE OVER F STREET Engineer: YP Project #
yakov@yakpol.net Date: 9/28/17
http://yakpol.net Subject: UNIT A CONTINUOUS CIP GIRDER Checker: Page:
Date:
Rev. 9/15/2004
PRESTRESS LOSSES IN POST-TENSIONING TENDON

Steel Ultimate Stress fpu = 270 Mpa Units: SI


Anchor Set DL = 0.375 MM
Steel Modulus Elasticity Es = 28000 Mpa Elongations, meters
Curvature Friction Coefficient m = 0.25 stress order 1 2
Wobble Friction Coefficient k= 0.0002 1/M Left End 1.580 0.145
Long-Term LossesDfLONGTERM = 25 Mpa Right End 1.579 0.145

Jacking End Left Right


Prestress Ratio fjack/fpu = 0.8 0.8 GUTS
Jacking Stress fjack = 216 216 Mpa
Seating Losses at Anchor Df = 26.08 31.0 Mpa
Seating Zone (from anchor) Lc = 58.81 59.4 M
Stress at Conversion Point fconv = ### 200.5 Mpa

Angular change in tendon profile

Distance Stresses
Segment Segment Vertical Horizontal Final
from left Total Stations after
No. Length Profile Profile Stresses
end seating

M M rad rad rad M Mpa Mpa


0 0 0.00 189.9 164.9
1 10 10 0.00000 0.00000 0.0000 10.00 190.4 165.4
2 40 30 0.10541 0.06000 0.1212 40.00 198.0 173.0
3 85 45 0.17568 0.09000 0.3184 58.81 203.0 178.0
4 100 15 0.17568 0.03000 0.4966 85.00 196.1 171.1
5 118 18 0.14055 0.03600 0.6417 100.00 187.0 162.0
6 160 42 0.14055 0.08400 0.8053 109.12 183.3 158.3
7 200 40 0.10014 0.08000 0.9333 118.00 186.9 161.9
8 220 20 0.10014 0.04000 1.0412 160.00 196.4 171.4
9 240 20 0.07115 0.04000 1.1228 180.65 200.5 175.5
10 200.00 196.6 171.6
11 220.00 190.2 165.2
12 240.00 185.0 160.0
13
14
15
16
17
18
19
20
21
22
23
Yakov Polyakov Project: BRIDGE OVER F STREET Engineer: YP Project #
yakov@yakpol.net Date: 9/28/17
http://yakpol.net Subject: UNIT A CONTINUOUS CIP GIRDER Checker: Page:
Date:
Rev. 9/15/2004
PRESTRESS LOSSES IN POST-TENSIONING TENDON
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Prestress Losses
200

190

180

170

160
Stress

150

140

130

120

110

100
0 2 4 6 8 10 12
Distance along tendon

Jacking from left end Jacking from right end


After seating Final
After seating on left After seating on right