Você está na página 1de 8

GUIDELINES FOR AWS SUPPORT MISSIONS

REPLACE ELECTONIC BOARD ON XARIA300

July 2015

Written by : F.Thebault Date : 02/07/2015 Page 1 / 8


1 Wind parameters missing on Xaria 300 3

1.1 Concerned sites 3

1.2 Description of the default 3

1.3 Redmine 3

2 Replacement procedure 3

2.1 Tools list 3

2.2 Procedure 3

2.3 Tests of good functioning 8

3 Before leaving the site 8

Written by : F.Thebault Date : 02/07/2015 Page 2 / 8


1 WIND PARAMETERS MISSING ON XARIA 300

1.1 Concerned sites

At this date, we have noticed the default on the following AWS sites:
Bawean
Tanjung Pandan.

1.2 Description of the default


All Wind parameters (Force and direction) are displayed as '0' on the datalogger Xaria300 screen.

After discussion with Degreane, the failure occurs on Xaria300 having a manufacturing defect on
the Wind acquisition board.

This wind acquisition board must be replaced.

1.3 Redmine
http://terrindo-str.mfi.fr/redmine/issues/519

2 REPLACEMENT PROCEDURE

2.1 Tools list


Flathead screwdriver
Kit of little Allen wrenches
Wind acquisition electronic board

2.2 Procedure
1. Switch off the Xaria 300 module by auctioning the ON/OFF button.
2. Disconnect all cable connected to the Xaria.
3. Extract the Xaria module from the cabinet by unscrewing the 2 lateral screw and put the module
on a table inside.
4. Open carefully the Xaria module by pushing simultaneously the 4 lateral round:

Written by : F.Thebault Date : 02/07/2015 Page 3 / 8


5. With a flat screwdriver, remove the two screws used to attach the electronic unit:

5. Remove the internal bus connector:

Written by : F.Thebault Date : 02/07/2015 Page 4 / 8


6. Remove the electronic unit from the case and after the front plastic panel:

Written by : F.Thebault Date : 02/07/2015 Page 5 / 8


7. The electronic unit is composed of specific electronic boards for each parameter. The wind
acquisition board is the biggest one. Reverse the electronic unit and use a Allen wrench to remove
the 4 screws of the wind acquisition board:

8. Unplug the wind electronic board from the rest of electronic unit:

Written by : F.Thebault Date : 02/07/2015 Page 6 / 8


9. Plug the spare wind acquisition board.

Before perform the reverse steps:

Check the state of RS485 jumper (ON or OFF ) on the other electronic unit.
Make sure that this jumper is well plugged on the 2 metallic pins as the following photo:

Written by : F.Thebault Date : 02/07/2015 Page 7 / 8


Reverse steps:
10. Screw the 4 screws to attach the new board.
11. Set the electronic unit inside the case.
12. Screw the 2 screws to secure the electronic unit at the bottom of the case (don't forget the
yellow cable for one screw).
13. Plug the internal bus connector.
14. Close the Xaria cases.
15. Set the Xaria module inside the cabinet.
16. Connect all connectors.

2.3 Tests of good functioning


Turn ON the Xaria module.
Wait for 2 or 3 minutes and check if there is data for wind force and wind direction.
If there is no wind (<0.5m/s), you have to tilt down the mast and manually rotate the
anemometer.
After more than 20 minutes, check on Cobalt/Monitoring page that Wind data (FF and
DD) are displayed regularly. Use the right click/List to display historic data.

3 BEFORE LEAVING THE SITE


Report the result to TBR and MFI support team whatever the result before leaving the
site. Report also the previous status of RS485 jumper (ON or OFF).
MFI must validate before you leave the site.
Don't hesitate to contact MFI if you need support during the operations.

Written by : F.Thebault Date : 02/07/2015 Page 8 / 8

Você também pode gostar