>>DSETERMINATION OF LOADS
AFETY REQUIREMENTS IN ALL STAGES OF CONSTRUCTION

3.1 Earth Pressure settlements can be accepted, the slurry calculation methods exist, e.g.
pressure can be lowered up to water FEM-calculations, the determination of
If a tunnel has an overburden of less pressure at the face. Redistribution of correct bedding parameters may be
than two times the diameter, the full loads around the tunnel are possible, difficult.
primary earth load should be inserted the release factor of 0.7 was chosen to
in the calculations. A reduction of calculate the maximal settlements. The Geotechnical engineers often only
the earth pressure, e.g. by using the earth loads on the lining lowers down to provide the Youngs Modulus. From
Terzaghi theory, often is not allowed a minimum. For this case, the grouting this, the stiffness moduluss Es must be
for the final state. Calculating the pressure around the segmental lining calculated with the Poisons ratio .
22 m overburden, the maximal vertical may give the maximal load on the ring.
load would be near 440 kN/m. Finite Because of uncertain input values, the
Element calculations show, that a load parameter studies are necessary to
reduction of approximately 25% should find a realistic load determination and
be possible. This corresponds with to understand the specific interaction
the Terzaghi reduction. This reduced between surrounding soil and In the clayey loams with 0.4, the
vertical earth pressure was used for segmental lining. stiffness modulus ES is about two times
the calculations. The full cover was higher than the Youngs modulus E!
calculated with reduced safety factors. 3.2 Loads during Ring Erection
From the ES modulus, the spring
and Advance stiffness can be calculated:
For huge diameter tunnels with
segmental lining, a marginal change Segments already get considerable
of side pressure leads to notable loads during transport and ring
changes of ring bending moments. erection. They are pulled out of the
The side pressure in most of all (R = system radius of the segmental
formwork when concrete hardening is ring)
projects is determined by the soil in an early stage, and the segments
angle of internal friction (k0= 1-sin ). are manipulated during stocking,
Measurements to determine the side Geotechnical engineers often tend to
transport, ring erection and advance. provide a Youngs modulus, which was
pressure factor k0 are quite difficult and For the dimensioning of reinforcement,
need elaborated instrumentation and determined by the lowest measured
the loads during advance are often values. The experts may not realize,
interpretation. For the Orlovski project decisive.
k0 varies from 0.6 to 0.75. Because of that small layers of soft soil have no
possible over consolidation, a maximal influence on the real bedding situation
Big tunnel diameters need big TBMs of the lining. Additionally, the face
k0 of 1.0 was calculated, too. Higher to excavate the tunnel. The foreseen
values are not realistic, as small soil support pressure and the ring grouting
slurry TBM with an excavation diameter pressure pre-stress the surrounding soil
deformations already lower the of 19.2 m will has 37 double rams with
k0-factor under 1.0. and equalises the bedding situation.
about 7000 kN advance force, each.
The pressure must be absorbed by the Another problem is the determination
For control calculations with a two segments in a small circumferential joint
dimensional Finite Element Method of the loading, unloading and reloading
area. High tensile splitting forces must modulus for the calculation of the
(FEM), the release factor at the tunnel be taken by special reinforcement.
face was varied between 0.3 and 0.7. segmental ring.
If ground deformations must be limited, The longitudinal joints between
the small factor of 0.3 is used. This All given soil parameters should be
the segments of a ring react as discussed between designer and
means, the slurry pressure in the cutting articulations. Because of the high
chamber must be high, more than 0.5 geotechnical expert to determine
normal forces, bending moments can realistic values for the final calculations.
bar over the water pressure in the top be transferred over the joints, but the
area of the TBM. Only a small stress stability of the ring depends on bedding
release in the ground is possible, the reactions. The bedding parameters are
load on the segments is high, ground calculated from the Youngs modulus
deformations are low. If higher ground of the surrounding soil. Even if powerful

6 SEGMENTAL RING DESIGN NEW CHALLENGES WITH HIGH TUNNEL DIAMETERS