Energy Measurement and Management

MT860
High precision multi-function meter 0.2S

Installation manual
Version 2.0, 1.4.2005
Energy Measurement and Management

Contents
1. Meter parts .............................................................3
1.1. Front plate........................................................4
1.2. Meter terminals ................................................4
1.3. Module terminals .............................................5
1.4. Power supply ...................................................5
1.5. Display .............................................................5
2. Installation ..............................................................6
2.1. Wiring...............................................................6
3. Checking the meter ................................................7
3.1. Voltages ...........................................................7
3.2. Statuses ...........................................................7
3.3. Resetting cover status .....................................7
3.4. Load .................................................................7
3.5. Display .............................................................7
4. Handling .................................................................7
5. Technical data ......................................................10

DOCUMENTATION
Technical and programming details on the MT860
meter can be found in:

MT860, Technical Description,


MeterView 4: Users manual.

WARNING!
The meter installation must be performed by
authorized persons, who are familiar with security
against electric current stroke. Feed-through
terminals and auxiliary terminals are under
voltage that can be lethal!
MT860
Installation manual

1. Meter parts Meter dimensions and fixing dimensions comply with


the DIN 43857 standard.

19

1 16

15
2
14
3
4 13
12
5 11
6 10
18
7 17
Fig. 2: Dimensions
7
A compact plastic casing is made of high quality self-
extinguishable materials and is resistant to water and
8 dust (IP53).

1. Display
2. Active energy meter diode
3. Technical data
4. Optical-magnetic interface
5. Input/output module mark
6. Legend for register display
7. Meter cover sealing screw
8. Terminal cover
9. Terminal cover sealing screw
10. Meter program number
11. Communication module mark
12. Reset key blocking element
13. Reset key
14. Scroll key
15. Reactive energy meter diode
16. Meter cover
17. Labels
18. Bar code
19. Adjustable hook

Fig. 1: Meter parts

3
MT860
Installation manual

1.1. Front plate 1.2. Meter terminals


The following data is printed on the meter nameplate: There are 12 or 6 (with a RJ-11 connector) terminals
on the meter basic board. They are used for inputs,
serial number, outputs, communication and power supply.
ownership number, To access terminal block remove terminal cover (8),
type and version designation, fixed with two screws (9). Seals from screws must be
accuracy, removed.
year of manufacturing,
approval mark,
rated voltage, Sensor for Sensor for
meter cover opening terminal cover opening
rated and maximum currents,
rated frequency,
LED and output pulse constants at meter
testing,
software version,
owners name or logo,
bar code,
code of connection diagram and program
number.

Voltage and current terminals Auxiliary RJ11


terminals

Fig. 4: Terminal block

Fig. 3: Front plate

Fig. 5: RJ11 and 6 auxiliary terminals

4
MT860
Installation manual

1.3. Module terminals 1.5. Display


In addition to the meter terminal block also each The liquid crystal matrix-dot display with 4x20
module has its own terminals. characters enables complex and clear display of
Connection diagram for modules is stuck on the different data, messages and events. Depending to
module itself and inside the terminal block cover. meter mode different information is shown. Displayed
data is identified with OBIS IEC 62056-61.

Meters have back-light illumination for easy data


reading at metering place with bad light condition.
The LCD is illuminated when any pushbutton is
pressed. The illumination is switched-off after 3
minutes if no pushbutton was pressed at that time.

Fig. 6: Module terminals


Fig. 8: Auto mode

1.4. Power supply Standard meter status indicators are:


In operation, meter is supplied from:
L123 Phase voltage detection, blinking
multi-range internal power supply from mains, incorrect phase sequence.
external power supply (50-230 V AC/DC) or A+, A- Active energy direction
both. R+, R- Reactive energy direction
Tx Valid tariff for energy
With a internal supply at least one phase must be IM Blinking, un-recognized module
connected. CM Blinking, un-recognized module
C Communication
For parameterization only (reading/writing), supply F Fatal error
from USB connector by optical-magnetic interface S Setting mode
can be used. E External supply
P Parameterization mode
M Meter cover opened
T Terminal cover opened

Fig. 7: Optical-magnetic interface, Iskraemeco PROBE 6

5
MT860
Installation manual

2. Installation 2.1. Wiring


To install meter follow next steps: The meters can be wired via CT or CT/VT in three-
phase 3 or 4-wire networks. Connection diagram for
1 - Adjust hook height to fit installation position of the meter and modules is stuck inside the terminal block
meter. Sliding hanger enables installation for all fixing cover.
dimensions, from 165 to 230 mm.

Fig. 9: Adjustable hook at meter back

2 - Fasten the meter to the measuring spot by three


screws.

Fig. 10: Screw positions

3 - Connect measuring, input and output circuits and


communication cables in conformity with the
connection diagram stuck inside the terminal block
cover on the meter and modules.

4- Install the terminal block cover and fasten it by two


screws. Seal the terminal block cover screws by wire
and seal.
Fig. 11: 3 wire and 4 wire meter connection
5- If you wish to have the reset key locked, hang up
the overhang and lock it up. The overhang hole
diameter is 5 mm.

6 - Power-up the meter. By connecting to the voltage,


the light emitting diodes illuminate and measuring
data from the AUTO data sequence are cyclically
shown on the display.
Fig. 12: Input/output module connection diagram

6
MT860
Installation manual

3. Checking the meter 3.5. Display


3.1. Voltages LCD test mode is used to check if all LCD dots are
displayed.
If all three symbols (L123) are displayed, it means When scroll button is depressed in auto mode,
that all three phase voltages are present. display is illuminated and all segments (dots) of the
LCD blink.
Any not displayed symbol (L1, 2 or 3) shows this
phase voltage failure.

If symbols L123 pulse, it means a wrong phase


sequence. In this case it is required to change the
cables phase sequence, otherwise the reactive
energy is registered in the wrong quadrant. The
phase sequence does not impact on measurement Fig. 13: LCD test, all dots are displayed
and registration of the active energy.

3.2. Statuses 4. Handling


Display is menu driven and is handling by pressing
Meter has many different statuses to indicate errors.
one pushbutton at time (one-hand handling).
Check for:
Employed menu is controlled by two pushbuttons on
the meter front side:
IM Blinking, un-recognized module
CM Blinking, un-recognized module
scroll (black),
F Fatal error
reset (red, sealed).
In a case of fatal error check the value of F.F.
register. Binary or hexadecimal value of F.F. register
describes the cause of the error.

3.3. Resetting cover status


If the meter or terminal cover is removed while meter
is running status M or T will be displayed on LCD. Fig. 14: Meter buttons
Event will be written in logbook.
Each button has three activation times:
Statuses M and T will be displayed on LCD for 10
min. or until reset button is pressed and held for time short, up to 1 second,
longer than 2 s. long, 1-3 seconds,
extended, more than 3 seconds.
3.4. Load
If no load or lower than the meter sensitivity Principles of the meter handling and data displaying
threshold, the light emitting diodes illuminate without described in this chapter are shown in Fig. 16:
interruption, and the power flow direction symbols or
quadrant respectively pulse.

If the load is higher than the meter sensitivity


threshold, the light emitting diodes pulse with a
frequency proportional to the load and the power flow
direction symbols and quadrant are shown on the
display.

Un (V) In (A) LED Output


(imp/kWh, (imp/kWh,
imp/kvarh) imp/kvarh)
Multi-range 1 500.000
3x58230/ 5(6) 100.000 Output=LED/N
100400 1(6) 100.000
Table 1: LED and output constants. N=integer divider

7
MT860
Installation manual

Fig. 15: Meter pushbutton handling flowchart diagram

8
MT860
Installation manual

Fig. 16: Setting date and time flowchart diagram

9
MT860
Installation manual

5. Technical data
Accuracy class
Active energy 0.2S or 0.5S (IEC 62053-22)
Reactive energy class 2, 3 (IEC 62053-23), calibrated up to 0.5%.
Apparent energy 0.5%
Measuring voltage (V) Multi-range, 57-240 V 20% (phase to neutral)
3 x 57.7/100 3 x 100
3 x 63/110 3 x 110
3 x 115/200 3 x 200
3 x 127/220 3 x 220
3 x 220/380 3 x 380
3 x 230/400 3 x 400
3 x 240/415 3 x 415
Voltage range 0.8 - 1.15 Un
Rated frequency 45-65 Hz
Measuring current (A) 1(1.2), 1(2), 1(6), 5(6), 5(10)
Short-circuit current 30 Imax
Starting current 0.001 In
Outputs
Type PHOTO-MOS potential-free relay
Permitted load 25 VA (100 mA, 250 V AC)
Isolation dielectric strength make contact: 5000 Vrms
Impulse length from 10 to 2500 ms (programmable in steps of 10 ms)
Impulse frequency max. 5 imp/s at impulse length 80 ms (shorter length, larger frequency is possible)
Transfer distance 1 km
Inputs 57.7 230 V AC
Voltage threshold ON: U 50 V
OFF: U < 20 V
Current consumption < 2 mA @ 57.7V
< 10 mA @ 230V
Communication
IR max. 9600 Baud
RS232 max. 19200 Baud
RS485 max. 9600 Baud

Protocols IEC 62056-21, IEC 60870-102-5


Optical reading LED
Impulse frequency 40 Hz
Impulse length approx. 14 or 30 ms
Real time clock
Accuracy crystal: 6 ppm = 3 min./year (at Top= +25C)
Power back-up super-Cap: 1F for minimal 250 h of back-up.
Li-battery: Operation reserve: 2 years. Life span: 20 years.
External power supply 50 - 230 V AC/DC
EMC testing
Electrostatic discharge 15 kV (IEC 60801-2)
HF Magnetic field 10 V/m (IEC 60801-3)
Burst test 4 kV (IEC 60801-4)
Dielectric strength 4 kVrms, 50 Hz, 1 min
Impulse voltage 6 kV, 1.2/50 s
Temperature range In compliance with IEC62053-22
Operation -20C ... +60C
Storage -30C ... +70C
Housing DIN 43857, 327 x 177 x 90 mm, 1.4 kg, UL94 (94V0), IP53
Self consumption
Current circuits <0,1 VA / phase
Voltage circuits <3 W / 10 VA
Table 2: Technical data

10
MT860
Installation manual

Owing to periodical improvements of our products the supplied products can differ in some details from the data stated in the prospectus material.

Iskraemeco d.d., Energy Measurement and Management


4000 Kranj, Savska loka 4, Slovenia
Telephone (+386 4) 206 40 00, Fax: (+386 4) 206 43 76
http://www.iskraemeco.si, E-mail: info@iskraemeco.si
Published by Iskraemeco. Data subject to alteration without notice. MT860 EN installation v2.doc