Você está na página 1de 9

PRECIPITACIONES MENSUALES

ESTACION: LA CASCARILLA LAT.: 05 40' 40'' DEP.: CAJAMARCA


CATEGORIA: "CP" LONG.: 78 53' 51.6' PROV.: JAEN
PARAMETRO: PRECIPITACION mensual ALT.: 1908 m.s.n.m DIST.: JAEN

AO Ene. Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic PROM. ANUAL MAX. ANUAL TOTAL
1999 19.60 34.84 17.49 27.41 7.50 3.95 10.59 3.14 10.24 35.81 24.12 34.72 19.12 35.81 229.43
2000 14.10 22.23 28.04 26.90 14.34 10.04 1.62 1.42 5.57 18.75 13.63 7.84 13.71 28.04 164.48
2001 16.50 45.92 15.72 15.84 11.38 12.11 4.32 2.56 9.07 20.30 11.39 25.59 15.89 45.92 190.69
2002 21.20 30.50 67.00 17.50 18.50 20.00 4.80 0.00 5.50 2.20 23.30 17.90 19.03 67.00 228.40
2003 24.00 35.60 24.20 21.00 10.00 18.60 6.00 11.20 4.40 24.80 43.10 27.60 20.88 43.10 250.50
2004 19.60 26.00 29.40 41.40 15.80 4.20 3.80 0.00 4.60 22.00 19.70 29.80 18.03 41.40 216.30
2005 14.10 18.30 32.00 20.00 16.80 26.00 3.50 0.00 4.00 23.50 70.00 51.50 23.31 70.00 279.70
MAX 24.00 45.92 67.00 41.40 18.50 26.00 10.59 11.20 10.24 35.81 70.00 51.50
MIN 14.10 18.30 15.72 15.84 7.50 3.95 1.62 0.00 4.00 2.20 11.39 7.84
PROMEDIO 18.44 30.49 30.55 24.29 13.47 13.56 4.95 2.62 6.20 21.05 29.32 27.85

ESTACION: CHONTAL LAT.: 05 38' "S'' DEP.: CAJAMARCA


CATEGORIA: "CP" LONG.: 79 5' "W' PROV.: JAEN
PARAMETRO: PRECIPITACION mensual ALT.: 1627 m.s.n.m DIST.: CHONTAL

AO ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC. PROM. ANUAL MAX. ANUAL TOTAL
1999 47.00 20.20 12.30 50.40 15.80 9.40 10.40 6.60 20.00 22.80 29.80 35.00 23.31 50.40 279.70
2000 24.50 32.80 25.60 51.30 35.10 22.40 5.80 4.00 11.00 36.20 34.70 19.80 25.27 51.30 303.20
2001 23.80 43.00 24.40 25.50 21.00 29.00 9.30 8.30 16.20 51.60 27.20 42.30 26.80 51.60 321.60
2002 11.60 34.30 92.50 30.60 31.20 24.60 12.80 6.00 27.00 8.50 6.70 24.20 25.83 92.50 310.00
2003 70.50 13.30 21.70 31.90 13.30 4.70 11.00 6.60 30.00 13.40 43.30 20.50 23.35 70.50 280.20
2004 27.20 18.20 17.40 24.70 21.50 6.00 20.30 1.70 15.30 28.80 29.00 19.39 19.12 29.00 229.49
2005 30.90 24.60 22.60 32.00 23.90 30.50 10.80 3.10 9.20 48.00 28.70 22.20 23.88 48.00 286.50
MAX 70.50 43.00 92.50 51.30 35.10 30.50 20.30 8.30 30.00 51.60 43.30 42.30
MIN 11.60 13.30 12.30 24.70 13.30 4.70 5.80 1.70 9.20 8.50 6.70 19.39
PROMEDIO 33.64 26.63 30.93 35.20 23.11 18.09 11.49 5.19 18.39 29.90 28.49 26.20
ESTACION: EL PROGRESO LAT.: 05 27'59" S DEP.: CAJAMARCA
CATEGORIA: PLU LONG.: 78 59'19" w PROV.: JAEN
PARAMETRO: PRECIPITACION mensual ALT.: 753 m.s.n.m

AOS ENE FEB MAR ABR MAY JUN JUL AGOS SET OCT NOV DIC PROM. ANUAL MAX. ANUAL TOTAL
1999 4.60 21.60 10.10 5.10 0.70 0.00 5.10 0.30 1.50 21.50 9.50 16.40 8.03 21.60 96.40
2000 31.60 34.50 55.10 33.20 12.00 10.00 0.00 0.80 6.60 22.80 10.40 6.10 18.59 55.10 223.10
2001 29.50 58.50 14.70 14.30 8.80 5.70 2.60 0.00 7.30 7.90 5.40 22.50 14.77 58.50 177.20
2002 7.30 30.30 27.10 44.40 52.60 8.30 3.70 3.00 10.30 0.60 4.30 6.80 16.56 52.60 198.70
2003 31.40 15.10 31.80 19.90 7.60 1.40 3.30 3.10 17.30 8.40 30.60 8.00 14.83 31.80 177.90
2004 4.00 12.50 55.40 16.40 15.50 1.60 5.10 0.00 0.40 20.50 11.10 18.00 13.38 55.40 160.50
2005 2.70 24.10 12.10 9.80 3.70 17.00 8.70 0.00 2.50 6.90 12.90 7.40 8.98 24.10 107.80
MAX 31.60 58.50 55.40 44.40 52.60 17.00 8.70 3.10 17.30 22.80 30.60 22.50
MIN 2.70 12.50 10.10 5.10 0.70 0.00 0.00 0.00 0.40 0.60 4.30 6.10
PROMEDIO 15.87 28.09 29.47 20.44 14.41 6.29 4.07 1.03 6.56 12.66 12.03 12.17
ANALISIS DE CONSISTENCIA DE LAS ESTACION MENSUALES

Anual Acumulado
Ao A (LA CASCARILLA) B (EL PROGRESO) C (CHONTALI) PP A B C PPA
1999 229.2 96.40 279.70 201.78 1559.30 1141.60 2010.69 1570.53
2000 164.5 223.10 303.20 230.26 1330.07 1045.20 1730.99 1368.75
2001 190.7 177.20 321.60 229.83 1165.59 822.10 1427.79 1138.49
2002 228.4 198.70 310.00 245.70 974.90 644.90 1106.19 908.66
2003 250.5 177.90 280.20 236.20 746.50 446.20 796.19 662.96
2004 216.3 160.50 229.49 202.10 496.00 268.30 515.99 426.76
2005 279.7 107.80 286.50 224.67 279.70 107.80 286.50 224.67

2500

2000
R = 0.998787523

ESTACION A
Linear (ESTACION A)
1500 R = 0.9964272212
Linear (ESTACION A)
ESTACION B
Linear (ESTACION B)
Linear (ESTACION B)
R = 0.9977043538
ESTACION C
1000
Linear (ESTACION C)
Linear (ESTACION C)
Linear (ESTACION C)

500

0
0 200 400 600 800 1000 1200 1400 1600 1800

CONCLUSION: LOS DATOS SON CONSISTENTES


METODO DE THIESSEN

PRECIPITACIONES MEDIAS MENSUALES


MES N DATOS CASCARILLA (A) EL PROGRESO (B) CHONTALI(C)
ENERO 1 24.00 31.60 70.50
FEBRERO 2 45.92 58.50 43.00
MARZO 3 67.00 55.40
ABRIL 4 41.40 44.40 20.44
MAYO 5 18.50 52.60 14.41
JUNIO 6 26.00 30.50 6.29
JULIO 7 10.59 20.30 4.07
AGOSTO 8 11.20 8.30 1.03
SEPTIEMBRE 9 10.24 17.30 6.56
OCTUBRE 10 35.81 22.80 12.66
NOVIEMBRE 11 70.00 30.60 12.03
DICIEMBRE 12 51.50 22.50 12.17

PRECIPITACIONES MAXIMAS EN 24 HORAS

MES P(mm) vol. (MM3)


ENERO 61.20 2.47 ANALISIS ESTADISTICA
FEBRERO 45.77 1.85 Media 20.65
MARZO 13.30 0.54 Mediana 16.00
ABRIL 25.71 1.04 Desviacin estndar 16.87
MAYO 21.06 0.85 Mnimo 2.86
JUNIO 11.53 0.47 Mximo 61.20
JULIO 7.18 0.29 Suma 247.79
AGOSTO 2.86 0.12 N 12
SETIEMBRE 8.58 0.35
OCTUBRE 15.74 0.64
NOVIEMBRE 18.61 0.75
DICIEMBRE 16.25 0.66
P. MX 61.20 2.47
Precipitaciones (m m )

PRECIPITACIONES MEDIAS MENSUALES


70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00

Tiempo (aos)

REGISTROS PLUVIOMTRICOS
DE THIESSEN

TACIONES MEDIAS MENSUALES


A (m2) B (m2) C (m2) AREA CUENCA Pmed. (mm) Pmin (mm)
6039072 16961773 78100549 101101394 61.20 Err:508
6039072 16961773 78100549 101101394 45.77 Err:508
6039072 16961773 78100549 101101394 13.30 Err:508
6039072 16961773 78100549 101101394 25.71 Err:508
6039072 16961773 78100549 101101394 21.06 Err:508
6039072 16961773 78100549 101101394 11.53 Err:508
6039072 16961773 78100549 101101394 7.18 Err:508
6039072 16961773 78100549 101101394 2.86 Err:508
6039072 16961773 78100549 101101394 8.58 Err:508
6039072 16961773 78100549 101101394 15.74 Err:508
6039072 16961773 78100549 101101394 18.61 Err:508
6039072 16961773 78100549 101101394 16.25 Err:508
101 KM2
S EN 24 HORAS

Volumen de agua potencialmente aprovechable


PARAMETROS UTILIZADOS Vm=C*P*A
C 0.4
A 101.1 Km2 Vm = Volumen mensual
C = Coeficiente de escurrimiento
p = Precipitacin pluvial del mes (m)
A = rea de cuenca m2
S MEDIAS MENSUALES

Tiempo (aos)

ROS PLUVIOMTRICOS
1. CEDULA DE CULTIVO
1. CEDULA DE CULTIVO
CEDULA DE CULTIVO

AREA TOTAL =1200 Ha


Ener Febr Marz Abr May Jun Jul Agos Set Oct Nov Dic
Cultivo Area (ha) 31 28 31 30 31 30 30 31 30 31 30 31

Kc Arroz 150.00 0.49 1.03 1.09 1.03 0.48 0.00 0.49 0.90 0.75 1.03 0.48 0.00
Kc Cacao 150.00 1.05 1.05 1.05 1.00 1.00 1.00 1.00 1.00 0.55 1.00 1.00 1.05
Kc Platano 200.00 1.20 1.20 1.20 1.20 1.00 1.00 1.00 0.80 0.40 1.10 1.10 1.10
Kc Caa de azucar 700.00 1.20 1.20 1.20 1.20 1.15 0.95 0.75 0.40 0.25 0.70 1.05 1.20
Area de Terreno Cultivado 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00 1200.00
Kc Promedio Ponderado (mes) 1.09 1.16 1.17 1.15 1.02 0.85 0.79 0.60 0.38 0.85 0.98 1.01
ETO(Dato) 128.00 106.00 107.00 94.00 95.00 93.00 105.00 65.00 63.20 139.00 150.00 135.00
UC(mm/mes) 139.84 122.96 124.92 108.45 97.14 78.66 82.99 39.27 23.70 117.51 147.13 136.97
Pmin (mm/mes) Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Coeficiente de Escorrentia (C ) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Pp efectiva = (1-C)*Pmin. Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Requerimiento Neto-mm (ETR -Pp efectiva) Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Requerimiento volumetrico (m3/Ha) Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508

Eficiencia de aplicacin de riego por Gravedad 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

N de dias al mes 31 28 31 30 31 30 31 31 30 31 30 31
Numero de horas de jornada de Riego 18 18 18 18 18 18 18 18 18 18 18 18
Modulo de Riego Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Caudal Requerido m3/seg cab. De chacra Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
2. BALANCE HIDRICO
Mes Dias A-B A-B acumulado
OFERTA DEMANDA A B
vol entrada Qec. Vol. Cultivo V OFERTA V DEMANDA
(MMC (m3/s) (MMC) MMC MMC
Enero 31 2.47 0.1 Err:508 2.47 Err:508 Err:508 Err:508
Febrero 28 1.85 0.1 Err:508 1.85 Err:508 Err:508 Err:508
Marzo 31 0.54 0.1 Err:508 0.54 Err:508 Err:508 Err:508
Abril 30 1.04 0.1 Err:508 1.04 Err:508 Err:508 Err:508
Mayo 31 0.85 0.1 Err:508 0.85 Err:508 Err:508 Err:508
Junio 30 0.47 0.1 Err:508 0.47 Err:508 Err:508 Err:508
Julio 31 0.29 0.1 Err:508 0.29 Err:508 Err:508 Err:508
Agosto 31 0.12 0.1 Err:508 0.12 Err:508 Err:508 Err:508
Septiembre 30 0.35 0.1 Err:508 0.35 Err:508 Err:508 Err:508
Octubre 31 0.64 0.1 Err:508 0.64 Err:508 Err:508 Err:508
Noviembre 30 0.75 0.1 Err:508 0.75 Err:508 Err:508 Err:508
Diciembre 31 0.66 0.1 Err:508 0.66 Err:508 Err:508 Err:508

MES voL. Q (M3/seg.)


ENERO (MM3)
Err:508 Err:508
FEBRERO Err:508 Err:508
MARZO Err:508 Err:508
ABRIL Err:508 Err:508
MAYO Err:508 Err:508
JUNIO Err:508 Err:508
JULIO Err:508 Err:508
AGOSTO Err:508 Err:508
SEPTIEMBRE Err:508 Err:508
OCTUBRE Err:508 Err:508
NOVIEMBRE Err:508 Err:508
DICIEMBRE Err:508 Err:508

Você também pode gostar