Você está na página 1de 3

- Keeping the productivity of the site, but with mixed uses

- Good integration and distribution of facilities


- Study of the area, in that way, to find the best connection between economy productive city
and sustainability
- Turning the site into a connection with the nearby sites and typologies
- Visibility in the urban fabric
- The look of the contemporary inner-city productive zones
- Social and functional mixture
- Could housing be implemented?

- Danube the basis for the development of the urban fabric


- Eferdinger Basin agricultural area
- Position in Europe, towards the roads, water and shipping traffic
- Railway hub
- Public buses individual traffic pedestrian
- Small scaled mediaeval structures surrounded by late 19. Century housing blocks
- N of the Danube heterogeneous urban layout
- East VOEST Alpine
- South housing Wohnhof Herman Goering Werke
- West green belt
- Grune Mitte, Solar City, Ebelsberg/Pichling

- Manual production
- Dusty steel city changing image since 1970 environmental requirements
- Industrial city to cultural city
- Ars Electronica, Musiktheater, Brucknerhaus
- Increasing number of creative workers => changing the population structure
- Maintain the cultural diversity
- Development of creative businesses
- Creative city between Munchen Wien Prague

- 110.000 mp 36.000 mp
- Small workshops, maintaining and updating railway carriages and equipment
- TS Werk location might change, but does not have to
- Some factory workshops are vacant, while others are still in use
- Relocation of the workshops
- 1856 railway and maintaining
- Enormous time spans and much effort in productive processes
- Production restarted after WW2
- 600 employees work for the service company on the site
- The area transformations if the factory will leave
- Proximity to the railway station gain importance in the existing urban fabric
- Physical communicator between public transport in the north mixed use in the south east

Railway station

- International, regional infrastructure network


- 30.000 travelers/day the most frequented in Austria
- 3 levels top level public level of the city
- Middle level linked with the area of TS Werk closed to the public
- Impact on transition between districts

North of the station office district

- High rise buildings Energie AG


- Mixed city => housing
- Transformative progress another high rise
- Main post office of the city west side of the station square refugee crisis in 2015
- Multi-layered spot
- The entrance to the city
- High rises: lansmarks
- A hub within the Westring

Volksgarten Blumau

- 2009 Musiktheater
- Most southern spot of the Landstrasse
- The connectivity between the districts was eliminated
- Bahnhofstrasse not very inviting to walk

Wienerstrasse

- Musiktheater with its back to the starting point of the street


- Tramlines between Landstrasse and Wienerstrasse
- Population structure altered
- Multicultural quarter
- Busy shopping street
- Phoenix theatre (Markarviertel)

Project site

- OEBB Technical Service next 30 years at least


- Change from bus stop to underground station of the trams
- One of the most frequented pedestrian crossroads
- Access from Wiener Strasse
- Road parallel to the roads has to be kept emergency
Northern zone

- Workshop buildings
- Removing of one function change the working progress of the others => common relocation
- Common relocation of the workshops
- Arbeitskammer EBS
- Apartment building renting contracts until 2054

Southern zone

- Widely cleared
- Demolition of a big workshop cluster
- GMK property to acquire it or start a common development
- 2 or more phases of urbanizing the site
- Launching the southern zone in 3 5 years; the other one (northern 10 years)

Strategies of use

- Kerngebiet mixture of facilities, like in city centres


- 50 m to the border of Technical Service and along the tracks no housing
- No buildings 12 m parallel to the tracks and 6 m to the TS (emergency)
- Work and production, to keep jobs within the city
- Programmatic synergies with external stakeholders and neighbouring actors
- Possible new OBB headquarter: 800-1000 employees, 25.000 mp, NW, along the tracks
- OR: keeping the old place for the headquarter, demolishing the buildings in the NW area,
implementing new structures
- 2 scenarios (north and south)

Você também pode gostar