Air Assisted Cooling Tower

AIR ASSISTED COOLING TOWER


Abhishek M. Mali (9765095517)

Swapnil S. Phadtare (7030175837)


Prashant P. Mali (9765673513)

TKIET, Warananagar, Kolhapur (416113)

1) SCHEMATIC DIAGRAM OF
COOLING TOWER

2) PROCEDURE FOR SETUP OF THE


MODEL

a. Determination of minimum L/G ratio

b. Calculation of superficial area and mass


transfer coefficient

c. Calculation of NTU and HTU

3) METHODOLOGY USED IN
COOLING TOWER

Induced draft cooling tower

Cooling tower is essentially a heat and


mass transfer device. It removes heat from the water and
loses a fraction of water during heat transfer to the air.
When air is blown from downwards it came in contact
with upcoming water the enthalpy of which is higher and
at the time of contact this air causes evaporation of water
droplet. It is known that in order to get evaporated water
requires to gain certain amount of latent heat. It does so
from nearby droplet and evaporates into vapor form. Due
to removal of sensible heat, remaining water droplets
loses temperature and cools down. Due to higher surface
area in packing heat transfer rate increases and water is

VORTEX 2K17 1|Page


Air Assisted Cooling Tower

further cooled to the require temperature. Air moving


upward takes away certain amount of water content in
(vapor form) with it which is not desirable. In order to 5) ENVIRONMENTAL AND SAFETY
recover lost water drift eliminators are provided. FEATURES
Upcoming air loses their velocity and causes certain 1) Primary filtration of inlet water: removal of
amount of vapor to be converted into water. The water suspended particles from inlet water which may clog
falls downward and collected in the basin. our water distributor
2) Determination of pH: operating on suitable ph
4) COST OF MATERIALS USED so that we can avoid the corrosion of inner parts of
A) Fixed cost cooling tower
3) Avoid algae formation by using anti-fungal
Sr. No components Cost of No. of agents
components compo
-nents
6) CREATIVITY AND UNIQUENESS IN THE
1 Pipe 100 1
DESIGN
2 Packing 100 - We have used saline bottle rings as
material packing material in our cooling tower. This is random
(saline type of packing and we are reusing the waste materials
bottle rings)
7) POWER CONSUMPTION
3 fan 600 1 In our cooling tower we require fan
4 Water 50 1 to induce the air. The power requirement for
distributor the fan is as follows:-
o fan motor 12 watt
5 Inlet nozzle 20 1 o period of operation 1hr
6 stacks 20 4 pairs o cost for operation 5.46 Rs/hour

7 Plywood 100 1
piece

8 Support 100 2 pairs


stands

TOTAL 1090/-

*all these costs are with reference to costs


on AMAZON