Você está na página 1de 4

CEILING REPAIR - A

A. OFFICE AREA: 8M X 3M

Quantity Unit Description/Specification


6 pcs. 3/16" Hardilite
### pcs. metal farring
4 pcs. carrying channel
### pcs. w- clip
### pcs. wall angle
1 box 1/8" X 1/2" blind rivets
3 pcs. 1/8" drill bit ( Dormer or Irwin preferably)
1 kg. 1" concrete nail
8 pcs. 3" X 10" Cornice
1 kg. Stikwel wood glue
### m 1/2 " flexible hose
1 roll Electrical Insulation Tape
1 bag Skimcoat Ultra thin
3 gals. odorless paint Easy Care Paint ( American Brand if available)
1 pc. 7" Roller Brush
1 pc. 1" paint brush
5 pcs. Sand paper #120

ESTIMATED LABOR COST: 15,000

Scope of Work
* Ceiling Repair
* V- Cornice Installation
* Wiring Arrangement
* Painting ( Semi-gloss Finish)
CEILING REPAIR - B
GATE -1/ HALLWAY 10.5 M X 3 M

Quantity Unit Description/Specification


### pcs. 3/16" Hardilite
### pcs. metal farring
5 pcs. carrying channel
### pcs. w- clip
### pcs. wall angle
1 box 1/8" X 1/2" blind rivets
3 pcs. 1/8" drill bit ( Dormer or Irwin preferably)
### pcs. Quarter C moulding
2 gals. Flatwall Enamel Paint
2 liters Polifuff Body Filler
2 gals. Semi-gloss latex paint

ESTIMATED LABOR COST: 15,000

Scope of Work
* Ceiling Repair
* Installation of secondary ceilinf ( for wires and cables)
* Wiring Arrangement
* Painting ( Semi-gloss Finish)
CEILING REPAIR C & D
ENTRY PORCH & RIGHT WING CANOPY
Materials: Wood 1/2" X 6" X 5'
Wood Stain Flat Finish
ESTIMATED LABOR COST: 7,000

CEILING REPAIR - E
ROOF EAVES (MASTER'S BEDROOM)
9M X 0.60 M
Materials: Hardilite w/ metal farring C-Joist @ 16" interval

Quantity Unit Description/Specification


4 pcs. 3/16" Hardilite
4 pcs. metal farring
2 pcs. carrying channel
### pcs. w- clip
8 pcs. wall angle
### pcs. 1" gypsum board screw (for metal)
3 pcs. 1/8" drill bit ( Dormer or Irwin preferably)
2 liters Flatwall Enamel Paint
1 gal Gloss latex paint
2 pcs. 30 cm X 60 cm PVC ventilation

ESTIMATED LABOR COST: 5,000

Scope of Work
* Ceiling Repair
* Painting

Total Labor Cost


Job Labor Cost
A 15,000
B 15,000
C&D 7,000
E 5,000
Total 42,000
Total Labor Cost
Job Labor Cost
A 15,000
B 15,000
C&D 7,000
E 5,000
Total 42,000

Você também pode gostar