Escolar Documentos
Profissional Documentos
Cultura Documentos
A. OFFICE AREA: 8M X 3M
Scope of Work
* Ceiling Repair
* V- Cornice Installation
* Wiring Arrangement
* Painting ( Semi-gloss Finish)
CEILING REPAIR - B
GATE -1/ HALLWAY 10.5 M X 3 M
Scope of Work
* Ceiling Repair
* Installation of secondary ceilinf ( for wires and cables)
* Wiring Arrangement
* Painting ( Semi-gloss Finish)
CEILING REPAIR C & D
ENTRY PORCH & RIGHT WING CANOPY
Materials: Wood 1/2" X 6" X 5'
Wood Stain Flat Finish
ESTIMATED LABOR COST: 7,000
CEILING REPAIR - E
ROOF EAVES (MASTER'S BEDROOM)
9M X 0.60 M
Materials: Hardilite w/ metal farring C-Joist @ 16" interval
Scope of Work
* Ceiling Repair
* Painting