JOB HAZARD ANALYSIS WORKSHEET

PROJECT B11LQ
MAJOR WORK DISMANTLE OF SCAFFOLDINGS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT DISMANTLE OF SCAFFOLDINGS
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
1 Increased ignition Hot work activities 3C 2B 1B 3B Explosion Proper ventilation during hot 1B 1B 0 0 Proper job planning and HUC team /Rigger
sources work,Fire watcher, fire extinguisher supervision and good & Scaffolder
are in placed coordination

2. Unignited HC N/A
release
Toxic/Asphyxiating
Release

3. High Pressure N/A


Liquid / Gas
Release

4. High / Low Cutting and Welding 3B 3B 3B 2B personnel Injury,Fire Fire extinguisher to be placed & 1B 1B 0 0 Proper job planning and HUC team /Rigger
Temperature shall be inspected peroidically. supervision and good & Scaffolder
Liquid / Gas All combustible material shall be coordination
segregated.

5. Dropped Improper handling of 3B 3C 2B 1B Finger, back injury and Proper handling tools and 1B 1B 0 0 Proper job planning and HUC team /Rigger
Objects/Swinging scaffolding during transfer of damage property procedure, access platform to be supervision & Scaffolder
loads materials use, proper PPE, handling posture

6. Ship Impact Improper lifting of equipment 3B 3B 2B 2B Damage property Proper Coordination 1B 1B 0 0 Proper job planning and HUC team /Rigger
supervision & Scaffolder

7. Structural Failure / Preparation and dismantle of 3B 3B 2B 3C Collapse of newly erected Double check to ensure that all 1B 1B 0 0 Proper Inspection HUC team /Rigger
Buoyancy Loss Scaffolding in progress platform clamps are properly tightened and & Scaffolder
secures to solid structure / beam

Use of weak structure to Personnel Injury Scaffolders and inspectors should


support scafffolding inspect the work area before
errecting of scaffolding.

1 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK DISMANTLE OF SCAFFOLDINGS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT DISMANTLE OF SCAFFOLDINGS
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
8. Manual Handling Sort out the scaffold material 3B 2B 1C 2C Hand / Finger injuries, Finger Wear proper rigging handgloves 1B 1B 0 0 Proper job planning and HUC team /Rigger
needed and transfer to the site pinched supervision & Scaffolder
location
Trip and fall Ensure well coordination during
lifting and transferring
Sharp Object Personnel Injury Carry out visual inspection of
sharp edges/object.
Wear proper hand gloves.

9. Chemical Handling N/A

10 Access / Engress Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0 Proper Inspection and HUC team /Rigger
all times comply wit scaff. Tag housekeeping & Scaffolder
system.

11. Escape/Evacuation Escape route obstruction 2B 2B 1C 1C Personnel Injury,Trap Ensure that escape route is well 1B 1B 0 0 Proper Inspection and HUC team /Rigger
clear for emergency exit housekeeping & Scaffolder
Congested area
Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0
all times comply wit scaff. Tag
system.
12. Location / H2S area, weather 3B 0 3B 3B Personnel Injury Proper H2S detection & escape 1B 0 0 0 Proper training and provision of HUC team /Rigger
Escalation equipment equipment & Scaffolder

13. Electricity Electric shock 3C 2B 1C 1C Personal Injury Rubber type of gloves shall to be 2B 0 0 0 Proper job planning and HUC team /Rigger
use for hand protection.PTW supervision and good & Scaffolder
coordination
Improper Isolation 2C 2B 2C 1C Personal Injury Observed Lock out & tag out. 2B 0 0 0

14. Working Heat from live equipment 1B 1C 1C 1C Barricade the area and sinage in 1B 0 0 0 Proper job planning and HUC team /Rigger
Conditions, e.g. place. supervision and good & Scaffolder
heat, noise, bad coordination
Working beside high noise 1C 1C 1C 1C Personal Injury Use of ear muff/ear plug 1B 0 0 0
weather etc
equipment
Raining/windy condition. 1C 3C 1C 1B Stop work. 1B 0 0 0

2 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK DISMANTLE OF SCAFFOLDINGS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT DISMANTLE OF SCAFFOLDINGS
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
15. Others Raise cold work permit for the 3B 3B 2C 2C Conflict with others activities in Discuss during morning permit 1B 0 0 0 Proper job planning and HUC team /Rigger
job. the area coordination meeting. supervision and good & Scaffolder
coordination
Climb up to scaffolding using Trip and fall Climb ladder catiously, Use safety
ladder harness and anchor above head

Remove timber and scaffolding Falling, trip and fall Check full body harness, lanyards
tubes and hooks for any defects.
Falling objects Ensure well coordination during
lifting and handling of materials

Remove the last main Falling object, trip and fall and Wear safety harness and a double
standards of tubings handfinger injuries lifeline anchored above, Secure
tube by tying rope and loweer
down gently to the floor where
waiting scaffolder is attending,
Barricade the area with barricade
tape

House Keeping Ensure that proper house keeping


Trip, Slip and fall being done

Concurrent Activities Not Permitted/Restricted:


1) Restrict rigging and lifting activities when divers are in water.
2) Hot works will be restricted during operation activities which results in hydrocarbon release to atmosphere.