PRESUPUESTO No.

37-2008-B
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales
2.80
CLIENTE Contratos
Costo Costo Unitario U$ (cambio S/. 2.8)
Item Descripcion Un. Metrado Parcial Total Parcial Total
Unitario Materiales M. O. A todo costo

A TABIQUERIA, ACABADOS E INSTALACIONES 87,903.15 42,064.22

1 TRABAJOS PRELIMINARES 1,550.00 0.00


1.01 Trazo y replanteo preliminar Glb. 1.00 650 650.00 0.00 0.00
1.02 Transporte de materiales y herramientas a almacen Minera Volcan-Callao Glb. 1.00 900 900.00 0.00 0.00

2 TABIQUES DE DRYWALL 18,932.59 15,779.57


2.01 TABIQUES TIPO-01: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una
m2plancha475.56 23.625
STD 1/2" por 11235.11 aislamiento acustico e=3"
ambas caras,con 19.00 9035.64
2.02 TABIQUES TIPO-02: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una
m2plancha 53.93
RH 1/2" por una
26.25
cara,una
1415.66
plancha STD 1/2" por una cara,con aislamiento acustico e=3" 22.00 1186.46
2.03 CIELORASO ACUSTICO: Baldosa modelo Vantage (ex Baroque) de 2x 4, borde
m2 recto,supensin
424.12 15/16".
13.44 5700.17 12.00 5089.44
2.04 CIELORASO DRYWALL STD: Estructura de 38mm x 38mm x 45mm y plancham2 25.62
STD de 1/2". 17.325 443.87 14.00 358.68
2.05 CIELORASO DRYWALL RH: Estructura de 38mm x 38mm x 45mm y plancha m2
RH de 1/2". 7.29 18.90 137.78 15.00 109.35

3 ACABADOS 31,388.46 18,010.22


3.01 PISO CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad (o similar)
m2 465.00 23.52 10936.80 25.37 9.06 15.00 5.36 14.42 6704.30
3.02 REVESTIMIENTO DE CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera
m2 Calidad41.34
(o similar) 23.52 972.32 23.00 8.21 15.00 5.36 13.57 561.04
3.03 ZOCALO DE CERAMICO: Modelo Alaska, color gris, marca San Lorenzo, h:11cm
ml 295.00 8.7675 2586.41 5.50 1.96 5.00 1.79 3.75 1106.67
3.04 Pintura latex en muros,vigas y tabiques de drywall No inlcuye empaste. m2 1,178.00 3.675 4329.15 3.00 1.07 3.00 1.07 2.14 2524.29
3.05 V-1:Ventana corrediza (1.15 x 1.40) con marco de aluminio y vidrio doble d Und 21.00 134.925 2833.43 185.00 66.07 90.00 32.14 98.21 2062.50
3.06 V-2: (1.15 X 0.50) con marco de aluminio y vidrio doble de 4mm. Und 2.00 77.70 155.40 65.00 23.21 40.00 14.28 37.50 75.00
3.07 V-3: Ventana fija (1.15 X 1.40) con marco de aluminio y vidrio doble de 4mm. Und 11.00 110.25 1212.75 150.00 53.57 65.00 23.21 76.79 844.64
3.08 M-1: (1.80 X 2.30) Puerta y marco de aluminio y vidrio triple de 6mm con cierrapuertas
Und 2.00 589.05 1178.10 852.00 304.29 350.00 125.00 429.29 858.57
3.09 P-1: (0.90 X 2.30) Puerta batiente contraplacada MDF con acabado al duco Und 21.00 317.10 6659.10 250.00 89.29 165.00 58.93 148.21 3112.50
3.1 Puerta y Separador para inodoro:Plancha de melamina de 19mm sujeta con pe
Und. 1.00 525.00 525.00 300.00 107.14 150.00 53.57 160.71 160.71

4 INSTALACIONES ELECTRICAS 14,831.60 6,429.80


4.01 Fluorescente doble con pantalla difusora colgada al tech, (h=2.40m) con 02 t und 6.00 74.60 447.60 30.00 16.00 5.71 35.71 214.28
4.02 Fluorescente enrasado al cielo raso con rejilla y 04 tubos, Phillips de 40w. und 45.00 103.00 4635.00 30.00 16.00 5.71 35.71 1607.08
4.03 Fluorescente en rasado al cielo raso con rejilla difusora, Phillips de 40w. und 12.00 74.00 888.00 20.00 16.00 5.71 25.71 308.55
4.04 Reflector para lmpara halgena de 1000w. Y 220v. und 1.00 50.00 50.00 50.00 20.00 7.14 57.14 57.14
4.05 Lmpara de emergencia 2 x 20w. Luz halgena, batera 12v. radio de ilumin und 3.00 130.00 390.00 80.00 20.00 7.14 87.14 261.43
4.06 Lampara tipo dicroico und 4.00 75.00 300.00 20.00 16.00 5.71 25.71 102.85
4.07 Salida para centro de luz, incluye tubo, caja, cable und 71.00 28.00 1988.00 4.81 26.00 9.29 14.10 1001.10
4.08 Salida para interruptor simple, incluye tubo, caja, cable y placa, Siemens und 35.00 28.00 980.00 3.57 20.00 7.14 10.71 375.00
4.09 Salida para tomacorrientes doble universal bipolar con toma a tierra, incluye und 70.00 30.00 2100.00 5.40 26.00 9.29 14.69 1028.00
4.1 Salida para voz y data, incluye ducto y caja und 36.00 19.25 693.00 4.05 20.00 7.14 11.19 402.94
4.11 Pozo de tierra con cemento conductivo nacional de acuerdo a caracterstica glb 1.00 780.00 780.00 178.57 400.00 142.86 321.43 321.43
4.12 Tablero metlico BRANCH trifsico de 10 KA, 60 Hz. De 30 polos, con 1 llav glb 1.00 780.00 780.00 178.57 300.00 107.14 285.71 285.71
4.13 Tendido de tubera bajo losa. No incluye corte de losa glb 1.00 800.00 800.00 1,300.00 464.29 464.29 464.29

5 INSTALACIONES SANITARIAS 5,300.50 1,844.63


5.01 Habilitacion de puntos de agua fra 1/2" Pto 4.00 27 108.00 12.45 25.00 8.93 21.38 85.50
5.02 Habilitacion de puntos de agua caliente 1/2" Pto 2.00 27 54.00 6.03 25.00 8.93 14.95 29.91
5.03 Habilitacion de puntos de desage 2" Pto 3.00 3.5 10.50 10.75 22.00 7.86 18.60 55.81
5.04 Habilitacion de puntos de desage 4" Pto. 2.00 28 56.00 10.75 25.00 8.93 19.68 39.35
5.05 Habilitacion de salida de ventilacin 2" Pto 2.00 23 46.00 10.75 30.00 10.71 21.46 42.92
5.06 Habilitacion de puntos de registro 4" Pto. 2.00 27 54.00 9.65 25.00 8.93 18.58 37.16
5.07 Habilitacion de vlvula de compuerta1/2" Pto 2.00 24 48.00 7.73 30.00 10.71 18.45 36.89
5.08 Tendido de tuberas de agua fra y agua caliente bajo la losa (No incluye ex Glb. 1.00 1700 1700.00 1.14 560.00 200.00 201.14 201.14
5.09 Tendido de desage y relleno para conexin con red de desage .Long=5.00 Ml. 5.00 33 165.00 7.88 30.00 10.71 18.59 92.95
PRESUPUESTO No. 37-2008-B
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales
2.80
CLIENTE Contratos
Costo Costo Unitario U$ (cambio S/. 2.8)
Item Descripcion Un. Metrado Parcial Total Parcial Total
Unitario Materiales M. O. A todo costo
5.1 Suministro e instalacin de Lavatorio Trbol Manantial con pedestal y mezcl Und 2.00 130 260.00 24.00 35.00 12.50 36.50 73.00
5.11 Suministro e instalacin de Inodoro Trbol Sifon Jet con accesorio y asiento Und 2.00 130 260.00 45.00 40.00 14.29 59.29 118.57
5.12 Suministro e instalacin de Urinario Trbol Cadet (color blanco) Und 1.00 190 190.00 30.00 40.00 14.29 44.29 44.29
5.13 Suministro e instalacin de terma Rotoplas elctrica de 80 lt.,con accesorios Und. 2.00 550 1100.00 350.00 60.00 21.43 371.43 742.86
5.14 Suministro e instalacin de espejo 0.60 x 0.90 con marco de acero inoxidabl Und. 2.00 220 440.00 20.00 10.00 3.57 23.57 47.14
5.15 Suministro e instalacin de dispensador de papel higinico Und. 2.00 34.5 69.00 10.00 8.00 2.86 12.86 25.71
5.16 Suministro e instalacin de dispensador de jabn liquido Und. 2.00 20 40.00 10.00 8.00 2.86 12.86 25.71
5.17 Suministro e instalacin de secamanos elctrico con sensor automtico Und. 2.00 350 700.00 30.00 20.00 7.14 37.14 74.29
Prueba Hidrahulica de agua Glb. 1.00 150.00 53.57 53.57
Prueba Hidrahulica de desague Glb. 1.00 50.00 17.86 17.86

6 VARIOS 15,900.00 0.00


6.01 Viticos de personal (incluye alimentacin, hospedaje y pasajes) glb 1.00 12700 12700.00 0.00 0.00
6.02 Limpieza permanente de obra glb 1.00 3200 3200.00 0.00 0.00

B ESTRUCTURAS METALICAS, COBERTURAS Y FORROS 95,993.80 76,795.04

7 Frente 1: Estructuras metlicas 50,969.40 40,775.52


7.1 Estructura principal Kg 14934 2.85 42561.90 2.28 34049.52
7.2 Estructuras interiores a tabaquera drywall Kg 2000 2.85 5700.00 2.28 4560.00
7.3 Canales y marcos en forros laterales Kg 950 2.85 2707.50 2.28 2166.00
8 Frente 2: Coberturas y forros 45,024.40 36,019.52
8.1 Cobertura de techo
8.11 Cobertura de techo DANICA o similar m2 534 48.8 26059.20 39.04 20847.36
8.12 Forros laterales DANICA e=100mm o similar m2 252 45.1 11365.20 36.08 9092.16
8.13 Remates de cobertura glo 1 3600 3600.00 2880.00 2880.00
8.14 Sellos y elementos de fijacin glo 1 4000 4000.00 3200.00 3200.00

TOTAL 183,896.95 118,859.26

65,037.69
35%
Item Descripcion Un. Metrado Materiales M.O. C.U. Parcial TOTAL

3 ACABADOS 36,058.27
3.01 PISO CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad (o
m2similar) 465.00 15.00 15.00 6,975.00
3.02 REVESTIMIENTO DE CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera
m2 Calidad
41.34(o similar) 15.00 15.00 620.10
3.03 ZOCALO DE CERAMICO: Modelo Alaska, color gris, marca San Lorenzo, h:11cm
ml 295.00 5.00 5.00 1,476.18
3.04 Pintura latex en muros,vigas y tabiques de drywall No inlcuye empaste. m2 1,178.00 3.00 3.00 6.00 7,068.00
3.05 V-1:Ventana corrediza (1.15 x 1.40) con marco de aluminio y vidrio dobl Und 21.00 185.00 90.00 275.00 5,775.00
3.06 V-2: (1.15 X 0.50) con marco de aluminio y vidrio doble de 4mm. Und 2.00 65.00 40.00 105.00 209.99
3.07 V-3: Ventana fija (1.15 X 1.40) con marco de aluminio y vidrio doble de Und 11.00 150.00 65.00 215.00 2,365.00
3.08 M-1: (1.80 X 2.30) Puerta y marco de aluminio y vidrio triple de 6mm con Und
cierrapuertas2.00 852.00 350.00 1,202.00 2,404.00
3.09 P-1: (0.90 X 2.30) Puerta batiente contraplacada MDF con acabado al du Und 21.00 250.00 165.00 415.00 8,715.00
3.1 Puerta y Separador para inodoro:Plancha de melamina de 19mm sujeta con
Und. 1.00 300.00 150.00 450.00 450.00

4 INSTALACIONES ELECTRICAS 8,237.73


4.01 Fluorescente doble con pantalla difusora colgada al tech, (h=2.40m) con und 6.00 16.00 16.00 95.98
4.02 Fluorescente enrasado al cielo raso con rejilla y 04 tubos, Phillips de 40w und 45.00 16.00 16.00 719.82
4.03 Fluorescente en rasado al cielo raso con rejilla difusora, Phillips de 40w. und 12.00 16.00 16.00 191.95
4.04 Reflector para lmpara halgena de 1000w. Y 220v. und 1.00 20.00 20.00 20.00
4.05 Lmpara de emergencia 2 x 20w. Luz halgena, batera 12v. radio de il und 3.00 20.00 20.00 60.00
4.06 Lampara tipo dicroico und 4.00 16.00 16.00 63.98
4.07 Salida para centro de luz, incluye tubo, caja, cable und 71.00 26.00 26.00 1,846.00
4.08 Salida para interruptor simple, incluye tubo, caja, cable y placa, Siemens und 35.00 20.00 20.00 700.00
4.09 Salida para tomacorrientes doble universal bipolar con toma a tierra, inc und 70.00 26.00 26.00 1,820.00
4.1 Salida para voz y data, incluye ducto y caja und 36.00 20.00 20.00 720.00
4.11 Pozo de tierra con cemento conductivo nacional de acuerdo a caracterst glb 1.00 400.00 400.00 400.00
4.12 Tablero metlico BRANCH trifsico de 10 KA, 60 Hz. De 30 polos, con 1 glb 1.00 300.00 300.00 300.00
4.13 Tendido de tubera bajo losa. No incluye corte de losa glb 1.00 1,300.00 1,300.00 1,300.00

5 INSTALACIONES SANITARIAS 1,748.00


5.01 Habilitacion de puntos de agua fra 1/2" Pto 4.00 25.00 25.00 100.00
5.02 Habilitacion de puntos de agua caliente 1/2" Pto 2.00 25.00 25.00 50.00
5.03 Habilitacion de puntos de desage 2" Pto 3.00 22.00 22.00 66.00
5.04 Habilitacion de puntos de desage 4" Pto. 2.00 25.00 25.00 50.00
5.05 Habilitacion de salida de ventilacin 2" Pto 2.00 30.00 30.00 60.00
5.06 Habilitacion de puntos de registro 4" Pto. 2.00 25.00 25.00 50.00
5.07 Habilitacion de vlvula de compuerta1/2" Pto 2.00 30.00 30.00 60.00
5.08 Tendido de tuberas de agua fra y agua caliente bajo la losa (No incluye Glb. 1.00 560.00 560.00 560.00
5.09 Tendido de desage y relleno para conexin con red de desage .Long=5 Ml. 5.00 30.00 30.00 150.00
5.1 Suministro e instalacin de Lavatorio Trbol Manantial con pedestal y me Und 2.00 35.00 35.00 70.00
5.11 Suministro e instalacin de Inodoro Trbol Sifon Jet con accesorio y asien Und 2.00 40.00 40.00 80.00
5.12 Suministro e instalacin de Urinario Trbol Cadet (color blanco) Und 1.00 40.00 40.00 40.00
5.13 Suministro e instalacin de terma Rotoplas elctrica de 80 lt.,con accesor Und. 2.00 60.00 60.00 120.00
5.14 Suministro e instalacin de espejo 0.60 x 0.90 con marco de acero inoxid Und. 2.00 10.00 10.00 20.00
5.15 Suministro e instalacin de dispensador de papel higinico Und. 2.00 8.00 8.00 16.00
5.16 Suministro e instalacin de dispensador de jabn liquido Und. 2.00 8.00 8.00 16.00
5.17 Suministro e instalacin de secamanos elctrico con sensor automtico Und. 2.00 20.00 20.00 40.00
Prueba Hidrahulica de agua Glb. 1.00 150.00 150.00 150.00
Prueba Hidrahulica de desague Glb. 1.00 50.00 50.00 50.00

SUB TOTAL 46,044.00


IGV 19% 8,748.36
TOTAL 54,792.36
PRESUPUESTO No. 37-2008-B
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales
Fecha: 08.04.08
Analisis de Costo ( soles)
Item Descripcion Un. Metrado Rendimiento Operario Oficial
40.00 35.00

A TABIQUERIA, ACABADOS E INSTALACIONES

1 TRABAJOS PRELIMINARES
1.01 Trazo y replanteo preliminar Glb. 1.00
1.02 Transporte de materiales y herramientas a almacen Minera Volcan-Calla Glb. 1.00

2 TABIQUES DE DRYWALL
2.01 TABIQUES TIPO-01: Tabique estructura de 89mm x 38mm x 45mm @ 40.6,m2 475.56STD 1/2" por ambas caras,con aislamiento acustico e=3"
una plancha
2.02 TABIQUES TIPO-02: Tabique estructura de 89mm x 38mm x 45mm @ 40.6,m2
una plancha
53.93RH 1/2" por una cara,una plancha STD 1/2" por una cara,c
2.03 CIELORASO ACUSTICO: Baldosa modelo Vantage (ex Baroque) de 2x 4,
m2borde recto,supensin
424.12 15/16".
2.04 CIELORASO DRYWALL STD: Estructura de 38mm x 38mm x 45mm y plancha
m2 STD de
25.62
1/2".
2.05 CIELORASO DRYWALL RH: Estructura de 38mm x 38mm x 45mm y plancha
m2 RH de 1/2".
7.29
0.84
3 ACABADOS
3.01 PISO CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad (o
m2similar)465.00 5.60 1.00
3.02 REVESTIMIENTO DE CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera
m2 41.34(o similar) 5.60
Calidad 1.00
3.03 ZOCALO DE CERAMICO: Modelo Alaska, color gris, marca San Lorenzo, h:11cm
ml 295.00 16.80 1.00
3.04 Pintura latex en muros,vigas y tabiques de drywall No inlcuye empaste. m2 1,178.00 17.20 1.00
3.05 V-1:Ventana corrediza (1.15 x 1.40) con marco de aluminio y vidrio dobl Und 21.00 1.00 1.00 1.00
3.06 V-2: (1.15 X 0.50) con marco de aluminio y vidrio doble de 4mm. Und 2.00 2.25 1.00 1.00
3.07 V-3: Ventana fija (1.15 X 1.40) con marco de aluminio y vidrio doble de Und 11.00 1.39 1.00 1.00
3.08 M-1: (1.80 X 2.30) Puerta y marco de aluminio y vidrio triple de 6mm con Und
cierrapuertas2.00 0.25 1.00 1.00
3.09 P-1: (0.90 X 2.30) Puerta batiente contraplacada MDF con acabado al du Und 21.00 0.53 1.00 1.00
3.1 Puerta y Separador para inodoro:Plancha de melamina de 19mm sujeta con
Und. 1.00 0.70 1.00 1.00

4 INSTALACIONES ELECTRICAS
4.01 Fluorescente doble con pantalla difusora colgada al tech, (h=2.40m) con und 6.00 5.25 1.00
4.02 Fluorescente enrasado al cielo raso con rejilla y 04 tubos, Phillips de 40w und 45.00 5.25 1.00
4.03 Fluorescente en rasado al cielo raso con rejilla difusora, Phillips de 40w. und 12.00 5.25 1.00
4.04 Reflector para lmpara halgena de 1000w. Y 220v. und 1.00 3.60 1.00
4.05 Lmpara de emergencia 2 x 20w. Luz halgena, batera 12v. radio de il und 3.00 3.60 1.00
4.06 Lampara tipo dicroico und 4.00 5.25 1.00
4.07 Salida para centro de luz, incluye tubo, caja, cable und 71.00 3.20 1.00
4.08 Salida para interruptor simple, incluye tubo, caja, cable y placa, Siemens und 35.00 4.00 1.00
4.09 Salida para tomacorrientes doble universal bipolar con toma a tierra, inc und 70.00 3.20 1.00
4.1 Salida para voz y data, incluye ducto y caja und 36.00 4.00 1.00
4.11 Pozo de tierra con cemento conductivo nacional de acuerdo a caracterst glb 1.00 0.40 1.00 1.00
4.12 Tablero metlico BRANCH trifsico de 10 KA, 60 Hz. De 30 polos, con 1 l glb 1.00 0.31 2.00
4.13 Tendido de tubera bajo losa. No incluye corte de losa glb 1.00 0.17 3.00
5 INSTALACIONES SANITARIAS
5.01 Habilitacion de puntos de agua fra 1/2" Pto 4.00 3.00 1.00
5.02 Habilitacion de puntos de agua caliente 1/2" Pto 2.00 3.00 1.00
5.03 Habilitacion de puntos de desage 2" Pto 3.00 3.50 1.00
5.04 Habilitacion de puntos de desage 4" Pto. 2.00 3.00 1.00
5.05 Habilitacion de salida de ventilacin 2" Pto 2.00 3.50 1.00
5.06 Habilitacion de puntos de registro 4" Pto. 2.00 3.00 1.00
5.07 Habilitacion de vlvula de compuerta1/2" Pto 2.00 3.00 1.00
5.08 Tendido de tuberas de agua fra y agua caliente bajo la losa (No incluye Glb. 1.00 1.00 1.00
5.09 Tendido de desage y relleno para conexin con red de desage .Long=5 Ml. 5.00 1.00 1.00
5.1 Suministro e instalacin de Lavatorio Trbol Manantial con pedestal y me Und 2.00 2.00 1.00
5.11 Suministro e instalacin de Inodoro Trbol Sifon Jet con accesorio y asien Und 2.00 2.00 1.00
5.12 Suministro e instalacin de Urinario Trbol Cadet (color blanco) Und 1.00 2.00 1.00
5.13 Suministro e instalacin de terma Rotoplas elctrica de 80 lt.,con accesor Und. 2.00 2.00 1.00
5.14 Suministro e instalacin de espejo 0.60 x 0.90 con marco de acero inoxid Und. 2.00 8.00 1.00
5.15 Suministro e instalacin de dispensador de papel higinico Und. 2.00 8.00 1.00
5.16 Suministro e instalacin de dispensador de jabn liquido Und. 2.00 8.00 1.00
5.17 Suministro e instalacin de secamanos elctrico con sensor automtico Und. 2.00 4.00 1.00
Prueba Hidrahulica de agua Glb. 1.00
Prueba Hidrahulica de desague Glb. 1.00

6 VARIOS
6.01 Viticos de personal (incluye alimentacin, hospedaje y pasajes) glb 1.00
6.02 Limpieza permanente de obra glb 1.00
sis de Costo ( soles) Gallegos Diferencia
Peon C.U. M.O. Materiales M.O. CU Parcial
30.00

2,357.32
1.00 12.50 15.00 17.00 2.00 930.00
1.00 12.50 15.00 17.00 2.00 82.68
1.00 4.17 5.00 5.50 0.50 146.32
2.33 2.80 3.50 0.70 829.31
75.00 90.00 100.00 10.00 210.00
33.33 40.00 40.00 0.00 0.01
53.96 65.00 67.00 2.00 22.00
300.00 350.00 366.00 16.00 32.00
141.78 165.00 170.00 5.00 105.00
107.14 150.00 150.00 0.00 0.00

1,076.27
1.00 13.33 16.00 18.00 2.00 12.02
1.00 13.33 16.00 18.00 2.00 90.18
1.00 13.33 16.00 18.00 2.00 24.05
1.00 19.44 20.00 50.00 30.00 30.00
1.00 19.44 20.00 50.00 30.00 90.00
1.00 13.33 16.00 22.00 6.00 24.02
1.00 21.88 26.00 30.00 4.00 284.00
1.00 17.50 20.00 22.00 2.00 70.00
1.00 21.88 26.00 30.00 4.00 280.00
1.00 17.50 20.00 22.00 2.00 72.00
2.00 337.50 400.00 500.00 100.00 100.00
258.06 300.00 300.00 0.00 0.00
2.00 1,058.82 1,300.00 1,300.00 0.00 0.00
398.21
0.50 18.33 25.00 25.00 6.67 26.68
0.50 18.33 25.00 25.00 6.67 13.34
0.50 15.71 22.00 22.00 6.29 18.87
0.50 18.33 25.00 25.00 6.67 13.34
0.50 15.71 30.00 30.00 14.29 28.58
0.50 18.33 25.00 25.00 6.67 13.34
0.50 18.33 30.00 30.00 11.67 23.34
0.50 55.00 560.00 100.00 45.00 45.00
0.50 55.00 30.00 30.00 -25.00 -125.00
0.50 27.50 35.00 35.00 7.50 15.00
0.50 27.50 40.00 40.00 12.50 25.00
0.50 27.50 40.00 40.00 12.50 12.50
0.50 27.50 60.00 60.00 32.50 65.00
0.50 6.88 10.00 10.00 3.12 6.24
0.50 6.88 8.00 8.00 1.12 2.24
0.50 6.88 8.00 8.00 1.12 2.24
0.50 13.75 20.00 20.00 6.25 12.50
150.00 150.00 150.00 150.00
50.00 50.00 50.00 50.00
2.80
Contratos
Costo Unitario U$ (cambio S/. 2.8)
Parcial Total
Materiales M. O. A todo costo

38,747.16

0.00
0.00 0.00
0.00 0.00

15,779.57
19.00 9035.64
22.00 1186.46
12.00 5089.44
14.00 358.68
15.00 109.35

18,789.55
9.11 6.07 15.18 7059.70
8.21 6.07 14.29 590.57
1.96 1.96 3.93 1158.93
1.07 1.25 2.32 2734.64
66.07 35.71 101.79 2137.50
23.21 14.29 37.50 75.00
53.57 23.93 77.50 852.50
304.29 130.71 435.00 870.00
89.29 60.71 150.00 3150.00
107.14 53.57 160.71 160.71

3,668.25
6.43 6.43 38.57
6.43 6.43 289.29
6.43 6.43 77.14
17.86 17.86 17.86
17.86 17.86 53.57
7.86 7.86 31.43
4.81 10.71 15.53 1102.53
7.86 7.86 275.00
10.71 10.71 750.00
7.86 7.86 282.86
178.57 178.57 178.57
107.14 107.14 107.14
464.29 464.29 464.29
509.79
12.45 8.93 21.38 85.50
8.93 8.93 17.86
7.86 7.86 23.57
8.93 8.93 17.86
10.71 10.71 21.43
8.93 8.93 17.86
10.71 10.71 21.43
35.71 35.71 35.71
10.71 10.71 53.57
12.50 12.50 25.00
14.29 14.29 28.57
14.29 14.29 14.29
21.43 21.43 42.86
3.57 3.57 7.14
2.86 2.86 5.71
2.86 2.86 5.71
7.14 7.14 14.29
53.57 53.57
17.86 17.86

0.00
0.00 0.00
0.00 0.00
PRESUPUESTO No. 37-2008-B
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales

CLIENTE
Costo
Item Descripcion Un. Metrado Parcial
Unitario

A TABIQUERIA, ACABADOS E INSTALACIONES

1 TRABAJOS PRELIMINARES
1.01 Trazo y replanteo preliminar Glb. 1.00 650 650.00
1.02 Transporte de materiales y herramientas a almacen Minera Volcan-Callao Glb. 1.00 900 900.00

2 TABIQUES DE DRYWALL
2.01 TABIQUES TIPO-01: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una plancha
m2 STD475.56 23.625
1/2" por ambas 11235.11
caras,con aislamiento acustico e=3"
2.02 TABIQUES TIPO-02: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una plancha
m2 RH 1/2"
53.93
por una cara,una
26.25 plancha
1415.66
STD 1/2" por una cara,c
2.03 CIELORASO ACUSTICO: Baldosa modelo Vantage (ex Baroque) de 2x 4, borde recto,supensin
m2 424.1215/16". 13.44 5700.17
2.04 CIELORASO DRYWALL STD: Estructura de 38mm x 38mm x 45mm y plancha STDm2
de 1/2". 25.62 17.325 443.87
2.05 CIELORASO DRYWALL RH: Estructura de 38mm x 38mm x 45mm y plancha RH dem2
1/2". 7.29 18.90 137.78

3 ACABADOS
3.01 PISO CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad (o similar)m2 465.00 23.52 10936.80
3.02 REVESTIMIENTO DE CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad
m2 (o similar)
41.34 23.52 972.32
3.03 ZOCALO DE CERAMICO: Modelo Alaska, color gris, marca San Lorenzo, h:11cm ml 295.00 8.7675 2586.41
3.04 Pintura latex en muros,vigas y tabiques de drywall No inlcuye empaste. m2 1,178.00 3.675 4329.15
3.05 V-1:Ventana corrediza (1.15 x 1.40) con marco de aluminio y vidrio doble doble Und 21.00 134.925 2833.43
3.06 V-2: (1.15 X 0.50) con marco de aluminio y vidrio doble de 4mm. Und 2.00 77.70 155.40
3.07 V-3: Ventana fija (1.15 X 1.40) con marco de aluminio y vidrio doble de 4mm. Und 11.00 110.25 1212.75
3.08 M-1: (1.80 X 2.30) Puerta y marco de aluminio y vidrio triple de 6mm con cierrapuertas
Und 2.00 589.05 1178.10
3.09 P-1: (0.90 X 2.30) Puerta batiente contraplacada MDF con acabado al duco (Incl Und 21.00 317.10 6659.10
3.1 Puerta y Separador para inodoro:Plancha de melamina de 19mm sujeta con perfileUnd. 1.00 525.00 525.00

4 INSTALACIONES ELECTRICAS
4.01 Fluorescente doble con pantalla difusora colgada al tech, (h=2.40m) con 02 tubos und 6.00 74.60 447.60
4.02 Fluorescente enrasado al cielo raso con rejilla y 04 tubos, Phillips de 40w. und 45.00 103.00 4635.00
4.03 Fluorescente en rasado al cielo raso con rejilla difusora, Phillips de 40w. und 12.00 74.00 888.00
4.04 Reflector para lmpara halgena de 1000w. Y 220v. und 1.00 50.00 50.00
4.05 Lmpara de emergencia 2 x 20w. Luz halgena, batera 12v. radio de iluminacin und 3.00 130.00 390.00
4.06 Lampara tipo dicroico und 4.00 75.00 300.00
4.07 Salida para centro de luz, incluye tubo, caja, cable und 71.00 28.00 1988.00
4.08 Salida para interruptor simple, incluye tubo, caja, cable y placa, Siemens und 35.00 28.00 980.00
4.09 Salida para tomacorrientes doble universal bipolar con toma a tierra, incluye tubo und 70.00 30.00 2100.00
4.1 Salida para voz y data, incluye ducto y caja und 36.00 19.25 693.00
4.11 Pozo de tierra con cemento conductivo nacional de acuerdo a caractersticas del glb 1.00 780.00 780.00
4.12 Tablero metlico BRANCH trifsico de 10 KA, 60 Hz. De 30 polos, con 1 llave gen glb 1.00 780.00 780.00
4.13 Tendido de tubera bajo losa. No incluye corte de losa glb 1.00 800.00 800.00
5 INSTALACIONES SANITARIAS
5.01 Habilitacion de puntos de agua fra 1/2" Pto 4.00 27 108.00
5.02 Habilitacion de puntos de agua caliente 1/2" Pto 2.00 27 54.00
5.03 Habilitacion de puntos de desage 2" Pto 3.00 3.5 10.50
5.04 Habilitacion de puntos de desage 4" Pto. 2.00 28 56.00
5.05 Habilitacion de salida de ventilacin 2" Pto 2.00 23 46.00
5.06 Habilitacion de puntos de registro 4" Pto. 2.00 27 54.00
5.07 Habilitacion de vlvula de compuerta1/2" Pto 2.00 24 48.00
5.08 Tendido de tuberas de agua fra y agua caliente bajo la losa (No incluye excavaci Glb. 1.00 1700 1700.00
5.09 Tendido de desage y relleno para conexin con red de desage .Long=5.00ml (Se Ml. 5.00 33 165.00
5.1 Suministro e instalacin de Lavatorio Trbol Manantial con pedestal y mezcladora Und 2.00 130 260.00
5.11 Suministro e instalacin de Inodoro Trbol Sifon Jet con accesorio y asiento (colo Und 2.00 130 260.00
5.12 Suministro e instalacin de Urinario Trbol Cadet (color blanco) Und 1.00 190 190.00
5.13 Suministro e instalacin de terma Rotoplas elctrica de 80 lt.,con accesorios. Und. 2.00 550 1100.00
5.14 Suministro e instalacin de espejo 0.60 x 0.90 con marco de acero inoxidable Und. 2.00 220 440.00
5.15 Suministro e instalacin de dispensador de papel higinico Und. 2.00 34.5 69.00
5.16 Suministro e instalacin de dispensador de jabn liquido Und. 2.00 20 40.00
5.17 Suministro e instalacin de secamanos elctrico con sensor automtico Und. 2.00 350 700.00
Prueba Hidrahulica de agua Glb. 1.00
Prueba Hidrahulica de desague Glb. 1.00

6 VARIOS
6.01 Viticos de personal (incluye alimentacin, hospedaje y pasajes) glb 1.00 12700 12700.00
6.02 Limpieza permanente de obra glb 1.00 3200 3200.00

B ESTRUCTURAS METALICAS, COBERTURAS Y FORROS

7 Frente 1: Estructuras metlicas


7.1 Estructura principal Kg 14934 2.85 42561.90
7.2 Estructuras interiores a tabaquera drywall Kg 2000 2.85 5700.00
7.3 Canales y marcos en forros laterales Kg 950 2.85 2707.50
8 Frente 2: Coberturas y forros
8.1 Cobertura de techo
8.11 Cobertura de techo DANICA o similar m2 534 48.8 26059.20
8.12 Forros laterales DANICA e=100mm o similar m2 252 45.1 11365.20
8.13 Remates de cobertura glo 1 3600 3600.00
8.14 Sellos y elementos de fijacin glo 1 4000 4000.00
2.80
CLIENTE Contratos
Costo Unitario U$ (cambio S/. 2.8)
Total Parcial Total
Materiales M. O. A todo costo

87,903.15 43,063.66

1,550.00 0.00
0.00 0.00
0.00 0.00

18,932.59 15,779.57
19.00 9035.64 4.63
22.00 1186.46 4.25
12.00 5089.44 1.44
14.00 358.68 3.33
15.00 109.35 3.90

31,388.46 18,789.55
9.11 6.07 15.18 7059.70 8.34
8.21 6.07 14.29 590.57 9.23
1.96 1.96 3.93 1158.93 4.84
1.07 1.25 2.32 2734.64 1.35
66.07 35.71 101.79 2137.50 33.14
23.21 14.29 37.50 75.00 40.20
53.57 23.93 77.50 852.50 32.75
304.29 130.71 435.00 870.00 154.05
89.29 60.71 150.00 3150.00 167.10
107.14 53.57 160.71 160.71 364.29

14,831.60 6,814.19
30.00 6.43 36.43 218.57 38.17
30.00 6.43 36.43 1639.29 66.57
20.00 6.43 26.43 317.14 47.57
50.00 17.86 67.86 67.86 -17.86
80.00 17.86 97.86 293.57 32.14
20.00 7.86 27.86 111.43 47.14
4.81 10.71 15.53 1102.53 12.47
3.57 7.86 11.43 400.00 16.57
5.40 10.71 16.11 1128.00 13.89
4.05 7.86 11.91 428.66 7.34
178.57 178.57 357.14 357.14 422.86
178.57 107.14 285.71 285.71 494.29
464.29 464.29 464.29 335.71
5,300.50 1,680.35
12.45 8.93 21.38 85.50 5.63
6.03 8.93 14.95 29.91 12.05
10.75 7.86 18.60 55.81 -15.10
10.75 8.93 19.68 39.35 8.33
10.75 10.71 21.46 42.92 1.54
9.65 8.93 18.58 37.16 8.42
7.73 10.71 18.45 36.89 5.55
1.14 35.71 36.86 36.86 1,663.14
7.88 10.71 18.59 92.95 14.41
24.00 12.50 36.50 73.00 93.50
45.00 14.29 59.29 118.57 70.71
30.00 14.29 44.29 44.29 145.71
350.00 21.43 371.43 742.86 178.57
20.00 3.57 23.57 47.14 196.43
10.00 2.86 12.86 25.71 21.64
10.00 2.86 12.86 25.71 7.14
30.00 7.14 37.14 74.29 312.86
53.57 53.57 -53.57
17.86 17.86 -17.86

15,900.00 0.00
0.00 0.00
0.00 0.00

95,993.80 76,795.04

50,969.40 40,775.52
2.28 34049.52
2.28 4560.00
2.28 2166.00
45,024.40 36,019.52

39.04 20847.36
36.08 9092.16
2880.00 2880.00
3200.00 3200.00

183,896.95 119,858.70
64,038.25
35%
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales
Fecha: 08.04.08

Semana 01 Semana 02 Semana 03 Semana 04 Semana 05 Semana 06 Semana 07 Semana 08 Semana 09 Semana 10 Semana 11 Semana 12 Semana 13 Semana 14 Semana 15 Semana 16 Semana 17
Item Descripcion Dias
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
-
1 OFICINAS MINA CARAHUCRA 118.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
-
INGENIERIA DEL PROYECTO -
Compras y adquisiciones 14.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1
-
A TABIQUERIA, ACABADOS E INSTALAC -
1 Transporte de Instalaciones 7.00 1 1 1 1 1 1 1
2 SISTEMA DRYWALL -
Tabiques 38.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Cielo Raso 23.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 ACABADOS -
Piso Ceramico 38.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Pintura 14.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ventanas y Puertas 28.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 INSTALACIONES ELECTRICAS 45.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 INSTALACIONES SANITARIAS 11.00 1 1 1 1 1 1 1 1 1 1 1
-
B ESTRUCTURAS METALICAS, COBERTU -
7 Frente 1: Estructuras metlicas -
Fabricacin 35.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Transporte 13.00 1 1 1 1 1 1 1 1 1 1 1 1 1
Montaje 35.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 Frente 2: Coberturas y forros -
Cobertura y Forros 21.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
-

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUPUESTO No. 37-2008-B
Proyecto: Oficinas
Ubicacin: Carahuacra
Cliente: Volcan Compaa Minera SAA
Atencin: Sr. Ronald Castillo / Arq. Sandra Morales
Fecha: 08.04.08

Item Descripcion Un. Cant.

A TABIQUERIA, ACABADOS E INSTALACIONES

1 TRABAJOS PRELIMINARES
1.01 Trazo y replanteo preliminar Glb. 1
1.02 Transporte de materiales y herramientas a almacen Minera Volcan-Callao Glb. 1

2 TABIQUES DE DRYWALL
2.01 TABIQUES TIPO-01: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una plancha STD
m2 1/2" 475.56
por ambas caras,con aislamiento acustico e=3"
2.02 TABIQUES TIPO-02: Tabique estructura de 89mm x 38mm x 45mm @ 40.6, una plancha RH
m2 1/2" por una cara,una plancha STD 1/2" por una cara,c
53.93
2.03 CIELORASO ACUSTICO: Baldosa modelo Vantage (ex Baroque) de 2x 4, borde recto,supensin
m2 15/16".
424.12
2.04 CIELORASO DRYWALL STD: Estructura de 38mm x 38mm x 45mm y plancha STD de 1/2".
m2 25.62
2.05 CIELORASO DRYWALL RH: Estructura de 38mm x 38mm x 45mm y plancha RH de 1/2". m2 7.29

3 ACABADOS
3.01 PISO CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad (o similar) m2 465
3.02 REVESTIMIENTO DE CERAMICO: 33x33cm San Lorenzo Clase 2 PEI IV Primera Calidad m2
(o similar) 41.34
3.03 ZOCALO DE CERAMICO: Modelo Alaska, color gris, marca San Lorenzo, h:11cm ml 295
3.04 Pintura latex en muros,vigas y tabiques de drywall No inlcuye empaste. m2 1,178.00
3.05 V-1:Ventana corrediza (1.15 x 1.40) con marco de aluminio y vidrio doble doble de 4mm Und 21
3.06 V-2: (1.15 X 0.50) con marco de aluminio y vidrio doble de 4mm. Und 2
3.07 V-3: Ventana fija (1.15 X 1.40) con marco de aluminio y vidrio doble de 4mm. Und 11
3.08 M-1: (1.80 X 2.30) Puerta y marco de aluminio y vidrio triple de 6mm con cierrapuertas Und 2
3.09 P-1: (0.90 X 2.30) Puerta batiente contraplacada MDF con acabado al duco (Incluye marcoUnd 21
3.1 Puerta y Separador para inodoro:Plancha de melamina de 19mm sujeta con perfiles de aluUnd. 1

4 INSTALACIONES ELECTRICAS
4.01 Fluorescente doble con pantalla difusora colgada al tech, (h=2.40m) con 02 tubos Phillips und 6
4.02 Fluorescente enrasado al cielo raso con rejilla y 04 tubos, Phillips de 40w. und 45
4.03 Fluorescente en rasado al cielo raso con rejilla difusora, Phillips de 40w. und 12
4.04 Reflector para lmpara halgena de 1000w. Y 220v. und 1
4.05 Lmpara de emergencia 2 x 20w. Luz halgena, batera 12v. radio de iluminacin 100m. und 3
4.06 Lampara tipo dicroico und 4
4.07 Salida para centro de luz, incluye tubo, caja, cable und 71
4.08 Salida para interruptor simple, incluye tubo, caja, cable y placa, Siemens und 35
4.09 Salida para tomacorrientes doble universal bipolar con toma a tierra, incluye tubo, caja, c und 70
4.1 Salida para voz y data, incluye ducto y caja und 36
4.11 Pozo de tierra con cemento conductivo nacional de acuerdo a caractersticas del terreno glb 1
4.12 Tablero metlico BRANCH trifsico de 10 KA, 60 Hz. De 30 polos, con 1 llave general 3 x glb 1
4.13 Tendido de tubera bajo losa. No incluye corte de losa glb 1

5 INSTALACIONES SANITARIAS
5.01 Habilitacion de puntos de agua fra 1/2" Pto 4
5.02 Habilitacion de puntos de agua caliente 1/2" Pto 2
5.03 Habilitacion de puntos de desage 2" Pto 3
5.04 Habilitacion de puntos de desage 4" Pto. 2
5.05 Habilitacion de salida de ventilacin 2" Pto 2
5.06 Habilitacion de puntos de registro 4" Pto. 2
5.07 Habilitacion de vlvula de compuerta1/2" Pto 2
5.08 Tendido de tuberas de agua fra y agua caliente bajo la losa (No incluye excavacin ni co Glb. 1
5.09 Tendido de desage y relleno para conexin con red de desage .Long=5.00ml (Se consideMl. 5
5.1 Suministro e instalacin de Lavatorio Trbol Manantial con pedestal y mezcladora de 4". Und 2
5.11 Suministro e instalacin de Inodoro Trbol Sifon Jet con accesorio y asiento (color blanco) Und 2
5.12 Suministro e instalacin de Urinario Trbol Cadet (color blanco) Und 1
5.13 Suministro e instalacin de terma Rotoplas elctrica de 80 lt.,con accesorios. Und. 2
5.14 Suministro e instalacin de espejo 0.60 x 0.90 con marco de acero inoxidable Und. 2
5.15 Suministro e instalacin de dispensador de papel higinico Und. 2
5.16 Suministro e instalacin de dispensador de jabn liquido Und. 2
5.17 Suministro e instalacin de secamanos elctrico con sensor automtico Und. 2

6 VARIOS
6.01 Viticos de personal (incluye alimentacin, hospedaje y pasajes) glb 1
6.02 Limpieza permanente de obra glb 1

B ESTRUCTURAS METALICAS, COBERTURAS Y FORROS

7 Frente 1: Estructuras metlicas


(Area techada en planta: 523m2)

7.1 Estructura principal


Fabricacin y montaje de estructuras metlicas
para oficinas, compuesta por los siguientes
elementos:
7.11 Anclajes de columnas un 10
7.12 Columnas seccin tubular cuadrada un 10
7.13 Vigas principales un 5
7.14 Vigas secundarias un 12
7.15 Viguetas de techo glo 1
7.16 Arriostres de techo par 6
7.17 Arriostres de viguetas glo 1
Total de estructura principal Kg 14934
7.2 Estructuras interiores a tabaquera drywall
Fabricacin y montaje de estructuras
metlicas interiores a tabiquera drywall,
conformada por tubera cuadrada de 3" Kg 2000
7.3 Canales y marcos en forros laterales
Fabricacin y montaje de estructuras
metlicas para marcos de ventanas y
puertas y para canales inferiores
de tabiquera termo muro. Kg 950
Frente 2: Coberturas y forros

8.1 Cobertura de techo


Suministro y montaje de coberturas y forros
para techo y cierres laterales
8.11 Cobertura de techo DANICA o similar m2 534
8.12 Forros laterales DANICA e=100mm o similar m2 252
8.13 Remates de cobertura glo 1
8.14 Sellos y elementos de fijacin glo 1
Gallegos
Soles

Matriales Mano de Obra

12.5 12.5
12.5 12.5
8.5 8.5
11 11
11 11
0
0
127.1 17 144.1
23 17 40
5.5 5.5 11
3 3.5 6.5
185 100 285
65 40 105
150 67 217
852 366 1218
250 170 420
300 150 450
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Você também pode gostar