1 Pearl Compliance

Summary Envelope HVAC SHW Lighting Renewables

This tool provides a simple means of demonstrating compliance with the Prescriptive requirements of the Pearl Building Rating System, RE-R1: Minimum Energy Performa
This tool forms part of the submittal requirements for the PBRS RE-R1 Prescriptive Method.

Project Info Energy Efficient Appliances Calculator

Project ID Person Responsible

Project Name ADNOC Medical Centre Company

Location West 11, Plot 162 Date of Issue

PQP Mechanical Engineer

Building Type Other Electrical Engineer

Total Gross Floor Area, m2 Public Health Engineer

Building Footprint, m2
Building Project Overall Status: Pass

Last Revised: April 2011 Report a Template Bug :


way v1.0

stem, RE-R1: Minimum Energy Performance credit.

fficient Appliances Calculator

ponsible

ue

Engineer

Engineer

lth Engineer
Input Cells

PBRS.PrescEnergy@upc.gov.ae Next
Building Envelope

Summary Envelope HVAC SHW Lighting Renewables

The following building envelope elements must satisfy the minimum performance requirements where applicable. The quoted Design Value should be an area
weighted average of all relevant element types within the project.

Design Value
Envelope Element Construction Type Included? Target Requirement
Achieved
Roof
Attic and other Yes 0.17 0.17
U-value, W/m.K
Opaque Elements

Wall, above grade


Mass Yes 0.30 0.22
U-value, W/m.K
Wall, Below Grade
Below grade wall No 5.83
C-factor, W/m.K
Floor
No -
U-value, W/m.K
Slab-on-Grade Floor
No -
F-factor, W/m.K
Vertical Glazing Percentage of above
Yes 30% 8%
Area Ratio grade wall area
Vertical Glazing
All other Yes 1.90 1.31
U-value, W/m.K
Fenestration
Fenestration
Vertical Glazing
PF < 0.25 Yes 0.23 0.20
SHGC
Skylight Glazing Percentage of roof
No 3%
Area Ratio area
Skylight Glazing
- No 3.80
U-value, W/m.K
Skylight Glazing
- No 0.30
SHGC
Building Air Leakage
Infiltration Rate, l/s/m
@75Pa Test Pressure No 3.64

Overall Pass / Fail for Building Envelope

Previous
esign Value should be an area

Pass / Fail?

PASS

PASS

PASS

PASS

PASS

PASS

PASS
PASS

PASS

PASS

PASS

PASS

PASS Yes

Next
HVAC Systems & Controls

Summary Envelope HVAC SHW Lighting Renewables

The following tables consider the performance of various HVAC system components. Compliance must be demonstrated for all mandatory requirements relating to effic

Included? Equipment Type Size Category Capacity Target Requirement

Unitary Air Conditioners, VRF, Split (& multi-split) units

Air conditioners - Air


No < 19kW n/a 3.81 SCoP
cooled

0.00

Condensing Units
System Efficiency

Yes Air cooled > 70kW n/a 2.78 CoP

9.20 IPLV

Packaged Terminal Air Conditioners (PTAC) & Packaged Terminal Heat Pumps (PTHP)
System Effici
No PTAC n/a 539347 9.305 EER

Air Cooled Chillers

Yes Air cooled chiller n/a > 150 tons 2.80 CoP

12.75 IPLV

System Ef

Fan System Type Included? Target Requirement

Central mechanical ventilation, incl. heating & cooling No 0.00

Zonal supply system where fan is remote from zone, i.e. ceiling or
No 0.00
roof mounted

Zonal extract system where fan is remote from zone Yes 0.6 W/l/s
System Fan Power

Zonal supply & extract ventilation units such as ceiling void or roof
No 0.00
units serving single room/zone with heat recovery
Local supply & extract ventilation units such as wall/roof units serving
No 0.00
single room/zone with heat recovery
Local supply & extract ventilation units such as window/wall/roof
No 0.00
units serving single area (e.g. toilet extract)
HVAC Systems

Other local ventilation units No 0.00

Fan assisted terminal VAV unit No 0.00

Fan coil units (weighted average) Yes 0.6 W/l/s


HVAC Syste
System Fan

Energy Recovery Systems

Is there a dedicated outdoor air system providing fresh air to


No
occupied zones?

Percentage Outdoor Air at Full Design Flow Rate >40% & <50% Energy Recovery System Not Required

Design Supply Airflow Rate, m/s 10.00 Has an Energy Recovery syste

What is the overall effectivene


(based on change in enthalpy of ou

Demand Control Ventilation

Are there any zones with an Occupancy Density exceeding


No No Demand Control Ventilation required
2.3m/person?
System Performance

Do any of these zones exceed 50m in area? No Has Demand Control Ventilatio

HVAC System Controls

Are individual thermostatic controls provided in each zone, which are capable of responding to temperature

Is humidification/dehumidification provided by the system? No Does each humidity control system have ass

Is the control system a pr

Miscellaneous Additional System Requirements

Are all installed Chilled Water pump motors fitted with Varia
Are the ducts located in unconditioned space
Are any ducts located in unconditioned spaces? No
minimum
Are the ducts located in external spaces insulated
Are any ducts located in external spaces? No

Is all piping serving the cooling system insulated with a minimum of 38mm insulation (insulation thermal conductivity < 0.039W/m.

System Perfo

Overall Pass / Fa

Previous
andatory requirements relating to efficiency, fan power and performance.

Target Requirement Design Value Achieved Pass / Fail?

3.81 SCoP 3.85 PASS

0.00 PASS

2.78 CoP 3.10 PASS

9.20 IPLV 10.79 PASS


9.305 EER 9.31 PASS

2.80 CoP 3.10 PASS

12.75 IPLV 12.75 PASS

System Efficiency Compliance PASS

Target Requirement Design Value Achieved Pass / Fail?

0.00 PASS

0.00 PASS

0.6 W/l/s 0.60 PASS

0.00 PASS

0.00 PASS

0.00 PASS

0.00 PASS

0.00 PASS

0.6 W/l/s 0.60 PASS


System Fan Power Compliance PASS

Recovery System Not Required

Has an Energy Recovery system been provided? Yes

What is the overall effectiveness of the system?


(based on change in enthalpy of outdoor air supply)

and Control Ventilation required

Has Demand Control Ventilation been provided? No

capable of responding to temperature within the zone? Yes

each humidity control system have associated controls? No

Is the control system a proprietary system? Yes

d Water pump motors fitted with Variable Speed Drives? n/a


e ducts located in unconditioned spaces insulated with a
No
minimum of R-5 insulation?
cts located in external spaces insulated with a minimum
No
of R-8 insulation?

tion thermal conductivity < 0.039W/m.K) or equivalent? n/a

System Performance Compliance PASS

Overall Pass / Fail for HVAC Systems PASS

Next
Service Hot Water System

Summary Envelope HVAC SHW Lighting Renewables

This section considers the performance of the service hot water system, excluding the contribution of any renewable technologies

Included? Size Category Capacity Target Requirement

Hot Water System Efficiency

Yes < 12 kW 2510.0 0.09 Efficiency Factor


Electric Hot Water Systems

Hot Water System Controls

Are temperature controls provided to satisfy the set point requirements?


(43C for dwellings, 32C for other occupancies)
Is the hot water outlet temperature limited such that it cannot
Are public rest rooms provided? No
exceed 43C?
Are swimming pools, spas or hot tubs
No Are the pools equipped with a vapour retardant cover?
provided?
Are heating or cooling systems provided for Is a readily accessible on-off switch provided that can shut off the
No
swimming pools, spas or hot tubs? system without adjusting the thermostat settings?
Electric H
Are any of the swimming pools, spas or hot Are they provided with a cover that has an insulation value
No
tubs heated to more than 32C? exceeding R-12?

Overall Pass / Fail for SHW Systems

Previous
Design Value Achieved Pass / Fail?

0.93 PASS

tisfy the set point requirements?


Yes
ngs, 32C for other occupancies)
ature limited such that it cannot
No
exceed 43C?

d with a vapour retardant cover? No

ch provided that can shut off the


No
djusting the thermostat settings?
over that has an insulation value
No
exceeding R-12?

Overall Pass / Fail for SHW Systems PASS

Next
Lighting

Summary Envelope HVAC SHW Lighting Renewables

This section considers the overall performance of internal and external lighting systems. Compliance is based upon achievement or improvement beyond the target valu
Abu Dhabi International Energy Conservation Code. Compliance can be demonstrated either for Building Type or on a Space-by-Space basis. Calculation of the lighting p
(W/m) may require separate calculation relating to lighting power and area of coverage.

Lighting Loads (W/m)

Design Value
Building/Space Type Target Requirement Pass / Fail?
Achieved

Exam/Treatment 14.5 13.1 PASS

Exam/Treatment 14.5 10.4 PASS

Electrical/Mechanical 10.7 9.8 PASS

Hospital/Medical supplies 13.6 8.9 PASS

Enclosed 9.7 5.4 PASS


Enclosed 9.7 5.7 PASS

Reception/Waiting 24.2 22.1 PASS

Classroom/lecture/training 12.6 11.2 PASS

Active storage 7.8 6.2 PASS


Interior Lighting

Lobby 10.7 8.3 PASS

Enclosed 9.7 4.0 PASS

- PASS

- PASS

- PASS

- PASS

- PASS

- PASS

- PASS

- PASS

- PASS
Overall Pass / Fail for Internal Lighting PASS

Is Exterior Lighting Provided? No Lighting Loads

Design Value
Area Type Units Included? Target Requirement
Achieved

Parking Lots and Drives W/m No 1.45

Walkways <3m Wide W/linear meter No 2.95

Walkways 3m Wide W/linear meter No 1.94


Tradable Surfaces

Stairways W/m No 9.69

W/linear m of door
Main Entrance Door No 88.6
width
W/linear m of door
Other Entrance Doors No 59.1
width
Canopies and
W/m No 12.1
Overhangs
Outdoor Sales, Open
W/m No 4.84
Areas
Exterior Lighting

Outdoor Sales, Street


W/linear meter No 59.1
Frontage

Tradable Surfaces Compliance


Exterior Lightin
W/m for each
Building Faade illuminated wall or No -
surface

Automated teller W per location No 243.00

Non-Tradable Surfaces
machines and night
depositories W per additional ATM
No 81.00
per location
Inspection stations at W/m of uncovered
No 12.11
guarded facilities area

Loading areas
W/m of uncovered
emergency service No 4.84
area
vehicles

Drive-up windows at
W per drive-through No 360.00
fast food restaurants
Parking near 24-hour
W per main entry No 720.00
retail entrances

Overall Pass / Fail for External Lighting

Previous
or improvement beyond the target values outlined in the
pace basis. Calculation of the lighting power density
Yes

T
a
r
g
e
t
Length/Area Pass / Fail?
C
h
###
e
c
###
k

###

###

n/a ###

###

###

###

###

Tradable Surfaces Compliance PASS No ###


PASS

PASS

PASS

PASS

PASS

PASS

PASS

all Pass / Fail for External Lighting PASS No

Next
Renewable Energy

Summary Envelope HVAC SHW Lighting Renewables

This section considers the provision of an adequate solar thermal system for office buildings.
For other building typologies there is no requirement to provide renewable technologies.

Total Building Target Requirement,


Included? Achieved, kWh
Predicted Load kWh
Total Yearly Hot Water Usage Generated from
No 0.0
Renewable Sources (kWh)

Overall Pass / Fail for Renewables

Previous
Pass / Fail?

n/a

PASS No