Escolar Documentos
Profissional Documentos
Cultura Documentos
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 02 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 3.50 - 4.50 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 02 TESTED BY : Yusron
DEPTH : 3.50 - 4.50 M m DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 117.96
TEST END :
CONTAINER NO. 21
WT. CONTAINER + WET SOIL IN g 113.620
WT. CONTAINER IN g 34.320
WT. WET SOIL IN g 79.300
WT. DRY SOIL (Ws) IN g 58.230
WT. WATER (Ww) IN g 21.07
WATER CONTENT (w) IN % 36.18
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 02 Coefficient of Consolidation (Cv) : 0.01141 cm 2/sec
DEPTH : 3.50 - 4.50 M m Compression Index (Cc) : 0.173
TESTED BY : Yusron Swell Index (Cs) : 0.057
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.017 cm 2/kg
DESCRIPTION : UDS
0.800
0.700
0.600
Void ratio (e)
0.500
0.400
eo= 0.834
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 02 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 5.50 - 6.00 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 02 TESTED BY : Yusron
DEPTH : 5.50 - 6.00 M m DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 103.91
TEST END :
CONTAINER NO. 22
WT. CONTAINER + WET SOIL IN g 110.770
WT. CONTAINER IN g 37.650
WT. WET SOIL IN g 73.120
WT. DRY SOIL (Ws) IN g 54.990
WT. WATER (Ww) IN g 18.13
WATER CONTENT (w) IN % 32.97
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 02 Coefficient of Consolidation (Cv) : 0.01067 cm 2/sec
DEPTH : 5.50 - 6.00 M m Compression Index (Cc) : 0.266
TESTED BY : Yusron Swell Index (Cs) : 0.045
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.084 cm 2/kg
DESCRIPTION : UDS
0.800
0.700
0.600
Void ratio (e)
0.500
0.400
eo= 0.800
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 04 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 3.50 - 4.00 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 04 TESTED BY : Yusron
DEPTH : 3.50 - 4.00 M m DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 127.65
TEST END :
CONTAINER NO. 23
WT. CONTAINER + WET SOIL IN g 115.010
WT. CONTAINER IN g 35.560
WT. WET SOIL IN g 79.450
WT. DRY SOIL (Ws) IN g 57.390
WT. WATER (Ww) IN g 22.06
WATER CONTENT (w) IN % 38.44
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 04 Coefficient of Consolidation (Cv) : 0.01212 cm 2/sec
DEPTH : 3.50 - 4.00 M m Compression Index (Cc) : 0.192
TESTED BY : Yusron Swell Index (Cs) : 0.063
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.040 cm 2/kg
DESCRIPTION : UDS
0.800
0.700
0.600
Void ratio (e)
0.500
0.400
eo= 0.786
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 04 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 11.50 - 12.00 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 04 TESTED BY : Yusron
DEPTH : 11.50 - 12.00 Mm DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 106.19
TEST END :
CONTAINER NO. 24
WT. CONTAINER + WET SOIL IN g 110.630
WT. CONTAINER IN g 37.760
WT. WET SOIL IN g 72.870
WT. DRY SOIL (Ws) IN g 52.690
WT. WATER (Ww) IN g 20.18
WATER CONTENT (w) IN % 38.30
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 04 Coefficient of Consolidation (Cv) : 0.01731 cm 2/sec
DEPTH : 11.50 - 12.00 M
m Compression Index (Cc) : 0.211
TESTED BY : Yusron Swell Index (Cs) : 0.044
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.044 cm 2/kg
DESCRIPTION : UDS
0.900
0.800
0.700
0.600
Void ratio (e)
0.500
0.400
eo= 0.938
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 06 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 5.50 - 6.00 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 06 TESTED BY : Yusron
DEPTH : 5.50 - 6.00 M m DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 112.79
TEST END :
CONTAINER NO. 25
WT. CONTAINER + WET SOIL IN g 113.580
WT. CONTAINER IN g 39.300
WT. WET SOIL IN g 74.280
WT. DRY SOIL (Ws) IN g 53.120
WT. WATER (Ww) IN g 21.16
WATER CONTENT (w) IN % 39.83
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 06 Coefficient of Consolidation (Cv) : 0.02023 cm 2/sec
DEPTH : 5.50 - 6.00 M m Compression Index (Cc) : 0.262
TESTED BY : Yusron Swell Index (Cs) : 0.085
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.041 cm 2/kg
DESCRIPTION : UDS
0.900
0.800
0.700
0.600
Void ratio (e)
0.500
0.400
eo= 0.915
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH 06 TESTED BY Yusron
LOCATION : MM2000 CIBITUNG, BEKASI DATE 27-Nov-14
DEPTH : 7.50 - 8.00 M
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH 06 TESTED BY : Yusron
DEPTH : 7.50 - 8.00 M m DATE : 27-Nov-14
DEGREE OF SATURATION IN %
TEST START : 126.84
TEST END :
CONTAINER NO. 26
WT. CONTAINER + WET SOIL IN g 125.630
WT. CONTAINER IN g 45.920
WT. WET SOIL IN g 79.710
WT. DRY SOIL (Ws) IN g 59.150
WT. WATER (Ww) IN g 20.56
WATER CONTENT (w) IN % 34.76
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 CIBITUNG, BEKASI
BORING NO. : BH 06 Coefficient of Consolidation (Cv) : 0.02063 cm 2/sec
DEPTH : 7.50 - 8.00 M m Compression Index (Cc) : 0.191
TESTED BY : Yusron Swell Index (Cs) : 0.051
DATE : 27-Nov-14 Coeff. of Volume Comp. (mv) : 0.036 cm 2/kg
DESCRIPTION : UDS
0.700
0.600
0.500
Void ratio (e)
0.400
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02500
0.02000
Cv (cm2/sec)
0.01500
0.01000
0.00500
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-07 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 3.50-4.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-07 TESTED BY : Dimas
DEPTH : 3.50-4.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 119.07
TEST END :
CONTAINER NO. 28
WT. CONTAINER + WET SOIL IN g 116.350
WT. CONTAINER IN g 37.330
WT. WET SOIL IN g 79.020
WT. DRY SOIL (Ws) IN g 59.010
WT. WATER (Ww) IN g 20.01
WATER CONTENT (w) IN % 33.91
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-07 Coefficient of Consolidation (Cv) : 0.00745 cm2/sec
DEPTH : 3.50-4.00 m m Compression Index (Cc) : 0.132
TESTED BY : Dimas Swell Index (Cs) : 0.029
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.025 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.748
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-07 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 7.50-8.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-07 TESTED BY : Dimas
DEPTH : 7.50-8.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 122.72
TEST END :
CONTAINER NO. 27
WT. CONTAINER + WET SOIL IN g 119.520
WT. CONTAINER IN g 40.440
WT. WET SOIL IN g 79.080
WT. DRY SOIL (Ws) IN g 57.970
WT. WATER (Ww) IN g 21.11
WATER CONTENT (w) IN % 36.42
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-07 Coefficient of Consolidation (Cv) : 0.00691 cm2/sec
DEPTH : 7.50-8.00 m m Compression Index (Cc) : 0.458
TESTED BY : Dimas Swell Index (Cs) : 0.051
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.030 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.779
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-09 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 3.50-4.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-09 TESTED BY : Dimas
DEPTH : 3.50-4.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 106.76
TEST END :
CONTAINER NO. 30
WT. CONTAINER + WET SOIL IN g 113.100
WT. CONTAINER IN g 35.780
WT. WET SOIL IN g 77.320
WT. DRY SOIL (Ws) IN g 58.700
WT. WATER (Ww) IN g 18.62
WATER CONTENT (w) IN % 31.72
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-09 Coefficient of Consolidation (Cv) : 0.00692 cm2/sec
DEPTH : 3.50-4.00 m m Compression Index (Cc) : 0.217
TESTED BY : Dimas Swell Index (Cs) : 0.082
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.033 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.799
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-09 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 9.50-10.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-09 TESTED BY : Dimas
DEPTH : 9.50-10.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 123.33
TEST END :
CONTAINER NO. 31
WT. CONTAINER + WET SOIL IN g 111.740
WT. CONTAINER IN g 31.870
WT. WET SOIL IN g 79.870
WT. DRY SOIL (Ws) IN g 58.380
WT. WATER (Ww) IN g 21.49
WATER CONTENT (w) IN % 36.81
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-09 Coefficient of Consolidation (Cv) : 0.00728 cm2/sec
DEPTH : 9.50-10.00 m m Compression Index (Cc) : 0.179
TESTED BY : Dimas Swell Index (Cs) : 0.040
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.026 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.798
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-15 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 1.50 - 2.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-15 TESTED BY : Dimas
DEPTH : 1.50 - 2.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 117.79
TEST END :
CONTAINER NO. 26
WT. CONTAINER + WET SOIL IN g 128.770
WT. CONTAINER IN g 45.920
WT. WET SOIL IN g 82.850
WT. DRY SOIL (Ws) IN g 67.120
WT. WATER (Ww) IN g 15.73
WATER CONTENT (w) IN % 23.44
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-15 Coefficient of Consolidation (Cv) : 0.01637 cm2/sec
DEPTH : 1.50 - 2.00 m m Compression Index (Cc) : 0.072
TESTED BY : Dimas Swell Index (Cs) : 0.001
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.029 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.515
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.03000
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-15 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 11.50-12.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-15 TESTED BY : Dimas
DEPTH : 11.50-12.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 126.18
TEST END :
CONTAINER NO. 22
WT. CONTAINER + WET SOIL IN g 118.940
WT. CONTAINER IN g 37.650
WT. WET SOIL IN g 81.290
WT. DRY SOIL (Ws) IN g 62.120
WT. WATER (Ww) IN g 19.17
WATER CONTENT (w) IN % 30.86
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-15 Coefficient of Consolidation (Cv) : 0.02104 cm2/sec
DEPTH : 11.50-12.00 mm Compression Index (Cc) : 0.228
TESTED BY : Dimas Swell Index (Cs) : 0.025
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.022 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.631
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT :GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. :BH-15 TESTED BY Dimas
LOCATION :MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH :15.50-16.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-15 TESTED BY : Dimas
DEPTH : 15.50-16.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 119.08
TEST END :
CONTAINER NO. 28
WT. CONTAINER + WET SOIL IN g 115.140
WT. CONTAINER IN g 37.330
WT. WET SOIL IN g 77.810
WT. DRY SOIL (Ws) IN g 57.660
WT. WATER (Ww) IN g 20.15
WATER CONTENT (w) IN % 34.95
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-15 Coefficient of Consolidation (Cv) : 0.01891 cm2/sec
DEPTH : 15.50-16.00 mm Compression Index (Cc) : 0.158
TESTED BY : Dimas Swell Index (Cs) : 0.047
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.025 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.757
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.03000
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-17 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 7.50 - 8.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-17 TESTED BY : Dimas
DEPTH : 7.50 - 8.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 102.49
TEST END :
CONTAINER NO. 27
WT. CONTAINER + WET SOIL IN g 113.380
WT. CONTAINER IN g 40.440
WT. WET SOIL IN g 72.940
WT. DRY SOIL (Ws) IN g 54.100
WT. WATER (Ww) IN g 18.84
WATER CONTENT (w) IN % 34.82
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-17 Coefficient of Consolidation (Cv) : 0.00996 cm2/sec
DEPTH : 7.50 - 8.00 m m Compression Index (Cc) : 0.326
TESTED BY : Dimas Swell Index (Cs) : 0.064
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.035 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.880
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.04000
0.03000
Cv (cm2/sec)
0.02000
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-17 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 9.50-10.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-17 TESTED BY : Dimas
DEPTH : 9.50-10.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 110.14
TEST END :
CONTAINER NO. 24
WT. CONTAINER + WET SOIL IN g 111.920
WT. CONTAINER IN g 37.760
WT. WET SOIL IN g 74.160
WT. DRY SOIL (Ws) IN g 53.930
WT. WATER (Ww) IN g 20.23
WATER CONTENT (w) IN % 37.51
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-17 Coefficient of Consolidation (Cv) : 0.01733 cm2/sec
DEPTH : 9.50-10.00 m m Compression Index (Cc) : 0.193
TESTED BY : Dimas Swell Index (Cs) : 0.038
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.034 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.879
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-17 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 13.50-14.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-17 TESTED BY : Dimas
DEPTH : 13.50-14.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 118.80
TEST END :
CONTAINER NO. 21
WT. CONTAINER + WET SOIL IN g 110.140
WT. CONTAINER IN g 34.320
WT. WET SOIL IN g 75.820
WT. DRY SOIL (Ws) IN g 54.060
WT. WATER (Ww) IN g 21.76
WATER CONTENT (w) IN % 40.25
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-17 Coefficient of Consolidation (Cv) : 0.01915 cm2/sec
DEPTH : 13.50-14.00 mm Compression Index (Cc) : 0.227
TESTED BY : Dimas Swell Index (Cs) : 0.042
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.023 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.874
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.03000
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-18 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 2.50-3.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-18 TESTED BY : Dimas
DEPTH : 2.50-3.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 109.31
TEST END :
CONTAINER NO. 23
WT. CONTAINER + WET SOIL IN g 110.280
WT. CONTAINER IN g 35.560
WT. WET SOIL IN g 74.720
WT. DRY SOIL (Ws) IN g 55.010
WT. WATER (Ww) IN g 19.71
WATER CONTENT (w) IN % 35.83
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-18 Coefficient of Consolidation (Cv) : 0.01470 cm2/sec
DEPTH : 2.50-3.00 m m Compression Index (Cc) : 0.264
TESTED BY : Dimas Swell Index (Cs) : 0.086
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.036 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.849
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-18 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 9.50-10.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-18 TESTED BY : Dimas
DEPTH : 9.50-10.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 106.33
TEST END :
CONTAINER NO. 25
WT. CONTAINER + WET SOIL IN g 117.380
WT. CONTAINER IN g 39.300
WT. WET SOIL IN g 78.080
WT. DRY SOIL (Ws) IN g 61.790
WT. WATER (Ww) IN g 16.29
WATER CONTENT (w) IN % 26.36
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-18 Coefficient of Consolidation (Cv) : 0.01014 cm2/sec
DEPTH : 9.50-10.00 m m Compression Index (Cc) : 0.215
TESTED BY : Dimas Swell Index (Cs) : 0.051
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.030 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 0.640
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.03000
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO. : BH-18 TESTED BY Dimas
LOCATION : MM2000 Cibitung, Bekasi DATE 27/12/2014
DEPTH : 21.50-22.00 m
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
BORING NO.: BH-18 TESTED BY : Dimas
DEPTH : 21.50-22.00 m m DATE : 27/12/2014
DEGREE OF SATURATION IN %
TEST START : 107.37
TEST END :
CONTAINER NO. 29
WT. CONTAINER + WET SOIL IN g 108.550
WT. CONTAINER IN g 37.240
WT. WET SOIL IN g 71.310
WT. DRY SOIL (Ws) IN g 49.920
WT. WATER (Ww) IN g 21.39
WATER CONTENT (w) IN % 42.85
PROJECT : GEOTECHNICAL INVESTIGATION FOR MANUFACTURE BUILDING AT CIBITUNG MODERN INDUSTRIAL ESTATE
LOCATION : MM2000 Cibitung, Bekasi
BORING NO. : BH-18 Coefficient of Consolidation (Cv) : 0.01400 cm2/sec
DEPTH : 21.50-22.00 mm Compression Index (Cc) : 0.307
TESTED BY : Dimas Swell Index (Cs) : 0.054
DATE : 27/12/2014 Coeff. of Volume Comp. (mv) : 0.037 cm2/kg
DESCRIPTION : UDS
1.000
0.900
0.800
eo= 1.030
0.700
Void ratio (e)
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.10 1.00 10.00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0.03000
0.02000
Cv (cm2/sec)
0.01000
0.00000
0.100 1.000 10.000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,09
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 128,852
WT. CONTAINER IN g 62,557
WT. WET SOIL IN g 66,295
WT. DRY SOIL (Ws) IN g 46,762
WT. WATER (Ww) IN g 19,53
WATER CONTENT (w) IN % 41,77
eo= 1,175
1,170
PC = 1.080
1,120
1,070
1,020
Void ratio (e)
0,970
0,920
0,870
0,820
0,770
0,720
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00375
0,00300
Cv (cm2/sec)
0,00225
0,00150
0,00075
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 91,21
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 133,788
WT. CONTAINER IN g 63,052
WT. WET SOIL IN g 70,736
WT. DRY SOIL (Ws) IN g 53,438
WT. WATER (Ww) IN g 17,30
WATER CONTENT (w) IN % 32,37
eo= 0,934
0,900
PC = 1.053
0,850
0,800
Void ratio (e)
0,750
0,700
0,650
0,600
0,550
0,500
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,71
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 132,041
WT. CONTAINER IN g 62,742
WT. WET SOIL IN g 69,299
WT. DRY SOIL (Ws) IN g 50,933
WT. WATER (Ww) IN g 18,37
WATER CONTENT (w) IN % 36,06
eo= 1,018
1,030
0,980
PC = 1.069
0,930
0,880
Void ratio (e)
0,830
0,780
0,730
0,680
0,630
0,580
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 91,64
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,527
WT. CONTAINER IN g 62,884
WT. WET SOIL IN g 68,643
WT. DRY SOIL (Ws) IN g 50,480
WT. WATER (Ww) IN g 18,16
WATER CONTENT (w) IN % 35,98
eo= 1,019
1,025
0,975 PC = 1.055
0,925
0,875
Void ratio (e)
0,825
0,775
0,725
0,675
0,625
0,575
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00400
0,00300
Cv (cm2/sec)
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 91,76
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 130,122
WT. CONTAINER IN g 61,115
WT. WET SOIL IN g 69,007
WT. DRY SOIL (Ws) IN g 51,037
WT. WATER (Ww) IN g 17,97
WATER CONTENT (w) IN % 35,21
eo= 0,995
1,000
PC = 1.040
0,950
0,900
0,850
Void ratio (e)
0,800
0,750
0,700
0,650
0,600
0,550
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 91,00
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,695
WT. CONTAINER IN g 62,742
WT. WET SOIL IN g 68,953
WT. DRY SOIL (Ws) IN g 51,057
WT. WATER (Ww) IN g 17,90
WATER CONTENT (w) IN % 35,05
eo= 1,003
1,000
PC = 1.084
0,950
0,900
Void ratio (e)
0,850
0,800
0,750
0,700
0,650
0,600
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 90,68
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 130,834
WT. CONTAINER IN g 62,272
WT. WET SOIL IN g 68,562
WT. DRY SOIL (Ws) IN g 50,398
WT. WATER (Ww) IN g 18,16
WATER CONTENT (w) IN % 36,04
eo= 1,041
1,060
PC = 1.030
1,010
0,960
0,910
Void ratio (e)
0,860
0,810
0,760
0,710
0,660
0,610
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 95,71
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 129,866
WT. CONTAINER IN g 61,885
WT. WET SOIL IN g 67,981
WT. DRY SOIL (Ws) IN g 47,830
WT. WATER (Ww) IN g 20,15
WATER CONTENT (w) IN % 42,13
eo= 1,156
1,150
PC = 1.087
1,075
1,000
Void ratio (e)
0,925
0,850
0,775
0,700
0,625
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 81,48
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 129,883
WT. CONTAINER IN g 62,281
WT. WET SOIL IN g 67,602
WT. DRY SOIL (Ws) IN g 51,660
WT. WATER (Ww) IN g 15,94
WATER CONTENT (w) IN % 30,86
eo= 0,993
1,000
PC = 1.022
0,950
0,900
Void ratio (e)
0,850
0,800
0,750
0,700
0,650
0,600
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 93,33
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 130,738
WT. CONTAINER IN g 62,373
WT. WET SOIL IN g 68,365
WT. DRY SOIL (Ws) IN g 49,508
WT. WATER (Ww) IN g 18,86
WATER CONTENT (w) IN % 38,09
PC = 1.055
1,000
0,950
0,900
Void ratio (e)
0,850
0,800
0,750
0,700
0,650
0,600
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00600
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 91,77
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 134,269
WT. CONTAINER IN g 63,077
WT. WET SOIL IN g 71,192
WT. DRY SOIL (Ws) IN g 54,391
WT. WATER (Ww) IN g 16,80
WATER CONTENT (w) IN % 30,89
eo= 0,873
0,875
PC = 1,021
0,825
0,775
Void ratio (e)
0,725
0,675
0,625
0,575
0,525
0,475
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00600
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 90,11
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 132,384
WT. CONTAINER IN g 62,829
WT. WET SOIL IN g 69,555
WT. DRY SOIL (Ws) IN g 52,293
WT. WATER (Ww) IN g 17,26
WATER CONTENT (w) IN % 33,01
eo= 0,952
0,950
PC = 1.042
0,900
0,850
Void ratio (e)
0,800
0,750
0,700
0,650
0,600
0,550
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 95,77
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,919
WT. CONTAINER IN g 62,915
WT. WET SOIL IN g 69,004
WT. DRY SOIL (Ws) IN g 49,433
WT. WATER (Ww) IN g 19,57
WATER CONTENT (w) IN % 39,59
eo= 1,085
1,080
PC = 1.063
1,020
0,960
Void ratio (e)
0,900
0,840
0,780
0,720
0,660
0,600
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 97,81
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 126,955
WT. CONTAINER IN g 61,789
WT. WET SOIL IN g 65,166
WT. DRY SOIL (Ws) IN g 42,867
WT. WATER (Ww) IN g 22,30
WATER CONTENT (w) IN % 52,02
eo= 1,384
1,400
PC = 1.064
1,300
1,200
Void ratio (e)
1,100
1,000
0,900
0,800
0,700
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 93,12
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 125,914
WT. CONTAINER IN g 61,358
WT. WET SOIL IN g 64,556
WT. DRY SOIL (Ws) IN g 43,634
WT. WATER (Ww) IN g 20,92
WATER CONTENT (w) IN % 47,95
eo= 1,337
1,350
PC = 1.090
1,275
1,200
Void ratio (e)
1,125
1,050
0,975
0,900
0,825
0,750
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,06
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,281
WT. CONTAINER IN g 62,821
WT. WET SOIL IN g 68,460
WT. DRY SOIL (Ws) IN g 49,945
WT. WATER (Ww) IN g 18,51
WATER CONTENT (w) IN % 37,07
eo= 1,050
1,050
PC = 1.072
1,000
0,950
0,900
Void ratio (e)
0,850
0,800
0,750
0,700
0,650
0,600
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 77,83
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 130,896
WT. CONTAINER IN g 63,334
WT. WET SOIL IN g 67,562
WT. DRY SOIL (Ws) IN g 52,861
WT. WATER (Ww) IN g 14,70
WATER CONTENT (w) IN % 27,81
0,900
PC = 1.017
0,850
0,800
Void ratio (e)
0,750
0,700
0,650
0,600
0,550
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 93,29
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 128,986
WT. CONTAINER IN g 62,674
WT. WET SOIL IN g 66,312
WT. DRY SOIL (Ws) IN g 46,317
WT. WATER (Ww) IN g 20,00
WATER CONTENT (w) IN % 43,17
eo= 1,202
1,200
PC = 1.098
1,125
1,050
Void ratio (e)
0,975
0,900
0,825
0,750
0,675
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 93,24
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 133,674
WT. CONTAINER IN g 62,226
WT. WET SOIL IN g 71,448
WT. DRY SOIL (Ws) IN g 54,445
WT. WATER (Ww) IN g 17,00
WATER CONTENT (w) IN % 31,23
eo= 0,867
0,850
PC = 1.055
0,800
0,750
Void ratio (e)
0,700
0,650
0,600
0,550
0,500
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 84,28
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 132,584
WT. CONTAINER IN g 61,365
WT. WET SOIL IN g 71,219
WT. DRY SOIL (Ws) IN g 56,411
WT. WATER (Ww) IN g 14,81
WATER CONTENT (w) IN % 26,25
eo= 0,810
0,800
PC = 1.044
0,750
0,700
Void ratio (e)
0,650
0,600
0,550
0,500
0,450
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00600
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 94,16
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 130,627
WT. CONTAINER IN g 62,717
WT. WET SOIL IN g 67,910
WT. DRY SOIL (Ws) IN g 48,479
WT. WATER (Ww) IN g 19,43
WATER CONTENT (w) IN % 40,08
0,990
0,940
Void ratio (e)
0,890
0,840
0,790
0,740
0,690
0,640
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 95,41
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 129,071
WT. CONTAINER IN g 62,742
WT. WET SOIL IN g 66,329
WT. DRY SOIL (Ws) IN g 45,659
WT. WATER (Ww) IN g 20,67
WATER CONTENT (w) IN % 45,27
1,300
eo= 1,231
1,225
PC = 1.070
1,150
1,075
Void ratio (e)
1,000
0,925
0,850
0,775
0,700
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,68
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,834
WT. CONTAINER IN g 62,199
WT. WET SOIL IN g 69,635
WT. DRY SOIL (Ws) IN g 51,570
WT. WATER (Ww) IN g 18,06
WATER CONTENT (w) IN % 35,03
eo= 0,985
1,000
PC = 1.067
0,950
0,900
0,850
Void ratio (e)
0,800
0,750
0,700
0,650
0,600
0,550
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00600
0,00500
0,00400
Cv (cm2/sec)
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 93,59
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 128,447
WT. CONTAINER IN g 63,094
WT. WET SOIL IN g 65,353
WT. DRY SOIL (Ws) IN g 44,778
WT. WATER (Ww) IN g 20,58
WATER CONTENT (w) IN % 45,95
eo= 1,272
1,250
PC = 1.092
1,175
1,100
Void ratio (e)
1,025
0,950
0,875
0,800
0,725
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00400
0,00300
Cv (cm2/sec)
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,33
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 132,974
WT. CONTAINER IN g 63,456
WT. WET SOIL IN g 69,518
WT. DRY SOIL (Ws) IN g 51,725
WT. WATER (Ww) IN g 17,79
WATER CONTENT (w) IN % 34,40
0,900
0,850
Void ratio (e)
0,800
0,750
0,700
0,650
0,600
0,550
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00800
0,00600
Cv (cm2/sec)
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 81,47
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,207
WT. CONTAINER IN g 61,025
WT. WET SOIL IN g 70,182
WT. DRY SOIL (Ws) IN g 55,581
WT. WATER (Ww) IN g 14,60
WATER CONTENT (w) IN % 26,27
0,820
PC = 1.065
0,780
0,740
Void ratio (e)
0,700
0,660
0,620
0,580
0,540
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,01200
0,01000
0,00800
Cv (cm2/sec)
0,00600
0,00400
0,00200
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 90,01
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,831
WT. CONTAINER IN g 62,987
WT. WET SOIL IN g 68,844
WT. DRY SOIL (Ws) IN g 51,258
WT. WATER (Ww) IN g 17,59
WATER CONTENT (w) IN % 34,31
eo= 0,990
0,975
PC = 1.048
0,900
Void ratio (e)
0,825
0,750
0,675
0,600
0,525
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00525
0,00450
0,00375
Cv (cm2/sec)
0,00300
0,00225
0,00150
0,00075
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)
CONSOLIDATION TEST
DEGREE OF SATURATION IN %
TEST START : 92,12
TEST END :
CONTAINER NO.
WT. CONTAINER + WET SOIL IN g 131,688
WT. CONTAINER IN g 63,065
WT. WET SOIL IN g 68,623
WT. DRY SOIL (Ws) IN g 50,181
WT. WATER (Ww) IN g 18,44
WATER CONTENT (w) IN % 36,75
eo= 1,040
1,060
PC = 1.059
1,000
0,940
Void ratio (e)
0,880
0,820
0,760
0,700
0,640
0,580
0,10 1,00 10,00
Pressure, p (kg/cm2)
Cv vs Applied Pressure
0,00700
0,00600
0,00500
Cv (cm2/sec)
0,00400
0,00300
0,00200
0,00100
0,00000
0,100 1,000 10,000
Pressure, p (kg/cm2)