TUKOIL MID-EAST EPC OF PRODUCTION WELL PAD 11/14 AND | EPPM
ASSOCIATED GATHERING SYSTEM MSK
[EEE ___|__ EXPANSION AT WEST QURNA-2 (PHASE 2) Bee
Material Requisition For Manual Velve eto eee ee
‘CONPANY No, {BOIS O1ST-EPPNE-T2-000-PL-RG-O0004
Gontactr No? RIN7-Ra?P-00-008 Page soft
VENDOR DRAWING AND DATA REQUIREMENT FORM
PURCHASING REQUEST FOR: Manual Valve
REQUIRED WITH BID — Blectronic
SUBMIT FOR REVIEW AND APPROVAL. FABRICATION NOT TO COMMENCE UNTIL
REVIEW & ACCEPTANCE - Electronic Submission.
‘CERTIFIED & FINAL SUBMITTAL APPROVED BY PURCHASER - 5 prints, reproducible
electronic (Compact Disc/Hard Drive)
TO BE SUBMITTED FOR INFORMATION ONLY - 2 prints + Electronic
DESCRIPTION
REQUIRED | AGREED
BY BUYER BY
WEEKS | SELLER
ARO. DATE*
Taspection And Test Plan (generic for bid, detailed ARO)
Fabrication, Quality Surveillance and Delivery Schedule
‘Manual Valves Priced recommended list for spare pars
‘MIO for Manual valves with details nak appl calle
v4 |><| 4] >] 54
Tist of any and all exceptions/ deviations to specifications
‘Progress Reports (on Bi-weekly basis) wenllly op o assem — ap hed
>
‘Vendor catalogue for Manual Valves
‘Document Index (Drawings, Procedures, etc) and Submission
Schedule
Certified Welding Procedures, Procedures Qualification Records and
‘Weld maps
NDE Procedures
“Heat Treatment / PWHT procedures, any,
Hydrotest procedures
‘Valves Cross Sectional Drawing & complete Bill of Material
Assembly, Construction and Erection Drawing
‘Gross Sectional Drawing 8 complete Bill of Materia
Equipment Detail Drawings / internal sections
~ Dimensioned Equipment Outline Drawings
~ Equipment mass, shipping weights,
de] >| | ><] ps] pa] el]
| [|| ><|><] [4]
“All Design Calculations if applicable (Contractor/company could
request for calculation note to justify corrosion allowance proposed
by vendor)
‘Surface preparation and Painting/ Galvanizing Procedure
‘Complete Manufacturer's Record Book
o
qatec sapmbat
“Material Specification (Material Test Repons, Mill Contificates, ec)
"NDE Test Reports and Maps
BRT
Flext Treatment / PWHT records including chan, Fane
Cenified Hydvostaic Test Data
Fire Safe design certficave where required in the relevant valve
DS/Supply Spec
Reraae
6 ASR
“Equipment Nameplate Rubbing or facsimile
Tnstallation, Operation & Maintenance Manvals including for gearbox
‘when specified in relevant referenced documensation
‘weeks A/C | z
@ ith sh pun |
‘Code Cenifcation 7 Supporting Documentation
Zweels VC | Tin Binal
Factory Acteptance Test Reports
Teels WC] taata tele
va|><] |]!
‘Manufacturer certificate of conformity (design, fabrication &¢ testing)
weeks ATC
D2 ARTTA?TUKOIL MID-EAST EPC OF PRODUCTION WELL PAD 11/14 AND EPP
‘ASSOCIATED GATHERING SYSTEM MSK
ote EXPANSION AT WEST QURNA-2 (PHASE 2)
Material Requisition For Manual Valve ree ee Se [ee
| COMPANY ne. ‘8015-0167-EPPH-12-000-LRG-00004 |
Gontactor No. RINI7-RO-PP.00.004 Pes s20f2t
X[X |_| Packing Ui, handing, wansport & storage instructions i
X| [| Project Quality Plan, QCProcedures
X | [nspection release note weeks AVC
X |_| Dimension check repos 2weeks AMC |
‘Report on repairs 2 weeks AC.
|_| Painting and coating repors 2 weeks AC.
x 3 | Sub vendor lise if am Zeeks A/C
X [|_| Erection and installation procedures 8 Manual Y ath spre
‘C— After Completion ARO - After receipt of Order *Seller to complete and return with bid
NOTES:
* VENDOR SHALL SUBMIT ALL DELIVERABLES WITHIN THE PERIOD AS
INDICATED.
* VENDOR SHALL SUBMIT ALL THE DOCUMENTS & DRAWINGS
REQUESTED ALONG WITH THEIR BID WITHOUT WHICH THE OFFER WILL.
BE DEEMED INCOMPLETE & LIABLE FOR REJECTION
«FINAL CERTIFIED DRAWINGS AND DOCUMENTS MUST BE SUBMITTED
WITHIN TWO WEEKS OF FABRICATION AND TESTING COMPLETION.
oon aan17