Você está na página 1de 2
TUKOIL MID-EAST EPC OF PRODUCTION WELL PAD 11/14 AND | EPPM ASSOCIATED GATHERING SYSTEM MSK [EEE ___|__ EXPANSION AT WEST QURNA-2 (PHASE 2) Bee Material Requisition For Manual Velve eto eee ee ‘CONPANY No, {BOIS O1ST-EPPNE-T2-000-PL-RG-O0004 Gontactr No? RIN7-Ra?P-00-008 Page soft VENDOR DRAWING AND DATA REQUIREMENT FORM PURCHASING REQUEST FOR: Manual Valve REQUIRED WITH BID — Blectronic SUBMIT FOR REVIEW AND APPROVAL. FABRICATION NOT TO COMMENCE UNTIL REVIEW & ACCEPTANCE - Electronic Submission. ‘CERTIFIED & FINAL SUBMITTAL APPROVED BY PURCHASER - 5 prints, reproducible electronic (Compact Disc/Hard Drive) TO BE SUBMITTED FOR INFORMATION ONLY - 2 prints + Electronic DESCRIPTION REQUIRED | AGREED BY BUYER BY WEEKS | SELLER ARO. DATE* Taspection And Test Plan (generic for bid, detailed ARO) Fabrication, Quality Surveillance and Delivery Schedule ‘Manual Valves Priced recommended list for spare pars ‘MIO for Manual valves with details nak appl calle v4 |><| 4] >] 54 Tist of any and all exceptions/ deviations to specifications ‘Progress Reports (on Bi-weekly basis) wenllly op o assem — ap hed > ‘Vendor catalogue for Manual Valves ‘Document Index (Drawings, Procedures, etc) and Submission Schedule Certified Welding Procedures, Procedures Qualification Records and ‘Weld maps NDE Procedures “Heat Treatment / PWHT procedures, any, Hydrotest procedures ‘Valves Cross Sectional Drawing & complete Bill of Material Assembly, Construction and Erection Drawing ‘Gross Sectional Drawing 8 complete Bill of Materia Equipment Detail Drawings / internal sections ~ Dimensioned Equipment Outline Drawings ~ Equipment mass, shipping weights, de] >| | ><] ps] pa] el] | [|| ><|><] [4] “All Design Calculations if applicable (Contractor/company could request for calculation note to justify corrosion allowance proposed by vendor) ‘Surface preparation and Painting/ Galvanizing Procedure ‘Complete Manufacturer's Record Book o qatec sapmbat “Material Specification (Material Test Repons, Mill Contificates, ec) "NDE Test Reports and Maps BRT Flext Treatment / PWHT records including chan, Fane Cenified Hydvostaic Test Data Fire Safe design certficave where required in the relevant valve DS/Supply Spec Reraae 6 ASR “Equipment Nameplate Rubbing or facsimile Tnstallation, Operation & Maintenance Manvals including for gearbox ‘when specified in relevant referenced documensation ‘weeks A/C | z @ ith sh pun | ‘Code Cenifcation 7 Supporting Documentation Zweels VC | Tin Binal Factory Acteptance Test Reports Teels WC] taata tele va|><] |]! ‘Manufacturer certificate of conformity (design, fabrication &¢ testing) weeks ATC D2 ARTTA? TUKOIL MID-EAST EPC OF PRODUCTION WELL PAD 11/14 AND EPP ‘ASSOCIATED GATHERING SYSTEM MSK ote EXPANSION AT WEST QURNA-2 (PHASE 2) Material Requisition For Manual Valve ree ee Se [ee | COMPANY ne. ‘8015-0167-EPPH-12-000-LRG-00004 | Gontactor No. RINI7-RO-PP.00.004 Pes s20f2t X[X |_| Packing Ui, handing, wansport & storage instructions i X| [| Project Quality Plan, QCProcedures X | [nspection release note weeks AVC X |_| Dimension check repos 2weeks AMC | ‘Report on repairs 2 weeks AC. |_| Painting and coating repors 2 weeks AC. x 3 | Sub vendor lise if am Zeeks A/C X [|_| Erection and installation procedures 8 Manual Y ath spre ‘C— After Completion ARO - After receipt of Order *Seller to complete and return with bid NOTES: * VENDOR SHALL SUBMIT ALL DELIVERABLES WITHIN THE PERIOD AS INDICATED. * VENDOR SHALL SUBMIT ALL THE DOCUMENTS & DRAWINGS REQUESTED ALONG WITH THEIR BID WITHOUT WHICH THE OFFER WILL. BE DEEMED INCOMPLETE & LIABLE FOR REJECTION «FINAL CERTIFIED DRAWINGS AND DOCUMENTS MUST BE SUBMITTED WITHIN TWO WEEKS OF FABRICATION AND TESTING COMPLETION. oon aan17

Você também pode gostar