It has an objective to determine the variables in a process or product

What should the be last value of the lower boundary? that are critical parameters and their target values. Design of Histograms can obscure the time differences among data sets.
a. 72.93 experiments TRUE
b. 70.98
c. 71.96 "It is the practice of using a multidisciplinary team to conduct If an inspector wanted to know what types of nonconformities exist
d. 69.34 product or service concepting, design and production planning at in a batch, the control chart that he will be using would be u chart
How many samples are present? one time." Quality by Design
a. 49 "The machine was hung a red tag due to a point above UCL in
b. 50 "This is about the loss function concept, which combines cost, wirepull test (strength where the higher the reading, the better).
c. 45 target, and variation in one metric, with specifications being of What should be done?"
d. 60 secondary importance." Taguchi principle The machine should be stopped for analysis and corrective action.

What should be the first value of the upper boundary? "Customer's Risk is the probability that a ""good"" bacth will be
a. 65.15 rejected by the sampling plan." FALSE
b. 62.15
c. 66.15 These are designed to reduce the team's options rationally before
"This encourages team to think creatively, makes large projects
d. 50.15 detailed implementation planning occurs. Prioritization matrix
manageable, and generates a prpblem-solving atmosphere."
What is the class interval?
Tree diagram
a. 1.21 This systematically identifies what might go wrong in a plan under
b. 1.15 development. Process decision program chart
A type of sampling inspection wherein batches are rejected when
c. 1.45
the sample data indicate that the distribution of any parameter
d. 1.12 "This is a sampling technique where we select a group of subjects
extends beyond its specific limits? variable acceptance sampling
What is the range of the data? for study from a larger group. Each individual is chosen entirely by
a. 7.9 chance and each memberof the population has a known, but
What is the upper control limit given that the sample mean from a
b. 8.1 possibly non-equal chance of being included in the sample."
sample size of 3 is 28.45 inches with a mean range of 2.54 31.05
c. 7.8 None of the choices
A sampling scheme with an AQL of 0.15% ( = 5%) guarantees the
d. 8.2
customer that 95% of all lots will have defect rates of 0.15% or less.
What should be the value of the last upper boundary? Average Outgoing Quality Limit (AQL) is the maximum possible value
FALSE
a. 70.15 of the average outgoing defect rate which the customer experiences
b. 74.45 under a rectified sampling scheme TRUE "It allows the team to identify the root causes from subjective data,
c. 73.11 systematically explores cause-and-effect relationships, encourages
d. 76.98 "This allows individuals to identify, analyze, and rate the relationship members to think multidirectionally, and develops team harmony
How many classes should there be? among two or more variables." Matrix diagram and effectiveness." Interrelationship digraph
a. 8
b. 7 It can be a key to finding the root cause of a problem by focusing on "Determine the lower control limit for foreign materials, having 50
c. 9 the process rather than on people. "Why, why analysis" as sample size" 0.3417
d. 10
"In a histogram, if the sample size is 195, how many classes should "It is an analytical technique that combines the technology and "It is a system that identifies and sets the priorities for product,
there be?" experience of people in identifying foreseeable failure modes of a service and process improvement opportunities that lead to
a. 12 product, service or process and planning for its eliminination." increased customer satisfaction." Quality Function Deployment
b. 13 Failure mode and effects analysis
c. 14 It allows the team to classify the cause-and-effect relationship
d. 15 "It shows the required order of tasks in a project or process, the best among all the factors so that the key drivers and outcomes can be
"Upon getting the bondforce reading, you noticed that there are 4 schedule for the entire project, and potential shceduling and used to solve the problem. Interrelationship digraph
points above the central line. What should be done?"Just continue resource problems and their solutions."
the process a. Activity network diagram "Mil std-105E is classified by AQL (Acceptable Quality Level) which
is defined as the average percent defective that, for the purpose of
It helps the organization to better understand promoting or driving It is the search for industry's best practicies that leads to superior sampling inspection, can be considered satisfactory as a process
and restraining or inhibiting forces so that the positives can be performance. average." TRUE
reinforced and the negatives reduced or eliminated. Forced field a. Quality Function Deployment Which of the following statements is not true?
analysis b. Taguchi principle a. "For sampling plans with different sample
c. Benchmarking sizes/acceptance numbers and fixed lot size, OC curve
"In this type of sampling method, the population is divided into d. Design of experiments starts to appraoch the ideal OC curve when the sample
subpopulations." stratified sampling size and acceptance umber decrease."