VALORIZACIN 2
CONTRATO PRINCIPAL ###
### rea : JEFATURA EQUIPO TECNICO NORTE Monto Presup. Referencial (Total) S/. S/. 2,913,472.51 S/. 2,913,472.
S/. Contrato : L.P. N 0004-2017-SEDAPAL - CTTO. N 146-2017-SEDAPAL Monto Presupuesto Contrato (Total) S/. S/. 2,622,125.26 S/. 2,622,125.
S/. Nombre de Obra : CAMBIO DE COLECTOR EN LA URBANIZACIN SAN JOAQUIN BELLAVISTA Monto Presup. Referenc. (s/Trib) S/. S/. 2,469,044.50 S/. 2,469,044.
S/. Ubicacion Obra : DISTRITO DE BELLAVISTA - CALLAO -LIMA Monto Presupuesto Contrato (s/Trib) S/. S/. 2,222,140.05 S/. 2,222,140.
S/. Contratista : CONSORCIO MOHANA Monto Adicionales de Obra (s/Trib) S/. S/. 0.00 S/
S/. Inspector de Obra: Ing. Julio Cesar Torres Salazar (Reg. CIP. 73234) Monto Deductivos de Obra (s/Trib) S/. S/. 0.00 S/
S/. Residente de Obra: Ing. Victor H. Zavala Lagos (Reg. CIP. 33460) Adelanto Directo (c/Trib) S/. S/. 262,212.52
Valorizacion del 01-Sep-17 al 30-Sep-17 Adelanto de Materiales (c/Trib) S/. S/. 262,212.52
== ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== =
| VALORIZACION POR FORMULAS POLINOMICAS | VALORIZACION No. 1 ACUMULADO ANTERIOR | VALORIZACION No. 2 ACUMULADO ACTUAL | AVANCE PARCIAL |
| No. | DESCRIPCION | (+) (-) | (+) (-) | DEL MES |
|= ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== | ====================== |
| 1.0 EJECUCIN DE OBRA | 272,040.83 272,040.83 | 796,335.23 1,068,376.06 | 796,335.23 |
| Frmula Polinmica N 01 | 272,040.83 272,040.83 | 796,335.23 1,068,376.06 | 796,335.23 |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- | -------------------------------------- |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- | -------------------------------------- |
| Reajustes por Contrato Principal | 0.00 0.00 | 0.00 0.00 | 0.00 |
| Reajustes por Adicionales de Obra | 0.00 0.00 | 0.00 0.00 | 0.00 |
| Mayores Gastos Generales | 0.00 0.00 | 0.00 0.00 | 0.00 |
| Intereses por Mora | 0.00 0.00 | 0.00 0.00 | 0.00 |
| Otros Pagos Otorgados | 0.00 0.00 | 0.00 0.00 | 0.00 |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- | -------------------------------------- |
| Amortizacion Adel. Direc. 0.00% | 27,204.08 27,204.08 | 79,633.52 106,837.60 | 79,633.52 |
| Amortizacion Adel. Materiales 0.00% | 0.00 0.00 | 79,633.52 79,633.52 | 79,633.52 |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- -- -------------------------------------- |
| Fondo de Garantia de la Obra 0.00% | 0.00 | 0.00 0.00 | 0.00 |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- -- -------------------------------------- |
| Impuesto General a las Ventas 18.00% | 44,070.62 44,07 44,070.62 | 114,672.27 114,67 158,742.89 | 114,672.27 |
|= ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== |
| T O T A L E S ---> | 288,907.37 288,907.37 | 751,740.46 1,040,647.83 | 751,740.46 |
|= ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== |
| MULTA por Atraso | 0.00 | 0.00 | 0.00 |
|- ------------- -------------------- ------------------------------ ------------------------------ ---- ----------------------------------------------- ----- ------------------------------------------ ------ -------------------------------------- ------- -------------------------------------- -- -------------------------------------- |
| DESC.:Publicacion Avisos Convocatoria | 0.00 | 0.00 | 0.00 |
| DESC. | 0.00 | 0.00 | 0.00 |
|= ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== |
| S/. 751,740.46 <----- TOTAL LIQUIDO A PAGAR TOTAL LIQUIDO A PAGAR ---> S/. 751,740.46 |
| |
|= ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== |
| Fecha P.U. Presupuesto Base : 30-Sep-16 | Avance Parcial (s/T): 796,335.23 | Monto Neto Valoriz : 637,068.19 637,068.19 |
| Plazo de Ejecucion (d/c) : 90 | % Avance Parcial : 35.84% | Monto Tributos : 114,672.27 114,672.27 |
| Fecha de Entrega de Terreno : 09-Aug-17 | Avance Anterior (s/T): 272,040.83 | Multa por Atraso : 0.00 0.00 |
| Fecha de Inicio de Obra : 11-Aug-17 | % Avance Anterior : 12.24% | Descuentos : 0.00 0.00 |
| Ampliaciones de Plazo (d/c) : 0 | Saldo de Obra Total : 1,153,763.99 | Monto TOTAL Valoriz : 751,740.46 751,740.46 |
| Fecha de Termino Contractual : 08-Nov-17 | % Saldo de Obra Tot : 51.92% | Monto Liquid Valoriz: 751,740.46 751,740.46 |
| Fecha de Termino Real : | Costo TOTAL + SALDO : | Monto BRUTO Valoriz : 796,335.23 796,335.23 |
| Fecha del Acta de Recepcion : | Control 2/3 de Obra : Control 2/3 de Obra : | Avance Ctto (s/Trib): 796,335.23 35.84% |
| Fecha Presentacion Contta. : | Fianza Benef. Social : | Avance Adic (s/Trib): 0.00 0.00% |
| Fecha Presentacion Inspector : | Factor de Relacin : 1.00000 | Avance TOTAL(s/Trib): 1,068,376.06 48.08% |
== ======= =========== ================= ================= == =========================== === ======================== === ====================== ==== ====================== = ====================== =
= = = = = = = =
RESUMEN DE VALORIZACIN N 02
del 01 al 30 de Setiembre de 2017
VALORIZACIN
CONCEPTO ACUMULADO ANTERIOR ACUMULADO ACTUAL
ACTUAL
1.0 Ejecucin de Obra
1.1 Valorizacin 272,040.83 796,335.23 1,068,376.06
1.2 Reintegros - - -
2.0 Deducciones - - -
2.1 Por Adelanto Directo 27,204.08 79,633.52 106,837.60
2.2 Por Adelanto de Materiales - 79,633.52 79,633.52
VALORIZACIN N 02
del 01 al 30 de Setiembre de 2017
FRMULA POLINMICA N 01 PRESUPUESTO APROBADO ACUMULADO ANTERIOR VALORIZACION N 02 - SEP. 2017 ACUMULADO ACTUAL
tem Descripcin und. Metrado Precio (S/.) Parcial (S/.) % Metrado Precio S/. % Metrado Precio S/. % Metrado
01 OBRAS PRELIMINARES Y PROVISIONALES
01.01 Campamento provisional para la obra und 1.00 5,609.00 5,609.00 100.00% 1.00 5,609.00 0.00% 0.00 - 100.00% 1.00
01.02 Cartel de identificacin de la obra de 7,20 m x 3,60 m und 1.00 4,883.37 4,883.37 100.00% 1.00 4,883.37 0.00% 0.00 - 100.00% 1.00
01.03 Cono fibra vidrio fosforescente p/desvo de trnsito s/d (prov. durante obra) und 30.00 5.02 150.60 0.00% - 100.00% 30.00 150.60 100.00% 30.00
01.04 Tranquera tipo tijera de 2,40 x 1,20 m para seal PELIGRO (prov. durante obra) und 30.00 35.99 1,079.70 0.00% - 100.00% 30.00 1,079.70 100.00% 30.00
01.05 Letrero metlico 0,60 x 0,60 m s/poste p/desvo trnsito (prov.durante obra) und 20.00 37.09 741.80 100.00% 20.00 741.80 0.00% 0.00 - 100.00% 20.00
01.06 Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra) und 10.00 32.94 329.40 0.00% - 100.00% 10.00 329.40 100.00% 10.00
01.07 Puente de madera para pase vehicular sobre zanja s/d (prov. durante obra) und 5.00 364.23 1,821.15 0.00% - 0.00% - 0.00% 0.00
01.08 Movilizacin de campamentos,maquinarias, herramientas und 1.00 5,163.86 5,163.86 33.00% 0.33 1,704.07 0.00% - 33.00% 0.33
02.01 Plan de seguridad y salud en el trabajo (capacitacion, EPP, sealizacion temporal seg., recursos para respuestas ante emergencia) glb 1.00 34,941.80 34,941.80 33.00% 0.33 11,530.79 30.00% 0.30 10,482.54 63.00% 0.63
03 REDES DE ALCANTARILLADO
03.01 OBRAS PRELIMINARES Y PROVISIONALES ALC.
03.01.01 Seales-iluminacin nocturna con lmpara intermitente cada 10m (lnea hasta 12") km 1.42 6,372.97 9,049.62 0.00% - 39.85% 0.57 3,606.63 39.85% 0.57
03.01.02 Cerco de malla HDP de 1 m altura para lmite de seguridad de obra-SEDAPAL m 2,834.98 1.20 3,401.98 0.00% - 39.92% 1131.85 1,358.22 39.92% 1131.85
03.01.03 Desvo de aguas servidas incl. bombeo y alquiler de tubo p/mantenim. servicio m 1,417.49 24.57 34,827.73 0.00% - 39.92% 565.93 13,904.81 39.92% 565.93
03.01.04 Riego de zona de trabajo para mitigar la contaminacin -polvo (con autorizacin de uso de grifo) m 1,417.49 1.43 2,027.01 0.00% - 39.92% 565.93 809.27 39.92% 565.93
03.01.05 Proteccion de cable de telefono und 3.00 27.10 81.30 0.00% - 0.00% 0.00 - 0.00% 0.00
03.01.06 Proteccion de lineas de baja tension und 11.00 31.44 345.84 0.00% - 27.27% 3.00 94.32 27.27% 3.00
03.01.07 Proteccion de lineas de media tensin und 7.00 41.99 293.93 0.00% - 42.86% 3.00 125.97 42.86% 3.00
03.01.08 Proteccion de redes de agua potable existentes und 14.00 33.32 466.48 0.00% - 7.14% 1.00 33.32 7.14% 1.00
03.01.09 Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total km 1.42 770.53 1,094.15 0.00% - 39.85% 0.57 436.06 39.85% 0.57
03.01.10 Replanteo final de la obra, para lneas redes con estacin total km 1.42 364.06 516.97 0.00% - 39.85% 0.57 206.03 39.85% 0.57
03.02 MOVIMIENTOS DE TIERRAS - REDES A REHABILITAR
03.02.01 Provisin de material de prstamo seleccionado para reemplazo de material de relleno m3 614.63 46.44 28,543.42 0.00% - 0.00% - 0.00% 0.00
Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio 32,280.37 0.00% - 0.00% - 0.00% 0.00
03.02.02 m3 614.63 52.52
autorizado)
03.02.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 33.71 9.08 306.09 0.00% - 0.00% - 0.00% 0.00
03.02.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 50.00 10.49 524.50 0.00% - 0.00% - 0.00% 0.00
03.02.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 159.80 12.31 1,967.14 0.00% - 0.00% - 0.00% 0.00
03.02.06 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 209.17 15.35 3,210.76 0.00% - 0.00% - 0.00% 0.00
03.02.07 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,51 m a 3,00 m prof. m 24.70 19.04 470.29 0.00% - 0.00% - 0.00% 0.00
03.02.08 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. m 477.39 1.74 830.66 0.00% - 0.00% - 0.00% 0.00
03.02.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 33.71 25.22 850.17 0.00% - 0.00% - 0.00% 0.00
03.02.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 50.00 28.97 1,448.50 0.00% - 0.00% - 0.00% 0.00
03.02.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 159.80 33.77 5,396.45 0.00% - 0.00% - 0.00% 0.00
03.02.12 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 209.17 41.96 8,776.77 0.00% - 0.00% - 0.00% 0.00
03.02.13 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,51 m a 3,00 m prof. m 24.70 51.74 1,277.98 0.00% - 0.00% - 0.00% 0.00
Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio 4,726.16
03.02.14 m 477.39 9.90 0.00% - 0.00% - 0.00% 0.00
autorizado)
15,792.34 0.00% - 0.00% - 0.00% 0.00
03.02.15 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) m 209.17 75.50
03.02.17 Desmontaje y retiro de tuberia DN 160- 200 - 250 mm m 477.39 3.07 1,465.59 0.00% - 0.00% - 0.00% 0.00
Eliminacion y deposito de tuberia retirada en centro de acopio autorizado (Incluye pago por disposicin final en centro de acopio 787.80
03.02.18 m3 15.00 52.52 0.00% - 0.00% - 0.00% 0.00
autorizado)
VALORIZACIN N 02
del 01 al 30 de Setiembre de 2017
FRMULA POLINMICA N 01 PRESUPUESTO APROBADO ACUMULADO ANTERIOR VALORIZACION N 02 - SEP. 2017 ACUMULADO ACTUAL
tem Descripcin und. Metrado Precio (S/.) Parcial (S/.) % Metrado Precio S/. % Metrado Precio S/. % Metrado
03.03.01 Provisin de material de prstamo seleccionado para reemplazo de material de relleno m3 546.41 46.44 25,375.28 0.00% - 64.17% 350.61 16,282.39 64.17% 350.61
Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio 28,697.45
03.03.02 m3 546.41 52.52 0.00% - 64.17% 350.61 18,414.10 64.17% 350.61
autorizado)
2,565.19 0.00% - 100.00% 282.51 2,565.19 100.00% 282.51
03.03.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 282.51 9.08
03.03.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 186.40 10.49 1,955.34 0.00% - 85.84% 160.00 1,678.45 85.84% 160.00
03.03.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 78.20 12.31 962.64 0.00% - 0.00% 0.00 - 0.00% 0.00
03.03.06 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 55.21 15.35 847.47 0.00% - 0.00% 0.00 - 0.00% 0.00
03.03.07 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. m 602.33 1.74 1,048.05 0.00% - 73.47% 442.51 769.98 73.47% 442.51
03.03.08 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 282.51 25.22 7,124.90 0.00% - 100.00% 282.51 7,124.90 100.00% 282.51
03.03.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 186.40 28.97 5,400.01 0.00% - 85.84% 160.00 4,635.33 85.84% 160.00
03.03.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 78.20 33.77 2,640.81 0.00% - 0.00% 0.00 - 0.00% 0.00
03.03.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 55.21 41.96 2,316.61 0.00% - 0.00% 0.00 - 0.00% 0.00
Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio 5,963.07
03.03.12 m 602.33 9.90 0.00% - 73.47% 442.51 4,380.89 73.47% 442.51
autorizado)
4,168.36 0.00% - 0.00% 0.00 - 0.00% 0.00
03.03.13 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) m 55.21 75.50
03.03.14 Desmontaje y retiro de tuberia DN 160- 200 - 250 mm m 602.33 3.07 1,849.15 0.00% - 73.47% 442.51 1,358.52 73.47% 442.51
Eliminacion y deposito de tuberia retirada en centro de acopio autorizado (Incluye pago por disposicin final en centro de acopio 993.68 0.00% - 73.48% 13.90 730.13 73.48% 13.90
03.03.15 m3 18.92 52.52
autorizado)
03.04 MOVIMIENTOS DE TIERRAS - REDES PROYECTADAS
03.04.01 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,01 m a 1,25 m prof. m 41.38 7.71 319.04 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.02 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 72.47 9.08 658.03 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 41.58 10.49 436.17 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 53.47 12.31 658.22 0.00% - 49.15% 26.28 323.51 49.15% 26.28
03.04.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 106.06 15.35 1,628.02 0.00% - 84.23% 89.33 1,371.24 84.23% 89.33
03.04.06 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. m 314.97 1.74 548.05 0.00% - 36.71% 115.61 201.16 36.71% 115.61
03.04.07 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,01 m a 1,25 m prof. m 41.38 21.58 892.98 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.08 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. m 72.47 25.22 1,827.69 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. m 41.58 28.97 1,204.57 0.00% - 0.00% 0.00 - 0.00% 0.00
03.04.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. m 53.47 33.77 1,805.68 0.00% - 49.15% 26.28 887.49 49.15% 26.28
03.04.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. m 106.06 41.96 4,450.28 0.00% - 84.23% 89.33 3,748.35 84.23% 89.33
Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio 3,118.20 0.00% - 36.71% 115.61 1,144.56 36.71% 115.61
03.04.12 m 314.97 9.90
autorizado)
8,007.53 0.00% - 84.23% 89.33 6,744.53 84.23% 89.33
03.04.13 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) m 106.06 75.50
03.05 TUBERIAS
03.05.01 Tubera de Polietileno HDPE liso NTP ISO 8772: 2009 PE100 SDR 21, SN 8 DN 200mm m 1,409.89 48.97 69,042.31 100.00% 1409.89 69,042.31 0.00% 0.00 - 100.00% 1409.89
03.05.02 Instalacin tub. polietileno p/alcantarillado pot. DN 200 incluye prueba hidrulica m 1,409.89 9.77 13,774.63 0.00% - 39.96% 563.33 5,503.70 39.96% 563.33
03.06 BUZONES - A REHABILITAR (CPI y CPV)
5,110.93 0.00% - 27.27% 3.00 1,393.89 27.27% 3.00
03.06.01 Demolicin de buzn de mal estado, de 1,01 a 1,25 m de profundidad (incl. acomodo del desmonte para su eliminacin) und 11.00 464.63
7,666.56
03.06.04 Demolicin de buzn de mal estado, de 1,76 a 2,00 m de profundidad (incl. acomodo del desmonte para su eliminacin) und 12.00 638.88 8.33% 1.00 638.88 16.67% 2.00 1,277.76 25.00% 3.00
VALORIZACIN N 02
del 01 al 30 de Setiembre de 2017
FRMULA POLINMICA N 01 PRESUPUESTO APROBADO ACUMULADO ANTERIOR VALORIZACION N 02 - SEP. 2017 ACUMULADO ACTUAL
tem Descripcin und. Metrado Precio (S/.) Parcial (S/.) % Metrado Precio S/. % Metrado Precio S/. % Metrado
03.06.07 Cierre de buzn de 1,50 m de profundidad (incl. acomodo del desmonte para su eliminacin) und 1.00 123.85 123.85 0.00% - 0.00% 0.00 - 0.00% 0.00
31,669.51
03.06.08 Eliminacin de desmonte R=20 km proveniente de demolicion de concreto a pulso (incl disposicion final - material no peli m3 356.92 88.73 10.53% 37.60 3,336.25 35.21% 125.68 11,151.53 45.75% 163.28
03.06.10 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exterior e interior) und 35.00 1,903.98 66,639.30 8.57% 3.00 5,711.94 37.14% 13.00 24,751.74 45.71% 16.00
03.06.11 Buzn I t. normal a mq. 1,51 a 1,75 m profundidad (Reposicin de buzn, encof. exterior e interior) und 17.00 2,088.63 35,506.71 17.65% 3.00 6,265.89 23.53% 4.00 8,354.52 41.18% 7.00
03.06.12 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exterior e interior) und 11.00 2,272.98 25,002.78 0.00% - 18.18% 2.00 4,545.96 18.18% 2.00
03.06.13 Buzn I t. normal a mq. 2,01 a 2,50 m profundidad (Reposicin de buzn, encof. exterior e interior) und 10.00 2,551.64 25,516.40 0.00% - 40.00% 4.00 10,206.56 40.00% 4.00
03.06.14 Buzn I t. normal a mq. 2,51 a 3,00 m profundidad (Reposicin de buzn, encof. exterior e interior) und 11.00 2,920.93 32,130.23 0.00% - 54.55% 6.00 17,525.58 54.55% 6.00
03.06.15 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV und 8.00 2,045.52 16,364.16 50.00% 4.00 8,182.08 50.00% 4.00 8,182.08 100.00% 8.00
03.06.16 Buzn I t. normal a mq. 1,51 a 1,75 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV und 1.00 2,246.31 2,246.31 100.00% 1.00 2,246.31 0.00% 0.00 - 100.00% 1.00
03.06.17 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV und 1.00 2,595.16 2,595.16 100.00% 1.00 2,595.16 0.00% 0.00 - 100.00% 1.00
03.06.18 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) und 210.00 338.40 71,064.00 0.00% - 45.71% 96.00 32,486.40 45.71% 96.00
03.07 BUZONES - PROYECTADOS (CPI)
03.07.01 Buzn I t. normal a mq. 1,01 a 1,25 m profundidad (Reposicin de buzn, incluy encof. exterior e interior) und 2.00 1,781.10 3,562.20 0.00% - 0.00% 0.00 - 0.00% 0.00
03.07.02 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exterior e interior) und 3.00 1,903.98 5,711.94 0.00% - 0.00% 0.00 - 0.00% 0.00
03.07.03 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exterior e interior) und 1.00 2,272.98 2,272.98 0.00% - 100.00% 1.00 2,272.98 100.00% 1.00
03.07.04 Buzn I t. normal a mq. 2,01 a 2,50 m profundidad (Reposicin de buzn, encof. exterior e interior) und 2.00 2,551.64 5,103.28 0.00% - 50.00% 1.00 2,551.64 50.00% 1.00
03.07.05 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) und 16.00 338.40 5,414.40 0.00% - 25.00% 4.00 1,353.60 25.00% 4.00
03.08 VARIOS - EMPALMES, PAVIMENTOS, PRUEBAS
03.08.01 Sellado de tuberia existente PVC DN 200 m 320.01 10.55 3,376.11 0.00% - 36.72% 117.50 1,239.63 36.72% 117.50
03.08.02 Prueba hidrulica a zanja tapada, de tubera p/desague DN 200 m 1,409.89 3.48 4,906.42 0.00% - 39.96% 563.33 1,960.38 39.96% 563.33
03.08.03 Prueba de compactacin de suelos (procto modif densidad campo) und 38.00 72.04 2,737.52 5.26% 2.00 144.08 52.63% 20.00 1,440.80 57.89% 22.00
03.08.04 Prueba de calidad del concreto (prueba a la compresin) und 105.00 30.07 3,157.35 1.90% 2.00 60.14 28.57% 30.00 902.10 30.48% 32.00
03.08.05 Empalmes de tuberas DN 200 a 250 buzn existente en servicio und 15.00 502.96 7,544.40 0.00% - 0.00% - 0.00% 0.00
03.08.06 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) und 15.00 338.40 5,076.00 0.00% - 0.00% - 0.00% 0.00
Corte+rotura, ED y reposic. de pavimento rgido f'c 210 kg/cm2 de e= 8" (Incluye pago por disposicin final de desmonte en centro de 372,610.26 2.03% 45.00 7,578.00 38.89% 860.58 144,921.46 40.93% 905.58
03.08.07 m2 2,212.65 168.40
acopio autorizado)
03.09 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
03.09.01 OBRAS PRELIMINARES Y PROVISIONALES ALC.
03.09.01.01 Cerco de malla HDP de 1 m altura para lmite de seguridad de obra-SEDAPAL m 2,383.30 1.20 2,859.96 0.00% - 59.58% 1420.00 1,704.00 59.58% 1420.00
03.09.01.02 Riego de zona de trabajo para mitigar la contaminacin -polvo (con autorizacin de uso de grifo) m 1,191.65 1.43 1,704.06 0.00% - 59.58% 710.00 1,015.30 59.58% 710.00
03.09.01.03 Proteccion de cable elctrico de baja tensin und 148.00 27.10 4,010.80 0.00% - 49.32% 73.00 1,978.30 49.32% 73.00
03.09.01.04 Proteccion de cable elctrico de media tensin und 43.00 61.00 2,623.00 0.00% - 48.84% 21.00 1,281.00 48.84% 21.00
03.09.01.05 Proteccion de cables telefnicos und 18.00 27.10 487.80 0.00% - 50.00% 9.00 243.90 50.00% 9.00
03.09.01.06 Proteccion de redes existentes und 89.00 33.32 2,965.48 0.00% - 49.44% 44.00 1,466.08 49.44% 44.00
03.09.01.07 Proteccion de postes para alumbrado und 1.00 31.44 31.44 0.00% - 100.00% 1.00 31.44 100.00% 1.00
03.09.01.08 Trazo y replanteo inicial para conexin domiciliaria und 784.00 2.51 1,967.84 14.67% 115.00 288.65 34.82% 273.00 685.23 49.49% 388.00
03.09.01.09 Replanteo final de la obra para conexin domiciliaria und 784.00 3.67 2,877.28 0.00% - 34.82% 273.00 1,001.91 34.82% 273.00
03.09.02 MOVIMIENTOS DE TIERRAS
03.09.02.01 Provisin de material de prstamo seleccionado para reemplazo de material de relleno m3 385.19 46.44 17,888.22 0.00% - 53.20% 204.93 9,516.95 53.20% 204.93
Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio 20,230.18 0.00% - 53.20% 204.93 10,762.92 53.20% 204.93
03.09.02.02 m3 385.19 52.52
autorizado)
03.09.02.03 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 0,60 m a 1,00 m prof. m 307.50 18.30 5,627.25 0.00% - 81.95% 252.00 4,611.60 81.95% 252.00
03.09.02.04 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,01 m a 1,25 m prof. m 519.65 25.49 13,245.88 0.00% - 65.14% 338.50 8,628.37 65.14% 338.50
03.09.02.05 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,26 m a 1,50 m prof. m 284.50 30.28 8,614.66 0.00% - 31.63% 90.00 2,725.20 31.63% 90.00
03.09.02.06 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,51 m a 1,75 m prof. m 80.00 41.10 3,288.00 0.00% - 36.88% 29.50 1,212.45 36.88% 29.50
03.09.02.07 Refine y nivel de zanja terr-normal para tub. DN 100 - 150 para toda profund. m 1,191.65 1.44 1,715.98 0.00% - 59.58% 710.00 1,022.40 59.58% 710.00
03.09.02.08 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 0,60 m a 1,00 m prof. m 307.50 15.32 4,710.90 0.00% - 81.95% 252.00 3,860.64 81.95% 252.00
Pgina 6 de 19
VALORIZACIN N 02
del 01 al 30 de Setiembre de 2017
FRMULA POLINMICA N 01 PRESUPUESTO APROBADO ACUMULADO ANTERIOR VALORIZACION N 02 - SEP. 2017 ACUMULADO ACTUAL
tem Descripcin und. Metrado Precio (S/.) Parcial (S/.) % Metrado Precio S/. % Metrado Precio S/. % Metrado
03.09.02.09 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,01 m a 1,25 m prof. m 519.65 18.33 9,525.18 0.00% - 65.14% 338.50 6,204.71 65.14% 338.50
03.09.02.10 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,26 m a 1,50 m prof. m 284.50 21.58 6,139.51 0.00% - 31.63% 90.00 1,942.20 31.63% 90.00
03.09.02.11 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,51 m a 1,75 m prof. m 80.00 24.72 1,977.60 0.00% - 36.88% 29.50 729.24 36.88% 29.50
03.09.02.12 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 100 - 150 para toda prof. m 1,191.65 6.47 7,709.98 0.00% - 59.58% 710.00 4,593.70 59.58% 710.00
03.09.03 TUBERIAS
03.09.03.01 Tubera PVC-U UF NTP ISO 4435 SN 2 DN 150 (DNE 160) incl. anillo + 2% desperdicios m 1,191.65 17.20 20,496.38 100.00% 1191.65 20,496.38 0.00% 0.00 - 100.00% 1191.65
03.09.03.02 Instalacin de tubera de PVC p/desage DN 150 (DNE 160) incluye prueba hidrulica m 1,191.65 4.10 4,885.77 0.00% - 59.58% 710.00 2,911.00 59.58% 710.00
14,026.40 100.00% 178.00 14,026.40 0.00% 0.00 - 100.00% 178.00
03.09.03.03 Abrazadera de polietileno para conexin domiciliaria de alcantarillado DN 200 mm x 160mm incluye codo PVC-UF DN 160 mm und 178.00 78.80
Instalacin de abrazadera para red de HDPE DN 200 y salida a conexin domiciliaria de alcantarillado DN 160, incluye instal. codo 1,352.80 0.00% - 36.52% 65.00 494.00 36.52% 65.00
03.09.03.04 und 178.00 7.60
PVC-UF DN 160 mm
03.09.04 CAJAS
2,151.50 11.54% 15.00 248.25 38.46% 50.00 827.50 50.00% 65.00
03.09.04.01 Demolicin de caja y tapa en mal estado, de conex. dom. desague (incl. acomodo del desmonte para su eliminacin) und 130.00 16.55
03.09.04.02 Eliminacin desmonte por demoliciones (Incluye pago por disposicion final en centro de acopio autorizado) m3 16.85 88.73 1,495.10 11.51% 1.94 172.14 38.46% 6.48 574.97 49.97% 8.42
03.09.04.03 Suministro de caja de concreto simple y tapa concreto armado (C-PI) de 0,30 m x 0,60 m (cajas a rehabilitar) und 119.00 54.47 6,481.93 5.04% 6.00 326.82 42.02% 50.00 2,723.50 47.06% 56.00
03.09.04.04 Suministro de caja de concreto simple y tapa concreto armado (C-PV) de 0,30 m x 0,60 m (cajas a rehabilitar) und 11.00 61.57 677.27 81.82% 9.00 554.13 0.00% 0.00 - 81.82% 9.00
03.09.04.05 Suministro de caja de concreto simple y tapa concreto armado (C-PI) de 0,30 m x 0,60 m (insercion de cajas) und 597.00 54.47 32,518.59 10.05% 60.00 3,268.20 34.67% 207.00 11,275.29 44.72% 267.00
03.09.04.06 Suministro de caja de concreto simple y tapa concreto armado (C-PV) de 0,30 m x 0,60 m (insercion de cajas ) und 57.00 61.57 3,509.49 70.18% 40.00 2,462.80 28.07% 16.00 985.12 98.25% 56.00
03.09.04.07 Instalacin de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal (cajas a rehabilitar) und 130.00 74.85 9,730.50 11.54% 15.00 1,122.75 38.46% 50.00 3,742.50 50.00% 65.00
03.09.04.08 Instalacin de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal (insercion de cajas) und 654.00 101.83 66,596.82 15.29% 100.00 10,183.00 34.10% 223.00 22,708.09 49.39% 323.00
03.09.05 PRUEBAS
03.09.05.01 Prueba hidrulica a zanja tapada, de tubera p/desague DN 150 m 1,191.65 3.22 3,837.11 0.00% - 59.58% 710.00 2,286.20 59.58% 710.00
03.09.05.02 Prueba de compactacin de suelos (procto modif densidad campo) und 18.00 72.04 1,296.72 11.11% 2.00 144.08 22.22% 4.00 288.16 33.33% 6.00
03.09.06 PAVIMENTOS
Corte+rotura, ED y reposic. de pavimento rgido f'c 210 kg/cm2 de e= 8" (Incluye pago por disposicin final de desmonte en centro de 97,953.23 0.00% - 60.13% 349.73 58,894.53 60.13% 349.73
03.09.06.01 m2 581.67 168.40
acopio autorizado)
Corte+rotura, ED y reposicin de vereda rgida f'c 175 kg/cm2 de 10 cm espesor (Incluye pago por disposicin final en centro de 82,586.56 5.61% 44.00 4,634.96 31.12% 244.00 25,702.96 36.73% 288.00
03.09.06.02 m2 784.00 105.34
acopio autorizado)
03.09.06.03 Reposicin de jardines m2 66.98 19.65 1,316.16 0.00% - 0.00% - 0.00% 0.00
ORIZACIN N 02
0 de Setiembre de 2017
30.SEP.2016
ACUMULADO ACTUAL
Precio S/.
5,609.00
4,883.37
150.60
1,079.70
741.80
329.40
-
1,704.07
22,013.33
3,606.63
1,358.22
13,904.81
809.27
-
94.32
125.97
33.32
436.06
206.03
-
-
-
-
-
-
-
-
-
-
-
-
Pgina 8 de 19
ORIZACIN N 02
0 de Setiembre de 2017
30.SEP.2016
ACUMULADO ACTUAL
Precio S/.
16,282.39
18,414.10
2,565.19
1,678.45
-
-
769.98
7,124.90
4,635.33
-
-
4,380.89
1,358.52
730.13
-
-
-
323.51
1,371.24
201.16
-
-
-
887.49
3,748.35
1,144.56
6,744.53
69,042.31
5,503.70
1,393.89
12,266.40
4,543.12
1,916.64
2,920.60
5,111.04
Pgina 9 de 19
ORIZACIN N 02
0 de Setiembre de 2017
30.SEP.2016
ACUMULADO ACTUAL
Precio S/.
-
14,487.78
5,343.30
30,463.68
14,620.41
4,545.96
10,206.56
17,525.58
16,364.16
2,246.31
2,595.16
32,486.40
-
-
2,272.98
2,551.64
1,353.60
1,239.63
1,960.38
1,584.88
962.24
-
-
152,499.46
1,704.00
1,015.30
1,978.30
1,281.00
243.90
1,466.08
31.44
973.88
1,001.91
9,516.95
10,762.92
4,611.60
8,628.37
2,725.20
1,212.45
1,022.40
3,860.64
Pgina 10 de 19
ORIZACIN N 02
0 de Setiembre de 2017
30.SEP.2016
ACUMULADO ACTUAL
Precio S/.
6,204.71
1,942.20
729.24
4,593.70
20,496.38
2,911.00
14,026.40
494.00
1,075.75
747.11
3,050.32
554.13
14,543.49
3,447.92
4,865.25
32,891.09
2,286.20
432.24
58,894.53
30,337.92
804,014.35
20,100.36
108,541.94
0.00
932,656.65
26,830.52
27,222.22
13,611.11
68,055.56
1,068,376.06
192,307.69
1,260,683.75
CONTROL FINANCIERO
Programado Ejecutado
Mensual Acumulado % Mes % Acumulado Mensual Acumulado % Mes % Acumulado
Aug-17 131,127.80 131,127.80 5.00% 5.00% 321,008.18 321,008.18 12.24% 12.24%
Sep-17 794,889.94 926,017.74 30.31% 35.32% 939,675.57 1,260,683.75 35.84% 48.08%
Oct-17 1,101,275.86 2,027,293.60 42.00% 77.31% - 1,260,683.75 0.00% 48.08%
Nov-17 594,831.66 2,622,125.26 22.69% 100.00% - 1,260,683.75 0.00% 48.08%
Total 2,622,125.26 100.00% 1,260,683.75 48.08%
CURVA "S" DEL AVANCE FSICO DE OBRA
del 01 al 30 de Setiembre de 2017
Obra :
CAMBIO DE COLECTOR EN LA URBANIZACIN SAN JOAQUIN BELLAVISTA
Propietario : SEDAPAL
Contratista : CONSORCIO MOHANA
Inspector : Ing. Julio Cesar Torres Salazar (Reg. CIP. 73234)
Residente : Ing. Victor H. Zavala Lagos (Reg. CIP. 33460)
3000000 Chart
CURVA DE Title DE OBRA
AVANCE
Avance Acumulado Programado Avance Acumulado Ejecutado
2,622,125.26
2500000
SOLES
2000000 2,027,293.60
1500000
1,260,683.75
1000000
926,017.74
500000
321,008.18
131,127.80
00
7 7 7
01 01 01
/2 /2 1/2
11 11 /1
8/ 9/ 10
Fernando: Slo ejecucin de
Obra, no incluyeSEMANAS
las actividades
de Intervencin Social.
Obra :
CAMBIO DE COLECTOR EN LA URBANIZACIN SAN JOAQUIN BELLAVISTA
Propietario : SEDAPAL
Contratista : CONSORCIO MOHANA
Inspector : Ing. Julio Cesar Torres Salazar (Reg. CIP. 73234)
Residente : Ing. Victor H. Zavala Lagos (Reg. CIP. 33460)
100.00% 100.00%
80.00%
77.31%
60.00%
48.08%
40.00%
35.32%
20.00%
12.24%
5.00%
0.00%
Aug-2017 Sep-2017 Oct-2017 Nov-2017
OBRA 03 MESES
Item Descripcin Parcial S/. 1ra. Valorz. 2da. Valorz.
Agosto 21 Septiembre
Das 30 Das
01 OBRAS PRELIMINARES Y PROVISIONALES 19,778.88 13,530.66 1,389.64
01.01 Campamento provisional para la obra 5,609.00 5,609.00 0.00
01.02 Cartel de identificacin de la obra de 7,20 m x 3,60 m 4,883.37 4,883.37 0.00
01.03 Cono fibra vidrio fosforescente p/desvo de trnsito s/d (prov. durante obra) 150.60 35.53 50.76
01.04 Tranquera tipo tijera de 2,40 x 1,20 m para seal PELIGRO (prov. durante obra) 1,079.70 254.76 363.94
01.05 Letrero metlico 0,60 x 0,60 m s/poste p/desvo trnsito (prov.durante obra) 741.80 175.03 250.04
01.06 Puente de madera para pase peatonal sobre zanja s/d (prov. durante obra) 329.40 77.72 111.03
01.07 Puente de madera para pase vehicular sobre zanja s/d (prov. durante obra) 1,821.15 429.71 613.87
01.08 Movilizacin de campamentos,maquinarias, herramientas 5,163.86 2,065.54 0.00
02 PLAN SEGURIDAD Y SALUD OCUPACIONAL 34,941.80 1,655.58 12,479.21
02.01 Plan de seguridad y salud en el trabajo (capacitacion, EPP, sealizacion temporal seg., recursos para respuestas ante emergencia) 34,941.80 1,655.58 12,479.21
03.02.02 Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio autorizado) 32,280.37 1,076.01 6,140.19
03.02.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 306.09 10.20 153.05
03.02.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 524.50 17.48 262.25
03.02.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 1,967.14 65.57 983.57
03.02.06 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 3,210.76 107.03 1,605.38
03.02.07 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,51 m a 3,00 m prof. 470.29 15.68 235.15
03.02.08 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. 830.66 27.69 415.33
03.02.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 850.17 0.00 368.41
03.02.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 1,448.50 0.00 627.68
03.02.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 5,396.45 0.00 2,338.46
03.02.12 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 8,776.77 0.00 3,803.27
03.02.13 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,51 m a 3,00 m prof. 1,277.98 0.00 553.79
03.02.14 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio autorizado) 4,726.16 0.00 1,804.53
03.02.15 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) 15,792.34 526.41 1,896.17
03.02.16 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.51 a 3.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) 2,295.62 76.52 1,147.81
03.02.17 Desmontaje y retiro de tuberia DN 160- 200 - 250 mm 1,465.59 48.85 732.80
03.02.18 Eliminacion y deposito de tuberia retirada en centro de acopio autorizado (Incluye pago por disposicin final en centro de acopio autorizado) 787.80 0.00 0.00
03.03.02 Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio autorizado) 28,697.45 0.00 14,922.67
03.03.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 2,565.19 0.00 1,333.90
03.03.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 1,955.34 0.00 1,016.78
03.03.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 962.64 0.00 500.57
03.03.06 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 847.47 0.00 440.68
03.03.07 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. 1,048.05 0.00 544.99
03.03.08 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 7,124.90 0.00 2,849.96
03.03.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 5,400.01 0.00 2,160.00
03.03.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 2,640.81 0.00 1,056.32
03.03.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 2,316.61 0.00 926.64
03.03.12 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio autorizado) 5,963.07 0.00 1,788.92
03.03.13 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) 4,168.36 0.00 2,167.55
03.03.14 Desmontaje y retiro de tuberia DN 160- 200 - 250 mm 1,849.15 0.00 961.56
03.03.15 Eliminacion y deposito de tuberia retirada en centro de acopio autorizado (Incluye pago por disposicin final en centro de acopio autorizado) 993.68 0.00 0.00
CRONOGRAMA VALORIZADO ADECUADO A INICIO CONTRACTUAL
Presupuesto OBRA: "CAMBIO DE COLECTOR EN URBANIZACIN SAN JOAQUN BELLAVISTA"
Cliente EQUIPO TECNICO NORTE
Lugar LIMA - CALLAO - BELLAVISTA
Costo al 9/30/2016
OBRA 03 MESES
Item Descripcin Parcial S/. 1ra. Valorz. 2da. Valorz.
Agosto 21 Septiembre
Das 30 Das
03.04 MOVIMIENTOS DE TIERRAS - REDES PROYECTADAS 25,554.46 0.00 408.50
03.04.01 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,01 m a 1,25 m prof. 319.04 0.00 10.63
03.04.02 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 658.03 0.00 21.93
03.04.03 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 436.17 0.00 14.54
03.04.04 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 658.22 0.00 21.94
03.04.05 Excavac. zanja (mq.) p/tub. terr-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 1,628.02 0.00 54.27
03.04.06 Refine y nivel de zanja terr-normal para tub. DN 200 - 250 para toda profund. 548.05 0.00 18.27
03.04.07 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,01 m a 1,25 m prof. 892.98 0.00 0.00
03.04.08 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,26 m a 1,50 m prof. 1,827.69 0.00 0.00
03.04.09 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,51 m a 1,75 m prof. 1,204.57 0.00 0.00
03.04.10 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 1,76 m a 2,00 m prof. 1,805.68 0.00 0.00
03.04.11 Relleno comp.zanja(pulso) p/tub t-normal DN 200 - 250 de 2,01 m a 2,50 m prof. 4,450.28 0.00 0.00
03.04.12 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 200 - 250 para toda prof. (Incluye pago por disposicin final en centro de acopio autorizado) 3,118.20 0.00 0.00
03.04.13 Entibado metlico ambas caras, tipo cajn (Box), de zanjas de 2.00 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) 8,007.53 0.00 266.92
03.06.01 Demolicin de buzn de mal estado, de 1,01 a 1,25 m de profundidad (incl. acomodo del desmonte para su eliminacin) 5,110.93 1,088.74 4,022.19
03.06.02 Demolicin de buzn de mal estado, de 1,26 a 1,50 m de profundidad (incl. acomodo del desmonte para su eliminacin) 21,977.30 1,395.46 10,988.65
03.06.03 Demolicin de buzn de mal estado, de 1,51 a 1,75 m de profundidad (incl. acomodo del desmonte para su eliminacin) 10,222.02 0.00 9,199.82
03.06.04 Demolicin de buzn de mal estado, de 1,76 a 2,00 m de profundidad (incl. acomodo del desmonte para su eliminacin) 7,666.56 1,787.84 5,878.72
03.06.05 Demolicin de buzn de mal estado, de 2,01 a 2,50 m de profundidad (incl. acomodo del desmonte para su eliminacin) 7,301.50 0.00 0.00
03.06.06 Demolicin de buzn de mal estado, de 2,51 a 3,00 m de profundidad (incl. acomodo del desmonte para su eliminacin) 9,370.24 1,811.07 7,559.17
03.06.07 Cierre de buzn de 1,50 m de profundidad (incl. acomodo del desmonte para su eliminacin) 123.85 0.00 0.00
03.06.08 Eliminacin de desmonte R=20 km proveniente de demolicion de concreto a pulso (incl disposicion final - material no peli 31,669.51 1,166.95 15,834.76
03.06.09 Buzn I t. normal a mq. 1,01 a 1,25 m profundidad (Reposicin de buzn, incluy encof. exterior e interior) 19,592.10 1,959.21 9,796.05
03.06.10 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exterior e interior) 66,639.30 2,663.93 33,319.65
03.06.11 Buzn I t. normal a mq. 1,51 a 1,75 m profundidad (Reposicin de buzn, encof. exterior e interior) 35,506.71 1,550.67 17,753.36
03.06.12 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exterior e interior) 25,002.78 2,500.28 12,501.39
03.06.13 Buzn I t. normal a mq. 2,01 a 2,50 m profundidad (Reposicin de buzn, encof. exterior e interior) 25,516.40 2,551.64 12,758.20
03.06.14 Buzn I t. normal a mq. 2,51 a 3,00 m profundidad (Reposicin de buzn, encof. exterior e interior) 32,130.23 1,213.02 16,065.12
03.06.15 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV 16,364.16 1,454.62 12,273.12
03.06.16 Buzn I t. normal a mq. 1,51 a 1,75 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV 2,246.31 0.00 0.00
03.06.17 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exter e inter) C-PV 2,595.16 0.00 0.00
03.06.18 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) 71,064.00 3,106.40 35,532.00
03.07 BUZONES - PROYECTADOS (CPI) 22,064.80 1,966.32 10,556.46
03.07.01 Buzn I t. normal a mq. 1,01 a 1,25 m profundidad (Reposicin de buzn, incluy encof. exterior e interior) 3,562.20 1,424.88 2,137.32
03.07.02 Buzn I t. normal a mq. 1,26 a 1,50 m profundidad (Reposicin de buzn, encof. exterior e interior) 5,711.94 0.00 5,711.94
03.07.03 Buzn I t. normal a mq. 1,76 a 2,00 m profundidad (Reposicin de buzn, encof. exterior e interior) 2,272.98 0.00 0.00
03.07.04 Buzn I t. normal a mq. 2,01 a 2,50 m profundidad (Reposicin de buzn, encof. exterior e interior) 5,103.28 0.00 0.00
03.07.05 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) 5,414.40 541.44 2,707.20
03.08 VARIOS - EMPALMES, PAVIMENTOS, PRUEBAS 399,408.06 5,972.53 56,614.72
03.08.01 Sellado de tuberia existente PVC DN 200 3,376.11 0.00 0.00
03.08.02 Prueba hidrulica a zanja tapada, de tubera p/desague DN 200 4,906.42 0.00 2,102.75
03.08.03 Prueba de compactacin de suelos (procto modif densidad campo) 2,737.52 0.00 0.00
03.08.04 Prueba de calidad del concreto (prueba a la compresin) 3,157.35 0.00 0.00
03.08.05 Empalmes de tuberas DN 200 a 250 buzn existente en servicio 7,544.40 0.00 0.00
03.08.06 Pasamuro de polietileno para tubera de HDPE DN 200 mm (anclaje de pared) 5,076.00 507.60 2,538.00
Corte+rotura, ED y reposic. de pavimento rgido f'c 210 kg/cm2 de e= 8" (Incluye pago por disposicin final de desmonte en centro de acopio
03.08.07 372,610.26 5,464.93 51,973.97
autorizado)
03.09 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO 471,113.33 19,840.66 122,850.43
03.09.01 OBRAS PRELIMINARES Y PROVISIONALES ALC. 19,527.66 3,142.44 6,809.53
03.09.01.01 Cerco de malla HDP de 1 m altura para lmite de seguridad de obra-SEDAPAL 2,859.96 228.80 715.98
03.09.01.02 Riego de zona de trabajo para mitigar la contaminacin -polvo (con autorizacin de uso de grifo) 1,704.06 136.32 1,022.44
03.09.01.03 Proteccion de cable elctrico de baja tensin 4,010.80 320.86 1,406.48
03.09.01.04 Proteccion de cable elctrico de media tensin 2,623.00 209.84 1,573.80
03.09.01.05 Proteccion de cables telefnicos 487.80 39.02 292.68
03.09.01.06 Proteccion de redes existentes 2,965.48 237.24 1,779.29
CRONOGRAMA VALORIZADO ADECUADO A INICIO CONTRACTUAL
Presupuesto OBRA: "CAMBIO DE COLECTOR EN URBANIZACIN SAN JOAQUN BELLAVISTA"
Cliente EQUIPO TECNICO NORTE
Lugar LIMA - CALLAO - BELLAVISTA
Costo al 9/30/2016
OBRA 03 MESES
Item Descripcin Parcial S/. 1ra. Valorz. 2da. Valorz.
Agosto 21 Septiembre
Das 30 Das
03.09.01.07 Proteccion de postes para alumbrado 31.44 2.52 18.86
03.09.01.08 Trazo y replanteo inicial para conexin domiciliaria 1,967.84 1,967.84 0.00
03.09.01.09 Replanteo final de la obra para conexin domiciliaria 2,877.28 0.00 0.00
03.09.02 MOVIMIENTOS DE TIERRAS 100,673.34 0.00 24,183.73
03.09.02.01 Provisin de material de prstamo seleccionado para reemplazo de material de relleno 17,888.22 0.00 1,513.05
03.09.02.02 Eliminacin de desmonte en terreno normal R=20 km con maquinaria (Incluye pago por disposicin final en centro de acopio autorizado) 20,230.18 0.00 1,496.68
03.09.02.03 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 0,60 m a 1,00 m prof. 5,627.25 0.00 1,376.35
03.09.02.04 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,01 m a 1,25 m prof. 13,245.88 0.00 3,947.53
03.09.02.05 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,26 m a 1,50 m prof. 8,614.66 0.00 2,168.80
03.09.02.06 Excav. zanja (pulso) p/tub. terr-normal DN 100 - 150 de 1,51 m a 1,75 m prof. 3,288.00 0.00 2,192.00
03.09.02.07 Refine y nivel de zanja terr-normal para tub. DN 100 - 150 para toda profund. 1,715.98 0.00 960.95
03.09.02.08 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 0,60 m a 1,00 m prof. 4,710.90 0.00 1,978.58
03.09.02.09 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,01 m a 1,25 m prof. 9,525.18 0.00 2,000.58
03.09.02.10 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,26 m a 1,50 m prof. 6,139.51 0.00 1,578.59
03.09.02.11 Relleno comp.zanja(pulso) p/tub t-normal DN 100 - 150 de 1,51 m a 1,75 m prof. 1,977.60 0.00 922.88
03.09.02.12 Elimin. desmonte(carg+v) t-normal D=20km p/tub. DN 100 - 150 para toda prof. 7,709.98 0.00 4,047.74
03.09.03 TUBERIAS 40,761.35 2,761.82 13,084.32
03.09.03.01 Tubera PVC-U UF NTP ISO 4435 SN 2 DN 150 (DNE 160) incl. anillo + 2% desperdicios 20,496.38 1,639.71 6,297.83
03.09.03.02 Instalacin de tubera de PVC p/desage DN 150 (DNE 160) incluye prueba hidrulica 4,885.77 0.00 1,856.59
03.09.03.03 Abrazadera de polietileno para conexin domiciliaria de alcantarillado DN 200 mm x 160mm incluye codo PVC-UF DN 160 mm 14,026.40 1,122.11 4,415.84
Instalacin de abrazadera para red de HDPE DN 200 y salida a conexin domiciliaria de alcantarillado DN 160, incluye instal. codo PVC-UF DN
03.09.03.04 1,352.80 0.00 514.06
160 mm
03.09.04 CAJAS 123,161.20 8,833.29 67,614.50
03.09.04.01 Demolicin de caja y tapa en mal estado, de conex. dom. desague (incl. acomodo del desmonte para su eliminacin) 2,151.50 156.47 1,173.55
03.09.04.02 Eliminacin desmonte por demoliciones (Incluye pago por disposicion final en centro de acopio autorizado) 1,495.10 108.73 815.51
03.09.04.03 Suministro de caja de concreto simple y tapa concreto armado (C-PI) de 0,30 m x 0,60 m (cajas a rehabilitar) 6,481.93 471.41 3,535.60
03.09.04.04 Suministro de caja de concreto simple y tapa concreto armado (C-PV) de 0,30 m x 0,60 m (cajas a rehabilitar) 677.27 180.61 496.66
03.09.04.05 Suministro de caja de concreto simple y tapa concreto armado (C-PI) de 0,30 m x 0,60 m (insercion de cajas) 32,518.59 2,364.99 17,737.41
03.09.04.06 Suministro de caja de concreto simple y tapa concreto armado (C-PV) de 0,30 m x 0,60 m (insercion de cajas ) 3,509.49 0.00 2,222.68
03.09.04.07 Instalacin de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal (cajas a rehabilitar) 9,730.50 707.67 5,307.55
03.09.04.08 Instalacin de caja y tapa de registro de 0,30 m x 0,60 m en terreno normal (insercion de cajas) 66,596.82 4,843.41 36,325.54
03.09.05 PRUEBAS 5,133.83 0.00 385.03
03.09.05.01 Prueba hidrulica a zanja tapada, de tubera p/desague DN 150 3,837.11 0.00 287.78
03.09.05.02 Prueba de compactacin de suelos (procto modif densidad campo) 1,296.72 0.00 97.25
03.09.06 PAVIMENTOS 181,855.95 5,103.11 10,773.32
Corte+rotura, ED y reposic. de pavimento rgido f'c 210 kg/cm2 de e= 8" (Incluye pago por disposicin final de desmonte en centro de acopio
03.09.06.01 97,953.23 2,441.85 5,813.85
autorizado)
03.09.06.02 Corte+rotura, ED y reposicin de vereda rgida f'c 175 kg/cm2 de 10 cm espesor (Incluye pago por disposicin final en centro de acopio autorizado) 82,586.56 2,588.14 4,411.07
Total Costo Directo Incl. Gastos Generales y Utilidad 1,972,859.51 92,962.25 644,544.54
ESTUDIO E IMPLEMENTACION DEL IMPACTO VIAL 49,280.54 2,498.00 6,426.00
INTERVENCION SOCIAL 50,000.00 3,666.00 6,666.00
PLAN DE MONITOREO ARQUEOLOGICO 25,000.00 2,833.00 4,333.00
COSTOS POR MITIGACION AMBIENTAL 125,000.00 9,166.00 11,666.00
OBRA 03 MESES
3ra. Valorz. 4ta. Valorz.
Octubre Noviembre
31 Das 8 Das
1,389.64 3,468.94
0.00
0.00
50.76 13.55
363.94 97.06
250.04 66.69
111.03 29.62
613.87 163.70
0.00 3,098.32
13,479.21 7,327.80
13,479.21 7,327.80
745,840.31 293,453.35
20,665.11 0.00
2,714.89
1,020.59
15,448.31
608.10
24.39
103.75
88.17
139.94
0.00
516.97
68,767.24 1,920.93
13,320.26
25,064.17
142.84
244.77
918.00
1,498.35
219.46
387.64
425.09 56.67
724.25 96.57
2,698.23 359.76
4,388.39 585.11
638.99 85.20
2,577.91 343.72
13,369.76
1,071.29
683.94
393.90 393.90
47,446.01 596.31
12,180.13
13,774.78
1,231.29
938.56
462.07
406.79
503.06
4,274.94
3,240.01
1,584.49
1,389.97
3,577.84 596.31
2,000.81
887.59
993.68
MA VALORIZADO ADECUADO A INICIO CONTRACTUAL
OBRA 03 MESES
3ra. Valorz. 4ta. Valorz.
Octubre Noviembre
31 Das 8 Das
23,816.01 1,329.95
308.41
636.10
421.63
636.28
1,573.75
529.78
803.68 89.30
1,644.92 182.77
1,084.11 120.46
1,625.11 180.57
4,005.25 445.03
2,806.38 311.82
7,740.61
37,600.00 0.00
30,712.69
6,887.31
162,367.03 0.00
0.00
9,593.19
1,022.20
0.00
7,301.50
0.00
123.85
14,667.80
7,836.84
30,655.72
16,202.68
10,001.11
10,206.56
14,852.09
2,636.42
2,246.31
2,595.16
32,425.60
9,542.02 0.00
0.00
0.00
2,272.98
5,103.28
2,165.76
179,790.16 157,030.65
0.00 3,376.11
2,628.44 175.23
0.00 2,737.52
3,157.35
0.00 7,544.40
2,030.40
171,973.97 143,197.39
195,846.73 132,575.51
6,698.41 2,877.28
1,915.18
545.30
2,283.46
839.36
156.10
948.95
MA VALORIZADO ADECUADO A INICIO CONTRACTUAL
OBRA 03 MESES
3ra. Valorz. 4ta. Valorz.
Octubre Noviembre
31 Das 8 Das
10.06
0.00
0.00 2,877.28
76,489.61 0.00
16,375.17
18,733.50
4,250.90
9,298.35
6,445.86
1,096.00
755.03
2,732.32
7,524.60
4,560.92
1,054.72
3,662.24
23,667.49 1,247.72
12,558.84
2,052.02 977.16
8,488.45
568.18 270.56
46,713.41 0.00
821.48
570.86
2,474.92
0.00
12,416.19
1,286.81
3,715.28
25,427.87
3,978.72 770.08
2,973.76 575.57
1,004.96 194.51
38,299.09 127,680.43
22,174.31 67,523.22
15,558.10 60,029.25
566.68 127.96
760,709.16 304,250.09
19,017.73 7,606.24
102,695.74 41,073.76
0.00 0.00
882,422.63 352,930.09
10,974.00 29,382.54
10,222.00 29,446.00
6,611.00 11,223.00
23,055.00 81,113.00
933,284.63 504,094.63
167,991.23 90,737.03
1,101,275.86 594,831.66
42.00% 22.69%
77.31% 100.00%