Index Terms
Belts
Coal Industry
Control System
Magnetic Sensors
Materials Handling
Motor Drives
Variable Speed Drives
I. NOMENCLATURE
ft/s Feet per second
mtph Metric tons per hours
pcf Pounds per cubic foot
hp Horsepower
PLC Programmable Logic Controller
HMI Human Machine Interface
VFD Variable Frequency Drive
MT Metric Tons
PIW Pounds per inch of width
# Pounds
II. INTRODUCTION
Every overland conveyor is unique and presents different design considerations and problems to overcome. This paper will
not try to address every possible configuration but will instead focus on one conveyor that presented some typical conditions.
The conveyor for discussion in this paper is an Overland Conveyor (OC-1) to be installed in Colombia, South America. The
conveyor delivers coal from a reclaim yard, overland to a transfer point located on a new dock. The conveyor feeds a ship-
loader Dock Conveyor (DC-1). The overland conveyor has an overall length of 3,217 m (10,550 feet). The conveyor travels
1,830 m (6,000 feet) on land and 1,387 m (4,550 feet) on a concrete viaduct over the water. The conveyor also has a horizontal
curve located 1,235 m (4,050) feet from the tail end of the conveyor. The conveyor profile elevation change between the
lowest point and the head pulley is minus 15 m (50 feet).
The conveyor has a 72 inch belt width and uses 45 degree idlers. The belt speed is 4.57 mps (15 ft/s) and it has a capacity of
5,000 mtph of coal based upon 53 pounds per cubic foot (pcf) coal density.
The eight 300 hp drives are located on a grade supported portion of the conveyor a couple hundred meters from the end of
the viaduct. The drives are on the tail end side of the horizontal curve.
The Overland Conveyor transfers material from the Loading area to the Dock Conveyor. Eight drive units comprise the
Overland Conveyor. Speed of the drive units is controlled using eight VFD units configured to synchronize speeds of all
drive units based on operational parameters. Communication between the VFDs will allow one drive to act as the master
drive and ramp up to speed in a set point time while the other drives act as slave units match the master.
The amount of material loaded will vary due to the manual nature of the loading system. Material rates cannot be reliably
controlled due to this factor. The maximum conveyor speed will allow material to be conveyed at 5000 MTPH fully loaded.
Devices along the conveyor length monitor conveyor conditions, alert personnel of abnormal conditions, and provide
emergency shutdown of the system. Typical devices include belt misalignment switches, under speed switches, emergency
pull cords, emergency stop switches, warning strobes, and warning sirens. Given the length of the Overland Conveyor and
Dock Conveyor, consideration was given to a system that can alert operations and maintenance personnel to the exact
location of the warning devices that are activated.
A winch operated conveyor belt take up system maintains belt tension during startup and normal operation. Devices
monitor belt tension and the PLC sends a signal to the winch system to maintain set point tension during startup and normal
operation. The PLC communicates with the VFD(s) to monitor programmed startup and operating speeds to determine the
winch tension setpoint. The PLCs utilize a PID function with a feed forward signal from the VFDs incorporated with
multiple sets of tuning parameters for startup and normal operation to control the winches for each operating scenario.
Typical system startup and shutdown is performed by automatic sequencing. Conveyors are started in sequence from the
head of the system to the tail of the system.
In general, the first conveyor is started and allowed to reach full speed before the next conveyor in the sequence is started.
When a conveyor is issued a start command, a warning horn and strobe are activated prior to the conveyor starting. The
warning horn and strobe will remain activated for a specified time while the conveyor starts and gets up to speed. The time
allotted for startup warnings will allow sufficient time for personnel to clear away from the conveyor or activate an
emergency stop if unable to get clear.
Shutdown is typically a time-controlled sequence. The Overland Conveyor will run for a specified time after a system
shutdown is initiated allowing it to clear all material from the conveyor. Once a conveyor is stopped, the next belt in the
sequence runs for a specified time to clear material and then shuts down. The sequence continues until the Ship Loader
conveyor clears material and shuts down. The warning horn and strobe are not activated during normal conveyor
shutdowns.
System stoppage due to abnormal conditions is not a sequential operation. If a conveyor is stopped due to an alarm
condition, all conveyors upstream of the affected conveyor will stop and may be loaded with material. Typically, conveyors
downstream the affected conveyor will continue to run. This allows for the system to be restarted from the point of failure
after the alarm conditions are cleared. For abnormal shutdown due to power outage provisions in the design allow for the
V. DRIVE ARRANGEMENT
The client proposed drive layout had four drive pulleys with two 300 hp drives per pulley (See Fig. 1). All four drive pulleys
were located on the return side of the belt. Having the four drive pulley mounted as one unit resulted in extremely high belt
tension between the between the drives and the head pulley. Some of the disadvantages of this arrangement are:
The higher tension requires a higher piw belt which is more expensive. In this case there is 6,400 m (21,000 feet) of
belt which can be a large savings.
A higher tension requires larger pulley shafts and bearing and in some cases an increase in pulley size.
A high belt tension also means more steel in the head end tower.
The higher tension will also cause inconsistent tracking problems in the horizontal curve.
This type of arrangement does not provide a place to mount a magnetic separator.
The final drive arrangement also had four drive pulleys with two 300 hp drive per pulley. The difference between the
proposed and final arrangement is that two of the drive pulleys were mounted on the return belt and two drive pulleys were
mounted on the carry belt (See Fig. 2). The two drive pulleys mounted on the carry side of the belt are installed in a tripper
arrangement allowing material to reload onto the carrying belt.
The revised layout reduced the running and starting tensions by 40%. The result was a reduction in the PIW rating of the
belting, a reduction in drive and head shaft size by 40 mm and a reduction in the bend and snub shafts by as much as 100 mm.
There is also a significant saving in head end support structure size as a result of the belt pulls being reduced from 140,000# to
99,000#.
VII. BELTING
The final drive arrangement resulted in the reduction of the required belting rating from 1400 PIW to 800 PIW. The 800
1
Conveyor Equipment Manufacturers Association
2
Pro-Belt, Kent R. Rieske, Professional Designers & Engineers, Inc.,Boulder, CO
3
Belt AnalystTM , Overland Conveyor Company Inc., version 12.1 Lakewood, CO
PIW is available in the fabric belt in lieu of steel cable. The main disadvantage of fabric belting is the length of required take-
up travel, in this case about 60 m of take-up. An overland conveyor with a horizontal take-up located in the middle of the
conveyor using a cart and cable single reeved tower required a 200 foot tall tower and 20,000# counter weight. A quadruple
reeved take-up would still require a 15 m (50 foot) tall tower and 80,000 # counter weight.
The decision was made to use a winch style take-up tensioning. With the use of a 20,000 pull constant tension winch we
were able to remove the take-up tower and weight.
In this application and location, steel cable belting of the same strength was cheaper than the comparable fabric belt. This
allowed the take-up travel to be reduced to 10 m. One disadvantage of using steel cable belting is the transition distances at the
head and tail are increased from 2.5 time the belt width to 5.0 time the belt width for the tail pulleys and even higher for the
head pulley.
Another disadvantage of steel belting is it interferes with the operation of a magnet separator. This issue will be addressed
later in this paper.
The design basis of using CEMA 5th edition[1] or 6th edition[2]. On long conveyors there is a significant horse power
savings by using 6th edition.
Verify the idler classification. CEMA E idlers require more force but CEMA D are not as heavily built. In this case the
change form CEMA D to CEMA E was an additional 284 horsepower.
Drive pulley lagging, grooved rubber vs. ceramic does not significantly affect drive horsepower. It only affects the belt
tensions and take-up.
Belt wrap around the drive pulley also does not affect the drive horsepower significantly. The reduction of the belt
tension from additional belt wrap may reduce the require PIW rating of the belt or reduce the amount of take-up
weight.
Another factor affecting motor horsepower selection is the locked rotor or pull-up torque of the motor. The two
horsepowers considered in conveyor design are the running horsepower and the starting horsepower. The use of
high starting torque motors allow the motor size to be based on the running horsepower and not the starting
horsepower. (See Fig 3). This can save in the cost of the selected motor and gear box.
Another design consideration is coasting. It takes the overland conveyor 22 seconds to stop. The dock conveyor takes
10 seconds to stop. In a normal shutdown condition the overland conveyor would shut down and 30 second later the
dock conveyor would be shut down. In an emergency shutdown condition as a power failure or emergency pull cord,
both conveyors would be shut down at the same time. The overland conveyor will coast 12 seconds longer than the
dock conveyor and at 5000 mtph would discharge 16 MT of coal. The head chute on the overland conveyor is
designed as a surge hopper to hold the 16 MT.
Electronic equipment required to control the system such as PLC, HMI, and VFDs required a conditioned environment
for optimal performance. Monitoring of the cooling system is integrated into the PLC/HMI system to monitor system
health. Preventative maintenance in addition to monitoring of drive and cooling system status will contribute to the
extended life of the system.
X. MAGNETIC SEPARATOR
The typical conveying system uses a magnetic separator to remove ferrous metal and a metal detector to mark the location
on non-ferrous metal on the conveyor. There are two locations for a metal detector on a conveyor, either cross belt or over the
end at the head pulley. The cross belt is the simplest and less expensive to purchase, install, with less structure and chutework.
Because of the steel cords in the belt the cross belt application could not be used. The final drive arrangement provided a
tripper location with chute work at the carry side drive which was an ideal location for the over the end metal detector and
discharge chute.
station had to be redesigned to accept the magnetic separator. The structure also had to be redesigned to support the weight of
the separator.
Determining which type of belt to use was a direct result from the design of the drive system. Had the drive design been
completed earlier, engineering costs could have been reduced.
The final drive design resulted in lower costs of construction and will reduce future costs.
XII. CONCLUSION
There are many factors to be considered when designing overland conveyor drives including, drive locations, carry side or
return side drive locations, or a combination of the two, take-up size and type, conveyor belting and many more. The conveyor
used in this example was long with relative high capacity and a horizontal curve. The longer and the more complex the
conveyor the more time should be taken to evaluate the drive, take-up and loading options. In all cases the selection of the
drive arrangement and drive components should under taken very early in the design process.
APPENDIX
Appendixes, if needed, appear before the acknowledgment.
ACKNOWLEDGMENT
The authors gratefully acknowledge the contributions of T. K. Richardson for his review of the original version of this
document.
REFERENCES
[1] Engineering Conference of the Conveyor Equipment Manufacturers Association, Belt Conveyors for Bulk Materials, Fifth Addition. CEMA, 1997.
[2] Engineering Conference of the Conveyor Equipment Manufacturers Association, Belt Conveyors for Bulk Materials, Sixth Addition. CEMA, 2005.