Você está na página 1de 4

15/7/2014 Tutorial on Feasibility Study

Home
Numerical Excel Tutorial
Microscopic Pedestrian Simulation
Kardi Teknomo's Tutorial
Micro-PedSim Free Download
Personal Development Handbook

Re s e a r c h Feasibility Study Using MS Excel


Public a tions By Kardi Teknomo, PhD.

Tutor ia ls

Re s um e

Pe r s ona l <Previous | Next | C ontent >

Re s our c e s

Conta c t
Excel Gantt Chart
smartsheet.com/Gantt_Excel

Smartsheet is #1 Gantt
Spreadsheet. Smarter Than
Excel. Try it Free!

To put all previous cost and benefit formulas of Bus feasibility study in MS Excel, we better separate input
of user (constants) from the formulas and result of computation. You can see the relationship between all
formulas in the diagram below. This diagram is useful to separate them.

http://people.revoledu.com/kardi/tutorial/Feasibility/Excel-Feasibility-Study.html 1/4
15/7/2014 Tutorial on Feasibility Study
Since we have two type of vehicles, we put them in two columns so that easier to copy. MS Excel file
companion of this tutorial can be downloaded here.

Gesto Financeira
Online
aiec.br/Tecnlogo-Gesto-Finan

R$263,00/ms - 2 Anos de
Durao! Alavanque sua
Carreira de Gestor.

The formulas are put in separate places so that we obtain all results in one area of the spreadsheet.

http://people.revoledu.com/kardi/tutorial/Feasibility/Excel-Feasibility-Study.html 2/4
15/7/2014 Tutorial on Feasibility Study

Several notes must be given regarding the formulas:

1. All formulas for operation, benefit, cost and evaluation above are based on equation (1) to (14)
above.
2. Annual Salvage value are converted from Future Value into Annuity using either MS Excel function

=-PMT ( , ,0, ) or multiply with factor


3. Present Total C ost, , consist of initial cost and converted value of total operating cost. The

conversion is using MS Excel function =-PV ( , , ) or multiply with factor . Then


we put negative sign to this formula to make it negative value. This is useful step to calculate the
IRR using MS Excel function.
4. Present Total Benefit is converted from the summation of annual operating benefit plus subsidy
and annual salvage value. The conversion factor is similar to Present Total C ost without the
negative sign.
5. NPV and BC R should consider the negative sign of Present Total C ost
6. IRR is using MS Excel function =IRR(array of cost and benefit)

he results of this simple computation reveal that both minibus and minivan are both have positive NPV
(BC R>1 and IRR> interest rate). Thus both vehicle types are feasible. They can be operated without any
local government subsidy. This will be good news for the local government who hire you as consultant.
They may hire you again next time for better and larger project. Of course, among the two types of
proposed buses, minibus is the most feasible.

<Previous | Next | C ontent >

This tutorial is copyrighted.

Preferable reference for this tutorial is

Teknomo, Kardi (2006) Tutorial on Feasibility Study. http://people.revoledu.com/kardi/tutorial/What-If-


Analysis/index.html

http://people.revoledu.com/kardi/tutorial/Feasibility/Excel-Feasibility-Study.html 3/4
15/7/2014 Tutorial on Feasibility Study

2006 Kardi Teknomo. All Rights Reserved.


Designed by CNV Media

http://people.revoledu.com/kardi/tutorial/Feasibility/Excel-Feasibility-Study.html 4/4

Você também pode gostar