stack testing
determining pollutantS accurately
Depending on the method employed, measuring an engines exhaust gas emissions can lead to varying results.
Therefore, stack tests need to be performed as carefully and as precisely as possible.
There are several different test methods that may be performed to measure the engines
exhaust gas emissions. Every method has its advantages and disadvantages, however
different methods can lead to different results for the same pollutant being measured.
On the following pages, the stack testing process is analysed in regards to the proce-
dures required and the factors to be considered from the engine side. In addition, a
guideline is provided to help ensure that the results of a stack test are valid and not
impacted by either engine malfunctions or errors in the testing process.
exhaust gas emissions measurements of required for stack testing, methods to produce valid results.
particulate matter following EPA Method a definition of the factors to be
202 are generally not comparable with considered from engine side, // Before scheduling a stack test, clarify
the measurement results obtained from a guideline to ensure the results of a all testing requirements and test methods
emissions measurement equipment stack test are valid and not impacted e.g. Particle emissions. This information is
as described in 40 CFR part 1065. by either engine malfunctions or important for determining the proper test
Reliability and repeatability of the errors in the testing process. equipment for the required test methods and
test method. In field test equipment If you have any further questions or estimated emission concentrations is utilized.
can be hard to handle, and small mis- suggestions, please feel free to con- . Avoid using equipment with minimum or
takes can lead to a large deviation in tact your local sales engineer. maximum measurement ranges near the
the results. Other methods were not expected emission range for the compound
designed to measure the low level of Requirements regarding being tested. For example, if stack test equip-
emissions from todays cleaner engines. test Equipment ment can be used to measure particle emis-
sions between 2000 g/h and 100 g/h, ensure
In an effort to assist the customer in dealing // Most stack tests for Particulate Matter the tolerances are low throughout the entire
with these difficulties, MTU provides this White in the United States are done accord- test range. A tolerance of 10 g/h has lit-
Paper. Its goal is to deliver the following: ing to EPA Methods 5 and 202. The test tle influence at 1200 g/h, however diesel
an overview of the procedures equipment must be suitable for these engine particle emissions may be as low as
Temperature Sensor
Impinger Train Optional, May Be Replaced
By An Equivalent Condenser
Probe
Temperature Temperature
Type S Pitot Tube Sensor Sensor
Check
Temperature Sensor Impingers Valve
Heat Traced
Glass-lined
Probe
By-Pass Main
Figure 1: Valve Valve
Schema of test equipment acc.
EPA Method 5 & 202
(based on https://www.epa.gov/ Dry Glass Air-Tight
sites/production/files/2016-06/ Meter Pump
documents/m-05.pdf)
110 g/h. At this concentration a 10 g/h well-maintained equipment will mini- from electrical power output.
tolerance results in a 10% margin of error. mize the chance that a test will require Recording of the exhaust gas tem-
repeating. Additionally, an experienced perature on the same point where
Stack Test Preparation testing team may have a better under- the emission sample is collected.
standing of test methods that ensure a
General Points fast and accurate stack test is completed. Stabilization Run
// A well designed stack test ensures reli- // During low load operation, oil, unburned fuel
able results. Testing should be designed to Required Information etc. accumulates in the exhaust pipes. To minimize
minimize the amount of time the Genset is // In preparation of the stack test, it is useful the influence of this material on the test results,
out of service. To achieve this goal, please con- to have the following information on hand: it is important to ensure this material is removed
sider the following items prior to testing: Test method: What test methods from the stack prior to beginning any testing.
Equipment: Can it be brought safely on are mandated by the authority?
site? Is lifting equipment required to get Stack diameter and height: This is // A stabilization run is recommended to ensure
equipment and testing personnel near the important information for the testing the stacks are clean. A stabilization run consists
stack? It is recommended that the genset company and will ensure that they have of two hours of continuous operation at maxi-
be run under load in the weeks prior to the proper equipment and probes when mum load. The stabilization run will ensure the
testing to ensure everything is in work- they arrive. Additionally, the stack test oil/unburned fuel gets burned prior to testing.
ing order when the testing team arrives. company will need to know the loca- Ideally the stack test will begin immediately
Engine Load Requirements: Can the tion and size of all available test ports. following the stabilization run so there is no
required load be applied to the Genset? Engine serial number: If any questions need to reduce load or shut the engine down.
Is a load bank needed? A constant and arise during the stack test this is help-
stable load is required for a successful ful information when you need to get in Performing the Stack Test
stack test. Often, this cant be realized contact with After Sales/Application
by electric consumers installed on site. Maximum applicable load: Please con- Ambient Conditions
Timeline: A stack test is very time consum- sider that most gensets are unable to // The ambient conditions at the time of test-
ing, 6-7 hours per engine is not unusual operate the engine at 100% mechani- ing have a significant influence on the result.
Effects on surrounding areas: cal power due to limited generator Standard ambient conditions are the basis for the
Some authorities prohibit the usage power. This is also important to under- engine to fulfill the not-to-exceed values of the
of Gensets at certain times (nights, stand when comparing the test results data sheet. Important conditions to record include:
periods of poor air quality, etc.) with the emission data sheets. Air pressure, temperature and humidity.
Fuel quality and quantity: Take into These parameters must be recorded near
account the engine will run for several Equipment the air intake of the engine. Many times
hours at full load. Fuel consumption for // The testing company will bring the required a testing company records from the inter-
the duration of testing should be cal- test equipment. Additional equipment may be net a one time reading obtained from a
culated with an appropriate buffer to required to measure other parameters (fuel nearby weather station. These values are
ensure an adequate fuel supply will be flow meters). A list of all equipment used dur- not sufficient. It is important to obtain real
available for testing. Also, ensure the ing the test should be generated and should measurements on site during the testing.
fuel is of a sufficient quality. Aging include any relevant calibration or service dates During a stable weather situation, these
fuel may be a problem and can lead to for each piece of equipment. Ensure to provide parameters should be measured on site
clogging of fuel filters. A fuel sample access to power for the test equipment. The at least every 30 minutes, starting at the
should be taken for analysis purposes. power requirements of the equipment should beginning of testing. If weather conditions
Costs: Certainly cost is a factor in select- be discussed prior to the test crew arriving. are changing rapidly, the ambient condi-
ing the stack testing company. It is not tions should be recorded more frequently.
recommend to sacrifice the quality of // Please note that in some cases the ECU Altitude. Altitude also has an influence
the equipment or experience of the test- (Engine Control Unit) offers calculated val- on the emissions and must be accounted
ing personnel in favor of lower cost. In ues only, e.g. fuel consumption. For this rea- for when evaluating the test results.
many cases the fuel costs account for a son, MTU Friedrichshafen recommends: Air intake depression/exhaust gas back
significant portion of the overall testing The usage of a calibrated fuel flow meter. pressure. These two parameters influ-
cost. An experienced testing team with Recalculation of engine power ence the power output of the engine. If
Figure 2:
Typical Equipment for Stack tests
acc. EPA Method 5 & 202
the engine loses power due to these fac- according to EN590 or US EPA 40CFR89 the engine at steady-state conditions.
tors, use the values on the emission data & coolant and lubricant according MTU
sheet according to the absolute power Fuels and Lubricants Specification) // If engine loads are adjusted during the
output and not the percentage value. stack test, the engine should be allowed
Air mass ratio Q from the ECU as // The fuels and lubricants used must meet to run a minimum of 10 minutes at the
an indicator of lack of oxygen. Air the requirements of the Fuels and Lubricants new load point to reach steady-state condi-
mass ratio should be recorded with Specification provided by MTU. If there is tions prior to starting emission testing.
DiaSys. A list of other recommended any uncertainty about the quality and speci-
parameters to be recorded during fications of the fuel and lubricants used dur- // If the engine has been subjected
the test is provided in Appendix B. ing testing, a sample of the fuel and engine to a higher number of cold starts it
lubricant should be collected and analyzed. should be run forat least 30 minutesto
Fuels and Lubricants reach steady state conditions.
// The fuels and lubricants used will also Engine Operation
have an influence on the results of the // Emission values improve with time as Performing the Test
stack test. Refer to the emission data sheet the engine nears steady-state conditions.. // The stacking testing company should have a
provided by MTU for the type of fuel used Emission values provided on the MTU solid knowledge of the test methods and testing
during factory emission testing (e.g. fuel emission data sheet were collected with equipment, however from time to time mistakes
are made. The following points are the most the more reliable the results, but also the // The sample probe for collecting carbon dioxide
significant deviations observed in the field and greater the time and the expense. Discuss and the oxygen samples must be placed in cen-
are meant to help someone not familiar with testing time with the stack test company troid of the stack. The probe for determining par-
stack testing have a general idea of what to look prior to testing. EPA mandates a minimum ticulate should be placed in the ports according
for. There may be exceptions to items listed time of 1 hour per run and 30 minutes the stack traverse points. The port not in use must
below. Identify and document any deviations per port. remain closed and the port in use for the probe
from the test plan and always discuss this with should be sealed as much as feasible to prevent
the person performing the stack test, if some- // The sampling time per traverse point introducing fresh air into the exhaust stream.
thing looks different than mentioned below. should always be the same. For example, The probe must not make contact with any por-
for a one hour test on a stack with diam- tion of the stack at any time. Also it should be
// Sampling and velocity measurements must be eter of 0.45 meters/18 in., a sample time of avoided that the probe is bumped on the inside
performed at a site at least eight stack diameters 3:45 min. per traverse point is required: of the stack. The ports must be cleaned prior to
downstream and two stack diameters upstream eight traverse points required for test; each testing to remove any soot or other contaminates.
from any flow disturbance (e.g. elbows). stack has two ports; one hour test; 30 min-
utes per port; 3:45 per traverse position. // The EPA recommends a pre-test leak check
// The number of traverse points of the particulate probe assembly. The post-test
is dependent on the stack diameter It is important that the position of the probe leak check is mandatory following each sampling
(see Fig. 3). For circular stacks: meets the regulatory requirements. Different run and must be done according EPA method.
12 points for a stack diameter stack test companies use different methods
greater than 0.61 meters/24 in. to ensure the right position. Document how // The filters should be removed from
8 points for a stack diameter between the stack test company ensures that the probe the filter-impinger in a clean area pro-
0.30 and 0.61 meters/12 and 24 in. is at the right position for the right time. tected from wind to prevent contamina-
tion of the filter from airborne particles.
// The total testing time/time per port // The pitot tube should be aligned perpen-
depends on many factors, e.g. stack diameter, dicular in the exhaust flow. Document how // After each run, the probe must be cleaned
exhaust gas flow, expected quantity of par- the stack test company ensures that the pitot with acetone and a nylon brush. This must
ticulate and condensable. The longer the test, tube is correctly aligned, e.g. by a water-level. be done until the acetone comes out clean.
Traverse Stack
points
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
Figure 3:
Example of traverse points
in Stack <24 in.
Ports
Figure 4:
Probe aligned in stack
Checking the Test Results containers, which are in an extra box Hints to check results
// The results of the each test should be checked to prevent moisture from the air)?
regardless if the test passed or failed. When Where is the connection of the PM meas- 99 Are the results, e.g. particle emis-
the engine runs without problems and the urement device in the exhaust pipe? sion, steady during the test?
recorded Diasys values imply no instability, you Design of the exhaust pipe before meas- 99 Are the results reproducible?
should have the values and results of the stack urement point (e.g. after elbow is not good) 99 Are the protocols completed?
test should not fluctuate by more than around Measurement points always 99 Was a fuel used according to fuels
five percent. Large fluctuations in the data same distance from engine and and lubricants Specification?
could indicate improper equipment handling. last bend in exhaust line 99 Are the boundary conditions
A check list is provided in Appendix A Measurement in laminar flow (weather etc.) listed in the report?
to help determine if all steps and pro- (measurement position)
cesses have been completed. Use same nozzle for all measurements
Fixed probe positions
For Testing: across stack diameter Conclusion
How are the particle filters conditioned Probe in line with flow
and weighted (before and after sampling)? Measure exhaust gas mass The results of a stack test depend on many
Filters and equipment need to fit to each for each measurement influences and factors. Therefore, it is very
other otherwise leakage can occur Fixed duration of measurement important to perform the test as carefully
Filters need to be installed Maintain boundary conditions and precisely as possible. If you encounter
flat and not wavy Exhaust gas from nearby engines unforeseen problems, please feel free to
How are the filters handled (in separate might influence results contact your local MTU Sales Engineer.