platform catalogue
Gamesa 2.0 MW
Gamesa 2.5 MW
Gamesa 3.3 MW
Gamesa 5.0 MW
05 06
GAMESA, OVER 20 YEARS GAMESA, A TECHNOLOGICAL
08
GAMESA, global
11
Gamesa, extensive
COMMITTED TO SUSTAINABLE ALLY FOR YOUR WIND capacity FOR experience in operation
DEVELOPMENT POWER PROJECTS production and maintenance
12
Gamesa
15
Gamesa, the best technological
18 23
Technical specifications Discovering
technological partner for your wind POWER and services of GAMESA 2.0 MW
evolution projects ALL OVER THE WORLD Gamesas platforms PLATFORM
C o n t e n t
29
Gamesa 2.0 MW
31
Discovering
37 39
Gamesa 2.5 MW Discovering
Technical GAMESA 2.5 MW Technical GAMESA 3.3 MW
specifications platform specifications platform
43 45
Gamesa 3.3 MW Discovering
51 55
Gamesa 5.0 MW Gamesa 5.0 MW
Technical GAMESA 5.0 MW platform Technical
specifications platform Technologies specifications
GAME S A , O V ER 2 0 Y EAR S COMM I TTE D
TO S U S T A I N A B L E D E V E L O P M E N T
This is the great challenge facing todays society. In the areas of energy
management and power generation, Gamesa is tackling this challenge by
developing technologies that foster energy sustainability in a clean, effcient
and profitable manner.
The application of the best and most modern technology, combined with a
high level of industrial potential make Gamesa a market leader. At the same
time, this allows the company to improve the efficiency and capacity of its
products and services through the continuous advancement in the design and
manufacture of wind turbines.
Passion for the customer is what drives Gamesa, and underpins its goal of
ensuring total customer satisfaction. And, it is customer confidence that has
turned the Gamesa product range into the one of the most competitive on
the market.
4 5
GAME S A , A T E C H N O L O G I C A L A L L Y
FOR Y OUR W I N D PO W ER PROJECT S
Since the manufacture of its first turbine in 1994, wind turbines developed
and manufactured by Gamesa have evolved significantly, incorporating the
latest technological advances and growing, not just in terms of power but also
in performance for the customer.
The cornerstones of this broad product catalog are its robustness, high
reliability, and adaptability to all types of locations and wind conditions;
from the most demanding and difficult regions, to more accessible locations
with medium and low wind conditions. All of this is based on extensive,
experience gained from over 20 years of activity, making Gamesa an
excellent ally for its customers wind power projects.
6 7
PRO D UCT I ON CENTER S
I N THE M A I N W I N D P O W E R M A R K E T S
INDIA
B ra Z il
Nacelles, blades
Nacelles.
and towers.
Within the wind sector, Gamesa manages the entire tasks and operations all along the supply chain, ensuring EUROPE
process, from the design, manufacture and installation of customer satisfaction and the search for excellence. Nacelles, blades,
wind turbines, to their operation and maintenance. generators, gear boxes,
Gamesa has production centres in the main wind markets. convertors and towers.
Gamesa relies on a global industrial base with optimal Spain and China are the global production and supply
vertical integration that covers the design and manufacture hubs. Similarly, the company has an industrial presence
of its wind turbines. The tailor-made development of the in local markets such as India and Brazil. In addition to
critical components of its turbines-from the gearbox to a strong internal industrial capacity, strategic alliances
the blades- ensures excellence in the design and the very have been established with the foremost worldwide
highest quality standards. At the same time, it permits the component providers.
shortest delivery times and the fastest technical response
during the maintenance period. Thanks to this global production and supply capacity, Gamesa
fully controls the production process and attends to the needs
Research, Development and Innovation form an integral of its clients on all five continents, offering its customers the
part of the companys processes and products as well as its highest quality standards and short customer response times. Ga mesa designs and manufactures it s wind
t urbines crit ica l component s, comprehensiv ely
cont rolling t he product ion process.
8 9
GAME S A , e x t e n siv e e x p e r i e n c e i n
operation and maintenance
Operation & Maintenance (O&M) is one of the key activities useful life extension, integral solutions for the O&M of other
upon which Gamesa bases its development. With 70% of manufacturers wind turbines, and personalized financing
its installed capacity under O&M contracts and a broad options to meet the needs of each customer. Gamesa also
operational knowledge in complex locations, Gamesa focuses intensively on programs for maximizing energy
maintains 21 GW in 36 countries. All of this is possible production, improving availability and reducing O&M
thanks to a team of highly-qualified professionals, present related costs, with the goal of reducing the maximum cost
worldwide and focused on health and safety as well as on of energy.
service excellence and customer satisfaction.
Through a detailed analysis of extensive data drawn from
Backed by over 20 years of experience in wind turbine O&M two decades in the field, Gamesa continuously adapts
and optimization, Gamesa acontinues to be committed to its equipment to the most demanding network and
adding value, offering cutting edge solutions, such as the environmental settings.
Gamesa WindNet PRO is the new generation SCADA wind Predictive maintenance system for premature detection
farm system entirely developed by Gamesa which allows of potential deterioration or faults in the main wind-
remote operation and the monitoring of the wind turbine, its turbine components.
meteorological mast and electrical substation in real time.
Advantages:
Gamesa WindNet PROs innovative, modular design is
based on TCP/IP architecture. Control features include Fewer large correctives.
active and reactive power, voltage and frequency regulation
tools and environmental options to optimize production Improved reliability, availability and useful life of
while complying with current regulations. Accessible the machine.
anywhere through a Web browser, Gamesa WindNet
PRO is simple to use and intuitive. It features the Report Risk mitigation provides preferential conditions
Generator and Information Manager analytical tools, as in negotiations with insurance providers.
well as TrendViewer, an advanced tool to illustrate key
data trends. Integration with the control system.
10 11
34.6 GW installed
in
53 countries
22 GW
of the 2.0 MW
platform
10 GW installed
10,000
units of the
850 kW WTG
installed
installed
in
24 countries
10,000 MW
of the 2.0 MW
platform
installed Leader in Mexico Leader in India 1.8 GW installed
1 GW installed 1 GW installed in Brazil
1 GW
windfarm installed WF Dunas de Paracur WF Big Turtle
152x G90-2.0 MW (Brazil)
Largest 850 kW (US)
WF Blue Creek
installed 5,000 windfarm installed
(US)
evolution
Gamesas internationalization
process is strengthened.
1994 1998
Gamesa is committed
to global expansion.
Start of the design,
manufacturing, and wind
turbine sales activity.
12 13
T h e
b e s t
t e c h n o l o g i c a l
p a r t n e r
GAME S A
f o r y o u r wi n d p r o j e c t s
ALL O V ER THE W ORL D
Extensive knowledge of design criteria for key components enables Gamesa to from this wide technological offer,
quickly implement innovative technology in new design models, with a proven
capacity to adapt to any environment.
gamesa develops specific product
catalogues adapted to its clients
requirements in each market.
16 17
Me c h a n i c al d esi g n : To tal ligh tn in g
M a xi m u m r e l i a b i l i t y a nd p r o t e c tio n
p er fo r m a nc e
Gamesa turbines use the Total Lightning Protection system,
designed according to the IEC 62305 standard. This system
Gamesa turbines incorporate improved and increased
conducts the lightning from both sides of the tip of the blade
mechanical capacity in key wind-turbine components
to the root, and from there, through the nacelle and the tower
such as the yaw system, the framework, main axis and
structure, to the foundation grounding system. This protects
blade bearings. These improvements guarantee maximum
the blade and prevents the lightning from going through the
reliability of the equipment and allow larger rotors to be
blade bearings and main axis, safeguarding sensitive electrical
used to increase the power generated.
and electronic elements from damage.
18 19
Opt imum elect rica l grid
connection a nd stable
production
Gamesas doubly fed wind turbines guarantee compliance
with todays most demanding grid code requirements as
well as future electrical grid and wind farm configurations,
Requirement Gamesa fulfillment(1)
D y n am ic r e gu latio n of by offering full support for voltagedrop and dynamic
active and reactive power regulation.
r e a c tive po w er o n th e w in d f arm Voltage ride-through Low voltage ride-through
capabilities covering the
The DFIM Technology (Doubly Fed Induction Machine) most important grid codes.
The on-site power measurement equipment monitors the high- in combination with Gamesa WindNet PRO, the new
voltage active and reactive power data at the output of the substation SCADA System developed by Gamesa, allows the
transformer and send them to Gamesa WindNetPRO via the control regulation of active and reactive power via the injection Reactive regulation(2) Up to Cos phi 0.95 (cap)
unit of the substation. - 0.95 (ind) in output
of rotor currents with variable amplitude, frequency terminals of the turbine.
and phase. Specifically, the injection of currents with
Gamesa WindNet PRO dynamically calculates and corrects the power variable amplitude allows the system to control the
factor in accordance with the reference values of the System Operator. reactive power by varying the power factor, whereas Active regulation 10% P* and capacity
to participate in primary
the injection of currents with variable phase allows the regulation.
Gamesa WindNet PRO actuates on both the reactive power regulation system to control the active power. With less than 25%
capability of the turbine and, where available, other equipment in the of the generated power passing through the converter,
substation such as capacitor banks and FACTS systems. Operational frequency 47 - 53 Hz (50 Hz)
the DFIM Technology guarantees that the harmonics
range 57 - 63 Hz (60 Hz)
generated are minimized.
20 21
V ER S AT I L I T Y
GAME S A 2.0 M W
2.0 MW
G80 G87 G90 G97 G114
D I S CO V ER I NG GAME S A 2 .0 M W
125 m 125 m
120 m
104 m 106 m
100 m 100 m
90 m 90 m 90 m 93 m 93 m
78 m 78 m 78 m 78 m 80 m 80 m
67 m
60 m 55 m
and and
site specific site specific
24 25
GAME S A 2 . 0 M W , V E R S A T I L I T Y AN D M A X I M U M P R O D U C T I O N
G114-2.0 MW
G114-2.1 MW
The 2.0 MW Gamesa platform, with 22 installed GW accumulated in 37 countries, bases its technology on speed control HIGHEST CAPACITY
and variable pitch, incorporating the latest technologies in order to obtain maximum wind energy capture with the greatest FACTOR of the market.
efficiency. MINIMUM power density.
IMPROVED CoE.
MAXIMUM profitability.
2.0 MW and 2.1 MW generators. Variable pitch and speed technology maximize energy
TYPE CERTIfICATES available.
Maximum output in any type of site. production.
New, latest generation 114-meter rotor for low and Technological solutions guarantee compliance with
medium wind speeds which, together with the 80-, 87-, international grid connection requirements.
90- and 97-meter rotors, make this the most versatile Gamesa active yaw system ensures optimum adaptation
platform on the market. to complex terrain.
Availability figures exceeding 98%. Aerodynamic design and the Gamesa NRS control
State-of-the-art blade manufacturing technology: system minimize noise emissions.
Fiberglass reinforced materials in order to achieve Gamesa WindNet PRO: remote control and monitoring
lighter blades while maintaining rigidity and strength. system with web access.
New optimized blade profiles guarantee maximum Gamesa SMP: System for predictive maintenance.
production and low noise.
L a t es t m o d e ls
G a mes a 2. 0 MW
G114-2.1 MW IIIA/CS.
G114-2.0 MW IIA/IIIA.
G97-2.0 MW IIA/IIIA.
G90-2.0 MW IA.
160% 165%
147% 152%
Class I Class II Class III
134% 128%
G80
110% 114%
G87 100%
G90
G97 97 114 114 97 114 114 80 87 90
2.0 2.1 2.0 2.1
G114 MW MW MW MW
Average
wind speed 6.5 7.5 8.5
26 27
GAME S A 2 . 0 M W
Power
G80-2.0 MW G87-2.0 MW G90-2.0 MW G97-2.0 MW G114-2.0 MW G114-2.1 MW
2500
ROTOR
2000
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 BLADES
Wind speed (m/s)
G80-2.0 MW G87-2.0 MW G90-2.0 MW
Number of blades 3 3 3 3 3 3
G97-2.0 MW G114-2.0 MW G114-2.1 MW
Length 39 m 42.5 m 44 m 47.5 m 56 m 56 m
Airfoils NACA 63 XXX DU + FFA-W3 Gamesa Gamesa Gamesa Gamesa
+ FFA-W3
Material Pre-impregnated Pre-impregnated Fiberglass Fiberglass Fiberglass Fiberglass
epoxy glass fiber epoxy glass fiber reinforced with reinforced with reinforced reinforced
polyester resin polyester resin with epoxy or with epoxy or
polyester resin polyester resin
TOWER
GEAR BOX
Type 1 planetary stage 1 planetary stage 1 planetary stage 1 planetary stage 1 planetary stage 1 planetary stage
2 parallel stages 2 parallel stages 2 parallel stages 2 parallel stages 2 parallel stages 2 parallel stages
Ratio 1:100.5 (50 Hz) 1:100.5 (50 Hz) 1:100.5 (50 Hz) 1:106.8 (50 Hz) 1:128.5 (50 Hz) 1:128.5 (50 Hz)
1:120.5 (60 Hz) 1:120.5 (60 Hz) 1:120.5 (60 Hz) 1:127.1 (60 Hz) 1:102.5 (60 Hz) 1:102.5 (60 Hz)
GENERATOR
versatility
* Power factor at generator output terminals, on low voltage side before transformer input terminals.
28 29
I n t e l l i g e n t e v o l u t i o n
GAME S A 2.5 M W
2.5 MW
G106 G114 G126
D is c o v e r i n G GAME S A 2 .5 M W
With three new 106-, 114- and 126-meter rotors, new tower options and
a nominal power of 2.5 MW, the Gamesa 2.5 MW platform complements
the Gamesa 2.0 MW product series, which has become a reference in
the market, notable for excellent capacity factors and high profitability.
129 m 129 m
125 m 125 m
102 m 102 m
93 m 93 m 93 m
80 m 80 m 80 m 84 m 84 m
72 m
68 m 68 m
32 33
GAME S A 2. 5 M W , I ntelligent E V OLUT I ON
Backed by extensive experience and demonstrated adaptability, this platform combines the proven reliability of its
predecessor 2.0 MW platform with the companys latest technological advances to deliver significant improvements in
performance, thanks to optimized models and new tower portfolio:
New 2.5 MW and 2.625 MW generators. New and optimized blade root with high thickness
Demonstrated and validated technology from the profiles. Pre-impregnated fiberglass blades designed to
Gamesa 2.0 MW platform. reduce weight.
Greater energy production: up to 14% in the G114-2.5 Variable pitch and speed technology maximize energy
MW model and up to 21% in the G126-2.5 MW compared production.
to the G114-2.0 MW model. Gamesa active yaw system ensures optimum adaptation
Excellent capacity factor and reduction of Cost of to complex terrain.
Energy. Aerodynamic design and the Gamesa NRS control
Optimized models for medium and low wind locations. system minimize noise emissions.
Improved power curves. Gamesa WindNet PRO: remote control and monitoring
system with web access.
Gamesa SMP: System for predictive maintenance.
34 35
GAME S A 2 . 5 M W
Power
G106-2.5 MW G114-2.5 MW G114-2.625 MW G126-2.5 MW G126-2.625 MW
2500
2000
ROTOR
1500 Diameter 106 m 114 m 114 m 126 m 126 m
1000 Swept area 8,825 m 2
10,207 m 2
10,207 m 2
12,469 m 2
12,469 m2
500
Rotational speed 7.7 - 14.6 rpm 7.7 - 14.6 rpm 7.7 - 14.6 rpm 7.1 - 12.9 rpm 7.1 - 12.9 rpm
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
BLADES
Wind speed (m/s)
TOWER
Type Modular Modular Modular Modular Modular
Height 72, 80, 93 m and 68, 80, 93, 125 m and 68, 80, 93, 125 m and 84, 102, 129 m and 84, 102, 129 m and
and site specific and site specific and site specific and site specific and site specific
GEAR BOX
Type 2 planetary stages 2 planetary stages 2 planetary stages 2 planetary stages 2 planetary stages
1 parallel stage 1 parallel stage 1 parallel stage 1 parallel stage 1 parallel stage
Ratio 1:129.7 (50 Hz) 1:129.7 (50 Hz) 1:129.7 (50 Hz) 1:98 (50 Hz) 1:98 (50 Hz)
1:103.8 (60 Hz) 1:103.8 (60 Hz) 1:103.8 (60 Hz) 1:118 (60 Hz) 1:118 (60 Hz)
GENERATOR
Type Doubly-fed Doubly-fed Doubly-fed Doubly-fed Doubly-fed
machine machine machine machine machine
Rated power 2.5 MW 2.5 MW 2.625 MW 2.5 MW 2.625 MW
Voltage 690 V AC 690 V AC 690 V AC 690 V AC 690 V AC
Frequency 50 Hz/60 Hz 50 Hz/60 Hz 50 Hz/60 Hz 50 Hz/60 Hz 50 Hz/60 Hz
Protection class IP 54 IP 54 IP 54 IP 54 IP 54
Power factor 0.95 CAP-0.95 IND 0.95 CAP-0.95 IND 0.95 CAP-0.95 IND 0.95 CAP-0.95 IND 0.95 CAP-0.95 IND
intelligent
throughout the throughout the throughout the throughout the throughout the
power range* power range* power range* power range* power range*
evolution
* Power factor at generator output terminals, on low voltage side before transformer input terminals.
36 37
o p t i m u m COE
GAME S A 3.3 M W
3.3 MW
G132
D is c o v e r i n g GAME S A 3.3 M W
With this purpose in mind the new Gamesa 3.3 MW platform has been
launched with its first model: the G132-3.3 MW wind turbine for Class II
sites. A new generation of multi-megawatt turbines that reaches the
market to become the best solution in terms of Cost of Energy in the
3.0-3.3 MW segment.
134 m 134 m
114 m 114 m
97 m 97 m
84 m 84 m
and and
site specific site specific
G132(1) G132(1)
3.3 MW 3.465 MW
Class IIA Class IIA
40 41
GAME S A 3 . 3 M W , OPT I MUM C o E GAME S A 3 . 3 M W
G132-3.3 MW G132-3.465 MW
ROTOR
Thanks to the operative experience accumulated by Gamesa throughout more than 20 years in the wind energy market, the
Gamesa 3.3 MW platform enables the company to guarantee the highest levels of reliability. Diameter 132 m 132 m
Swept area 13,685 m 2
13,685 m2
Rotational speed 6.82 - 10.9 rpm 6.82 - 10.9 rpm
The best CoE in the 3.0-3.3 MW segment. 64.5 m fibreglass blade, optimized for Class II sites and
New 3.3 MW platform based on mature technologies with aerofoils that have already been thoroughly tested BLADES
proven in the Gamesa portfolio. and validated in the G132-5.0 MW IIA wind turbine.
34% larger swept area vs. 114 m. rotor. New models G132-3.3 MW and G132-3.465 MW that Number of blades 3 3
Installation of the first G132-3.3 MW prototype is guarantee maximum energy production and low noise Length 64.5 m 64.5 m
expected in 2016. emission levels. Airfoils Gamesa Gamesa
Optimum solution for medium wind sites. Extensive portfolio of towers with heights ranging
Material Fiberglass reinforced with Fiberglass reinforced with
Improvement of the production capacity thanks to from 84 m to 134 m, which enables it to comply with
nominal powers of 3.3 MW and 3.465 MW and a greater the different maximum blade tip height restrictions in epoxy or polyester resin epoxy or polyester resin
rotor swept area. certain markets.
TOWER
Type Modular Modular
Height 84, 97, 114, 134 m and 84, 97, 114, 134 m and
site specific site specific
GEAR BOX
Power
Type 3 stages 3 stages
3500
Ratio 1:102.75 (50 Hz) 1:102.75 (50 Hz)
3000 1:123.3 (60 Hz) 1:123.3 (60 Hz)
2500
GENERATOR
2000
0
Frequency 50 Hz/60 Hz 50 Hz/60 Hz
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
42 43
R e l i a bi l i t y
GAME S A 5.0 M W
5.0 MW
G128 G132
D I S CO V ER I NG GAME S A 5 .0 M W
The Spanish company has taken a leap forward in one of its biggest,
most ambitious technological challenges to date: the design and
development of the Gamesa 5.0 MW platform. With this new product
platform, Gamesa intends to position itself at the forefront of the
multimegawatt platform segment.
140 m 140 m
120 m 120 m
95 m 95 m
81 m(2)
G128 G132
Class IA/IIA Class IIA
(1) Different versions and optional kits are available to adapt machinery to high or low temperatures and saline or dusty environments.
(2) Only tower height available for Class I.
46 47
GAME S A 5 . 0 M W , G r e a t e r siz e FOR
greater production Superior reliability
Nacelle and blades modular design focused on
minimizing inactive time.
Drive train with no high-speed rotating
components.
Gamesa has applied design and validation concepts to its new wind turbine development that are only comparable to those Exhaustive validation and testing plan, as well as
used in such demanding industries as the aeronautical industry, where product reliability must be assured from the first the first operational prototype since 2009.
day in operation. Gamesa 5.0 MW is the result of the evolution of Gamesa technology:
Individual pitch and multivariable control maximize Compact, high-performance drive train reduces Optimizes co s t o f
energy and minimize weight, loads and noise. mechanical stress. energy (CoE)
Sectional blade for easy transport and installation. Aerodynamic blade design and the Gamesa NRS
Permanent magnet synchronous generator and full control system minimize noise emissions. Higher production for projects
converter technology that allow the most demanding Gamesa WindNet PRO: remote control and monitoring with limited space.
grid code requirements to be met. system with web access. Optimization of energetical
Add-on crane attaches to nacelle for assisting in the Gamesa SMP System: system for predictive positions.
assembly of the main modules. maintenance. Potential savings in project
civil works.
Increase
in production G132 Gamesa GridMate
G128
850 kW x 6,6
AEP
v=7.5 m/s
k=2
Maximum energy production in loca t ions wit h limit ed s p a c e
48 49
Gamesa InnoBlade Gamesa MultiS mart
Gamesas new aerodynamic profiles reduce noise and The wind turbine control system constantly monitors the
GAMESA 5.0 MW, maximize production.The innovative sectioned blade data it collects to regulate each individual blade, minimize
state-of-the-art is manufactured using a combination of materials in a vibration and reduces the load on some components up to
technology developed pioneering structure that reduces weight. Current tooling 30%. This control system incorporates the most advanced
and equipment used to transport 2-MW models to the site technologies to reduce noise, based on optimizing
entirely by Gamesa are also suitable for the Gamesa Innoblade. aerodynamics and control.
Gamesa GridMate
The electrical system for the Gamesa 5.0 MW is based on a permanent magnet synchronous generator and a full converter.
Gamesa GridMate is comprised of four modules that operate in parallel which allows partial-load operation in the event of
individual failure, and complies with the most demanding grid connection requirements.
Increased production: 1 2 3
Optimum performance at variable speed at any
wind speed. GRID
Robust, reliable mechanical elements:
De-coupling between the mechanical part and the
grid, thus preventing grid disruptions from affecting 1. Multi-pole 2. CONVERTER with 3. TRANSFORMER
synchronous four independent with multiple grid
the machine.
GENERATOR with modules and built-in voltage connection
Greater adjustment capacity: four independent automatic circuit options.
Active and reactive power control through modules in parallel. breaker.
conversion of all the power generated.
Superior output:
Range of power factor: 0.9 cap / 0.9 ind
Improves effciency at partial loads by optimally using Support of OV voltage-drop: YES
the individual power modules in the converter. Injection of reactive current: YES
Compliance with grid connection requirements: Adjustment of active, reactive,
Smooth connection and disconnection from the grid. frequency and voltage: YES, with Scada WindNet
50 51
T o w e rs
140 m 140 m
120 m 120 m
Several tower options available, using the appropriate 95 m
81 m
95 m
Reliability brought about through a thorough
materials and technologies to offer optimized solutions for
each project. program of validation checks and tests
G128-5.0 MW G132-5.0 MW This goal has been achieved because of an ambitious More than 600 tests on components of the various
validation and testing program that has allowed wind turbines in the Gamesa 5.0 MW platform were
Lo w e r a s s em b l y a nd the Gamesa 5.0 MW to start operating at maximum carried out at 100 certified laboratories in the United
logi s t i c s c o s t availability right from the outset. States, Japan and Europe.
More than 190 functional and/or integration tests
One of the key advantages of the Gamesa 5.0 MW The Gamesa InnoBlade segmented blade, patented by This extensive validation and development program performed at the Wind Turbine Test Laboratory (LEA)
platform is its compliance with the logistics and Gamesa, can be transported by road with no need for has taken over six years. It was designed to test each at the National Renewable Energy Centre (CENER,
construction requirements of the Gamesa 2.0 MW additional resources other than those already used for component and system under real life operating Spain), one of the most highly qualified international
platform. The modular design of the nacelle and blades the Gamesa 2.0 MW wind turbine. The longest module conditions, in controlled environments in order to technology centers specializing in applied research,
of the Gamesa 5.0 MW means that the heaviest module is no more than 35 meters long. Furthermore, lifting the verify these components will function under the most development and promotion of renewable energies.
does not exceed the total weight of the Gamesa 2.0 MW nacelle is the final step in the assembly requiring a heavy- demanding conditions. More than 300,000 hours of validation and test
platform, which makes it just as easy to transport and tonnage crane. The remaining modules only require the engineering.
assemble as a 2.0 MW wind turbine. help of a small auxiliary crane for assembly.
52 53
GAME S A 5 . 0 M W
G128-5.0 MW G132-5.0 MW
ROTOR
Diameter 128 m 132 m
Swept area 12,868 m 2
13,685 m2
Rotation speed 12 rpm 12 rpm
BLADES
Number of blades 3 3
Length 62.5 m 64.5 m
Type Segmented/One-piece One-piece
Material Organic matrix composite reinforced Organic matrix composite reinforced
with fiber glass or carbon fiber with fiber glass or carbon fiber
TOWER
Type Steel, hybrid or concrete Steel, hybrid or concrete
Height 81, 95, 120, 140 m 95, 120, 140 m
GEAR BOX
Type 2 planetary stages 2 planetary stages
Ratio 1:41.405 1:41.405
GENERATOR
Power
5000
Type Permanent magnet synchronous Permanent magnet synchronous
4500
4000 generator with independent generator with independent
3500
3000 modules in parallel modules in parallel
2500
2000 Rated power 5.0 MW 5.0 MW
1500
1000 Voltage 690 V AC 690 V AC
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Frequency 50 Hz/60 Hz 50 Hz/60 Hz
Wind speed (m/s)
Protection class IP 54 IP 54
G128-5.0 MW G132-5.0 MW Power factor 0.95 CAP-0.95 IND* 0.95 CAP-0.95 IND*
* Power factor at output terminals of the wind turbine on the low voltage side before entering the transformer, at the rated grid voltage.
54
reliability 55
C/ Ciudad de la Innovacin, 9-11 Parque Tecnolgico de Bizkaia, C/ Ramrez de Arellano, 37
31621 Sarriguren (Spain) Edificio 222 28043 Madrid (Spain)
Tel: +34 948 771 000 48170 Zamudio (Spain) Tel: +34 91 503 17 00
Fax: +34 948 165 039 Tel: +34 944 037 352 Fax: +34 915 19 67 18
info@gamesacorp.com Fax: +34 944 317 642
www.gamesacorp.com
In order to minimize the environmental impact, this document has been printed on paper The present document, its content, its annexes and/or amendments has been drawn up by
made from 50% pure cellulose fiber (ECF), 40% selected pre-consumer recycled fiber, and Gamesa Corporacin Tecnolgica, S.A. for information purposes only and could be modified
10% post-consumer deinked recycled fiber inks based exclusively on vegetable oils with a without prior notice. All the content of the Document is protected by intellectual and industrial
minimum volatile organic compound (VOC) content. Varnish based predominantly on natural property rights owned by Gamesa Corporacin Tecnolgica, S.A. The addressee shall not
and renewable raw materials. reproduce any of the information, neither totally nor partially.