LOAD LIST INPUT TO ELECTRICAL TEAM

Project 140 MLD Sewage Treatment Plant at Dinapur Rev. A Prepared CSK
Client UP Jal Nigam, Varanasi Date : 3-Dec-13 Checked CSK

BREAKUP - MOTORS
S.No Category Rev Mark Motor Description Location T W S F Operating Operating Operating Motor kW Motor Drive Hazardous Efficiency Location Service VFD DG Cable BKW/ Voltage Drive Motor Starter
hours days kW Speed Mounting Zone Level Loss KW Level Input scope Scope

h d kW kW rpm Nos. Nos. %


Preliminary Treament Section
1 PRO Fine Screen Power Pack Screen Channel 4 3 1 0 8.00 365.00 3.20 3.70 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.86 415 V Wabag Vendor Wabag
2 PRO Screenings Conveyor Screen Channel 1 1 0 0 8.00 365.00 1.65 2.20 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
3 PRO Grit Chamber Mixer Grit Chamber 4 3 1 0 24.00 365.00 1.13 1.50 1450 Vertical Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
4 PRO Classifier Classifier Platform 2 1 1 0 24.00 365.00 0.41 0.55 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
5 PRO Grit Transfer Pump Grit Chamber 4 3 1 0 24.00 365.00 0.83 1.10 1450 Vertical Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
Primary Treatment Section
1 PRO Primary Clarifer Scrapper Primary Clarifier 4 4 0 0 24.00 365.00 1.13 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
2 MISC Primary Sludge Valve Primary Clarifier 4 1 3 0 1.00 365.00 0.56 0.75 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
Secondary Treatment Section
1 BLW Aeration Air Blower Aeration Blower House 6 4 2 0 24.00 365.00 159.00 200.00 1450 Horizontal Safe EFF1 Indoor Continuous 6.0 0.0 2% 0.80 415 V Wabag Wabag Wabag
2 MH EOT Drive Aeration Blower House 1 1 0 0 0.50 100.00 2.78 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
3 MH EOT Long Travel Aeration Blower House 2 0 2 0 1.00 100.00 0.28 0.37 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
4 MH EOT Cross Travel Aeration Blower House 1 0 1 0 1.00 100.00 0.28 0.37 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
5 PRO Secondary Clarifier Scrapper Secondary Clarifier 4 4 0 0 24.00 365.00 1.13 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
6 MISC Secondary Sludge Valve Secondary Clarifier 4 1 3 0 1.00 365.00 0.56 0.75 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
7 PUMP Recirculation Sludge Pumps Secondary Recirculation PH 6 4 2 0 24.00 365.00 54.36 75.00 1450 Horizontal Safe EFF1 Indoor Continuous 2.0 0.0 2% 0.72 415 V Wabag Wabag Wabag
8 PUMP Excess Sludge Pumps Secondary Recirculation PH 3 2 1 0 24.00 365.00 10.72 15.00 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.71 415 V Wabag Wabag Wabag
9 PUMP Dewatering Pumps Secondary Recirculation PH 2 1 1 0 2.00 200.00 1.01 1.50 2900 Vertical Safe EFF1 Submersible Intermittent 0.0 0.0 2% 0.68 415 V Wabag Vendor Wabag
Disinfection Section
1 AGI Chlorine Agitator Chlorine Mixing Tank 1 1 0 0 24.00 365.00 0.76 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.51 415 V Wabag Wabag Wabag
2 MH EOT - Hoist Drive Chlorine Tonner Room 1 1 0 0 1.00 365.00 2.78 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
3 MH EOT - Long Travel Chlorine Tonner Room 2 0 2 0 0.50 365.00 0.28 0.37 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
4 MH EOT - Cross Travel Chlorine Tonner Room 1 0 1 0 0.50 365.00 0.28 0.37 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
5 PUMP Chlorine Booster Pumps Utility Pump Shed 3 2 1 0 24.00 365.00 8.52 15.00 2900 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.57 415 V Wabag Wabag Wabag
6 PUMP Dechlorination Agitator Dechlorination Tank 1 1 0 0 4.00 200.00 0.76 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.51 415 V Wabag Wabag Wabag
Sludge Handling Section
1 PUMP Primary Sludge Pumps Primary Sludge PH 3 2 1 0 24.00 365.00 2.13 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.58 415 V Wabag Wabag Wabag
2 PUMP Dewatering Pumps Primary Sludge PH 2 1 1 0 2.00 100.00 1.10 1.50 2900 Vertical Safe EFF1 Submersible Intermittent 0.0 0.0 2% 0.73 415 V Wabag Vendor Wabag
3 PRO Thickener Scrapper Gravity Sludge Thickener 2 2 0 0 24.00 365.00 0.83 1.10 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
4 MISC Thickened Sludge Valve Gravity Sludge Thickener 2 1 1 0 1.00 365.00 0.56 0.75 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
5 PRO DAF Skimmer Assembly DAF Thickener 2 2 0 0 24.00 365.00 1.13 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
6 PRO DAF Revolving Assembly DAF Thickener 2 2 0 0 24.00 365.00 1.13 1.50 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
7 MISC DAF Recirculation Pump DAF Control Block 4 2 2 0 1.00 365.00 53.40 75.00 2900 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.71 415 V Wabag Wabag Wabag
8 MISC DAF Compressor DAF Control Block 2 1 1 0 1.00 365.00 16.05 18.50 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.87 415 V Wabag Wabag Wabag
9 MISC DAF Sludge Valve DAF Thickener 2 1 1 0 1.00 365.00 0.56 0.75 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
10 AGI Thickened Sludge Mixer Thickened Sludge Sump 2 2 0 0 24.00 365.00 1.10 1.50 1450 Horizontal Zone2 EFF1 Submersible Continuous 0.0 0.0 2% 0.73 415 V Wabag Vendor Wabag
11 PUMP Thickened Sludge Pumps Thickener Sludge PH 6 4 2 0 12.00 365.00 3.00 3.70 1450 Horizontal Zone2 EFF1 Indoor Intermittent 0.0 0.0 2% 0.81 415 V Wabag Wabag Wabag
12 PUMP Digester Recirculation Pumps Digester Control Block 8 4 4 0 12.00 365.00 3.44 5.50 1450 Horizontal Zone2 EFF1 Indoor Continuous 0.0 0.0 2% 0.63 415 V Wabag Wabag Wabag
13 MISC Heat Exchanger Valve Digester Control Block 4 4 0 0 3.00 365.00 0.56 0.75 1450 Horizontal Zone2 EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
14 PUMP Gas Mixing Compressor Digester Control Block 6 4 2 0 24.00 365.00 44.00 55.00 1450 Horizontal Zone2 EFF1 Indoor Continuous 0.0 0.0 2% 0.80 415 V Wabag Wabag Wabag
15 MISC Gas Mixing Valve Digester 12 4 8 0 2.00 365.00 0.56 0.75 1450 Horizontal Zone2 EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
16 AGI Digested Sludge Mixer Digester Sludge Sump 2 2 0 0 24.00 365.00 1.10 1.50 1450 Horizontal Zone2 EFF1 Submersible Continuous 0.0 0.0 2% 0.73 415 V Wabag Vendor Wabag
17 PUMP Digested Sludge Pumps Digester Sludge PH 5 3 2 0 16.00 365.00 4.70 7.50 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.63 415 V Wabag Wabag Wabag
18 PRO Centrifuge - Main Drive Sludge Dewatering System 4 3 1 0 16.00 365.00 25.90 37.00 2900 Horizontal Safe EFF1 Indoor Intermittent 4.0 0.0 2% 0.70 415 V Wabag Vendor Wabag
19 PRO Centrifuge - Back Drive Sludge Dewatering System 4 3 1 0 16.00 365.00 1.54 2.20 2900 Horizontal Safe EFF1 Indoor Intermittent 4.0 0.0 2% 0.70 415 V Wabag Vendor Wabag
20 AGI DWPE Tank Agitator Sludge Dewatering System 2 1 1 0 16.00 365.00 1.59 2.20 1450 Horizontal Zone2 EFF1 Indoor Intermittent 0.0 0.0 2% 0.72 415 V Wabag Vendor Wabag
21 PUMP DWPE Dosing Pumps Sludge Dewatering System 5 4 1 0 16.00 365.00 1.65 2.20 1450 Horizontal Zone2 EFF1 Indoor Intermittent 5.0 0.0 2% 0.75 415 V Wabag Wabag Wabag
22 PUMP Plant Drain Pumps Plant Drain Sump 2 1 1 0 24.00 365.00 12.95 18.50 1450 Vertical Zone2 EFF1 Submersible Continuous 0.0 0.0 2% 0.70 415 V Wabag Vendor Wabag
23 PUMP Plant Water Pumps Plant Water Sump 2 1 1 0 24.00 365.00 12.95 18.50 1450 Vertical Safe EFF1 Submersible Continuous 0.0 0.0 2% 0.70 415 V Wabag Vendor Wabag
Chemical House
1 AGI SMBS Tank Agitator Sludge Dewatering System 2 1 1 0 16.00 365.00 1.01 1.50 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.67 415 V Wabag Wabag Wabag
2 PUMP SMBS Dosing Pumps Sludge Dewatering System 2 1 1 0 16.00 365.00 1.65 2.20 1450 Horizontal Safe EFF1 Indoor Continuous 2.0 0.0 2% 0.75 415 V Wabag Wabag Wabag
Gas Flare Panel
1 MISC Gas Flare Valve Gas Flare 2 2 0 0 1.00 250.00 0.56 0.75 1450 Horizontal Zone2 EFF1 Outdoor Intermittent 0.0 0.0 2% 0.75 415 V Wabag Vendor Wabag
Gas Scrubber Panel
1 BLW Gas Blowers Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 11.95 15.00 1450 Horizontal Zone2 EFF1 Indoor Continuous 2.0 0.0 2% 0.80 415 V Wabag Wabag Wabag
2 PRO Spary Pump Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 11.82 15.00 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.79 415 V Vendor Vendor Vendor

ELECTRICAL LOAD LIST Page 1 of 3


LOAD LIST INPUT TO ELECTRICAL TEAM
Project 140 MLD Sewage Treatment Plant at Dinapur Rev. A Prepared CSK
Client UP Jal Nigam, Varanasi Date : 3-Dec-13 Checked CSK

BREAKUP - MOTORS
S.No Category Rev Mark Motor Description Location T W S F Operating Operating Operating Motor kW Motor Drive Hazardous Efficiency Location Service VFD DG Cable BKW/ Voltage Drive Motor Starter
hours days kW Speed Mounting Zone Level Loss KW Level Input scope Scope

h d kW kW rpm Nos. Nos. %


3 PRO Sludge Pump Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 0.35 0.75 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.47 415 V Vendor Vendor Vendor
4 PRO Dosing Pump Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 0.37 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.67 415 V Vendor Vendor Vendor
5 PRO Measuring Pump Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 0.35 0.75 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.47 415 V Vendor Vendor Vendor
6 PRO Air Blower for Sulphur Reactor Gas Scrubber Utility Shed 2 1 1 0 24.00 365.00 12.53 15.00 1450 Horizontal Safe EFF1 Indoor Continuous 1.0 0.0 2% 0.84 415 V Vendor Vendor Vendor
Gas Engine - Plant Auxiliary Panel
1 PRO Ventilation Blower for Engine Room Engine Wet Ventilation Room 3 2 1 0 24.00 365.00 8.25 11.00 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
2 PRO Air Washer Pump for Ventilation Engine Wet Ventilation Room 2 1 1 0 24.00 365.00 0.56 0.75 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
3 PRO Fresh Lube Oil Pump Gas Engine Room 1 1 0 0 5.00 365.00 0.83 1.10 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
4 PRO Waste Lube Oil Pump Gas Engine Room 1 1 0 0 5.00 365.00 0.83 1.10 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
5 PRO Engine Cooling Water Pump Gas Engine Room 1 1 0 0 5.00 365.00 0.83 1.10 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
6 PRO Cooling Tower Fan Gas Engine Room - Roof Top 3 2 1 0 24.00 365.00 1.08 1.20 1450 Vertical Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.90 415 V Vendor Vendor Vendor
7 PRO Engine CT Water Circulation Pump Gas Engine Utility Room 3 2 1 0 24.00 365.00 0.83 1.10 1450 Horizontal Safe EFF1 Outdoor Continuous 0.0 0.0 2% 0.75 415 V Vendor Vendor Vendor
8 PRO Engine Control Room AC Gas Engine Control Room 1 1 0 0 24.00 365.00 0.99 1.10 1450 Continuous 0.0 0.0 2% 0.90 415 V Vendor
Chlorine Leak Absorption System
1 PRO Caustic Solution Pump Chlorine Leak Scrubber 2 1 1 0 24.00 365.00 4.00 5.50 2900 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.73 415 V Wabag Vendor Wabag
2 PRO Leak Absoption Blower Chlorine Leak Scrubber 2 1 1 0 24.00 365.00 2.96 3.70 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.80 415 V Wabag Vendor Wabag
3 PRO Chlorine Dampner Valve Chlorine Leak Scrubber 2 1 1 0 24.00 365.00 0.12 0.18 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.67 415 V Wabag Vendor Wabag
Auxiliary System
1 PUMP Hot Water Recirculation Pumps Gas Engine Utility Room 2 1 1 0 24.00 365.00 4.89 7.50 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.65 415 V Wabag Wabag Wabag
2 PUMP Service Water Pump Service Water Pump Shed 2 1 1 0 12.00 365.00 2.96 3.70 1450 Horizontal Safe EFF1 Outdoor Intermittent 0.0 0.0 2% 0.80 415 V Wabag Wabag Wabag
3 PRO Water Softner Gas Engine Utility Room 1 1 0 0 24.00 365.00 3.33 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.90 415 V Wabag Vendor Wabag
4 PUMP Utility Water Transfer Pumps Gas Engine Utility Room 2 1 1 0 12.00 365.00 2.42 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.65 415 V Wabag Wabag Wabag
5 PUMP Cooling Water Pumps Gas Engine Utility Room 2 1 1 0 12.00 365.00 2.42 3.70 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.65 415 V Wabag Wabag Wabag
5 PUMP High Pressure Pump Auxiliary Pump Shed 2 1 1 0 12.00 365.00 6.50 7.50 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.87 415 V Wabag Wabag Wabag
HVAC Load
1 VENT Ventilation Fans Primary Sludge PH 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
2 VENT Ventilation Fans Aeration Blower House 6 6 0 0 24.00 365.00 0.45 0.75 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.60 415 V Wabag Vendor Wabag
3 VENT Ventilation Fans RAS PH 4 4 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
4 VENT Ventilation Fans Chlorination Room 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
5 VENT Ventilation Fans Chlorine Tonner Room 6 6 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Intermittent 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
6 VENT Ventilation Fans Thickened Sludge PH 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
7 VENT Ventilation Fans Digested Sludge PH 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
8 VENT Ventilation Fans Centrifuge Building 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
9 VENT Ventilation Fans Digester Control Block 4 4 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
10 VENT Ventilation Fans Administration Building 6 6 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
11 VENT Ventilation Fans PMCC Room 10 10 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
12 VENT Ventilation Fans MCC Room - 1 4 4 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
13 VENT Ventilation Fans Control Room 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
14 VENT Air Conditioning Laboratory 2 2 0 0 24.00 365.00 2.20 2.20 Horizontal Safe EFF1 Continuous 0.0 0.0 2% 1.00 415 V Wabag Vendor Wabag
15 VENT Air Conditioning Control Room 2 2 0 0 24.00 365.00 3.70 3.70 Horizontal Safe EFF1 Continuous 0.0 0.0 2% 1.00 415 V Wabag Vendor Wabag
16 VENT Air Conditioning Administration Building 2 2 0 0 12.00 365.00 2.20 2.20 Horizontal Safe EFF1 Intermittent 0.0 0.0 2% 1.00 415 V Wabag Vendor Wabag
17 VENT Ventilation Fans Scrubber MCC Room 4 4 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
18 VENT Air Conditioning Blower Control Room 2 2 0 0 24.00 365.00 3.70 3.70 Horizontal Safe EFF1 Continuous 0.0 0.0 2% 1.00 415 V Wabag Vendor Wabag
19 VENT Ventilation Fans Store Room 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
20 VENT Ventilation Fans Maintenance Room 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
21 VENT Ventilation Fans Chemical House 2 2 0 0 24.00 365.00 0.34 0.55 1450 Horizontal Safe EFF1 Indoor Continuous 0.0 0.0 2% 0.61 415 V Wabag Vendor Wabag
Miscellaneous Load
1 MISC Lighting Load 1 1 0 0 16.00 365.00 15.00 15.00 Intermittent 0.0 0.0 2% 1.00 415 V
2 MISC Instrumentation Load 1 1 0 0 24.00 365.00 5.00 5.00 Continuous 0.0 0.0 2% 1.00 415 V
3 MISC Laboratory Load 1 1 0 0 24.00 365.00 10.00 10.00 Continuous 0.0 0.0 2% 1.00 415 V
Insert Rows above this row (Don't Delete this row)
Total 269 0
1 Gas Flare will have an independent Control Panel supplied by Vendor. Power Supply to be provided by us to this Local Control Panel.
2 Screens will have an combined Control Panel for operating Conveyor and Screen drives. Power Supply to this Local Control Panel to be provided by us.
3 Chlorinator Package will have a Local Control Panel. Power supply to be considered by us.
4 For EOT and Electric Hoist, Consider only one feeder sized for highest rating of the Motor.
5 Ventilation Fans and Air Conditioning Load shall be through Lighting Distribution Board.
6 For Submersible Pumps and Mixers, a Local Control Panel with Monitoring unit will be provided. Power Supply to be provided by us.
7 Gas Engine Power Auxiliary Panel, will be supplied by Vendor.

ELECTRICAL LOAD LIST Page 2 of 3


LOAD LIST INPUT TO ELECTRICAL TEAM
Project 140 MLD Sewage Treatment Plant at Dinapur Rev. A Prepared CSK
Client UP Jal Nigam, Varanasi Date : 3-Dec-13 Checked CSK

BREAKUP - MOTORS
S.No Category Rev Mark Motor Description Location T W S F Operating Operating Operating Motor kW Motor Drive Hazardous Efficiency Location Service VFD DG Cable BKW/ Voltage Drive Motor Starter
hours days kW Speed Mounting Zone Level Loss KW Level Input scope Scope

h d kW kW rpm Nos. Nos. %


8 Gas Scrubber Panel will be supplied by Vendor. We need to consider only cost for Starter and other components of Gas Blowers.
9 Electrical to Furnish the data on System losses : VFD, Transformer, Cable Losses.
10 Chlorine Leak Absorption System, will have a local control panel.