Primavera P6 Exercise Worksheet


Don't want to upload?
Get unlimited downloads as a member

Sign

Waterproofing for Foundations Submis 5 14-May-13 20-May-13 $0.00


0.01.0190 Chain Link Fence Submission 10 14-May-13 27-May-13 $0.00
0.01.0110 Blocks Submission 5 19-May-13 23-May-13 $0.00
0.01.0200 Hollow Core Slab Submission 6 19-May-13 26-May-13 $0.00
0.01.0120 Curbstone Submission 7 26-May-13 03-Jun-13 $0.00
0.01.0130 Interlocking Tiles Submission 7 26-May-13 03-Jun-13 $0.00
0.01.0170 Kitchen Equipment Submission 7 26-May-13 03-Jun-13 $0.00
0.01.0140 Ceramic Tiles Submission 7 04-Jun-13 12-Jun-13 $0.00
0.01.0150 Aluminum False Ceiling Submission 7 04-Jun-13 12-Jun-13 $0.00
0.01.0160 Internal & External Paints Submission 7 04-Jun-13 12-Jun-13 $0.00
0.01.0210 Water Sup. & Drainage Pipes Submiss 14 18-Jun-13 07-Jul-13 $0.00
0.01.0220 Solar Heater System Submission 9 18-Jun-13 30-Jun-13 $0.00
0.01.0230 Sanitary Wares Submission 14 01-Jul-13 18-Jul-13 $0.00
0.01.0180 Kitchen Cabinet Submission 10 09-Jul-13 22-Jul-13 $0.00
0.01.0240 Exhaust Fans Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0250 VCD Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0260 Copper Pipes & Fittings Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0270 G.I. Sheets Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0280 Fire Dampers Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0290 Rubber Insulation Submission 7 21-Jul-13 29-Jul-13 $0.00
0.01.0320 PVC Conduits & Accessories Submissio 5 25-Jul-13 31-Jul-13 $0.00
0.01.0330 G.I. Boxes & Pipes Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0340 Isolators Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0350 Cables & Wires Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0360 Lighting Control Panel Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0370 Fire Alarm System Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0380 Satellite Antenna Distribution System Su 5 25-Jul-13 31-Jul-13 $0.00
0.01.0390 Lighting Fixtures Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0400 Road Light Submission 5 25-Jul-13 31-Jul-13 $0.00
0.01.0300 Package Unit Submission 7 30-Jul-13 07-Aug-13 $0.00
0.01.0310 Split Unit Submission 7 30-Jul-13 07-Aug-13 $0.00
Material Approval 73 19-May-13 27-Aug-13 $0.00
0.01.0410 Steel Reinforcements Approval 14 19-May-13 05-Jun-13 $0.00
ay Jun Jul Aug Sep Oct
2013 Qtr 3, 2013 Qtr 4, 2013
13-Oct-
13-Oct-
Project Start
Project F
13-Oct-
13-Oct-
Mobilization
Field Offices
Site Clearance
Re-routing Existing Services
Security Permits Extraction
Soil Investigation
Demobil
04-Sep-13, Procurement
07-Aug-13, Material Submittal
Steel Reinforcements Submission
Ready Mix Concrete Submission
Waterproofing for Foundations Submission
Chain Link Fence Submission
Blocks Submission
Hollow Core Slab Submission
Curbstone Submission
Interlocking Tiles Submission
Kitchen Equipment Submission
Ceramic Tiles Submission
Aluminum False Ceiling Submission
Internal & External Paints Submission
Water Sup. & Drainage Pipes Submission
Solar Heater System Submission
Sanitary Wares Submission
Kitchen Cabinet Submission
Exhaust Fans Submission
VCD Submission
Copper Pipes & Fittings Submission
G.I. Sheets Submission
Fire Dampers Submission
Rubber Insulation Submission
PVC Conduits & Accessories Submission
G.I. Boxes & Pipes Submission
Isolators Submission
Cables & Wires Submission
Lighting Control Panel Submission
Fire Alarm System Submission
Satellite Antenna Distribution System Submission
Lighting Fixtures Submission
Road Light Submission
Package Unit Submission

Você também pode gostar