Escolar Documentos
Profissional Documentos
Cultura Documentos
PROYECTO: "MEJORAMIENTO, REHABILITACION DE LA INFRAESTRUCTURA VIAL DE LA AV. INDEPENDENCIA TRAMO (AV CIRCUNVALACIN-JR. POJCRACCASI) DE LA CIUDAD DE JULIACA, PROVINCIA DE
SAN ROMAN - PUNO"
UNIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
PRESUPUESTO 12,873,148.71 NUEVOS SOLES
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
01.01.00 CARTEL DE OBRA UND 4.00 764.83 3059.32 4.00 762.82 3051.28 2.00 849.09 1698.18
01.02.00 ALMACEN Y/O CASETA DE GUARDIANIA Y/O RESIDENCIA M2 120.00 141.82 17018.40 120.00 136.59 16390.80 0.00 0.00 0.00
01.03.00 HABILITACION DE VIAS ALTERNAS M2 42861.21 1.02 43718.43 43581.21 1.35 58834.63 21313.79 1.45 30905.00
02.00.00 OBRAS PRELIMINARES
02.01.01 SEGURIDAD DURANTE LA CONSTRUCCION GLB 1.00 15554.40 15554.40 0.90 25178.00 22660.20 0.10 26642.40 2664.24
02.02.00 TRAZO, NIVELACION Y REPLANTEO
02.02.01 TRAZO Y REPLANTEO INICIAL M 11620.80 0.90 10458.72 11620.00 0.84 9760.80 7840.00 1.14 8937.60
02.02.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION M2 43464.05 0.41 17820.26 54234.27 0.16 8677.48 259471.07 0.55 142709.09
02.03.00 MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO
02.03.01 MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO GLB 1.00 8486.62 8486.62 0.00 0.00 0.00 0.00 0.00 0.00
02.03 DEMOLICIONES
02.03.01 DEMOLICION DE PAVIMENTO m2 0.00 0.00 0.00 0.00 0.00 0.00 861.00 5.97 5140.17
02.03.02 DEMOLICION DE VEREDAS m2 0.00 0.00 0.00 0.00 0.00 0.00 2215.73 6.80 15066.96
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 RELLENOS
03.01.01 RELLENO CON MATERIAL DE PRESTAMO M3 0.00 0.00 0.00 1894.00 10.76 20379.44 1300.00 34.89 45357.00
03.01.02 RELLENO CON MATERIAL PROPIO M3 0.00 0.00 0.00 722.26 10.01 7229.82 0.00 0.00 0.00
03.02 NIVELADO Y COMPACTADO
03.02.01 NIVELADO Y COMPACTADO C/EQUIPO LIVIANO m2 0.00 0.00 0.00 0.00 0.00 0.00 6020.96 2.73 16437.22
03.02.00 CORTES
03.02.01 CORTE DE TERRENO CON MAQUINARIA M3 32857.30 4.71 154757.88 30883.14 6.10 188387.15 18606.42 6.42 119453.22
03.03.00 EXCAVACIONES
03.03.01 EXCAVACION EN FORMA MANUAL M3 1605.42 20.01 32124.45 1636.98 20.01 32755.97 8682.82 36.71 318746.32
03.04.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
03.04.01 ACARREO DE MATERIAL EXCEDENTE M3 2006.77 10.01 20087.77 1752.71 10.01 17544.63 19080.07 18.35 350119.28
03.04.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3 42051.61 3.69 155170.44 33282.15 3.42 113824.95 42668.29 3.51 149765.70
03.04.00 PERFILADO Y COMPACTADO DE SUB RASANTE
03.04.01 PERFILADO Y COMPACTADO EN ZONA DE CORTE M2 38110.00 0.90 34299.00 35705.00 1.30 46416.50 16870.40 1.34 22606.34
04.00.00 PAVIMENTO
04.01.01 CONFORMACION DE SUB RASANTE E=0.30M M2 29870.00 8.65 258375.50 27985.00 7.12 199253.20 304.60 7.38 2247.95
04.01.02 CONFORMACION DE SUB RASANTE E=0.40M M2 0.00 0.00 0.00 0.00 0.00 0.00 16870.40 9.29 156726.02
04.01.02 CONFORMACION DE EXPLANACIONES 2 CAPA E=0.20M M2 29870.00 6.21 185492.70 27985.00 5.28 147760.80 304.60 5.47 1666.16
04.01.03 CONFORMACION DE EXPLANACIONES 3 CAPA E=0.20M M2 29870.00 6.21 185492.70 23160.00 5.28 122284.80 0.00 0.00 0.00
04.02.00 SUB BASE
04.02.01 CONFORMACION DE SUB BASE E=0.15M M2 29870.00 8.58 256284.60 27985.00 7.15 200092.75 664.60 7.34 4878.16
04.02.02 CONFORMACION DE SUB BASE E=0.20M M2 0.00 0.00 0.00 0.00 0.00 0.00 16870.40 9.81 165498.62
04.03.00 BASE
04.03.01 CONFORMACION DE BASE E=0.15 M M2 40170.00 9.08 364743.60 29625.00 7.30 216262.50 22975.00 7.48 171853.00
04.04.00 PAVIMENTO FLEXIBLE
04.04.01 IMPRIMACION M2 35020.00 6.00 210120.00 18469.00 4.30 79416.70 31762.00 4.31 136894.22
04.04.02 CARPETA ASFALTICA E=3" M2 35020.00 65.24 2284704.80 0.00 0.00 0.00 50231.00 60.24 3025915.44
05.00.00 DRENAJE PLUVIAL
05.01.00 SOLADO CONCRETO F'C=100KG/CM2 M2 0.00 0.00 0.00 147.90 26.96 3987.38 299.70 36.89 11055.93
05.02.00 CONCRETO CICLOPEO 1:8 + 25% P.M M3 0.00 0.00 0.00 14.71 143.75 2114.56 6.27 162.45 1018.56
05.03.00 CONCRETO F'C=210 KG/CM2 M3 0.00 0.00 0.00 52.84 354.73 18743.93 38.25 439.42 16807.82
05.04.00 CONCRETO F'C=175 KG/CM2 M3 110.24 342.31 37736.25 88.80 286.93 25479.38 57.15 331.21 18928.65
05.05.00 ENCOFRADO Y DESENCOFRADO M2 648.40 43.01 27887.68 429.40 36.29 15582.93 546.12 55.34 30222.28
05.06.00 ACERO CORRUGADO KG 7254.96 4.25 30833.58 7075.71 4.27 30213.28 12516.72 4.75 59454.42
05.07.00 TAPA METALICA DE INSPECCION UND 14.00 154.98 2169.72 0.00 0.00 0.00 24.00 167.20 4012.80
06.00.00 CUNETAS
06.01.00 CUNETA DE CONCRETO TIPO 1 F'C=175 KG/CM2 A=0.50 M M 1906.76 23.72 45228.35 635.10 22.59 14346.91 2872.36 28.52 81919.71
06.02.00 CUNETA DE CONCRETO TIPO 1 F'C=175 KG/CM2 A=0.60 M M 0.00 0.00 0.00 640.30 23.55 15079.07 1014.03 29.97 30390.48
06.03.00 CUNETA TIPO 1: JUNTA ASFALTICA M 319.50 5.10 1629.45 0.00 0.00 0.00 924.66 7.10 6565.09
06.04.00 CUNETA DE CONCRETO TIPO 2 F'C=210 KG/CM2 A=1.00 M M 1906.76 93.65 178568.07 0.00 0.00 0.00 0.00 0.00 0.00
06.05.00 CUNETA DE CONCRETO TIPO 2 F'C=210 KG/CM2 A=1.20 M M 0.00 0.00 0.00 0.00 0.00 0.00 507.35 136.97 69491.73
06.06.00 CUNETA DE CONCRETO TIPO 2 F'C=210 KG/CM2 A=1.50 M M 0.00 0.00 0.00 0.00 0.00 0.00 141.86 153.42 21764.16
06.07.00 CUNETA TIPO 2: JUNTA ASFALTICA M 319.50 8.32 2658.24 0.00 0.00 0.00 263.23 11.56 3042.94
07.00.00 SEPARADOR CENTRAL
07.01.00 SARDINELES
SARDINELES: BLOQUES DE CONCRETO F'C=140 KG/CM2
07.01.01 M3 0.00 0.00 0.00 250.98 229.56 57614.97 179.42 261.34 46889.62
07.01.02 SARDINELES: CONCRETO fc=175 kg/cm2 M3 1162.96 319.82 371937.87 513.61 322.82 165803.58 186.84 395.44 73884.01
07.01.03 SARDINELES: ENCOFRADO Y DESENCOFRADO M2 3765.29 23.89 89952.78 5794.31 21.69 125678.58 3628.61 29.32 106390.85
PRESUPUESTO COMPARATIVO
PROYECTO: "MEJORAMIENTO, REHABILITACION DE LA INFRAESTRUCTURA VIAL DE LA AV. INDEPENDENCIA TRAMO (AV CIRCUNVALACIN-JR. POJCRACCASI) DE LA CIUDAD DE JULIACA, PROVINCIA DE
SAN ROMAN - PUNO"
UNIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
PRESUPUESTO 12,873,148.71 NUEVOS SOLES
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
07.01.04 SARDINELES: JUNTA ASFALTICA M 1256.45 5.10 6407.90 398.93 5.72 2281.88 1074.38 7.10 7628.10
VEREDAS
07.02.00
07.02.01 VEREDAS: CONCRETO F'C=140 KG/CM2 E=10CM ACAB 1 CM 1:2 COLO M2 0.00 0.00 0.00 0.00 0.00 0.00 4090.96 56.92 232857.44
07.02.02 VEREDA: ADOCRETO M2 0.00 0.00 0.00 0.00 0.00 0.00 1846.69 69.49 128326.49
07.02.03 VEREDAS: ENCOFRADO Y DESENCOFRADO M2 0.00 0.00 0.00 0.00 0.00 0.00 198.59 63.37 12584.65
07.02.04 VEREDA: JUNTA ASFALTICA M 0.00 0.00 0.00 0.00 0.00 0.00 2011.89 6.81 13700.97
RAMPAS
07.03.00
RAMPAS: CONCRETO F'C=175 KG/CM2 BRUADO COLOREADO
07.03.01 M2 0.00 0.00 0.00 9.00 78.22 703.98 216.00 87.90 18986.40
RAMPAS: CONCRETO F'C=210 KG/CM2 BRUADO
07.03.02 M2 0.00 0.00 0.00 22.35 98.26 2196.11 0.00 0.00 0.00
RAMPAS: ENCOFRADO Y DESENCOFRADO
07.03.03 M2 0.00 0.00 0.00 10.41 35.78 372.47 14.40 46.13 664.27
RAMPAS: ACERO DE REFUERZO
07.03.04 KG 0.00 0.00 0.00 427.13 4.80 2050.22 0.00 0.00 0.00
RAMPAS: JUNTA ASFALTICA
07.03.05 M 0.00 0.00 0.00 25.50 5.54 141.27 75.00 6.83 512.25
DELIMITADOR DE VIA
08.00.00
DELIMITADOR DE VIA: CONCRETO F'C=175 KG/CM2
08.01.00 M3 0.00 0.00 0.00 0.00 0.00 0.00 387.36 280.68 108724.20
DELIMITADOR DE VIA: ENCOFRADO Y DESENCOFRADO
08.02.00 M2 0.00 0.00 0.00 0.00 0.00 0.00 1829.20 50.76 92850.19
MALLA METALICA DE PROTECCION
09.00.00
REJA METALICA
09.01.00 M 0.00 0.00 0.00 0.00 0.00 0.00 1752.00 117.02 205019.04
10.02.00 PROTECTOR DE VIA
10.02.01 PROTECTOR DE VIA : CONCRETO F'C=210 KG/CM2 m3 0.00 0.00 0.00 0.00 0.00 0.00 20.12 348.74 7016.65
10.02.02 PROTECTOR DE VIA: ENCOFRADO Y DESENCOFRADO m2 0.00 0.00 0.00 0.00 0.00 0.00 46.04 50.76 2336.99
10.00.00 MITIGACION DE IMPACTO AMBIENTAL
10.01.01 RIEGO DE VIAS ALTERNAS Y CANTERA DIA 120.00 656.75 78810.00 113.00 120.00 13560.00 217.00 120.00 26040.00
10.01.02 HABILITACION PROVISIONAL DE LETRINAS UND 4.00 1250.00 5000.00 2.00 1250.00 2500.00 2.00 1250.00 2500.00
10.01.03 HABILITACION PROVISIONAL DE BASUREROS UND 10.00 120.00 1200.00 0.00 0.00 0.00 10.00 120.00 1200.00
10.01.04 PROGRAMA DE CONTENGENCIA UND 4.00 957.50 3830.00 0.00 0.00 0.00 4.00 957.50 3830.00
10.02.00 ETAPA DE ABANDONO
10.02.01 TRAZO Y REPLANTEO EN BOTADERO HA 1.50 684.18 1026.27 0.00 0.00 0.00 3.00 439.32 1317.96
10.02.02 RECONFORMACION DE BOTADERO HA 1.50 3080.53 4620.80 0.00 0.00 0.00 2.50 6277.50 15693.75
10.02.03 RECONFORMACION DE CANTERAS HA 1.60 671.66 1074.66 0.00 0.00 0.00 3.20 861.70 2757.44
10.02.04 SEMBRADO DE ARBUSTOS Y ARBOLES HA 1.50 1002.31 1503.47 0.00 0.00 0.00 2.50 3282.15 8205.38
10.02.05 PROGRAMA DE MONITOREO AMBIENTAL UND 7.00 257.50 1802.50 0.00 0.00 0.00 10.00 257.50 2575.00
11.00.00 PRUEBAS DE CONTROL DE CALIDAD
11.00.01 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD GLB 1.00 10000.10 10000.10 0.00 0.00 0.00 1.10 5000.00 5500.00
12.00.00 GUARDA VIAS METALICAS
12.00.01 GUARDAVIAS METALICO M 1934.00 218.49 422559.66 0.00 0.00 0.00 2097.83 193.38 405678.37
AREAS VERDES
13.00.00
PREPARACION DE TERRENO PARA AREA VERDE
13.01.00 M3 0.00 0.00 0.00 0.00 0.00 0.00 196.88 96.58 19014.67
SEMBRADO DE GRASS
13.02.00 M2 0.00 0.00 0.00 0.00 0.00 0.00 574.60 16.71 9601.57
SEMBRADO DE ARBUSTOS Y ARBOLES
13.02.00 UNID 0.00 0.00 0.00 0.00 0.00 0.00 465.00 35.86 16674.90
15 VARIOS, LIMPIEZA
15.01 REUBICACION DE POSTES EXISTENTES UND 18.00 372.55 6705.90 0.00 0.00 0.00 0.00 0.00 0.00
15.02 CONSTRUCCION DE BUZONES UND 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2329.55 51250.10
15.03 NIVELACION DE BUZONES UND 4.00 162.88 651.52 0.00 0.00 0.00 22.00 229.07 5039.54
15.04 EVAL. Y REPAR. DE RED MATRIZ DE AGUA UND 0.00 0.00 0.00 0.00 0.00 0.00 10.00 183.52 1835.20
15.05 EVAL. Y REPAR. RED MATRIZ DE DESAGUE UND 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1016.14 10161.40
15.06 NIVELACION DE CAJAS DE REGISTRO INSTALACIONES DOMICILIARIAS UND 0.00 0.00 0.00 0.00 0.00 0.00 70.00 149.20 10444.00
15.07 REPOSICION DE VALVULAS UND 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1750.58 3501.16
16 LIMPIEZA
14.03.00 LIMPIEZA PERMANENTE Y FINAL DE OBRA M2 38110.00 0.45 17149.50 34167.29 0.12 4100.07 21728.00 0.23 4997.44
II. CONSTRUCCION DE OBRAS COMPLEMENTARIAS
01.01.01.01 AGUA PARA LA CONSTRUCCION GLB 7.00 650.00 4550.00 3.00 650.00 1950.00 7.00 650.00 4550.00
01.01.01.02 ENERGIA ELECTRICA PARA LA CONSTRUCCION GLB 7.00 650.00 4550.00 3.00 650.00 1950.00 7.00 650.00 4550.00
01.01.02 TRABAJOS PRELIMINARES
01.01.02.01 LIMPIEZA INICIAL DE TERRENO MANUAL m2 19089.94 0.41 7826.88 16876.35 0.41 6919.30 0.00 0.00 0.00
01.01.03 TRAZO, NIVELACION Y REPLANTEO
01.01.03.01 TRAZO Y REPLANTEO INICIAL m2 19089.94 0.89 16990.05 40319.50 0.89 35884.36 10080.00 1.31 13204.80
01.01.03.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 19089.94 0.99 18899.04 117.17 0.99 116.00 16104.84 1.78 28666.62
01.01.04 SEGURIDAD Y SALUD
01.01.04.01 SELEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 3500.00 3500.00 1.00 3500.00 3500.00 0.00 0.00 0.00
01.01.04.02 SELEALIZACION DE SEGURIDAD GLB 1.00 1000.00 1000.00 1.00 1000.00 1000.00 0.00 0.00 0.00
02.00.00 ESTRUCTURAS
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
02.01.01 EXCAVACIONES
02.01.01.01 CORTE DE TERRENO CON MAQUINARIA m3 3954.19 6.14 24278.73 9048.38 7.81 70667.85 5126.24 8.11 41573.81
02.01.01.02 EXCAVACION MANUAL m3 0.00 0.00 0.00 9.99 20.01 199.90 375.15 36.71 13771.76
02.01.01.03 RELLENO CON MATERIAL DE PRESTAMO (MAT. CORTE DE LA VIA) m3 18948.14 9.77 185123.33 21246.76 20.71 440020.40 3893.24 21.42 83393.20
02.01.01.04 NIVELADO Y COMPACTADO C/EQUIPO PESADO m2 19089.94 9.53 181927.13 42040.38 3.07 129063.97 5346.40 3.10 16573.84
02.01.01.05 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 4942.74 11.28 55754.11 4066.60 1.98 8051.87 12942.00 2.03 26272.26
02.02.00 OBRAS DE CONCRETO SIMPLE
02.02.01 GRADAS
02.02.01.01 GRADAS DE CONCRETO FC=175KG/CM2 1:2 BRUADO m2 25.69 73.48 1887.70 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.02 GRADAS ENCOFRADO Y DESENCOFRADO m2 9.98 64.57 644.41 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02 RAMPAS
02.02.02.01 RAMPAS: CONC F'C=175 KG/CM2 ACAB 1:2 BRUADO m2 578.80 36.33 21027.80 0.00 0.00 0.00 499.19 100.80 50318.35
02.02.02.02 RAMPAS: ENCOFRADO Y DESENCOFRADO m2 237.64 28.81 6846.41 0.00 0.00 0.00 31.88 32.09 1023.03
02.02.03 FALSO PISO
02.02.03.01 FALSO PISO 4" MEZCLA 1:8 m2 13459.00 25.49 343069.91 0.00 0.00 0.00 0.00 0.00 0.00
02.03.00 OBRAS DE CONCRETO ARMADO
02.03.01 JARDINERAS
02.03.01.01 JARDINERIA CONCRETO FC=175KG/CM2 m3 72.36 400.23 28960.64 0.00 0.00 0.00 32.40 435.20 14100.48
02.03.01.02 JARDINERIA ENCOFRADO Y DESENCOFRADO m2 528.79 32.64 17259.71 0.00 0.00 0.00 435.62 45.75 19929.62
02.03.01.03 JARDINERIA ACERO DE REFUERZO kg 1612.17 4.25 6851.72 0.00 0.00 0.00 0.00 0.00 0.00
03.00.00 ARQUITECTURA
03.01.01 TARRAJEO SARDINELES m2 5153.17 21.85 112596.76 0.00 0.00 0.00 0.00 0.00 0.00
03.02.00 PISOS Y PAVIMENTOS
03.02.01 PISO DE ADOPASTO m2 1647.99 87.38 144001.37 0.00 0.00 0.00 845.90 92.35 78118.87
03.02.02 PISO DE CANTO RODADO m2 0.00 0.00 0.00 0.00 0.00 0.00 378.78 93.47 35404.57
03.02.03 PISO DE ADOCRETO m2 0.00 0.00 0.00 0.00 0.00 0.00 2107.57 62.20 131090.85
PISO DE CARPETA ASFALTICA E=1.5"
03.02.04 m2 0.00 0.00 0.00 0.00 0.00 0.00 3442.23 38.09 131114.54
03.02.05 PISO DE PIEDRA LAJA m2 1323.73 63.77 84414.26 0.00 0.00 0.00 0.00 0.00 0.00
03.02.06 PISO DE CEMENTO ACABADO BRUADO m2 542.77 24.19 13129.61 0.00 0.00 0.00 1452.69 60.77 88279.97
03.02.07 PISO DE CEMENTO ACABADO COLOREADO m2 4496.70 28.26 127076.74 0.00 0.00 0.00 1720.39 55.94 96238.62
03.02.08 PISO DE CEMENTO COLOREADO ACABADO BRUADO m2 5784.96 30.45 176152.03 0.00 0.00 0.00 0.00 0.00 0.00
03.02.09 PISO JUNTA ASFALTICA M 3670.86 2.95 10829.04 0.00 0.00 0.00 186.50 4.07 759.06
03.03.00 SARDINELES
03.03.01 SARDINELES: CONCRETO fc=175 kg/cm2 m3 664.61 400.23 265996.86 20.21 335.00 6770.35 400.08 408.83 163564.71
03.03.02 SARDINELES: ENCOFRADO Y DESENCOFRADO m2 7135.93 32.64 232916.76 136.36 32.64 4450.79 2995.07 45.75 137024.45
03.03.03 SARDINELES JUNTA ASFALTICA m 1555.20 2.95 4587.84 0.00 0.00 0.00 299.70 4.07 1219.78
03.03.04 SARDINELES: ENCHAPE CON CANTO RODADO m2 4.91 48.85 239.85 0.00 0.00 0.00 22.22 82.22 1826.93
03.04.00 PINTURA
03.04.01 PINTURA EN SARDINELES m2 5153.17 5.35 27569.46 0.00 0.00 0.00 2777.20 10.72 29771.58
03.05.00 VARIOS, LIMPIEZA Y JARDINERIA 0.00
03.05.01 LIMPIEZA PERMANENTE DE OBRA m2 19089.94 0.23 4390.69 0.00 0.00 0.00 16876.35 0.40 6750.54
03.05.02 LIMPIEZA FINAL DE OBRA m2 19089.94 0.12 2290.79 0.00 0.00 0.00 16876.35 0.23 3881.56
03.06.00 SEMBRIO DE GRASS
03.06.01 PREPARACION DE TERRENO PARA AREA VERDE m3 1288.10 66.64 85838.98 0.00 0.00 0.00 934.60 97.78 91385.19
03.06.02 SEMBRADO DE GRASS m2 4293.67 3.21 13782.68 0.00 0.00 0.00 4747.82 17.05 80950.33
03.07.00 TRABAJOS DE JARDINERIA
03.07.01 SEMBRADO DE ALAMOS und 221.00 53.30 11779.30 0.00 0.00 0.00 100.00 20.37 2037.00
03.07.02 SEMBRADO DE RETAMAS und 245.00 13.99 3427.55 0.00 0.00 0.00 0.00 0.00 0.00
03.07.03 SEMBRADO DE QUEUAS und 150.00 63.30 9495.00 0.00 0.00 0.00 0.00 0.00 0.00
SEMBRADO DE CACTUS
03.07.04 und 0.00 0.00 0.00 0.00 0.00 0.00 100.00 33.79 3379.00
SEMBRADO DE PINOS
03.07.05 und 0.00 0.00 0.00 0.00 0.00 0.00 100.00 18.79 1879.00
SEMBRADO DE FLORES MULTIPLES
03.07.06 und 0.00 0.00 0.00 0.00 0.00 0.00 4350.00 4.27 18574.50
03.07.04 CASETA PARA RIEGO und 10.00 2063.73 20637.30 0.00 0.00 0.00 0.00 0.00 0.00
CASETA DE RIEGO
04.00.00
EXCAVACION C/MAQUINARIA
m3
04.01.00 0.00 0.00 0.00 0.00 0.00 0.00 138.45 3.63 502.57
SOLADO F'C=100 KG/CM2 E=0.10 M
m2
04.02.00 0.00 0.00 0.00 0.00 0.00 0.00 56.24 33.85 1903.72
ACERO CORRUGADO F'Y =4200 KG/CM2
kg
04.03.00 0.00 0.00 0.00 0.00 0.00 0.00 5620.17 4.75 26695.81
ENCOFRADO Y DESENCOFRADO
m2
04.04.00 0.00 0.00 0.00 0.00 0.00 0.00 219.36 56.26 12341.19
CONCRETO F'C=210 KG/CM2
m3
04.05.00 0.00 0.00 0.00 0.00 0.00 0.00 43.70 456.56 19951.67
TARRAJEO DE MURO CON IMPERMEABILIZANTE
m2
04.06.00 0.00 0.00 0.00 0.00 0.00 0.00 248.31 36.85 9150.22
IMPLEMENTACION CASETA DE RIEGO
und
04.07.00 3.00 2525.00 7575.00 0.00 0.00 0.00 6.00 8230.66 49383.96
SISTEMA DE RIEGO
05.00.00
EXCAVACION DE ZANJA PARA TUBERIA EN FORMA MANUAL
m3
05.01.00 0.00 0.00 0.00 0.00 0.00 0.00 227.18 36.71 8339.78
TUBERIA PVC C-10 DE 1"
m
05.02.00 0.00 0.00 0.00 0.00 0.00 0.00 2470.00 12.15 30010.50
RELLENO MANUAL CON ARENA E=12CM
m3
05.03.00 0.00 0.00 0.00 0.00 0.00 0.00 88.02 110.99 9769.34
RELLENO COMPACTADO CON MATERIAL PROPIO
m3
05.04.00 0.00 0.00 0.00 0.00 0.00 0.00 125.28 67.76 8488.97
CONCRETO F'C=175 KG/CM2
m3
05.05.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 353.13 8475.12
06.00.00 OTROS
06.01.01 BANCAS ORNAMENTALES und 99.00 1534.18 151883.82 0.00 0.00 0.00 95.00 738.36 70144.20
06.01.02 COLECTOR DE DESECHOS und 65.00 597.93 38865.45 0.00 0.00 0.00 41.00 628.33 25761.53
06.01.03 COBERTURA DE ESTARES und 43.00 1025.98 44117.14 0.00 0.00 0.00 0.00 0.00 0.00
06.01.04 ESTACIONAMIENTO PARA BICICLETAS und 10.00 597.41 5974.10 0.00 0.00 0.00 10.00 696.18 6961.80
PERGOLA VIRTUAL
06.01.05 und 0.00 0.00 0.00 0.00 0.00 0.00 43.00 2426.70 104348.10
06.01.06 ELEMENTOS ORNAMENTALES TIPO I und 9.00 8289.88 74608.92 0.00 0.00 0.00 1.00 27245.61 27245.61
PRESUPUESTO COMPARATIVO
PROYECTO: "MEJORAMIENTO, REHABILITACION DE LA INFRAESTRUCTURA VIAL DE LA AV. INDEPENDENCIA TRAMO (AV CIRCUNVALACIN-JR. POJCRACCASI) DE LA CIUDAD DE JULIACA, PROVINCIA DE
SAN ROMAN - PUNO"
UNIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
PRESUPUESTO 12,873,148.71 NUEVOS SOLES
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
06.01.07 ELEMENTOS ORNAMENTALES TIPO II und 2.00 12289.88 24579.76 0.00 0.00 0.00 1.00 14996.12 14996.12
06.01.08 ELEMENTOS ORNAMENTALES TIPO III und 0.00 0.00 0.00 0.00 0.00 0.00 8.00 6283.60 50268.80
06.01.09 PILETA ORNAMENTAL und 0.00 0.00 0.00 0.00 0.00 0.00 1.00 6804.70 6804.70
07.00.00 INSTALACIONES SANITARIAS
07.01.01 RED DE RECOLECCION PTO 42.00 27.07 1136.94 0.00 0.00 0.00 0.00 0.00 0.00
08.00.00 INSTALACIONES ELECTRICAS Y MECANICAS
08.01.01 CONEXION A LA RED EXTERNA DE MEDIDORES GLB 3.00 1100.00 3300.00 0.00 0.00 0.00 3.00 1100.00 3300.00
08.02.00 SALIDA
08.02.01 CAJA DE PASO DE CONCRETO 0.30X0.30M. CON TAPA und 0.00 0.00 0.00 0.00 0.00 0.00 167.00 604.57 100963.19
08.02.02 CAJA DE PASO DE F G PESADO 20X20X10CM. CON TAPA und 222.00 118.63 26335.86 0.00 0.00 0.00 0.00 0.00 0.00
08.03.00 CANALIZACIONES, CONDUCTOS, O TUBERIAS
11.03.01 TUBERIA DE INSTALACION ELECTRICA PVC SAP 3" CLASE 10 m 2300.00 26.23 60329.00 0.00 0.00 0.00 2379.00 24.73 58832.67
08.03.01 TUBERIA DE INSTALACION ELECTRICA PVC SAP 2" CLASE 10 m 0.00 0.00 0.00 0.00 0.00 0.00 2481.00 36.73 91127.13
08.03.02 TUBERIA PVC SAP 3/4" m 750.00 4.56 3420.00 0.00 0.00 0.00 200.00 6.02 1204.00
08.04.00 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
08.04.01 CONDUCTOR DE COBRE NYY 3x1x25 MM2 m 2300.00 61.71 141933.00 0.00 0.00 0.00 2500.00 64.35 160875.00
08.04.02 CONDUCTOR DE COBRE NYY 1x25 MM2 m 2300.00 10.53 24219.00 0.00 0.00 0.00 2500.00 12.27 30675.00
08.04.03 CONDUCTOR NLT 2X2.50 MM2 m 850.00 8.62 7327.00 0.00 0.00 0.00 500.00 9.26 4630.00
08.04.04 BAJADA PARA CABLE SUBTERRANEO jgo 2.00 364.03 728.06 0.00 0.00 0.00 2.00 410.06 820.12
08.04.05 CONDUCTOR DE COBRE DESNUDO 25 MM2 m 120.00 15.85 1902.00 0.00 0.00 0.00 120.00 18.49 2218.80
08.05.00 TABLERO ELECTRICO DE DISTRIBUCION
08.05.01 TABLERO DE DISTRIBUCION CAJA METALICA IP 30 DE 12 POLOS und 3.00 495.88 1487.64 0.00 0.00 0.00 3.00 633.90 1901.70
08.06.00 DISPOSITIVOS DE MANIOBRA Y PROTECCION
08.06.01 INTERRUPTOR TERMOMAGNETICO DIN 3X200A und 3.00 652.52 1957.56 0.00 0.00 0.00 3.00 756.05 2268.15
08.06.02 INTERRUPTOR THERMOMAGNETICO TRIFASICO DIN 3X100A und 5.00 421.68 2108.40 0.00 0.00 0.00 5.00 428.87 2144.35
08.06.03 INTERRUPTOR HORARIO 16A pza 3.00 101.68 305.04 0.00 0.00 0.00 3.00 108.87 326.61
08.07.00 INSTALACION DEL SISTEMA DE PUESTA A TIERRA
08.07.01 SISTEMA DE PUESTA A TIERRA und 26.00 1224.88 31846.88 0.00 0.00 0.00 15.00 1411.80 21177.00
08.08.00 ARTEFACTOS
08.08.01 LUMINARIA DE VAPOR SODIO DE ALTA PRESION DE 70W und 218.00 51.05 11128.90 0.00 0.00 0.00 73.00 2960.59 216123.07
08.08.02 LUMINARIA DE LED RGB DE 5MM DE 7X7 MATRICIAL IP 65 und 90.00 2941.16 264704.40 0.00 0.00 0.00 61.00 722.69 44084.09
08.08.03 LUMINARIA BALIZA HCP 170 DE 70W und 92.00 705.70 64924.40 0.00 0.00 0.00 0.00 0.00 0.00
08.09.00 EQUIPOS ELECTRICOS Y MECANICOS
08.09.01 ELECTROBOMBA SUMERGIBLE DE 3HP TUBULAR (PARA PILETA) und 3.00 5455.81 16367.43 0.00 0.00 0.00 1.00 5573.69 5573.69
08.10.00 VARIOS
08.10.01 ELEMENTOS DE SEGURIDAD GLB 1.00 934.13 934.13 0.00 0.00 0.00 1.00 1190.10 1190.10
08.10.02 TRAZO Y REPLANTEO M 2320.00 0.67 1554.40 0.00 0.00 0.00 2485.00 0.93 2311.05
08.11.00 MOVIMIENTO DE TIERRAS
08.11.01 EXCAVACION DE ZANJA PARA TUBERIA EN FORMA MANUAL m3 695.00 20.01 13906.95 0.00 0.00 0.00 224.00 36.71 8223.04
08.11.02 EXCAVACION DE HOYO PARA TRATAMIENTO DE PUESTA A TIERRA EN m3 26.00 20.01 520.26 0.00 0.00 0.00 15.00 36.71 550.65
08.11.03 ELIMINACION DE MATERIAL EXCEDENTE m3 120.00 13.35 1602.00 0.00 0.00 0.00 107.00 13.90 1487.30
08.11.04 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 120.00 12.42 1490.40 0.00 0.00 0.00 0.00 0.00 0.00
08.11.05 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJA M3 550.00 49.65 27307.50 0.00 0.00 0.00 134.00 67.76 9079.84
08.11.06 RELLENO COMPACTADO CON MATERIAL TIPO CAMA (ARENA FINA) M3 140.00 137.33 19226.20 0.00 0.00 0.00 89.00 176.16 15678.24
08.12.00 POSTE ORNAMENTAL
08.12.01 POSTE ORNAMENTAL (COLONIAL) und 110.00 2786.94 306563.40 0.00 0.00 0.00 0.00 0.00 0.00
08.12.02 POSTE ORNAMENTAL DE CONCRETO und 0.00 0.00 0.00 0.00 0.00 0.00 77.00 1559.58 120087.66
08.13.00 PRUEBAS DEL SISTEMA ELECTRICO
08.13.01 PRUEBAS DEL SISTEMA ELECTRICO UND 2.00 441.81 883.62 0.00 0.00 0.00 2.00 559.69 1119.38
09.00.00 OVALO
09.01.01 LIMPIEZA INICIAL DE TERRENO m2 200.81 0.07 14.06 0.00 0.00 0.00 0.00 0.00 0.00
09.02.00 TRAZO, NIVELACION Y REPLANTEO
09.02.01 TRAZO Y REPLANTEO INICIAL m2 200.81 0.89 178.72 0.00 0.00 0.00 0.00 0.00 0.00
09.02.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 200.81 0.56 112.45 0.00 0.00 0.00 0.00 0.00 0.00
09.03.00 MOVIMIENTO DE TIERRAS
09.03.01 EXCAVACIONES
09.03.01.01 EXCAVACION EN FORMA MANUAL m3 168.16 20.01 3364.88 0.00 0.00 0.00 0.00 0.00 0.00
09.03.01.02 ACARREO DE MATERIAL EXCEDENTE m3 210.20 11.28 2371.06 0.00 0.00 0.00 0.00 0.00 0.00
09.03.01.03 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 210.20 1.33 279.57 0.00 0.00 0.00 0.00 0.00 0.00
09.04.00 OBRAS DE CONCRETO SIMPLE
09.04.01 SOLADO 1:10C:H m2 49.59 18.88 936.26 0.00 0.00 0.00 0.00 0.00 0.00
09.05.00 OBRAS DE CONCRETO ARMADO
09.05.01.01 BASE PILETA CONCRETO FC = 175KG/CM2 E=10CM m3 18.76 319.21 5988.38 0.00 0.00 0.00 0.00 0.00 0.00
09.05.01.02 BASE PILETA ENCOFRADO Y DESENCOFRADO m2 7.07 33.63 237.76 0.00 0.00 0.00 0.00 0.00 0.00
09.05.01.03 BASE PILETA ACERO F=42000KG/CM2 kg 71.93 4.25 305.70 0.00 0.00 0.00 0.00 0.00 0.00
09.05.02 PARAPETO
09.05.02.01 PARAPETO CONCRETO F'C=175 KG/CM2 m3 34.14 338.97 11572.44 0.00 0.00 0.00 0.00 0.00 0.00
09.05.02.02 PARAPETO ENCOFRADO Y DESENCOFRADO m2 120.97 34.04 4117.82 0.00 0.00 0.00 0.00 0.00 0.00
09.05.02.03 PARAPETO ACERO CORRUGADO F'Y =4200 KG/CM2 kg 227.88 4.25 968.49 0.00 0.00 0.00 0.00 0.00 0.00
09.05.03 CAJAS DE PASO
09.05.03.01 CAJA PARA BOQUILLAS FC=175 KG/CM2 m3 15.36 338.97 5206.58 0.00 0.00 0.00 0.00 0.00 0.00
09.05.03.02 CAJA PARA BOQUILLAS ENCOFRADO Y DESENCOFRADO m2 75.85 31.71 2405.20 0.00 0.00 0.00 0.00 0.00 0.00
PRESUPUESTO COMPARATIVO
PROYECTO: "MEJORAMIENTO, REHABILITACION DE LA INFRAESTRUCTURA VIAL DE LA AV. INDEPENDENCIA TRAMO (AV CIRCUNVALACIN-JR. POJCRACCASI) DE LA CIUDAD DE JULIACA, PROVINCIA DE
SAN ROMAN - PUNO"
UNIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
PRESUPUESTO 12,873,148.71 NUEVOS SOLES
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
09.05.03.03 CAJA PARA BOQUILLASACERO CORRUGADO FY =4200 KG/CM2 kg 113.25 4.25 481.31 0.00 0.00 0.00 0.00 0.00 0.00
09.06.00 ARQUITECTURA
09.06.01 TARRAJEOS
09.06.01.01 TARRAJEO EN PARAPETOS m2 236.11 19.98 4717.48 0.00 0.00 0.00 0.00 0.00 0.00
09.06.02 PISOS Y PAVIMENTOS
09.06.02.01 PISO DE LOSETA CERAMICA 30 x 30 CM m2 63.91 71.29 4556.14 0.00 0.00 0.00 0.00 0.00 0.00
09.06.03 PINTURA
09.06.03.01 PINTURA EN EXTERIORES m2 236.11 11.94 2819.15 0.00 0.00 0.00 0.00 0.00 0.00
09.06.04 INSTALACIONES SANITARIAS
09.06.04.01 TUBERIA DE AGUA PVC SAP 2" m 6.00 7.13 42.78 0.00 0.00 0.00 0.00 0.00 0.00
09.06.04.02 SISTEMA HIDRAULICO und 1.00 100000.00 100000.00 0.00 0.00 0.00 0.00 0.00 0.00
09.06.05 INSTALACIONES ELECTRICAS
09.06.05.01 SISTEMA DE ILUMINACION jgo 1.00 48948.24 48948.24 0.00 0.00 0.00 0.00 0.00 0.00
09.06.05.02 ELECTROBOMBA SUMERGIBLE und 1.00 6055.81 6055.81 0.00 0.00 0.00 0.00 0.00 0.00
09.06.06 VARIOS
09.06.06.01 LIMPIEZA PERMANENTE DE OBRA m2 200.81 0.23 46.19 0.00 0.00 0.00 0.00 0.00 0.00
09.06.06.02 LIMPIEZA FINAL DE OBRA m2 200.81 0.12 24.10 0.00 0.00 0.00 0.00 0.00 0.00
09.06.06.03 PREPARACION DE TERRENO PARA AREA VERDE m3 19.59 66.64 1305.48 0.00 0.00 0.00 0.00 0.00 0.00
09.06.06.04 SEMBRADO DE GRASS m2 19.59 3.21 62.88 0.00 0.00 0.00 0.00 0.00 0.00
10.00.00 MEJORAMIENTO DE DRENAJE PLUVIAL
10.01.01 TRAZO Y REPLANTEO INICIAL PARA DRENES CA KM 0.42 197.21 82.83 0.08 197.21 15.78 0.19 294.08 55.88
10.01.02 VERIFICACION DE INTEFERENCIAS und 3.00 27.79 83.37 0.00 0.00 0.00 4.00 50.99 203.96
10.01.03 PUENTES PEATONALES PROVISIONALES UND 8.00 165.63 1325.04 0.00 0.00 0.00 8.00 238.58 1908.64
10.01.04 LIMPIEZA Y MEJORAMIENTO DE CANAL EXISTENTE m 500.00 5.01 2505.00 0.00 0.00 0.00 500.00 9.18 4590.00
10.02.00 MOVIMIENTO DE TIERRAS
10.02.01 CORTE Y ROTURA DE PAVIMENTO FLEXIBLE E=3" m2 165.93 7.20 1194.70 0.00 83.82 7.20 603.50
10.02.02 EXCAVACION DE ZANJA C/MAQUINARIA TERRENO NORMAL M3 10119.99 10.77 108992.29 433.05 12.61 5460.76 894.21 13.42 12000.30
10.02.03 REFINE Y NIVELACION DE FONDO ZANJA M2 719.63 1.22 877.95 195.51 1.22 238.50 397.37 2.38 945.78
10.02.04 RELLENO CON MATERIAL DE PRESTAMO DE CANTERA m3 148.51 26.95 4002.34 38.60 29.59 1142.17 78.22 31.20 2440.46
10.02.05 RELLENO COMPACTADO CON MATERIAL PRESTAMO m3 158.06 137.33 21706.38 46.30 137.33 6358.38 95.75 176.16 16867.32
10.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 756.42 49.65 37556.25 0.00 0.00 0.00 0.00 0.00 0.00
10.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 1390.06 13.35 18557.30 0.00 0.00 0.00 1538.51 13.90 21385.29
10.03.00 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO F'C=100 KG/CM2 E=4" SOLADO m2 504.48 30.50 15386.64 211.26 29.27 6183.58 374.03 37.28 13943.84
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 56.60 25.21 1426.89 56.49 140.37 7929.50 56.49 152.85 8634.50
10.04.00 OBRAS DE CONCRETO ARMADO
10.04.01 CONCRETO F'C=210 KG/CM2 C/ADITIVOS m3 530.00 420.23 222721.90 153.00 371.51 56841.03 296.04 437.67 129567.83
10.04.02 ENCOFRADO Y DESENCOFRADO CARA VISTA m2 2471.19 63.89 157884.33 351.80 65.21 22940.88 846.52 80.70 68314.16
10.04.03 ACERO CORRUGADO F'Y =4200 KG/CM2 kg 46577.27 4.25 197953.40 7894.32 4.27 33708.75 24804.81 4.75 117822.85
10.04.04 CURADO C/ADITVO QUIMICO EN CONCRETO und 1603.73 2.20 3528.21 0.00 0.00 0.00 2869.42 2.47 7087.47
10.04.05 JUNTA DE DILATACION C/WATER STOP DE 6", E=1" m 78.43 23.68 1857.22 0.00 0.00 0.00 70.56 26.92 1899.48
10.04.06 JUNTA DE CONTRACCION E=1/2" m 81.25 15.40 1251.25 0.00 0.00 0.00 125.24 18.16 2274.36
10.04.07 SELLADO DE JUNTAS DE DILATACIONJ E=1" m 78.43 7.24 567.83 0.00 0.00 0.00 70.56 8.96 632.22
10.04.08 SELLADO DE JUNTAS DE DILATACION E=1/2" m 245.30 22.66 5558.50 0.00 0.00 0.00 125.24 23.70 2968.19
10.05.00 VARIOS
10.05.01 PROTECCION DE REDES EXISTENTES DE AGUA Y DESAGUE und 3.00 32.08 96.24 0.00 0.00 0.00 0.00 0.00 0.00
10.05.02 REPOSICION DE PAVIMENTO FLEXIBLE, E=3" m2 165.93 91.80 15232.37 0.00 0.00 0.00 83.82 110.48 9260.43
10.05.03 PASE VEHICULAR PARA CANAL DE DRENAJE GLB 15.00 4224.26 63363.90 0.00 0.00 0.00 1.00 43410.76 43410.76
PASE PEATONAL PARA CANAL DE DRENAJE und 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2966.54 29665.40
III. IMPLEMENTACION DEL SISTEMA DE ILUMINACION
01.01.01 ELEMENTOS DE SEGURIDAD GLB 1.00 934.13 934.13 0.00 0.00 0.00 1.00 1190.10 1190.10
01.01.02 TRAZO Y REPLANTEO INICIAL M 2060.00 0.67 1380.20 0.00 0.00 0.00 1800.00 0.93 1674.00
01.01.03 ACARREO DE MATERIAL EXCEDENTE m3 174.60 10.01 1747.75 0.00 0.00 0.00 195.74 18.35 3591.83
01.01.04 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 20.60 1.33 27.40 0.00 0.00 0.00 11.74 3.28 38.51
01.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 61.80 49.65 3068.37 0.00 0.00 0.00 57.15 67.76 3872.48
01.01.06 RELLENO MANUAL CON ARENA FINA m3 82.40 31.41 2588.18 0.00 0.00 0.00 57.46 54.99 3159.73
01.01.07 SOLADO PARA POSTES DE CONCRETO C.A.C. 13/400, 13/300 Y 12/200 m3 14.40 76.25 1098.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.08 RETIRO DE POSTE DE CONCRETO C.A.C. 8/200 EXISTENTE und 11.00 259.24 2851.64 0.00 0.00 0.00 11.00 313.30 3446.30
01.01.09 RETIRO DE POSTE DE CONCRETO C.A.C. 13/300 EXISTENTE und 7.00 648.10 4536.70 0.00 0.00 0.00 7.00 783.24 5482.68
02.00.00 REDES SUBTERRANEAS
02.01.01 EMPALME PARA CONDUCTOR TIPO NYY und 124.00 68.82 8533.68 0.00 0.00 0.00 124.00 78.64 9751.36
02.02.00 ENSAYOS Y PRUEBAS DE CONTROL DE LABORATORIO 0.00 0.00
02.02.01 CORTE PARA PUESTA EN SERVICIO GLB 1.00 520.49 520.49 0.00 0.00 0.00 1.00 638.37 638.37
02.02.02 REVISION Y PRUEBAS ELECTRICAS GLB 1.00 779.77 779.77 0.00 0.00 0.00 1.00 1107.72 1107.72
02.02.03 PINTADO Y SEALIZACION DE POSTES UND 70.00 20.60 1442.00 0.00 0.00 0.00 33.00 37.61 1241.13
02.03.00 ZANJAS
02.03.01 EXCAVACION DE ZANJA PARA TUBERIA EN FORMA MANUAL M3 618.00 20.01 12366.18 0.00 0.00 0.00 77.49 36.71 2844.66
02.03.02 EXCAVACION DE HOYO PARA POSTES 13/400 M. EN FORMA MANUAL M3 7.20 20.01 144.07 0.00 0.00 0.00 7.20 36.71 264.31
02.03.03 EXCAVACION DE HOYO PARA POSTE DE 13/300M. EN FORMA MANUAL m3 9.00 20.01 180.09 0.00 0.00 0.00 9.00 36.71 330.39
02.03.04 EXCAVACION DE HOYO PARA POSTES DE 12/200 C. A. C. EN FORMA M M3 97.60 20.01 1952.98 0.00 0.00 0.00 55.08 36.71 2021.99
02.03.05 EXCAVACION DE HOYO PARA TRATAMIENTO DE PUESTA A TIERRA E M3 54.24 20.01 1085.34 0.00 0.00 0.00 18.00 36.71 660.78
02.04.00 CABLES DE ENERGIA DE BAJA TENSION PARA ALUMBRADO PUBLICO
PRESUPUESTO COMPARATIVO
PROYECTO: "MEJORAMIENTO, REHABILITACION DE LA INFRAESTRUCTURA VIAL DE LA AV. INDEPENDENCIA TRAMO (AV CIRCUNVALACIN-JR. POJCRACCASI) DE LA CIUDAD DE JULIACA, PROVINCIA DE
SAN ROMAN - PUNO"
UNIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
PRESUPUESTO 12,873,148.71 NUEVOS SOLES
PRESUPUESTO APROBADO PRESUPUESTO N01 SIN VARIACION H-H PRESUPUESTO N02 CON VARIACION H-H
ITEM DESCRIPCION
UND METR. P.UNIT PRESUP METR. P.UNIT PRESUP METR. P.UNIT PRESUP
02.04.01 CONDUCTOR DE COBRE NYY 3x1x25 MM2 m 2120.00 61.71 130825.20 0.00 0.00 0.00 2120.00 64.35 136422.00
02.04.02 CONDUCTOR DE COBRE NYY 1x25 MM2 m 2120.00 10.53 22323.60 0.00 0.00 0.00 1980.00 12.27 24294.60
02.04.03 CONDUCTOR DE COBRE DESNUDO 25 MM2 m 300.00 15.85 4755.00 0.00 0.00 0.00 80.00 18.49 1479.20
02.04.04 BAJADA PARA CABLE SUBTERRANEO jgo 2.00 364.03 728.06 0.00 0.00 0.00 2.00 410.06 820.12
02.05.00 CABLES DE ENERGIA DE BAJA TENSION PARA ALUMBRADO PUBLICO
02.05.01 CONDUCTOR NLT 2x2.5 MM2 M 1220.00 10.53 12846.60 0.00 0.00 0.00 1050.00 12.27 12883.50
02.06.00 DUCTOS
02.06.01 TUBERIA DE INSTALACION ELECTRICA PVC SAP 3" X6M CLASE 10 m 2120.00 26.23 55607.60 0.00 0.00 0.00 2022.00 24.73 50004.06
02.06.02 TUBERIA INSTALACION ELECT. PVC SAP 3/4"X5M m 150.00 6.79 1018.50 0.00 0.00 0.00 0.00 0.00 0.00
03.00.00 REDES AEREAS
03.01.01 CABLE DE ENERGIA DE MEDIA TENSION DE ALEACION DE ALUMINIO m 900.00 57.23 51507.00 0.00 0.00 0.00 900.00 58.65 52785.00
03.02.00 ESTRUCTURA SOPORTE 0.00 0.00
03.02.01 POSTES DE C. A. C. 13/400/180/380 und 4.00 5493.19 21972.76 0.00 0.00 0.00 4.00 5560.59 22242.36
03.02.02 POSTES DE C.A.C. 13/300/160/375 und 5.00 6432.69 32163.45 0.00 0.00 0.00 5.00 6500.09 32500.45
03.02.03 POSTE DE C.A.C DE 12/200/140/320 und 61.00 1538.40 93842.40 0.00 0.00 0.00 51.00 1575.46 80348.46
POSTE ORNAMENTAL DE CONCRETO
03.02.04 und 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1559.58 18714.96
03.02.04 IZADO DE POSTES DE CONCRETO C. A. C. 12/200/140/320,13/300 und 70.00 595.19 41663.30 0.00 0.00 0.00 60.00 671.39 40283.40
03.03.00 SUB ESTACION DE DISTRIBUCION
03.03.01 TRANSFORMADOR TRIFASICO DE RED PRIMARIA 100 KVA FRECUENCIA und 2.00 57455.90 114911.80 0.00 0.00 0.00 2.00 58159.02 116318.04
03.03.02 MONTAJE DE TRANSFORMADOR DE RED PRIMARIA DE 100KVA GLB 2.00 2013.33 4026.66 0.00 0.00 0.00 2.00 3029.45 6058.90
03.03.03 PUESTA A TIERRA und 24.00 665.42 15970.08 0.00 0.00 0.00 12.00 783.31 9399.72
03.04.00 INSTALACION DE ALUMBRADO PUBLICO 0.00 0.00
03.04.01 LUMINARIA VAPOR DE SODIO ALTA PRESION SON-T-250W und 136.00 582.93 79278.48 0.00 0.00 0.00 130.00 609.94 79292.20
IV IMPLEMENTACION DE SEALIZACION VIAL
01.01.01 LIMPIEZA INICIAL DE TERRENO MANUAL m2 2875.02 1.11 3191.27 0.00 0.00 0.00 6457.95 0.76 4908.04
01.01.02 TRAZO Y REPLANTEO INICIAL m2 2832.46 0.89 2520.89 0.00 0.00 0.00 6457.95 1.31 8459.91
01.01.03 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 2832.46 0.56 1586.18 0.00 0.00 0.00 6457.95 0.76 4908.04
01.02.00 SEGURIDAD Y SALUD
01.02.01 SELEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 3500.00 3500.00 0.00 0.00 0.00 1.00 3500.00 3500.00
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACIONES
02.01.01 EXCAVACION EN FORMA MANUAL m3 0.94 20.01 18.81 0.00 0.00 0.00 2.12 36.71 77.83
02.02.00 NIVELADO Y COMPACTADO 0.00 0.00
02.02.01 NIVELADO Y COMPACTADO C/EQUIPO LIVIANO m2 1.83 2.66 4.87 0.00 0.00 0.00 4.79 4.31 20.64
02.03.00 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
02.03.01 ACARREO DE MATERIAL EXCEDENTE m3 0.64 11.28 7.22 0.00 0.00 0.00 1.82 2.03 3.69
03.00.00 OBRAS DE CONCRETO SIMPLE
03.01.00 BASE DE CONCRETO FC = 175KG/CM2 M3 13.83 318.24 4401.26 0.00 0.00 0.00 23.87 277.54 6624.88
03.02.00 BASE DE CONCRETO ENCOFRADO Y DESENCOFRADO m2 235.00 20.14 4732.90 0.00 0.00 0.00 45.31 32.71 1482.09
04.00.00 SEALIZACION
04.01.01 PINTURA EN SARDINELES m 5612.00 6.85 38442.20 0.00 0.00 0.00 8481.00 10.20 86506.20
04.01.02 PINTURA EN PAVIMENTO m2 2818.22 7.20 20291.18 0.00 0.00 0.00 5517.41 10.78 59477.68
04.01.03 PINTURA EN DELIMITADOR DE VIA m2 0.00 0.00 0.00 0.00 0.00 0.00 1849.65 9.29 17183.25
04.01.03 SEALIZACION SENTIDO DE TRANSITO und 4.00 52.92 211.68 0.00 0.00 0.00 4.00 58.93 235.72
TACHAS REFLECTIVAS 0.13X0.13
04.01.04 und 0.00 0.00 0.00 0.00 0.00 0.00 2749.00 33.75 92778.75
04.01.05 TACHAS REFLECTIVAS DE 0.25X0.15 und 325.00 33.94 11030.50 0.00 0.00 0.00 0.00 0.00 0.00
TACHAS REFLECTIVAS 0.11X0.20
04.01.06 und 0.00 0.00 0.00 0.00 0.00 0.00 719.00 43.38 31190.22
04.01.07 TACHAS REFLECTIVAS DE 0.12X0.07 und 3684.00 12.60 46418.40 0.00 0.00 0.00 0.00 0.00 0.00
04.02.00 SEALIZACION VERTICAL
04.02.01 SOPORTE TIPO I und 6.00 393.98 2363.88 0.00 0.00 0.00 11.00 477.35 5250.85
04.02.02 SOPORTE TIPO II und 98.00 270.73 26531.54 0.00 0.00 0.00 140.00 354.10 49574.00
04.02.03 MONTAJE DE SOPORTE TIPO I und 6.00 36.12 216.72 0.00 0.00 0.00 11.00 65.15 716.65
04.02.04 MONTAJE DE SPORTE TIPO II und 98.00 45.67 4475.66 0.00 0.00 0.00 140.00 82.67 11573.80
04.02.05 PINTURA EN EXTERIORES m2 13.00 11.94 155.22 0.00 0.00 0.00 22.25 18.06 401.84
04.02.06 SEALIZACION REGULADORA O REGLAMENTARIA und 98.00 330.09 32348.82 0.00 0.00 0.00 11.00 260.55 2866.05
04.02.07 SELEALIZACION PREVENTIVA und 6.00 230.09 1380.54 0.00 0.00 0.00 140.00 360.55 50477.00
04.02.08 SELEALIZACION INFORMATIVA und 0.00 0.00 0.00 0.00 0.00 0.00 27.00 1252.76 33824.52
04.02.08 PANEL INFORMATIVO 35.00 X 1.40 und 2.00 42085.96 84171.92 0.00 0.00 0.00 2.00 42740.82 85481.64
04.02.09 PANEL INFORMATIVO 11.50 X 1.20 und 2.00 19494.03 38988.06 0.00 0.00 0.00 2.00 19997.77 39995.54
05.00.00 VARIOS, LIMPIEZA
05.01.00 LIMPIEZA PERMANENTE Y FINAL DE OBRA m2 2875.02 0.12 345.00 0.00 0.00 0.00 2904.31 0.23 667.99
05.02.00 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD und 50.00 17.00 850.00 0.00 0.00 0.00 65.00 17.00 1105.00
V IMPLEMENTACION DE PROGRAMA DE EDUCACION VIAL
01.00.00 CAPACITACION
01.01.00 CAPACITACION VIAL GLB 1.00 2000.00 2000.00 0.00 0.00 0.00 1.00 2000.00 2000.00
VALORIZACION FINANCIERA
PRESUPUESTO DE
AVANCE FINANCIERO EXPEDIENTE ANTERIOR ACTUAL ACUM. SALDO
El objetivo del presente Expediente Tcnico es construir infraestructura vial en la Avenida Andrs Avelino Cceres lado derecho (desde 0+000.00
hasta 0+986.06), avenida Andrs Avelino Cceres lado izquierdo (desde 0+000.00 hasta 1+011.02), para que brinde un optim servicio de
transitabilidad en beneficio de los pobladores de la urbanizacin municipalla capilla de la ciudad de Juliaca. El financiamiento y ejecucin es
competencia del gobierno local y busca lograr:
SUPERVISOR DE OBRA
NOMBRES Y APELLIDOS : :ING VICTOR MELITON MAITA VERA
PROFESION : Ingeniero Civil
DIRECCION : Juliaca
TELEFONO : CEL 951799224
DOCUMENTO DE DESIGNACION : Memorandum :N -2017-MPSR-J/GEIN-APQ
FECHA DE DESIGNACION :
RESIDENTE DE OBRA
NOMBRES Y APELLIDOS : : ING. RONI MAMANI ARUQUIPA
PROFESION : Ingeniero Civil
DIRECCION : JR. COMCHARANI N 980-PUNO
TELEFONO : CEL 978888838
DOCUMENTO DE DESIGNACION : Memorandum :N 750-2017-MPSR-J/GEIN-APQ
FECHA DE DESIGNACION : 22 de julio 2017
1.1
1 0.9854637111
1
0.9
0.8
0.7 0.6905214026
0.6
0.5
0.4369279141
0.4
0.3 0.2807551382
0.2
0.1503987656
0.1 0.080540099
0.0178222836
0.0153639539
0 0
0 0
INICIO AGOSTO 2017 SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO 2018 FEBRERO MARZO 2018
2017 2017 2017 2017 2018
MESES VALORIZADOS
Municipalidad Provincial de San Roman VALORIZACION FISICA QUINCENAL DEL MES DE OCTUBRE 2017
Juliaca
VALORIZACION FISICA N03
VALORIZACION FISICA
EXPEDIENTE APROBADO
ITEM DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO SALDO
METR. P.UNIT PRESUP METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
###
01.01.01 CARTEL DE OBRA und 1.00 1,415.21 1,415.21 1.00 1,415.21 100.00% 0.00 0.00% 1.00 1,415.21 100.00% 0.00 0.00 0.00%
01.02.01.01 SEGURIDAD DURANTE LA CONSTRUCCION und 1.00 1,497.96 1,497.96 1.00 1,497.96 100.00% 0.00 0.00% 1.00 1,497.96 100.00% 0.00 0.00 0.00%
01.02.02.01 TRAZO Y REPLANTEO INICIAL m2 23,180.35 0.21 4,867.87 23,180.35 4,867.87 100.00% 0.00 0.00% 23,180.35 4,867.87 100.00% 0.00 0.00 0.00%
01.02.02.02 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 23,180.35 0.27 6,258.69 15,260.20 4,120.25 65.83% 4,062.40 1,096.85 17.53% 19,322.60 5,217.10 83.36% 3,857.75 1,041.59 16.64%
01.03.01.01 CORTE DE TERRENO CON MAQUINARIA m3 21,631.81 4.33 93,665.74 15,675.00 67,872.75 72.46% 5,956.81 25,792.99 27.54% 21,631.81 93,665.74 100.00% 0.00 0.00 0.00%
01.03.02.01 EXCAVACION EN FORMA MANUAL m3 463.61 19.78 9,170.21 262.62 5,194.62 56.65% 110.01 2,176.00 23.73% 372.63 7,370.62 80.38% 90.98 1,799.58 19.62%
01.03.03.01 ACARREO DE MATERIAL EXCEDENTE m3 579.51 13.18 7,637.94 332.63 4,384.06 57.40% 135.67 1,788.13 23.41% 468.30 6,172.19 80.81% 111.21 1,465.75 19.19%
01.03.03.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 22,118.86 5.92 130,943.65 18,555.00 109,845.60 83.89% 3,563.86 21,098.05 16.11% 22,118.86 130,943.65 100.00% 0.00 0.00 0.00%
01.04.01.01 MATERIAL DE SUB RASANTE: CANTERA m3 7,653.28 18.55 141,968.34 1,377.59 25,554.30 18.00% 5,545.00 102,859.75 72.45% 6,922.59 128,414.05 90.45% 730.69 13,554.29 9.55%
01.06.01.01 HABILITACION PROVISIONAL DE BASUREROS und 5.00 408.00 2,040.00 5.00 2,040.00 100.00% 0.00 0.00% 5.00 2,040.00 100.00% 0.00 0.00 0.00%
01.07.05 REPOSICION CONEXIONES DOMICILIARIAS AGUA und 32.00 121.78 3,896.96 18.00 2,192.04 56.25% 14.00 1,704.92 43.75% 32.00 3,896.96 100.00% 0.00 0.00 0.00%
01.07.06 REPOSICION CONEXIONES DOMICILIARIAS DESAGUE und 32.00 476.95 15,262.40 16.00 7,631.20 50.00% 16.00 7,631.20 50.00% 32.00 15,262.40 100.00% 0.00 0.00 0.00%
01.07.07 CAMA DE APOYO CONEXIONES DOMICILIARIAS AGUA m 128.00 3.43 439.04 65.00 222.95 50.78% 63.00 216.09 49.22% 128.00 439.04 100.00% 0.00 0.00 0.00%
01.07.08 CAMA DE APOYO CONEXIONES DOMICILIARIAS DESAGUE m 240.00 3.43 823.20 97.10 333.05 40.46% 142.90 490.15 59.54% 240.00 823.20 100.00% 0.00 0.00 0.00%
02.01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 8,397.82 0.27 2,267.41 4,278.50 1,155.20 50.95% 2,271.60 613.33 27.05% 6,550.10 1,768.53 78.00% 1,847.72 498.88 22.00%
02.02.01.01 EXCAVACION EN FORMA MANUAL m3 400.16 19.78 7,915.16 204.62 4,047.38 51.13% 113.97 2,254.33 28.48% 318.59 6,301.71 79.62% 81.57 1,613.45 20.38%
02.02.02.01 ACARREO DE MATERIAL EXCEDENTE m3 500.20 13.18 6,592.64 255.78 3,371.18 51.14% 133.60 1,760.85 26.71% 389.38 5,132.03 77.84% 110.82 1,460.61 22.16%
02.02.02.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 500.20 5.92 2,961.18 257.45 1,524.10 51.47% 119.32 706.37 23.85% 376.77 2,230.48 75.32% 123.43 730.71 24.68%
02.02.03.01 MATERIAL SELECCIONADO m3 1,000.41 10.03 10,034.11 310.83 3,117.62 31.07% 426.87 4,281.51 42.67% 737.70 7,399.13 73.74% 262.71 2,634.98 26.26%
02.02.03.02 RELLENO MANUAL CON MATERIAL DE PRESTAMO m3 1,000.41 13.18 13,185.40 310.83 4,096.74 31.07% 426.87 5,626.15 42.67% 737.70 9,722.89 73.74% 262.71 3,462.52 26.26%
02.05.02 NIVELACION DE CAJAS DE REGISTRO AGUA INSTALACION und 80.00 45.19 3,615.20 30.00 1,355.70 37.50% 33.00 1,491.27 41.25% 63.00 2,846.97 78.75% 17.00 768.23 21.25%
02.05.03 NIVELACION DE CAJAS DE REGISTRO DESAGUE INSTALAC und 80.00 74.69 5,975.20 18.00 1,344.42 22.50% 41.00 3,062.29 51.25% 59.00 4,406.71 73.75% 21.00 1,568.49 26.25%
03.01.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 1,288.82 0.27 347.98 458.00 123.66 35.54% 0.00 0.00% 458.00 123.66 35.54% 830.82 224.32 64.46%
03.02.01.01 EXCAVACION EN FORMA MANUAL m3 20.74 19.78 410.24 10.08 199.38 48.60% 0.00 0.00% 10.08 199.38 48.60% 10.66 210.85 51.40%
03.02.02.01 ACARREO DE MATERIAL EXCEDENTE m3 25.92 13.18 341.63 12.60 166.07 48.61% 0.00 0.00% 12.60 166.07 48.61% 13.32 175.56 51.39%
03.02.02.02 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m3 25.92 5.92 153.45 12.60 74.59 48.61% 0.00 0.00% 12.60 74.59 48.61% 13.32 78.85 51.39%
RESUMEN DE LA VALORIZACIN RESPECTO AL PRESUPUESTO TOTAL SETIEMBRE 2017
Municipalidad Provincial de San Roman
Juliaca
PROYETCO: CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AV. ANDRES AVELINO CACERES (TRAMO JR. PACHACUTEC - AV. LOS GERANIOS) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (SEGUNDA ETAPA).
1 CONSTRUCCION DE CALZADA CON PAVIMENTO FLEXIBLE 2,281,993.40 237,171.90 10.39% 231,190.68 10.13% 468,362.56 20.52% 1,813,630.84 79.48%
2 CONSTRUCCION DE VEREDAS 489,160.05 20,012.33 4.09% 19,796.07 4.05% 39,808.42 8.14% 449,351.63 91.86%
3 CONSTRUCCION DE CUNETAS 192,790.61 563.70 0.29% (0.01) 0.00% 563.69 0.29% 192,226.92 99.71%
4 SEALIZACION VIAL 13,193.56 - 0.00% - 0.00% - 0.00% 13,193.56 100.00%
5 ACONDICIONAMIENTO DE AREAS VERDES 224,254.77 - 0.00% - 0.00% - 0.00% 224,254.77 100.00%
COSTO DIRECTO 3,201,392.41 257,747.93 8.05% 250,986.74 7.84% 508,734.67 15.89% 2,692,657.73 84.11%
GASTOS GENERALES 267,316.27 21,521.95 8.35% 20,957.39 8.35% 42,479.35 8.35% 224,836.92 8.35%
SUPERVISION 76,833.42 6,185.95 2.40% 6,023.68 2.40% 12,209.63 2.40% 64,623.79 2.40%
LIQUIDACION 31,373.65 2,525.93 0.98% 2,459.67 0.98% 4,985.60 0.98% 26,388.05 0.98%
EXPEDIENTE TECNICO 68,829.94 1,226.71 0.48% 5,396.21 2.15% 10,937.80 2.15% 57,892.14 2.15%
SEGUIMIENTO Y MONITOREO 11,204.87 902.12 0.35% 878.45 0.35% 1,780.57 0.35% 9,424.30 0.35%
PRESUPUESTO TOTAL 3,656,950.54 290,110.59 7.93% 286,702.15 7.84% 581,127.61 15.89% 3,075,822.94 84.11%
.
VALORIZACION FISICA MENSUAL DEL MES DE JUNIO 2016
Municipalidad Provincial de
San Roman-Juliaca (MAYORES METRADOS) N02
PROYETCO: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SERVICIO DE RECREACION Y DEPORTE EN EL COMPLEJO DEPORTIVO LA BOMBONERA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN PUNO
VALORIZACION FISICA
EXPEDIENTE APROBADO
ITEM DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO
05.01.04.01 ZAPATAS
05.01.04.01.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORM m2 79.20 37.02 2,931.98 17.44 645.63 22.02% 61.76 2,286.36 77.98% 79.20 2,931.98 100.00%
06 IMPLEMENTACION DE JUEGOS INFANTILES 0.00 0.00 0.00 0.00
SUB TORTAL COSTO DIRECTO S/. 2,931.98 645.63 22.02% 2,286.37 77.98% 2,931.98 ###
100.00%
GASTOS GENERALES 9.10% 9.10 266.81 58.75 9.10% 208.06 9.10% 266.81 9.10%
GASTOS DE SUPERVISION 3.91% 3.91 114.60 25.23 3.91% 89.36 3.91% 114.60 3.91%
GASTOS DE LIQUIDACION 2.30% 2.30 67.38 14.84 2.30% 52.54 2.30% 67.38 2.30%
GASTOS DE PRE INVERSION 6.26% 6.26 183.49 40.41 6.26% 143.09 6.26% 183.49 6.26%
3,564.26 S/. 784.86 0.02% S/. 2,779.42 0.08% S/. 3,564.27 ###
0.10%
VALORIZACION FISICA MENSUAL DEL MES DE JUNIO 2016
Municipalidad Provincial de
San Roman-Juliaca (PARTIDAS NUEVAS) N02
PROYETCO: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SERVICIO DE RECREACION Y DEPORTE EN EL COMPLEJO DEPORTIVO LA BOMBONERA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN PUNO
VALORIZACION FISICA
EXPEDIENTE APROBADO
ITEM DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO
05.01.04.04.01 FALSA ZAPATA DE CONCRETO CON 30% PIEDRA GRANDE m3 17.60 118.19 2,080.14 2.05 242.29 11.65% 15.55 1,837.85 88.35% 17.60 2,080.14 100.00%
06 IMPLEMENTACION DE JUEGOS INFANTILES 0.00 0.00 0.00 0.00
SUB TORTAL COSTO DIRECTO S/. 10,240.14 8,402.29 82.05% 1,837.86 17.95% 10,240.14 ###
100.00%
GASTOS GENERALES 9.10% 9.10 931.86 764.61 9.100% 167.25 9.100% 931.86 9.100%
GASTOS DE SUPERVISION 3.91% 3.91 400.25 328.41 3.909% 71.83 3.909% 400.25 3.909%
GASTOS DE LIQUIDACION 2.30% 2.30 235.33 193.09 2.298% 42.24 2.298% 235.33 2.298%
GASTOS DE PRE INVERSION 6.26% 6.26 640.87 525.85 6.258% 115.02 6.258% 640.87 6.258%
12,448.43 S/. 10,214.25 0.28% S/. 2,234.20 0.06% S/. 12,448.45 ###
0.34%
Municipalidad CONSOLIDADO GENERAL DE LAS VALORIZACIONES DEL MES DE JUNIO 2016
Provincial de San
Roman-Juliaca
(PRESUPUESTO BASE + MAYORES METRADOS + PARTIDAS NUEVAS)
PROYETCO: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SERVICIO DE RECREACION Y DEPORTE EN EL COMPLEJO DEPORTIVO LA BOMBONERA DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN PUNO
PRESUPUESTO VALORIZACIONES
APROBADO DEL SALDO POR
ITEM DESCRIPCION EXPEDIENTE
MAYO JUNIO
TOTAL VALORIZACION
16 Mayo-31 Mayo 01 Junio-30 Junio
TECNICO
2.00 AVANCE PORCENTUAL MENSUAL SEGN E.T. 3,656,950.56 1.22% 3.69% 4.91% 95.09%
NOTA: EL AVANCE PORCENTUAL DE LOS MAYORES METRADOS Y PARTIDAS NUEVAS ES CON REFERENCIA AL PRESUPUESTO PRINCIPAL DEL EXP. TEC. (Por no contar con Expedientes Adicionales Aprobados)
CONSOLIDADO GENERAL DE LAS VALORIZACIONES DEL MES DE JUNIO 2016
(PRESUPUESTO BASE + MAYORES METRADOS + PARTIDAS NUEVAS)
PROYETCO: MEJORAMIENTO DE LA INFRAESTRUCTURA PARA EL SERVICIO DE RECREACION Y DEPORTE EN EL COMPLEJO DEPORTIVO LA BOMBONERA DE LA CIUDAD DE
JULIACA, PROVINCIA DE SAN ROMAN PUNO
FUENTE DE FINA : RECURSOS DETERMINADOS REGION PUNO
ENTIDAD MUNICIPALIDAD PROVINCIAL DE SAN ROMAN DEPARTAMENTO PUNO
NOTA: EL AVANCE PORCENTUAL DE LOS MAYORES METRADOS Y PARTIDAS NUEVAS ES CON REFERENCIA AL PRESUPUESTO PRINCIPAL DEL
EXP. TEC. (Por no contar con Expedientes Adicionales Aprobados)
MUNICIPALIDAD PROVINCIAL DE SAN ROMAN - JULIACA
GERENCIA DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS PUBLICAS
CURVAS "S" PARA EL CONTROL: AVANCE - MES DE AGOSTO (Segn Expediente Aprob)
PROYECTO CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AV. ANDRES AVELINO CACERES (TRAMO JR. PACHACUTEC - AV. LOS
GERANIOS) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (SEGUNDA ETAPA).
OBRA CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AV. ANDRES AVELINO CACERES (TRAMO JR. PACHACUTEC - AV. LOS
GERANIOS) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (SEGUNDA ETAPA).
CODIGO SNIP 171316
SUPERVISOR :ING VICTOR MELITON MAITA VERA FECHA: AGOSTO 2017 FECHA DE INICIO: 8/14/2017
RESIDENTE : ING. RONI MAMANI ARUQUIPA FECHA DE CULMINACION: 3/11/2018
VALORIZACION DE OBRA N ro 01
DATOS DE CRONOGRAMA
Programado Fisico Ejecutado Financiero Ejecutado
N de Mes del Monto % Ejecucin % Monto Porcentaje % Monto Porcentaje %
Informe Informe S/. Programada Acumulado S/. de Ejecucin Acumulado S/. de Ejecucin Acumulado
0 INICIO 0 0 0 0 0 0 0 0 0
1 AGOSTO 2017 56,185.22 1.54% 1.54% 65,175.21 1.78% 1.78% 0.00 0.00% 0.00%
2 ETIEMBRE 2017 238,345.94 6.52% 8.05%
3 OCTUBRE 2017 255,469.69 6.99% 15.04%
4 OVIEMBRE 2017 476,706.81 13.04% 28.08%
5 DICIEMBRE 2017 571,116.12 15.62% 43.69%
6 ENERO 2018 927,378.85 25.36% 69.05%
7 FEBRERO 2018 1,078,589.44 29.49% 98.55%
8 MARZO 2018 53,158.49 1.45% 100.00%
Total a la Fecha 3,656,950.56 100.00% 65,175.21 1.78% 0.00 0.00%
700,001.35
% de Avances Acu mu la do s
1.1
1 0.9854637111
1
0.9
0.8
0.7 0.6905214026
0.6
0.5
0.4369279141
0.4
0.3
0.2807551382
0.2
0.1503987656
0.1
0.080540099
0.0178222836
0.0153639539
0 0
0 0
INICIO AGOSTO 2017 SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO 2018 FEBRERO MARZO 2018
2017 2017 2017 2017 2018
MESES VALORIZADOS
MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
GERENCIA DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS PUBLICAS
29.49%
30.00%
25.36%
25.00%
PROGRAMADO EJECUTADO FISICO
EJ ECUTADO FINANCIERO
20.00%
15.62%
15.00%
13.04%
10.00%
6.99%
6.52%
5.00%
1.78%
1.54% 1.45%
0.00%
0.00%
0.00%
0.00% 0.00%
INICIO
AGOSTO 2017
SETIEMBRE 2017
OCTUBRE 2017
NOVIEMBRE 2017
DICIEMBRE 2017
ENERO 2018
FEBRERO 2018
MARZO 2018
MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
GERENCIA DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS PUBLICAS
OBRA CONSTRUCCION DE INFRAESTRUCTURA VIAL EN LA AV. ANDRES AVELINO CACERES (TRAMO JR. PACHACUTEC - AV.
LOS GERANIOS) DE LA CIUDAD DE JULIACA, PROVINCIA DE SAN ROMAN - PUNO (SEGUNDA ETAPA).
MES DEL
PROGRAMADO EJECUTADO FISICO EJECUTADO FINANCIERO
INFORME
INICIO 0.00% 0.00% 0.00%
AGOSTO 2017 1.54% 1.78% 0.00%
SETIEMBRE 2017 6.52%
OCTUBRE 2017 6.99%
NOVIEMBRE 2017 13.04%
DICIEMBRE 2017 15.62%
ENERO 2018 25.36%
FEBRERO 2018 29.49%
MARZO 2018 1.45%
40.00%
29.49%
35.00%
25.36%
30.00%
25.00%
15.62%
20.00% 13.04%
15.00%
6.52% 6.99%
10.00%
1.78%
1.54% 1.45%
5.00%
0.00%
0.00%
0.00% 0.00%
0.00%
INICIO
AGOSTO 2017
SETIEMBRE 2017
OCTUBRE 2017
NOVIEMBRE 2017
DICIEMBRE 2017
ENERO 2018
FEBRERO 2018
MARZO 2018
PROGRAMADO
Column D
EJ ECUTADO FISICO
EJ ECUTADO FINANCIERO
Column G
MUNICIPALIDAD PROVINCIAL DE SAN ROMAN
GERENCIA DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS PUBLICAS
FISICO VS FINANCIERO
PRESUPUESTO TOTAL:
COSTO DIRECTO: S/. 3201392.41
COSTO TOTAL:
100.00% S./. 3656950.56
90.00%
80.00%
70.00%
FINANCIERO
60.00%
FISICO
40.00%
30.00%
20.00%
10.00%
1.78%
0.00%
0.00% SETIEMB OCTUBRE NOVIEMB DICIEMBR
AGOSTO ENERO FEBRERO MARZO
2017 RE 2017 2017 RE 2017 E 2017 2018 2018 2018
MES AGOSTO 2017