Escolar Documentos
Profissional Documentos
Cultura Documentos
Floor Slab
Depth Load
m KN/m3 KN/m2
Dead Load (Own Wt.) 0.15 25 3.75
Terrazzo tile 0.02 23 0.46
Ceiling plaster 0.02 23 0.46
Cement screed 0.03 23 0.69
Total 5.36
Wall
Depth Height Length Direction Load
m m m KN/m 3
KN
10cm thick HCB 0.1 2.1 6.32 1 14 18.5808
20cm thick HCB 0.2 2.1 3.12 1 14 18.3456
Ceramic 0.02 1.5 6.32 2 23 8.7216
Cement screed 0.02 1.5 6.32 2 23 8.7216
Cement screed 0.02 2.1 3.12 2 23 6.02784
Total 60.39744
Discription KN/m2
LL 3.00
Dead Load 9.23
Total Load 12.23
Factored Load 18.67
Wall
Depth Height Length Direction Load
m m m KN/m 3
KN
10cm thick HCB 0.1 2 6.32 1 14 17.696
Ceramic 0.02 2 6.32 2 23 11.6288
Cement screed 0.02 2 6.32 2 23 11.6288
Total 40.9536
Discription KN/m2
LL 3.00
Dead Load 10.16
Total Load 13.16
Factored Load 20.15
Wall C-1
Depth Height Length Direction Load
m m m KN/m3 KN
10cm thick HCB 0.1 2 1.1 1 14 3.08
20cm thick HCB 0.2 2.85 0.8 1 14 6.384
Ceramic 0.02 2 3.4 1 23 3.128
Cement screed (20cm) 0.02 2.85 0.8 2 23 2.0976
Cement screed 0.02 2 3.4 2 23 6.256
Total 20.9456
Discription KN/m2
LL 3.00
Dead Load 11.28
Total Load 14.28
Factored Load 21.94
Wall C-2
Depth Height Length Direction Load
m m m KN/m3 KN
10cm thick HCB 0.1 2 1.1 1 14 3.08
Ceramic 0.02 2 1.1 2 23 2.024
Cement screed 0.02 2 1.1 2 23 2.024
Total 7.128
Discription KN/m2
LL 3.00
Dead Load 8.85
Total Load 11.85
Factored Load 18.05
RHS
L Wt. of RHS Wt.
m Kg/m Kg KN
10.8 1.77 19.116 0.19116 RHS (40x40x1.5)
12.6 1.3 16.38 0.1638 RHS (30x30x1.5)
Total 0.35496
Wall C-3
Depth Height Length Direction Load
m m m KN/m 3
KN
20cm thick HCB 0.2 2.85 1.2 1 14 9.576
Cement screed 0.02 1 2 2 23 1.84
Cement screed (20cm) 0.02 2.85 1.2 2 23 3.1464
Total 14.5624
20cm thick HCB 0.2 1 2 1 14 5.6
Discription KN/m2
LL 3.00
Dead Load 14.03
Total Load 17.03
Factored Load 26.35
Wall C-4
Depth Height Length Direction Load
m m m KN/m3 KN
Cement screed 0.02 2.85 3.52 2 23 9.23
20cm thick HCB 0.2 1 2 1 14 5.6
Total 14.83
Discription KN/m2
LL 3.00
Dead Load 4.93
Total Load 7.93
Factored Load 11.79
SS1 (Type 3)
lx ly ly/lx vx
m m
3 3.32 1.107 0.403
3 3.32 1.107 0.271
3 3.32 1.107
SS2 (Type 4)
lx ly ly/lx vx
m m
3.32 5.2 1.566 0.548
3.32 5.2 1.566 0.358
3.32 5.2 1.566
3.32 5.2 1.566
(Type 2)
lx ly ly/lx vx
m m
3.32 5.2 1.566 0.478
3.32 5.2 1.566
3.32 5.2 1.566
Average
Type 4 Type 2 Average
Span Ratio Span 16.80 14.65 15.72 Vx (cont.)
1.1 0.042 10.97 0 5.49 Vx (dis. cont.)
1.143 0.044 12.26 11.03 11.65 Vy (cont.)
1.2 0.047 7.97 7.36 7.66 Vy (dis. cont.)
C-1
lx conc. load Dist. Load Moment
m KN KN/m KNm
1.3 23.94 11.28 40.650927
C-2
lx conc. load Dist. Load Moment
m KN KN/m KNm
2.1 0.35496 8.85 20.248641
C-3
lx conc. load Dist. Load Moment
m KN KN/m KNm
0.93 5.6 14.03 11.276787
C-4
lx conc. load Dist. Load Moment
m KN KN/m KNm
0.93 14.83 4.93 15.924223
Load
KN/m2
3.87
Load
KN/m2
4.80
Load
KN/m2
5.92
Conc. Load
Load
KN/m2
1.49
RHS (40x40x1.5)
RHS (30x30x1.5)
Load
KN/m2
9.10
Conc. Load
Conc. Load
vy Pd Load
KN/m 2
KN
10.16 12.28 Vx (cont.)
10.16 8.26 Vx (dis. cont.)
0.36 10.16 10.97 Vy (cont.)
vy Pd Load
KN/m 2
KN
9.23 16.80 Vx (cont.)
9.23 10.97 Vx (dis. cont.)
0.4 9.23 12.26 Vy (cont.)
0.26 9.23 7.97 Vy (dis. cont.)
vy Pd Load
KN/m 2
KN
9.23 14.65 Vx (cont.)
0.36 9.23 11.03 Vy (cont.)
0.24 9.23 7.36 Vy (dis. cont.)
Vx (dis. cont.)
Vy (dis. cont.)
Shear
KN
38.599887
Shear
KN
18.92946
Shear
KN
18.651155
Shear
KN
19.4162
C-2 (4th support condtion)
lx ly ly/lx qd lx2 Moment
Coefficient ()
m m KN/m2 m2 qd*lx2*
2.1 2.4 1.143 11.85 4.41 xs = -0.059 -3.08
2.1 2.4 1.143 11.85 4.41 xf = 0.044 2.30
1.3 3 2.307692
Mxs
Mxf
Mys
Myf
Serviciblity Requirement (some Note.)
C= 30 Mpa fcd= 11.17
S= 400 Mpa fyd= 260
Minimum effective depth required by deflection EBCS 2/95
Thickness for ribs
dmin=(0.4+0.6fy/400)le/a
fy le Type a d D Remark
SS1 400 3030 End span 39 77.69 103.69
Solid slab
SS2 400 3320 End span 34 97.65 123.6 Accordint to Arch. Drw.Provide D=150mm
RS1 400 4400 End span 37.9 116.09 150.1 Therefore: D>=143.8mm and D<=500mm
Rib
RS2 400 3030 End span 35.5 85.35 119.4 D=Topping + Height of HCB = 60+220=280mm
C1 400 1300 Cantilever 11.4 114.04 140.04 Provide D=150mm
Cantilever C2 400 2100 Cantilever 10.28 204.28 230.28 Provide D=230mm
C3 & C4 400 930 Cantilever 12 77.50 103.50 Provide D=150mm
N/mm2 Interpolet
N/mm2 Span Ratio Span
1.75 0.57
1.57 2.26
1.5 0.54
mark
rw.Provide D=150mm
8mm and D<=500mm
of HCB = 60+220=280mm
Unit weight for Rib Slab
A A
Concrete part 0.07 25 1.75
HCB part 0.134 14 1.876
Total 0.204 3.626
Total Unit for rib = 18
m2 KN/m3 KN/m
Cement Screed 0.018 23 0.414
PVC 0.0012 16 0.0192
Rib 0.204 18 3.672
Ceiling Plaster 0.012 23 0.276
Total Weight of Rib slab (60cm) 4.38
Axis
4,5,6,8,10
L Conc load Dist Load Axis 3,7,8,12 ,11
Beam due to rib slab (B-C) 5.2 83.53488 16.0644 16.0644 32.1288
L W H Dist. Load
Axis 4-11
Axis 3 & 12
Depth Determination
No. of Risers No. of Threads H Thread width Riser Height
Pcs Pcs mm mm mm
10 9 1500 300 150
Load on Stair
For First Flight
Area Depth Width Length
m2 m m m KN/m3
Dead Load (Own Wt.) 0.7562 1.76 2.7 25 26.57
Mortar (Thread) 0.03 0.3 1.76 23
Mortar (Riser) 0.02 0.15 1.76 23
Marble (Thread) 0.02 0.3 1.76 27
Marble (Riser) 0.02 0.15 1.76 27
Plastering 0.0499 1.76 2.7 23 26.57
For Cantiliver
Depth Width Load
m m KN/m3 KN/m
Dead Load (Own Wt.) 0.17 1.76 25 7.48
Cement screed 0.03 1.76 23 1.21
Marble 0.02 1.76 27 0.95
Plastering 0.02 1.76 23 0.81
Total 10.45
Height Thicknes Width Load
m m m KN/m3 KN
Wall 1 0.2 1 14 2.80 Conc. Load
For Slab
Thicknes Width Load
m m KN/m3 KN/m
Dead Load (Slab) 0.2 1.76 25 8.80
Cement screed 0.03 1.76 23 1.21
Plastering 0.02 1.76 23 0.81
PVC 0.002 1.76 16 0.06
Total 10.88
D
121.00
168.9 Provide D=170mm
189.33 Provide D=200mm
Load Load
KN KN/m
29.76 11.02
3.28 1.21
1.09 0.40
2.57 0.95
1.28 0.48
1.81 0.67
Total 14.74
Conc. Load
Load Load
KN/m KN/m
35.69 13.22
3.28 1.21
1.09 0.40
2.57 0.95
1.28 0.48
2.47 0.91
Total 17.18
Live Load Transfering
Rib (3-4) L Dist. Load End Rxn.
m KN/m KN
4.4 1.80 3.96
Rib (A-B) L Dist. Load End Rxn.
m KN/m KN
3.02 1.80 2.72
Single side Both side
Axis
4,5,6,9,10,
L Conc load Dist Load Axis 3,7,8,12 11
Beam due to rib slab (B-C) 5.2 34.32 6.6 6.6 13.2
Beam due to rib slab (Axis A & B L Conc load Dist Load
from 3-12),(except 7-8) 4.4 19.93 4.53 Axis A , B
Beam due to rib slab (Axis A & B 7- L Conc load Dist Load
8) 3.32 15.04 4.53 Dist
SS1 (Type 3)
lx ly ly/lx vx
m m
3 3.32 1.107 0.403
3 3.32 1.107 0.271
3 3.32 1.107
SS2 (Type 4)
lx ly ly/lx vx
m m
3.32 5.2 1.566 0.548
3.32 5.2 1.566 0.358
3.32 5.2 1.566
3.32 5.2 1.566
(Type 2)
lx ly ly/lx vx
m m
3.32 5.2 1.566 0.478
3.32 5.2 1.566
3.32 5.2 1.566
Average
Type 4 Type 2 Average
Span Ratio Span 5.46 4.76 5.11 Vx (cont.)
1.4 0.43 3.57 0 1.78 Vx (dis. cont.)
1.413 0.433 3.98 3.59 3.78 Vy (cont.)
1.5 0.45 2.59 2.39 2.49 Vy (dis. cont.)
C-1
lx Load Dist. Load
m KN/m 2
KN/m
1.3 3 3.90
C-2
lx Load Dist. Load
m KN/m 2
KN/m
2.1 4 8.40
C-3
lx Load Dist. Load
m KN/m 2
KN/m
0.93 3 2.79
C-4
lx Load Dist. Load
m KN/m 2
KN/m
0.93 3.00 2.79
For Cantiliver
lx Load Dist. Load
m KN/m2 KN/m
1.76 3.00 5.28
For Slab
lx Load Dist. Load
m KN/m 2
KN/m
3.32 3.00 9.96
Dist
vy Pd Load
KN/m 2
KN
3.00 3.63 Vx (cont.)
3.00 2.44 Vx (dis. cont.)
0.36 3.00 3.24 Vy (cont.)
vy Pd Load
KN/m 2
KN
3.00 5.46 Vx (cont.)
3.00 3.57 Vx (dis. cont.)
0.4 3.00 3.98 Vy (cont.)
0.26 3.00 2.59 Vy (dis. cont.)
vy Pd Load
KN/m 2
KN
3.00 4.76 Vx (cont.)
0.36 3.00 3.59 Vy (cont.)
0.24 3.00 2.39 Vy (dis. cont.)
Vx (dis. cont.)
Vy (dis. cont.)
C-2 (4th support condtion)
lx ly ly/lx qd lx2 Moment
Coefficient ()
m m KN/m2 m2 qd*lx2*
2.1 2.4 1.143 0.00 4.41 xs = -0.059 0.00
2.1 2.4 1.143 0.00 4.41 xf = 0.044 0.00
1.3 3 2.307692
Mxs
Mxf
Mys
Myf