Escolar Documentos
Profissional Documentos
Cultura Documentos
Following up
the post audit
setting up Internal audit actions QMR
internal audit procedure Qualification of
processes API Internal audit the internal
Q1 planning auditors
Stage Management Process Management 2 8 2 0 Direction
8 review process review review report QMR
Performance Decision on
indicators quality
Normative management
requirements
8 QMR
Pre audit API Q1 Audit report 3
Process Interlinking 2 2 2
API Mapping manufacturing
Spec process to
10A Standard
Training in the Format of existing documents
drafting of documents Product
professional Requirements description
documents API Q1 sheets
Stage Quality
5 document 3 8 2.5 0
Methods to
evaluate and
control the
product
conformity in
the laboratory
and the API
Support for the Documents to be Approved 5 5 5
drafting of approved documents
professional
documents
Pre Pre audit API spec 10A Audit report integrated integrated
audit definition of Audit report Actions plan integrated integrated
QMS compliance 2 4
actions
preparation of Required Applicant forms in integrated integrated
the documents documents by the English
to be provided API
to the API
Off-site Off-site
mission mission