Você está na página 1de 4

D1 PROJECT_REVIEW & DA2 REVIEW SCHEDULE

For the Project Report & Presentation for Final review

1. The Project document has to be prepared according to the Guidelines.


(Check Annexure I)
2. The Project document should be soft binded with white colour.
3. The Project Report should be binded after getting the verification signature.
4. Final Project Submission
Software Projects: Should be in a CD containing PPT, Report in PDF,
source code, executing files and supporting files for Demonstration.
Hardware Projects: Soft copies of final power point presentation, final
report, code and .exe files have to be submitted through the CD along
with the Project report (hard copy) and working models
5. The Presentation should contain the following
1. Project Description (Aim, Objective & Motivation)
2. Introduction ( Purpose & Scope)
3. Detailed Description of Methodology (Framework,
Architecture, & Module)
4. No. of tables,constraints,no.records,E-R diagram
5. Demonstration
6. Conclusion
7. References

DA2 Requirements:

I request you to install the respective dbms allotted to your group .Copy the screen
shot of the establishment method and do the essential opreations(like make
table,insert values,modify,update, delete,etc., least 25 records/group)
I request you to stick on the date & time on the schedule.
S.No Reg.No Title Date Time Signature

1 16BCE0592 Mood Prediction 02/11/2017 8am


16BCE0354 based Music
16BCE0611 System
2 16BCE0300 Open Source 02/11/2017 8am
Resume
3 16BCE0558 Automation of 02/11/2017 8am
16BCE0625 Collectorate.
4 16BCE0188 Next Generation 02/11/2017 8am
16BCE0096 Electronic
Voting Machine
16BCE0846
5 16BCE0190 Credit Card 02/11/2017 8am
16BCE0910 Fraud Detection
16BCE2294
6 16BCI0033 Time Table 04/11/2017 11am
16BCI0077 Generator
7 16BCE0719 Traffic 04/11/2017 11.15am
16BCE02092 Management in
16BCE0744 Smart Cities
8 16BCE0226 Secured Banking 04/11/2017 11.30am
16BCE0351 Transaction
16BCE0645 Using Virtual
Password
9 16BCE2243 Railway Route 04/11/2017 11.45am
16BCE2213 Optimization
16BCE0556 System
10 16BCE0539 Secure Group 04/11/2017 12pm
16BCE2100 Communication
16BCE0573
11 16BCE2232 Employee 04/11/2017 3pm
Tracking System
-
12 16BCE0582 Web based 04/11/2017 3.15
16BCE2220 Applications for
16BCE0546 Insurance
Services
13 16BCI0075 Virtual Class 04/11/2017 3.30pm
16BCI0037 Rooms
16BCE2305
S.No Reg.No Title Date Time Signature

14 16BCE0608 Vehicle 04/11/2017 3.45pm


16BCI0028 Management
16BCI0206 System
15 16BCB0056 Mingle Box 04/11/2017 4pm
16BCI0092
16BCB0104
16 16BCE0480 Analysis of 06/11/2017 10am
16BCB0049 Social Media 06/11/2017 10am
16BCB0067 Metrics and 06/11/2017 10am
Human
Behaviour on
Social n/w
17 16BCE0298 Online Feedback 06/11/2017 10am
16BCE0265 Portal
18 16BCE0185 Online Services 06/11/2017 10am
16BCE0440 Management
19 16BCE0442 web based bus 07/11/2017 10.30am-
locator 12.30pm
16BCE0445
16BCE0470
20 16BCB0017 Online 07/11/2017 10.30am-
Community 12.30pm
16BCE0216 Management
16BCE0404 System
21 16BCE0250 Student 07/11/2017 10.30am-
Attendance 12.30pm
16BCE0402 Management
16BCE0724 System
22 16BCE2314 Training & 09/11/2017 8am
16BCI0071 Placement Cell
16BCB0012 Management
23 16BCE0429 Digital Diary 09/11/2017 8am
16BCE2229 Project
24 16BCE2199 Courier 09/11/2017 8am
Information
System.
25 16BCE0116 Food Online 09/11/2017 8am
system
26 16BCE0999 Online 10/11/2017 8am
matrimonial
website
S.No Reg.No Title Date Time Signature

Você também pode gostar